CN206707716U - A kind of tunnel portal weak surrounding rock section overlength pipe shed construction positioner - Google Patents

A kind of tunnel portal weak surrounding rock section overlength pipe shed construction positioner Download PDF

Info

Publication number
CN206707716U
CN206707716U CN201720517405.1U CN201720517405U CN206707716U CN 206707716 U CN206707716 U CN 206707716U CN 201720517405 U CN201720517405 U CN 201720517405U CN 206707716 U CN206707716 U CN 206707716U
Authority
CN
China
Prior art keywords
locator
pipe
surrounding rock
tunnel portal
display
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720517405.1U
Other languages
Chinese (zh)
Inventor
颜勇
申剑
李波
高锋
张鹏飞
谭奔
洪峰
颜学华
莫南
周桃
王文科
邓冠伟
王开荣
王松能
颜林
王永辉
张晓寿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fifth Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd
Original Assignee
Fifth Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fifth Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd filed Critical Fifth Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd
Priority to CN201720517405.1U priority Critical patent/CN206707716U/en
Application granted granted Critical
Publication of CN206707716U publication Critical patent/CN206707716U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The utility model discloses a kind of tunnel portal weak surrounding rock section overlength pipe shed construction positioner, it includes locator, and locator is placed on steel plate, and both sides are fixed using steel pipe, locator is connected by cable with display, and display is connected by frequency conversion equipment with extraneous power supply.The precision of pipe roof construction is ensure that using guiding technique, and drilling process provides reference, effective advance support provides technical guarantee for tunnel excavation to geologic record for tunnel excavation.The utility model drilling process is accurate, unbiased hole, hole phenomenon of collapsing, and pore-forming efficiency is high, is adapted to the environment such as complex geologic conditions, the loose layer of sand of soil property, argillic horizon.

