CN206780683U - Fly ash base cementing material filling system - Google Patents

Fly ash base cementing material filling system Download PDF

Info

Publication number
CN206780683U
CN206780683U CN201720563742.4U CN201720563742U CN206780683U CN 206780683 U CN206780683 U CN 206780683U CN 201720563742 U CN201720563742 U CN 201720563742U CN 206780683 U CN206780683 U CN 206780683U
Authority
CN
China
Prior art keywords
agitating device
slurry
fly ash
filling system
activation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720563742.4U
Other languages
Chinese (zh)
Inventor
陈维新
关显华
杨悦
兰永伟
迟学海
史晓萍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Heilongjiang University of Science and Technology
Original Assignee
Heilongjiang University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Heilongjiang University of Science and Technology filed Critical Heilongjiang University of Science and Technology
Priority to CN201720563742.4U priority Critical patent/CN206780683U/en
Application granted granted Critical
Publication of CN206780683U publication Critical patent/CN206780683U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Processing Of Solid Wastes (AREA)

Abstract

Fly ash base cementing material filling system, a kind of filling system for goaf filling is the utility model is related to, it will solve the problems, such as that fly ash base cemented filling material caused plugging rate in industrial applications is high, less efficient.The filling system include each feed bin, pond, spiral metering scale, activation agitating device and into slurry agitating device, belt conveyer scale is connected through rib belt with activating the feeding port of agitating device, pond is connected with activating the water inlet of agitating device, fine coal ash silo is connected through conveyer belt with hopper, the outlet for activating agitating device is connected through Kaplan pipeline with into slurry agitating device, cement bin is connected through conveyer with into slurry agitating device, and grout pipe line is connected to goaf.The utility model optimizes the design of each device, and so as to conveniently carry out haul, activation, slurrying and conveying, pack effectiveness is high, and combines slurry transporting system by pump wind and substantially reduce plugging rate.

