CN206752454U - One kind perfusion embedded pile - Google Patents

One kind perfusion embedded pile Download PDF

Info

Publication number
CN206752454U
CN206752454U CN201720574844.6U CN201720574844U CN206752454U CN 206752454 U CN206752454 U CN 206752454U CN 201720574844 U CN201720574844 U CN 201720574844U CN 206752454 U CN206752454 U CN 206752454U
Authority
CN
China
Prior art keywords
pile
perfusion
prefabricated pile
stake holes
prefabricated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720574844.6U
Other languages
Chinese (zh)
Inventor
樊春义
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Installation Group Co Ltd
Original Assignee
SHANXI INDUSTRIAL EQUIPMENT INSTALLATION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANXI INDUSTRIAL EQUIPMENT INSTALLATION Co Ltd filed Critical SHANXI INDUSTRIAL EQUIPMENT INSTALLATION Co Ltd
Priority to CN201720574844.6U priority Critical patent/CN206752454U/en
Application granted granted Critical
Publication of CN206752454U publication Critical patent/CN206752454U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The realm of building construction is the utility model is related to, especially discloses a kind of perfusion embedded pile.The technical solution adopted in the utility model is:One kind perfusion embedded pile, including ground stake holes and the prefabricated pile in the ground stake holes at center is arranged on, filled with expansion pulp layer between the prefabricated pile and ground stake holes madial wall;Multiple Grouting Pipes are uniformly arranged around the prefabricated pile;The prefabricated pile bottom sets locating support, is fixed at the locating support center with prefabricated pile, and locating support outer end contacts through expansion pulp layer with ground stake holes madial wall.The utility model has the characteristics of high capacity, stability are not easy to offset well.

