CN206707247U - Electric hydaulic operating platform for construction of lift well - Google Patents

Electric hydaulic operating platform for construction of lift well Download PDF

Info

Publication number
CN206707247U
CN206707247U CN201720558578.8U CN201720558578U CN206707247U CN 206707247 U CN206707247 U CN 206707247U CN 201720558578 U CN201720558578 U CN 201720558578U CN 206707247 U CN206707247 U CN 206707247U
Authority
CN
China
Prior art keywords
flat board
operating platform
bending segment
supporting frame
shear wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720558578.8U
Other languages
Chinese (zh)
Inventor
杜家欣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201720558578.8U priority Critical patent/CN206707247U/en
Application granted granted Critical
Publication of CN206707247U publication Critical patent/CN206707247U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Types And Forms Of Lifts (AREA)

Abstract

It the utility model is related to a kind of electric hydaulic operating platform for construction of lift well,Flat board including being arranged on elevator shear wall opening,The periphery of flat board is provided with supporting frame,Supporting frame is in folding rod-like structure and including first,Second bending segment,Second bending segment is in the weight of the first bending segment,The shear wall upper end of first bending segment and elevator against or separate,The periphery of operating platform is provided with the opening for accommodating supporting frame,The bending place of supporting frame is be hinged to be arranged at the opening two side of operating platform and jointed shaft is horizontal,The upper surface of first bending segment and the bottom surface of operating platform against or separate,Above-mentioned flat board is placed on to the shear wall upper end of bottom elevator,So that supporting frame rides upon the shear wall upper end of stair shaft,So as to realize the bracketing to flat board,Flat board is moved up using electric hydaulic mechanism,Supporting frame rotates around jointed shaft,Avoided so as to be formed with elevator shear wall,The operating platform is easy to operate.

Description

Electric hydaulic operating platform for construction of lift well
Technical field
It the utility model is related to Construction Technology field, and in particular to a kind of electric hydaulic for construction of lift well is grasped Make platform.
Background technology
More than building in being built due to current engineering based on high level, its elevator setting generally increases, and structure type is big More based on concrete shear force wall, multiple erection construction operating platform is formed in construction, reinforcing bar, template and concrete is carried out and mixes Compound etc. is constructed, the operating platform unstability that happens occasionally, operating personnel's falling accident, and some projects under construction even occur in elevator Wall form and operating personnel fall, and smash the major accident of operating platform.
Utility model content
The purpose of this utility model is:A kind of electric hydaulic operating platform for construction of lift well is provided, can be facilitated Realize the construction operation to high rise elevator well, it is ensured that the safety of construction.
To achieve the above object, the technical solution adopted in the utility model is:
For the electric hydaulic operating platform of construction of lift well, including the flat board of elevator shear wall opening is arranged on, The periphery of the flat board is provided with supporting frame, and support frame as described above body is in folding rod-like structure and including first, second bending segment, institute The second bending segment is stated in the weight of the first bending segment, the shear wall upper end of first bending segment and elevator against or separate, The periphery of the operating platform is additionally provided with the opening for accommodating supporting frame, and the bending place of support frame as described above body is be hinged to be arranged on behaviour Make at the opening two side of platform and jointed shaft be horizontal, the upper surface of first bending segment and the bottom surface of operating platform against or Separation.
Following characteristics also be present in the utility model:
It is provided with back-up roller wheel above the end of first bending segment, the core wheel of the back-up roller wheel and supporting frame Jointed shaft is parallel.
The upper face of the flat board is provided with insertion pipe, and hanging support body, the pylon are provided with above the flat board Body is plugged in insertion pipe including vertical pole, is made up of detachably fastening bolt between the insertion pipe and the vertical pole for hanging support body Formula connects.
Compared with prior art, the technique effect that the utility model possesses is:Aforesaid operations platform is in practice of construction operation When, to be constructed first against the first layer elevator of building, construction finishes, after coming on the concrete strength of shear wall, Above-mentioned operation support body is jacked to elevator shear wall upper end by electro-hydraulic system so that supporting frame rides upon elevator The shear wall upper end of well, after realizing the interim fixation of operation support body, flat board is lifted up using hydraulic pressure backhaul, lifting is arrived Shear wall upper end, plateau levels support self-return, is supported on shear wall and reaches fixed position.Supporting frame turns around jointed shaft It is dynamic, avoided so as to be formed with elevator shear wall, its platform is lifted in place.Therefore the operating platform is able to ensure that personnel Safety and the degree of safety entirely constructed, it is and easy to operate.
Brief description of the drawings
Fig. 1 is the top view of the electric hydaulic operating platform for construction of lift well;
Fig. 2 is the front view of the electric hydaulic operating platform for construction of lift well;
Fig. 3 is the structure that use state is in for the electric hydaulic operating platform of construction of lift well and hanging support body cooperation Schematic diagram.
Embodiment
With reference to Fig. 1 to Fig. 3, the utility model is further described:
For the electric hydaulic operating platform of construction of lift well, including it is arranged on the flat board of elevator shear wall opening 10, the periphery of the flat board 10 is provided with supporting frame 20, and support frame as described above body 20 is in folding rod-like structure and including first, second Bending segment 21,22, second bending segment 22 are more than the weight of the first bending segment 21, first bending segment 21 and elevator Shear wall upper end against or separation, the periphery of the operating platform 10 be additionally provided with the opening for accommodating supporting frame 20, the branch The bending place of support body 20 is be hinged to be arranged at the opening two side of operating platform 10 and jointed shaft is horizontal, first bending segment The bottom surface of 21 upper surface and operating platform 10 against or separate;
With reference to shown in Fig. 2, aforesaid operations platform is in practice of construction operation, first against the first layer elevator of building Constructed, construction is finished, and after coming on the concrete strength of shear wall, above-mentioned flat board 10 is placed on into bottom elevator Shear wall upper end, the first bending segment 21 of supporting frame 20 is under the Action of Gravity Field of the second bending segment 22 so that the first bending segment 21 Ride upon the shear wall upper end of stair shaft, so as to realize the bracketing to flat board 10, and the upper surface of first bending segment 21 with The bottom surface of operating platform 10 is against so as to realize the limited support to supporting frame 20;
After the layer is constructed, flat board 10 is moved up using hydraulic mechanism, supporting frame 20 rotates around jointed shaft, Avoided so as to be formed with elevator shear wall, therefore the safety that the operating platform is able to ensure that the safety of personnel and entirely constructed Degree, and it is easy to operate.
As preferred scheme of the present utility model, back-up roller wheel 30 is provided with above the end of first bending segment 21, The core wheel of the back-up roller wheel 30 is parallel with the jointed shaft of supporting frame 20;
Above-mentioned hang sets mechanism during flat board 10 is hung sets, and above-mentioned back-up roller wheel 30 is formed to supporting frame 20 Roll and be oriented to, supporting frame 20 on the one hand can be avoided to cause the scuffing to elevator shearing inner wall, and in back-up roller wheel 30 In the presence of, the slip of supporting frame 20 can be reduced caused by frictional resistance, facilitate the upward lifting of whole equipment.
The upper face of the flat board 10 is provided with insertion pipe 11, and the top of the flat board 10 is provided with hanging support body 40, institute State hanging support body 40 to be plugged in insertion pipe 11 including vertical pole 41, lead between the insertion pipe 11 and the vertical pole 41 for hanging support body 40 Cross fastening bolt 111 and form detachable connection;
Above-mentioned hanging support body 40 forms detachable connection with flat board 10, can be by the inner template for being molded shear wall 50 are fixed on hanging support body 40, set mechanism using hanging and are formerly transported to the upper end of elevator shear wall by support body 40 is hung, and And cause inner template 50 to ride upon the upper end of shear wall, the fixation to hanging support body 40 is realized, recycling, which is hung, sets mechanism by flat board 10 are transported to the upper end of shear wall, and then vertical pole 41 is plugged in insertion pipe 11, and using fastening bolt 111 by vertical pole 41 with Insertion pipe 11 is fixed, and conveniently realizes the connection of two parts, then carries out the construction operation of the shear wall of this layer.
With reference to shown in Fig. 3, above-mentioned hanging sets the hydraulic thrust that mechanism can be provided between hanging support body 40 and flat board 10 Bar 60, the piston rod of the hydraulic push rod 60 is vertical, and the center of support body 40 is being hung in the upper end of hydraulic push rod 60 by pin connection Position, the lower end of hydraulic push rod 60 are fixed on flat board 10, when needing lifting that equipment is upward, by vertical pole 41 and insertion pipe 11 Separation, is acted using hydraulic push rod 60, and hanging support body 40 moves up, so that hanging support body 40 is raised to elevator shear wall Upper end, during reset, the negative drawing power of hydraulic push rod 60 can get on the lifting of flat board 10 hydraulic push rod 60.
It is obvious to a person skilled in the art that the utility model is not limited to the details of above-mentioned one exemplary embodiment, and And in the case of without departing substantially from spirit or essential attributes of the present utility model, it can realize that this practicality is new in other specific forms Type.Therefore, no matter from the point of view of which point, embodiment all should be regarded as exemplary, and is nonrestrictive, this practicality is new The scope of type limits by appended claims rather than described above, it is intended that the equivalency fallen in claim is contained All changes in justice and scope are included in the utility model.Any reference in claim should not be considered as limitation Involved claim.
Moreover, it will be appreciated that although the present specification is described in terms of embodiments, not each embodiment is only wrapped Containing an independent technical scheme, this narrating mode of specification is only that those skilled in the art should for clarity Using specification as an entirety, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art It is appreciated that other embodiment.

Claims (3)

1. the electric hydaulic operating platform for construction of lift well, it is characterised in that:Including being arranged on elevator shear wall opening The flat board (10) at place, the periphery of the flat board (10) are provided with supporting frame (20), and support frame as described above body (20) is in pole shape knot Structure and including first, second bending segment (21,22), second bending segment (22) is more than the weight of the first bending segment (21), institute State the shear wall upper end of the first bending segment (21) and elevator against or separate, the periphery of the flat board (10) is additionally provided with receiving The opening of supporting frame (20), the bending place of support frame as described above body (20) is be hinged be arranged at the opening two side of flat board (10) and Jointed shaft is horizontal, the upper surface of first bending segment (21) and the bottom surface of flat board (10) against or separate.
2. the electric hydaulic operating platform according to claim 1 for construction of lift well, it is characterised in that:Described first Back-up roller wheel (30), core wheel and the supporting frame (20) of the back-up roller wheel (30) are provided with above the end of bending segment (21) Jointed shaft is parallel.
3. the electric hydaulic operating platform according to claim 2 for construction of lift well, it is characterised in that:The flat board (10) upper face is provided with insertion pipe (11), and hanging support body (40), the pylon are provided with above the flat board (10) Body (40) is plugged in insertion pipe (11) including vertical pole (41), the vertical pole (41) of the insertion pipe (11) and hanging support body (40) it Between pass through fastening bolt (111) form detachable connection.
CN201720558578.8U 2017-05-18 2017-05-18 Electric hydaulic operating platform for construction of lift well Expired - Fee Related CN206707247U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720558578.8U CN206707247U (en) 2017-05-18 2017-05-18 Electric hydaulic operating platform for construction of lift well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720558578.8U CN206707247U (en) 2017-05-18 2017-05-18 Electric hydaulic operating platform for construction of lift well

Publications (1)

Publication Number Publication Date
CN206707247U true CN206707247U (en) 2017-12-05

Family

ID=60464727

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720558578.8U Expired - Fee Related CN206707247U (en) 2017-05-18 2017-05-18 Electric hydaulic operating platform for construction of lift well

Country Status (1)

Country Link
CN (1) CN206707247U (en)

Similar Documents

Publication Publication Date Title
CN206801439U (en) A kind of Multifunctional stairs
CN206737388U (en) Lift-on/lift-off type elevator hoistway construction platform device
CN206842919U (en) A kind of stable type monkey
CN203381649U (en) Pushing type transport vehicle for rod piece materials
CN206707247U (en) Electric hydaulic operating platform for construction of lift well
CN202882376U (en) Elevator shaft template support platform
CN107178204A (en) Elevator electric hydaulic construction platform device and the elevator shear wall construction method
CN206800968U (en) Elevator electric hydaulic construction platform device
CN204139567U (en) Aerial work platform
CN207363587U (en) A kind of aerial ladder of fire truck support device
CN205976394U (en) Convenient low layer construction scaffolding
CN201062431Y (en) Lifting device of cantilever scaffold
CN203341363U (en) Earthquake-resisting bed
CN201834705U (en) Rescue support
CN206288902U (en) A kind of safety translation lowering or hoisting gear in combined platform
CN103977512A (en) Building climbing rescue vehicle
CN204139940U (en) Novel compositions type pin ladder frame
CN207159977U (en) A kind of immersible pump tower stage apparatus
CN201647224U (en) Novel brick suspending box
CN202913678U (en) Hinged elevator shaft material platform
CN205531262U (en) Steel construction construction platform can rise automatically
CN202323725U (en) Hanging basket device for bridge construction
CN201463582U (en) Charging device of electric furnace
CN205772649U (en) A kind of balcony elevator
CN203977836U (en) A kind of tool-type escalator building formwork platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171205