Description

Fly ash base cementing material filling system
Technical field
It the utility model is related to a kind of filling system for goaf filling.
Background technology
Coal accounts for 70% or so of China's energy-consuming, is still the main of China's industrial development in following long time The energy.A large amount of goafs are generated as coal mining amount is continuously increased, water source, earth's surface ecology is destroyed, brings a large amount of rings Border problem.Old coal industry base also faces the problem that " under three " exploit with resourse-depleting.It is mined out based on above reason Area's filling mining is gradually paid attention to by scientific worker, generates the skills such as water sand material filling, waste filling, cementing material filling Art, consolidated fill due to good integrity, intensity is high the advantages that, into the main direction of studying of filling mining.Cemented backfilling technology Mainly include cemented filling material and filling system.Filling system is typically according to the character and preparation flow of filler raw material Design.Efficiently, reliable filling system is guarantee of the filler in industrial applications.
Li Fengyi, Chen Weixin are entitled in Patent No. CN103319123A《Fly ash base cemented filling material and its system Preparation Method》Patent in recorded a kind of fly ash base cemented filling material, the fly ash base cemented filling material include 450~ 485 parts of rejected fly ashes, 705~725 parts of underground waste water, 15~20 parts of activators, 4~6 parts of lime, 32~40 parts of desulfurated plasters (containing 5%~10% moisture), 11~14 parts of early strength agent, 90~112 parts of sulphate aluminium cements and 128~148 parts of composition silicates Cement.Rationally design the filling system corresponding to fly ash base cemented filling material and then can solve the problem that fly ash base consolidated fill material Material is the industrial applications the problem of.
Utility model content
The purpose of this utility model is fly ash base cemented filling material to be solved caused plugging in industrial applications The problem of rate is high, less efficient, and a kind of filling system for flyash cementing material is provided.
The utility model fly ash base cementing material filling system include fine coal ash silo, No.1 cement bin, No. two cement bins, Pond, centrifugal pump, conveying worm, (deep trouth) rib belt, roots blower, spiral metering scale, activation agitating device and into slurry Agitating device, belt conveyer scale are connected through (deep trouth) rib belt with activating the feeding port of agitating device, and pond is stirred through water pipe and activation The water inlet for mixing device is connected, and No.1 spiral metering scale is provided with below fine coal ash silo, No.1 spiral metering scale is through conveyer belt It is connected with the entrance of hopper, the bottom of hopper is connected with roots blower, is stirred positioned at the outlet of feed hopper bottom through delivery pipe and activation The flyash entrance for mixing device is connected, and activates the outlet of agitating device through Kaplan pipeline and the slurry inlet into slurry agitating device It is connected, No. two spiral metering scales is provided with below No.1 cement bin and No. two cement bins, No. two spiral metering scales are through spiral Conveyer is connected with into the cement entrance of slurry agitating device, and one end of grout pipe line is connected with into the outlet of slurry agitating device, defeated The other end of slurry pipeline is connected with goaf to be filled, and delivery pump and pressure fan are provided with grout pipe line.
The utility model be used for fly ash base cemented filling material industrial applications filling system by warehousing system, Transportation system, metering system, activation slurrying stirring system, the optimization design of pump wind joint slurry transporting system, so as to convenient fast Prompt carry out haul, activation, slurrying and conveying, pack effectiveness are high.Fly ash base cementing material is conveyed using the filling system It can ensure material property after entering to fill place, while reference can be provided for the filling system of other fillers.
The utility model be used for the filling system of fly ash base cemented filling material industrial applications input is low, plugging rate Low, efficiency high.For various trait, the raw material reasonable selections storage of dosage, metering, transportation system, and according to filling material Flyash is first pumped into slurry agitating device after activation agitating device activation and filling slurry, the above is made by material pulping process again Filling slurry can be continuously made in system coordination running, improve pack effectiveness.Pump wind joint slurry transporting system can be from start to finish The sufficient kinetic energy of slurries is assigned so as to substantially reduce plugging rate.The utility model is mainly used in the work of fly ash base cementing material Industry application.
Brief description of the drawings
Fig. 1 is the structural representation of the utility model fly ash base cementing material filling system, and wherein A is to treat exploiting field domain, B For goaf.
Embodiment
Embodiment one:Present embodiment fly ash base cementing material filling system includes fine coal ash silo 1, No.1 water 2, No. two cement bins 3 of hopper dredger, pond 10, conveying worm 7, belt conveyer scale 4, (deep trouth) rib belt 5, roots blower 8, multiple spiral shells Revolve weigher, activation agitating device 14 and into slurry agitating device 15, belt conveyer scale 4 is through (deep trouth) rib belt 5 and activation stirring dress Put 14 feeding port to be connected, pond 10 is connected through water pipe 13 with activating the water inlet of agitating device 14, and the lower section of fine coal ash silo 1 goes out Mouth is provided with No.1 spiral metering scale 6, and No.1 spiral metering scale 6 is connected through conveyer belt with the entrance of hopper 11, the bottom of hopper 11 Portion is connected with roots blower 8, positioned at flyash entrance of the outlet of the bottom of hopper 11 through ash handing pipeline 9 with activation agitating device 14 It is connected, the outlet for activating agitating device 14 is connected through Kaplan pipeline 22 with into the slurry inlet of slurry agitating device 15, No.1 water The lower section of hopper dredger 2 and No. two cement bins 3 is provided with No. two spiral metering scales 16, and No. two spiral metering scales 16 are through conveying worm 7 are connected with into the cement entrance of slurry agitating device 15, and one end of grout pipe line 23 is connected with into the outlet of slurry agitating device 15, defeated The other end of slurry pipeline 23 is connected with goaf B to be filled, and delivery pump 17 and pressure fan 18 are provided with grout pipe line 23.
The filling system that the utility model is used for fly ash base cemented filling material industrial applications mainly includes storage system System, transportation system, metering system, activation slurrying stirring system, pump wind joint slurry transporting system.Warehousing system is used for the storage of powder-material Deposit, mainly include fine coal ash silo, No.1 cement bin and No. two cement bins.Transportation system is used to raw material being transported to agitating device In, mainly it is made up of centrifugal pump, conveying worm, deep trouth rib belt, roots blower and ash handing pipeline etc..Metering system is used for Metering to raw material, mainly it is made up of spiral metering scale, belt conveyer scale, electromagnetic flowmeter.Activate slurrying stirring system mainly by Two sets of mixing plants and reprint pump, reprint pipeline composition, two sets of agitating devices are flyash activating agitating device and into slurry respectively Agitating device.
Embodiment two:Present embodiment is provided with centrifugation unlike embodiment one in water pipe 13 Pump.
Embodiment three:Present embodiment is set unlike embodiment one or two in Kaplan pipeline 22 It is equipped with and reprints pump 12.
Embodiment four:In grout pipe line 23 unlike one of present embodiment and embodiment one to three In be provided with electromagnetic flowmeter.
Embodiment:The present embodiment fly ash base cementing material filling system includes fine coal ash silo 1, No.1 cement bin 2, two Cement bin 3, pond 10, conveying worm 7, belt conveyer scale 4, (deep trouth) rib belt 5, roots blower 8, multiple spiral metering scales, Activate agitating device 14 and into slurry agitating device 15, filler of the belt conveyer scale 4 through (deep trouth) rib belt 5 with activation agitating device 14 Mouth is connected, and pond 10 is connected through water pipe 13 with activating the water inlet of agitating device 14, and the lower exit port of fine coal ash silo 1 is provided with one Number spiral metering scale 6, No.1 spiral metering scale 6 are connected through conveyer belt with the entrance of hopper 11, bottom and the Roots's wind of hopper 11 Machine 8 is connected, and is connected positioned at the outlet of the bottom of hopper 11 through ash handing pipeline 9 with activating the flyash entrance of agitating device 14, living The outlet for changing agitating device 14 is connected through Kaplan pipeline 22 with into the slurry inlet of slurry agitating device 15, No.1 cement bin 2 and two The lower section of number cement bin 3 is provided with No. two spiral metering scales 16, and No. two spiral metering scales 16 are through conveying worm 7 with being stirred into slurry The cement entrance for mixing device 15 is connected, and one end of grout pipe line 23 is connected with into the outlet of slurry agitating device 15, grout pipe line 23 The other end be connected with goaf B to be filled, delivery pump 17 and pressure fan 18 are provided with grout pipe line 23, in feed pipe for mortar Valve controlling valve is additionally provided with road 23, control valve also is provided with the branch road between pressure fan and grout pipe line 23.
The present embodiment is provided with centrifugal pump in water pipe 13, is provided with Kaplan pipeline 22 and reprints pump 12.
Filling process using the present embodiment fly ash base cementing material filling system is as follows:
Before filling, first by the water in pond by being injected into activation agitating device after centrifugal pump, flowmeter metering, together When the flyash in fine coal ash silo by roots blower wind-force is transported to activation agitating device after spiral metering, then will be living Agent is sent into activation agitating device after belt scale metering by deep trouth rib belt, is displayed after stirring, in order to prevent slurries from sinking Bottom, assembly time is interior to stir 5min every 30~60min.Desulfurated plaster in bulk and lime are passed through into belt after completion activation process Scale, deep trouth rib belt are transported to activation agitating device.Mortar after activation is made in stirring 10min~20min.
When needing filling, it is pumped into by reprinting in slurry agitating device, then by the aluminium sulfate in No. two cement bins Portland cement (being measured by metering screw 7) and early strength agent in cement and No.1 cement bin is defeated by conveying worm Deliver into slurry agitating device, filling is made into slurry after stirring 10min~20min, start delivery pump and open control valve and start Conveying is filled into slurry.Above-mentioned technique is repeated at the same time it can also set again in a set of agitating device into slurry, treats first agitating device After the completion of pumping, you can to second into slurry agitating device in being pumped into slurry.Alternate cycles are sequentially completed, realization partly connects Continuous slurrying.When filling termination, closing control valve after being conveyed into the slurry in slurry agitating device, blower fan is opened with controlling Valve, remaining slurries are blasted into filling place.
Raw material transport, metering, the activation of fly ash base cementing material can be realized using the filling system of the present embodiment And slurrying, finally stir into slurry and be conveyed into filling place, the accuracy of Proportioning of filling materials, pump wind can be ensured to greatest extent Pressure wind apparatus in joint slurry transporting system can drain pipeline raffinate in time, effectively reduce plugging rate.