Description

A kind of tunnel portal weak surrounding rock section overlength pipe shed construction positioner
Technical field
A kind of weak section progress overlength pipe shed of area of heavy rainfull mountain ridge location tunnel portal length that is directed to is the utility model is related to apply The positioner of work, and in particular to mountain tunnel weak surrounding rock, it is soft or hard it is irregular, have the geology bars such as V, VI grade of Wei Yan ﹚ of water Wei Yan ﹙ The especially complex tunnel portal of part carries out the construction positioner of overlength pipe shed advance support.
Background technology
In China Express Railway Tunnel Engineering entrance construction, pipe canopy is very common as the advance support for entering hole, applies Work method is also highly developed, it can be common that using drawing, hole heads into method construction and pipe-following drilling method is constructed two kinds.Pipe canopy operation principle Mainly there are two:One girder structure, rock stratum in wall and hole is oriented to by hole and forms a simply supported beam;Second passes through note Slurry, the country rock on consolidation steel pipe periphery, steel pipe are collectively forming " arching effect " with peripheral rock;The two is formed around tunnel profile Shell-like structure, so as to effectively suppress wall rock loosening and collapse.And although conventional construction technology is provided with hole guide pipe, by Irregular in geology, pipe canopy is in the inclined hole phenomenon of frequent generation for drawing hole or drilling process, and detection methods are limited during performing, The track of pipe-s hed drilling process can not be grasped, the final mesh that grouting reinforcement is carried out to tunnel excavation periphery can not be effectively achieved , the phenomenon that pipe dingle portion is dropped in excavation contour line is often found after excavation, so the pipe canopy of conventional engineering method is typically all controlled System is within 30~40m, and construction speed is slow, and construction precision is relatively low.
The content of the invention
The technical problems to be solved in the utility model is:It is fixed to provide a kind of tunnel portal weak surrounding rock section overlength pipe shed construction Position device, using guide-localization technology, the position data of drill bit can be understood in real time, it is ensured that the precision of pipe roof construction, effectively The technical problem for solving above-mentioned appearance.
The technical solution of the utility model is:A kind of tunnel portal weak surrounding rock section overlength pipe shed construction positioner, it Including locator, locator is placed on steel plate, and both sides are fixed using steel pipe, and locator is connected by cable with display, Display is connected by frequency conversion equipment with extraneous power supply.
The steel plate is arranged in the drilling rod head of rig.
The drilling rod processing:(1)Body of rod 6m mono- is saved, one end car internal sealing plug, one end car external sealing plug, is locally welded during connection Connect reinforcement;(2)Drilling rod is connected with rig:One off-balance bit of welding in front of drilling rod first segment, body of rod rear connect with drilling tool thread Connect;(3)Correction:Guiding instrument apparatus is installed in first pole body, it includes the locator of bit location, and locator is placed on On steel plate, both sides are fixed using steel pipe, and locator is connected by cable with display, and guiding instrument apparatus is by frequency conversion equipment and outside Boundary's power supply is connected;Locator in drilling process, drill bit steel pipe reaches the situation of drilling on display by cable, operation The body of rod drilling off normal situation that personnel feed back according to display is rectified a deviation in time, while with drilling length and soil layer geology feelings Condition, pass through manual operation rig motivation of adjustment, it is ensured that rig depth and position, until reaching depth and the position of requirement;(4)Note Record geological condition:In drilling process, according to landwaste situation, front geological condition is recorded in time.
The beneficial effects of the utility model are:Compared with prior art, the utility model has the advantages that:
1st, drilling process is accurate, unbiased hole, hole phenomenon of collapsing, and pore-forming efficiency is high, is adapted to complex geologic conditions, soil property is loose Layer of sand, argillic horizon etc.;
2nd, apply that process power output is uniform, the interference to geology is lacked;
3rd, boring procedure water consumption is few, and drilling uses pressure-air as power-forced drilling in soil layer(Drilled dry), rock stratum Middle control water, it is particularly suitable to gravelly soil, argillic horizon class soil layer, sandy soils;
4th, speed of fulfiling hole is fast, and work efficiency is high;
5th, long pipe shed one end enters basement rock, and one end is that hole is oriented to wall, and both ends are fixing end, can effectively control and play Simply supported beam effect is obvious to control Portal Section excavation deformation effect;
6th, overlength pipe shed can effectively verify earth layer in front situation, excavated for subsequent tunnel and provide reference.
Brief description of the drawings
A kind of tunnel portal weak surrounding rock section overlength pipe shed construction positioning device structure schematic diagrames of Fig. 1;
A kind of tunnel portal weak surrounding rock section overlength pipe shed construction method process charts of Fig. 2;
Fig. 3 is oriented to wall formwork erection schematic diagram;
Fig. 4 orifice tube construction drill schematic diagrames.
Embodiment
The utility model embodiment:
Embodiment 1:A kind of tunnel portal weak surrounding rock section overlength pipe shed construction positioner, it includes locator 3, fixed Position device 3 is placed on steel plate 1, and both sides are fixed using steel pipe 2, and locator 3 is connected by cable with display 5, and display 5 passes through Frequency conversion equipment 6 is connected with extraneous power supply 7.
The steel plate 1 is arranged in the drilling rod first 4 of rig.
A kind of tunnel portal weak surrounding rock section overlength pipe shed construction positioner, its detailed application method and construction technology Shown in flow as accompanying drawing 2:
(1)Preparation of construction:Determined to excavate the height and width of platform according to drill height and the longitudinal length needed, by original Step is dug on ground from top to bottom, after digging to desired height and width, side slope to both sides and is faced upward slope and is carried out slope, while two Side sets interim ditch;Excavation method uses mechanical equivalent of light excavation, artificial allotment of labor, and digging machine is cut clearly;