Description

One kind perfusion embedded pile
Technical field
The realm of building construction is the utility model is related to, especially discloses a kind of perfusion embedded pile.
Background technology
It is well known that bored concrete pile is the directly perforate on designed stake position, steel reinforcement cage is placed in hole after pore-forming, is irrigated Concrete forms;This pouring pile bearing capacity is low, and in concrete perfusion because hole wall has slump soil body phenomenon, pile body mixes Solidifying soil property amount is difficult to ensure that, and the side wall of stake holes, stake end mudcake or loosened soil are thick, therefore causes to build and to design stake number more and heavy The shortcomings of drop deformation is uneven;Secondly there are the phenomenon at the offset apertures center of position.
Utility model content
The utility model overcomes the shortcomings of the prior art, there is provided a kind of high capacity, stability are not easy what is offset well Irrigate embedded pile.
In order to solve the above-mentioned technical problem, the technical solution adopted in the utility model is:One kind perfusion embedded pile, including ground Face stake holes and the prefabricated pile in the ground stake holes at center is arranged on, is filled between the prefabricated pile and ground stake holes madial wall There is expansion pulp layer;Multiple Grouting Pipes are uniformly arranged around the prefabricated pile;The prefabricated pile bottom sets locating support, described fixed Fixed at the carriage center of position with prefabricated pile, locating support outer end contacts through expansion pulp layer with ground stake holes madial wall.Using this Kind of scheme, by using prefabricated pile, overcome job site perfusion existing for pile quality the problem of being difficult to ensure that, solve conventional The problem of pouring pile bearing capacity, stake side, stake end loosened soil are few;Secondly, by setting locating support in prefabricated pile bottom, ensure that pre- Stake processed may be at the center of stake holes in infall process, the problem of overcoming position to offset;Again, by setting expansion slurry The associativity of layer, increase prefabricated pile and stake holes madial wall soil layer, add the side skin friction and end bearing of prefabricated pile and soil layer Power, improve bearing capacity of pile foundation.
One kind perfusion embedded pile, the prefabricated pile cross section are circular or square.
One kind perfusion embedded pile, the prefabricated pile are solid or hollow.
One kind perfusion embedded pile, the Grouting Pipe is steel pipe.
One kind perfusion embedded pile, the expansion pulp layer are the cement mortar mixed with swelling agent.
A kind of construction method for irrigating embedded pile, it is characterised in that comprise the following steps:
Step 1: pour circular or square prefabricated pile according to design requirement;
Step 2: it is drilled in design requirement building or structures position, is impacted using boring machine, extruded, shoveled and dig shape Into circular or square stake holes;
Step 3: the prefabricated pile in prefabrication step one is sunk in the stake holes of step 2 formation;
Step 4: sinking to multiple Grouting Pipes around the prefabricated pile, Grouting Pipe bottom is arranged at stake holes bottom;
Step 5: injected mixed with the cement mortar of swelling agent by Grouting Pipe in prefabricated stake holes with slip casting machine, produce perfusion Embedded pile.
The utility model has following beneficial effect compared with prior art:
First, by using prefabricated pile, overcome job site perfusion existing for pile quality the problem of being difficult to ensure that, solution Certainly the problem of conventional pouring pile bearing capacity, stake side, stake end loosened soil are few;Secondly, by setting locating support in prefabricated pile bottom, protect Prefabricated pile has been demonstrate,proved in infall process, may be at the center of stake holes, the problem of overcoming position to offset;Again, setting is passed through Expand pulp layer, the associativity of increase prefabricated pile and stake holes madial wall soil layer, add prefabricated pile and soil layer side skin friction and End resistance, improve bearing capacity of pile foundation.
Brief description of the drawings
Fig. 1 is a kind of perfusion embedded pile structural representation;
Fig. 2 is a kind of cross-sectional view for irrigating embedded pile, wherein, prefabricated pile is circular and is solid;
Fig. 3 is a kind of cross-sectional view for irrigating embedded pile, wherein, prefabricated pile is circular and is hollow;
Fig. 4 is a kind of cross-sectional view for irrigating embedded pile, wherein, prefabricated pile is square and is solid;
Fig. 5 is a kind of cross-sectional view for irrigating embedded pile, wherein, prefabricated pile is square and is hollow.
Embodiment
With reference to the accompanying drawings and examples, specific embodiment of the present utility model is described in further detail, below Embodiment is used to illustrate the utility model, but is not limited to the scope of the utility model.
It is as Figure 1-5 a kind of perfusion embedded pile, including ground stake holes 1 and is arranged in ground stake holes 1 at center Prefabricated pile 2, filled with expansion pulp layer 4 between prefabricated pile 2 and the madial wall of ground stake holes 1;Multiple notes are uniformly arranged around prefabricated pile 2 Starch pipe 3;The bottom of prefabricated pile 2 sets locating support 5, is fixed at the center of locating support 5 with prefabricated pile 2, the outer end of locating support 5 passes through Expansion pulp layer 4 contacts with the madial wall of ground stake holes 1.
As preferred embodiment, one kind perfusion embedded pile, the cross section of prefabricated pile 2 is circular or square.
As preferred embodiment, one kind perfusion embedded pile, prefabricated pile 2 is solid or hollow.
As preferred embodiment, one kind perfusion embedded pile, Grouting Pipe 3 is steel pipe.
As preferred embodiment, one kind perfusion embedded pile, expansion pulp layer 4 is the cement mortar mixed with swelling agent.
A kind of construction method for irrigating embedded pile, comprises the following steps:
Step 1: pour circular or square prefabricated pile 2 according to design requirement;
Step 2: it is drilled in design requirement building or structures position, is impacted using boring machine, extruded, shoveled and dig shape Into circular or square stake holes 1;
Step 3: the prefabricated pile 2 in prefabrication step one is sunk in the stake holes 1 of step 2 formation;
Step 4: sinking to multiple Grouting Pipes 3 around prefabricated pile 2, the bottom of Grouting Pipe 3 is arranged at the bottom of stake holes 1;
Step 5: injected mixed with the cement mortar of swelling agent by Grouting Pipe 3 in prefabricated stake holes 1 with slip casting machine, produce filling Note embedded pile.
Bored concrete pile of the present utility model and its construction method use prefabricated pile, overcome in situ pile of the prior art The defects of, and filled with expansion pulp layer 4, increase prefabricated pile and stake holes madial wall between prefabricated pile 2 and the madial wall of ground stake holes 1 The associativity of soil layer, the side skin friction and end resistance of prefabricated pile and soil layer are added, improves bearing capacity of pile foundation.
Preferred embodiment of the present utility model is these are only, is not limited to the utility model, although with reference to before State embodiment the utility model is described in detail, for those skilled in the art, it still can be to preceding State the technical scheme described in each embodiment to modify, or equivalent substitution is carried out to which part technical characteristic, it is all at this Within the spirit and principle of utility model, any modification, equivalent substitution and improvements made etc., the utility model should be included in Protection domain within.

Claims (5)

1. one kind perfusion embedded pile, it is characterised in that:Including ground stake holes(1)Be arranged on the ground stake holes(1)Interior center The prefabricated pile at place(2), the prefabricated pile(2)With ground stake holes(1)Filled with expansion pulp layer between madial wall(4);It is described prefabricated Stake(2)Surrounding is uniformly arranged multiple Grouting Pipes(3);The prefabricated pile(2)Bottom sets locating support(5), the locating support (5)At center and prefabricated pile(2)It is fixed, locating support(5)Outer end passes through expansion pulp layer(4)With ground stake holes(1)Madial wall connects Touch.
A kind of 2. perfusion embedded pile as claimed in claim 1, it is characterised in that:The prefabricated pile(2)Cross section to be circular or It is square.
A kind of 3. perfusion embedded pile as claimed in claim 2, it is characterised in that:The prefabricated pile(2)To be solid or hollow.
A kind of 4. perfusion embedded pile as claimed in claim 3, it is characterised in that:The Grouting Pipe(3)For steel pipe.
A kind of 5. perfusion embedded pile as claimed in claim 4, it is characterised in that:The expansion pulp layer(4)For mixed with swelling agent Cement mortar.
CN201720574844.6U 2017-05-23 2017-05-23 One kind perfusion embedded pile Active CN206752454U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720574844.6U CN206752454U (en) 2017-05-23 2017-05-23 One kind perfusion embedded pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720574844.6U CN206752454U (en) 2017-05-23 2017-05-23 One kind perfusion embedded pile