Claims (4)

1. fly ash base cementing material filling system, it is characterised in that the fly ash base cementing material filling system includes flyash Storehouse (1), No.1 cement bin (2), No. two cement bins (3), pond (10), conveying worm (7), belt conveyer scale (4), rib belt (5), roots blower (8), multiple spiral metering scales, activation agitating device (14) and into slurry agitating device (15), belt conveyer scale (4) warp Rib belt (5) is connected with the feeding port of activation agitating device (14), and pond (10) are through water pipe (13) and activation agitating device (14) water inlet is connected, and the lower exit port of fine coal ash silo (1) is provided with No.1 spiral metering scale (6), No.1 spiral metering scale (6) it is connected through conveyer belt with the entrance of hopper (11), the bottom of hopper (11) is connected with roots blower (8), positioned at hopper (11) The outlet of bottom is connected through ash handing pipeline (9) with the flyash entrance of activation agitating device (14), activation agitating device (14) Outlet through Kaplan pipeline (22) with into slurry agitating device (15) slurry inlet be connected, No.1 cement bin (2) and No. two cement Be provided with No. two spiral metering scales (16) below storehouse (3), No. two spiral metering scales (16) through conveying worm (7) with into slurry The cement entrance of agitating device (15) is connected, and one end of grout pipe line (23) is connected with into the outlet of slurry agitating device (15), defeated Slurry pipeline (23) the other end be connected with goaf (B) to be filled, be provided with grout pipe line (23) delivery pump (17) and Pressure fan (18).
2. fly ash base cementing material filling system according to claim 1, it is characterised in that set in water pipe (13) There is centrifugal pump.
3. fly ash base cementing material filling system according to claim 1, it is characterised in that in Kaplan pipeline (22) It is provided with and reprints pump (12).
4. fly ash base cementing material filling system according to claim 1, it is characterised in that in grout pipe line (23) It is provided with electromagnetic flowmeter.
CN201720563742.4U 2017-05-19 2017-05-19 Fly ash base cementing material filling system Expired - Fee Related CN206780683U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720563742.4U CN206780683U (en) 2017-05-19 2017-05-19 Fly ash base cementing material filling system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720563742.4U CN206780683U (en) 2017-05-19 2017-05-19 Fly ash base cementing material filling system

Publications (1)

Publication Number Publication Date
CN206780683U true CN206780683U (en) 2017-12-22

Family

ID=60711934

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720563742.4U Expired - Fee Related CN206780683U (en) 2017-05-19 2017-05-19 Fly ash base cementing material filling system

Country Status (1)

Country Link
CN (1) CN206780683U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108590750A (en) * 2018-07-09 2018-09-28 中国矿业大学 A kind of flyash and the method for aqua with high salt disposition
CN112282836A (en) * 2020-10-22 2021-01-29 陕西中建永鑫建设工程有限公司 Gangue filling material, filling method and mine filling system
CN113858441A (en) * 2021-09-01 2021-12-31 中煤科工集团武汉设计研究院有限公司 Preparation system and process of fly ash mixed slurry for pipeline transportation

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108590750A (en) * 2018-07-09 2018-09-28 中国矿业大学 A kind of flyash and the method for aqua with high salt disposition
CN112282836A (en) * 2020-10-22 2021-01-29 陕西中建永鑫建设工程有限公司 Gangue filling material, filling method and mine filling system
CN113858441A (en) * 2021-09-01 2021-12-31 中煤科工集团武汉设计研究院有限公司 Preparation system and process of fly ash mixed slurry for pipeline transportation
CN113858441B (en) * 2021-09-01 2023-01-31 中煤科工集团武汉设计研究院有限公司 Preparation system and process of fly ash mixed slurry for pipeline transportation

Similar Documents

Publication Publication Date Title
CN206780683U (en) Fly ash base cementing material filling system
CN102418555A (en) Method for filling mine goaf by utilizing high-concentration all tailing cement
CN112814732A (en) Preparation of mixed ground paste of barren rock and tailings and pump sending filling device
CN106903800B (en) A kind of cement mixing equipment of controlled amounts charging
CN106194249B (en) A kind of coal mine gob totipotency Paste-filling System and method
CN109956712A (en) Continous way builds recycled aggregate filling coal mine gob system and technique
CN201041052Y (en) Filling type paste preparation system for quarry
CN106065783B (en) For the device for filling and its application method of extensive non-metal mine
CN114033483A (en) Construction method suitable for collapse pit tailing filling process
CN1295178C (en) Method and system for treating high sulfur contained tails as binding filler aggregates
CN114673552A (en) Gob CO2Mineralizing and filling method and system
CN102661170A (en) Process and device for continuously stirring and filling paste-like body for mine manufactured by use of building waste
CN205628313U (en) Wholegrain level tailings consolidated fill ground paste is system of preparing in succession
CN210343417U (en) Realize closely knit filling system that full roof was met in collecting space area filling tunnel in pit
CN101749047A (en) Paste filling simulation test system
CN201587031U (en) Automatic mixing device for ointment filling system
CN206071641U (en) A kind of coal mine gob totipotency Paste-filling System
CN205326007U (en) Concrete mixing plant
CN108167017A (en) A kind of metal mine consolidated fill method of environmental protection cementitious material
CN208858400U (en) A kind of Mine Tailings filling system
CN111691915A (en) Combined filling station suitable for underground mine filling
CN208858399U (en) A kind of efficient Mine Tailings filling system
CN116378750A (en) Underground dynamic filling method for gangue paste
CN206589157U (en) A kind of concrete batching and mixing tower structure
WO2016065906A1 (en) Ground material feeding system and feeding process for solid backfilling mining of coal mine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171222

Termination date: 20180519