(2)Surveying setting-out:Required according to design document, tunnel center line, absolute altitude are gone out using total powerstation setting-out, and check standard Really;According to review correct tunnel center line coordinates and elevation, identify be oriented to wall excavation scope and absolute altitude at the scene;
(3)Wall 9 is oriented to construct:
It is oriented to bow member installation in wall 9:After being oriented to the position of wall 9 excavation in place, bearing capacity examination is carried out to being oriented to the basis of wall 9 first Test, be such as oriented to the foundation bearing capacity of wall 9 deficiency, consolidation process need to be carried out, after basis is qualified, 3 Pin I20b works are set in being oriented in wall 9 Word steel, set per Pin steelframes by 3 units, bow member joint is forbidden being arranged on keystone;
Pre-buried guide pipe:By surveying setting-out, pipe canopy position of opening is determined, and is identified with cross, guide pipe uses φ 127 × 6mm steel pipes, guide pipe and bow member firm welding, it is oriented to tube angulation and is strictly controlled by design requirement;
It is oriented to the formwork erection of wall 9, casting concrete:It is bolted before being oriented to the template of wall 9;To ensure to be oriented to the internal model of wall 9 It is smoother, it is oriented to the end head formwork of wall 9 and is installed using 5cm solid woods, connection is used between plank plus back up mode is reinforced, plank sheathing It is connected firmly between steel form using dog or steel nail.Template and concrete surface brushing releasing agent;Model sheetinstallat is simultaneously examined Look into it is qualified after, pour and be oriented to the concrete of wall 9, casting process needs strict control raw material quality, strengthens the mix matter of concrete Amount, casting process are made firm by ramming closely knit, and concrete is unified symmetrically to be poured into a mould by blending station centralizedly supply, casting sequence from arch springing both sides, directly To vault;After the completion of concreting, that is, maintenance, 7 days curing periods are proceeded by, while after intensity reaches 70%, start to remove non- Load-carrying members and external mold, after intensity reaches 100%, that is, remove internal model and other templates;Orifice tube is numbered in sequence. (See accompanying drawing 4)
(4)Face and side, face upward slope surface encapsulation:In order to prevent slip casting process, hole grout;Spray C25 coagulation graves Close, thickness 15cm;
(5)Rig is in place:Rig uses track-mounted drill, according to the position of surveying setting-out, adjustment rig position;Using from The high principle to even hole behind low, first odd number hole;
(6)Drilling:
A drilling rods are processed:The body of rod is uniformly processed by reinforcement yard, and material is φ 108*6mm pipe canopy materials, by 6m mono- Section, one end car internal sealing plug, one end car external sealing plug, silk mouth depth are 3mm, length 8cm, locally carry out welding reinforcement during connection;
B drilling rods are connected with rig:One off-balance bit of welding in front of drilling rod first segment;Firm welding, the drill bit is once Use;Body of rod rear is connected with drilling tool thread;
C rectifies a deviation:Guiding instrument apparatus is installed in first pole body, it includes the locator 3 of bit location, and locator 3 is put Put on steel plate 1, both sides are fixed using steel pipe 2, and locator 3 is connected with outside hole using seizing wire, are oriented to instrument apparatus and are passed through change Frequency device 6 is connected with extraneous power supply 7;The situation of drilling is reflected into display 5 by the locator 3 in drilling process, drill bit steel pipe On, the body of rod drilling off normal situation that operating personnel feeds back according to display 5 is rectified a deviation in time, while with drilling length and soil Layer geological condition, motivation of adjustment, it is ensured that rig depth and position, until reaching depth and the position of requirement;Sensor when performing Can send signal, display 5 receive can show after signal drill bit now from hole depth, the discrepancy in elevation and drilling rod with it is in place Horizontal angle, it is directed to the data that instrument apparatus receives and is contrasted with gross data, such as shows that discrepancy in elevation h is bigger than normal, then need Adjustment drill bit is directed downward;Angle α is used for controlled level direction, and α values answer≤1, α>Then drill bit opposite direction " top " is entered to entangle when 1 Partially;If h and α values horizontally advance all in allowed band along with regard to bit line, finished until performing.
D records geological condition:In drilling process, according to landwaste situation, front geological condition is recorded in time.
(7)Move back drilling tool:After drilling to design attitude, the threaded connection between drilling rod and drilling tool is unclamped, head installation is only starched Valve;
(8)Slip casting
A grouting sequences
Tube shed grouting order follows the principle of " among behind first both sides, from thin to thick ".Mortar depositing construction is constructed by both ends, Promoted to tunnel vault direction, the concentration of slurry of slip casting is lower during beginning, gradual enriching to design concentration.
B slurries mixings
Slurrying is carried out according to deployed match ratio, slurries mix uniform, and have good mobility and viscosity.Note The stirring work of slurry process can not stop, and one untill slip casting finishes.
C grouting pressures control with grouting amount
Using amount control and voltage-controlled double standards, should blow slowly during slip casting slip casting process pressurization, after reaching pressure, after voltage stabilizing, starch Liquid uniformly overflows from sealing part sometimes, can also be overflowed sometimes at the rock crazing seam of surrounding, and expression has filled.Slip casting finishes Afterwards, should illustrate not note in pipe grouting amount compared with theoretical values, when more when grouting amount is less than theoretical values It is full, it should now stop carrying out pressure injection again after slip casting ascertains the reason.
D slip casting ending standards
As long as meet one of following three conditions during slip casting, you can think that single hole slip casting reaches the requirement of design and can Terminate slip casting.First, grouting pressure is stepped up, and reaches design final pressure (generally 1.0~2.0MPa) stable 10min;Second, 80% of grouting amount not less than design grouting amount;3rd, it is to start 1/4 into slurry speed to enter to starch speed.
(9) sealing of hole
After the completion of slip casting, sealing of hole is carried out in time, prevents slurries from outflowing, ultimately form the arch ring of fixing-stable(See Fig. 4), really Stabilizing power during guarantor's tunnel excavation, reduce risk of distortion of the tunnel in work progress.