Publications (1)

Publication Number Publication Date
CN206752454U true CN206752454U (en) 2017-12-15

Family

ID=60619044

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720574844.6U Active CN206752454U (en) 2017-05-23 2017-05-23 One kind perfusion embedded pile

Country Status (1)

Country Link
CN (1) CN206752454U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110528516A (en) * 2019-09-03 2019-12-03 浙江易通基础工程有限公司 For reinforcing the device and method of steel pile casting stability when drilling construction
CN113309089A (en) * 2021-06-11 2021-08-27 河北省水利规划设计研究院有限公司 Prefabricated hollow pile and construction method for taking soil and planting pile
CN115522536A (en) * 2022-08-23 2022-12-27 广西大学 Preparation method of self-reinforced frictional resistance implanted pile and implanted pile manufactured by same

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110528516A (en) * 2019-09-03 2019-12-03 浙江易通基础工程有限公司 For reinforcing the device and method of steel pile casting stability when drilling construction
CN113309089A (en) * 2021-06-11 2021-08-27 河北省水利规划设计研究院有限公司 Prefabricated hollow pile and construction method for taking soil and planting pile
CN115522536A (en) * 2022-08-23 2022-12-27 广西大学 Preparation method of self-reinforced frictional resistance implanted pile and implanted pile manufactured by same
CN115522536B (en) * 2022-08-23 2023-09-01 广西大学 Preparation method of self-reinforced friction resistance implantation pile and implantation pile manufactured by same

Similar Documents

Publication Publication Date Title
CN101812976B (en) Adjustable multiple coil extruding and expanding drilling tool
CN105780763B (en) Mesoporous vibrates the construction method of casing retaining wall long auger guncreting pile
CN104988907A (en) Construction method of concrete pile
CN103510510B (en) A kind of enhancement mode long auger cast-with-pressure concrete pile and construction method
CN104863131A (en) Polygonal cement-soil stirring pile and formation method thereof
CN206752454U (en) One kind perfusion embedded pile
CN103556628B (en) Spiral conical soil compaction pile construction method
CN105672307A (en) Expanded-base combination end pile bearing foundation
CN107513994A (en) One kind segmentation becomes supporting rotary digging stake and its construction method without leave
CN105442532A (en) Construction method for pile-head-expanded bored pile
CN104863132A (en) Bougainvillea spectabilis willd-shaped cement-soil mixing pile and shaping method thereof
CN107700480B (en) Concrete pile suitable for foundation treatment
CN201050303Y (en) Self-dumping cone type spiral anchor drill bit
CN102626946A (en) Manufacture method for concrete irregular fender post
CN203866852U (en) Anti-floating pile structure composited by deep spiral-spraying cement soil plate and anchor rod
CN105672329B (en) The large size prefabricated building enclosure of deep basal pit and construction method
CN201874482U (en) Semi-spiral drill rod
CN110792077A (en) Supporting disc pile device suitable for muddy soft soil and construction process thereof
CN201650154U (en) Adjustable multi-stage helical extruding type drilling tool
CN108049804B (en) Non-excavation in-situ replacement spiral drilling method for unconsolidated formation
CN102220760B (en) Method for casting deep inverted T-shaped pile
CN201722684U (en) Compound pile
CN206233232U (en) A kind of upper and lower part expansion type soil cement is combined pile tube
CN204780943U (en) H type precast concrete pile and excavation supporting device
CN205501998U (en) Expand end combination end -bearing pile basis

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: 030032 No. 8, Xinhua Road, Tanghuai Industrial Park, Shanxi transformation and comprehensive reform demonstration zone, Taiyuan City, Shanxi Province

Patentee after: Shanxi Installation Group Co.,Ltd.

Address before: 030012 No. 8, Xinhua Road, Taiyuan Economic and Technological Development Zone, Xiaodian District, Taiyuan City, Shanxi Province

Patentee before: SHANXI INDUSTRIAL EQUIPMENT INSTALLATION Co.,Ltd.

CP03 Change of name, title or address