Claims (2)

  1. The positioner 1. a kind of tunnel portal weak surrounding rock section overlength pipe shed is constructed, it is characterised in that:It includes locator (3), locator(3)It is placed on steel plate(1)On, both sides use steel pipe(2)It is fixed, locator(3)Pass through cable and display(5) It is connected, display(5)Pass through frequency conversion equipment(6)With extraneous power supply(7)It is connected.
  2. 2. a kind of tunnel portal weak surrounding rock section overlength pipe shed construction positioner according to claim 1, its feature exist In:The steel plate(1)Installed in the drilling rod head of rig(4)In.
CN201720517405.1U 2017-05-10 2017-05-10 A kind of tunnel portal weak surrounding rock section overlength pipe shed construction positioner Active CN206707716U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720517405.1U CN206707716U (en) 2017-05-10 2017-05-10 A kind of tunnel portal weak surrounding rock section overlength pipe shed construction positioner

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720517405.1U CN206707716U (en) 2017-05-10 2017-05-10 A kind of tunnel portal weak surrounding rock section overlength pipe shed construction positioner

Publications (1)

Publication Number Publication Date
CN206707716U true CN206707716U (en) 2017-12-05

Family

ID=60465972

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720517405.1U Active CN206707716U (en) 2017-05-10 2017-05-10 A kind of tunnel portal weak surrounding rock section overlength pipe shed construction positioner

Country Status (1)

Country Link
CN (1) CN206707716U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109252876A (en) * 2018-06-26 2019-01-22 中铁五局集团贵州工程有限公司 A kind of advanced tubule angle positioning device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109252876A (en) * 2018-06-26 2019-01-22 中铁五局集团贵州工程有限公司 A kind of advanced tubule angle positioning device
CN109252876B (en) * 2018-06-26 2024-05-10 中铁五局集团贵州工程有限公司 Advance little pipe angle positioner

Similar Documents

Publication Publication Date Title
CN102943466B (en) Construction method for miniature steel pipe concrete pile to penetrate through roadbed layer for reinforcing soft foundation construction
CN106988755A (en) A kind of tunnel portal weak surrounding rock section overlength pipe shed construction method
CN110056369B (en) Construction method for entrance and exit hole of tunnel
CN104612162B (en) A kind of Deep Foundation Pit of Metro Stations excavation construction method
CN104453946B (en) Advanced reinforcing construction method for building tunnel in soft surrounding rock
CN104389610B (en) A kind of ultrashort step construction method of traversing operation freeway tunnel
CN109372517A (en) One kind is suitable for wearing water supplying pipe construction method under upper soft lower hard compound stratum tunnel
CN103306687A (en) Construction method for deformation control via horizontal whirling jet grouting of long cantilever in soft-rock tunnel
CN110080237A (en) It cheats the shallow earthing subway tunnel pit earthwork in bottom and excavates anti-floating construction method and structure
CN110374633A (en) The Portal Section Construction method of Tunnel Passing loose media
CN106759297A (en) A kind of construction method of support pile and three pipe high-pressure rotary jet grouting pile deep basal pits
CN109763483B (en) Up-going type sectional grouting process for thick fourth-system deep-buried mining cave-in broken stratum
CN110130927A (en) A kind of carbonaceous slate serious deformation control construction method
CN108252719B (en) Plastic flow modeling shape red clay layer construction method is worn under a kind of urban shallow tunnel
CN114233385B (en) Treatment method for mud-bursting water of inclined shaft
CN107023300A (en) A kind of use canopy, which is defended the doctrine, builds the construction method of subway station
CN103410522A (en) Continuous close-range underpass railway bridge construction method employing shallow tunneling method
CN106812150A (en) A kind of mountain area steep slope region Road Bridge Pile Foundation construction method
CN104695458A (en) Construction method of deep stirring and jet grouting compound pile waterproof curtain
CN111852515A (en) Tunnel stratum pre-reinforcement comprehensive grouting method
CN109706945A (en) Come down fracture belt tunnel construction method
CN107339122B (en) Construction method for treating goaf by steel pipe column
CN109057802A (en) Shallow tunnel with big cross-section underpass of freeways construction method
CN107514266A (en) Shield export & import bolt anchorage soil body construction method
CN104032763A (en) Combined-type anti-seepage waterstop curtain structure and construction method thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant