CN202323725U - Hanging basket device for bridge construction - Google Patents
Hanging basket device for bridge construction Download PDFInfo
- Publication number
- CN202323725U CN202323725U CN2011204510217U CN201120451021U CN202323725U CN 202323725 U CN202323725 U CN 202323725U CN 2011204510217 U CN2011204510217 U CN 2011204510217U CN 201120451021 U CN201120451021 U CN 201120451021U CN 202323725 U CN202323725 U CN 202323725U
- Authority
- CN
- China
- Prior art keywords
- hanging basket
- steel cable
- bridge
- bridge construction
- rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model discloses a hanging basket device for bridge construction, comprising a lower box beam of a bridge. The hanging basket device is characterized by further comprising hanger rods mounted in multiple pull rod holes at two ends of the lower box beam, every two hanger rods at two ends form a group and are connected together via a steel sling, a hanging basket is located under the steel sling, and the hanging basket is movably mounted on the steel sling via multiple structural parts. The hanging basket device can perform construction work at the whole undersurface of the bridge, thus, the construction bind zone is avoided, and the quality of bridge construction can be improved.
Description
Technical field
The utility model relates to a kind of nacelle device that is used for the construction of bridge bottom surface.
Background technology
At present; The nacelle device that is used for bridge construction all is to be installed in the structural members such as truss on the bridge floor through cantilever, and it is positioned at the side of bridge, can only construct to the side of bridge and near very short one section bridge bottom surface of side; Can't carry out construction operation to whole bottom surfaces of bridge; For wide more bridge floor, there is bigger construction blind area in its bottom, is difficult to improve the quality of bridge construction.
The utility model content
The purpose of the utility model is the above-mentioned deficiency to prior art, and a kind of nacelle device of bridge construction is provided, and it can carry out construction operation to whole bottom surfaces of bridge, can improve the quality of bridge construction.
For achieving the above object; The nacelle device of the bridge construction of the utility model; The nowel beam that comprises bridge is characterized in that also comprising the suspension rod that is installed in several tie rod holes of nowel beam two ends, the suspension rod at two ends in twos one group link to each other through steel cable; Below all steel cables, be provided with a hanging basket, hanging basket movably is loaded on the steel cable through several structural members.
Said structure spare can be the suspension ring that are loaded on the roller on the steel cable, the support that is connected with roller, the hook that is connected with support and connect firmly with the framework of hanging basket, and suspension ring are hung on the corresponding hook.
Said structure spare also can for connecting rod on the framework that is fixedly arranged on hanging basket, with the collar that connecting rod connects firmly, cover is located on the steel cable.
During use, the operator spurs steel cable in hanging basket, can make hanging basket oppositely move, thereby construction operation is carried out in whole bottom surfaces of bridge, can improve the quality of bridge construction;
As the utility model further; On the nowel beam, also be provided with several lifting appliances; The drag hook that each lifting appliance comprises screw rod in the tie rod hole of being located between the suspension rod of two ends, connect firmly with the screw rod lower end, be loaded on nut and top board on the screw rod through screw thread, nut is positioned at the top board below and places on the nowel beam, on the nowel beam of nut both sides, also is respectively equipped with jack; The two ends of top board place on the jack, and drag hook hooks corresponding steel cable; Can increase the stability of shroud through lifting rope and weight, further improve protection effect; When steel cable occurs sagging or nowel beam when being arch, hanging basket moves to the stage casing of steel cable, and this moment, hanging basket was far away apart from the top of nowel beam; Can operate two jack and make the top board lifting; Descend spin nut to being adjacent to the nowel beam again,, draw steel cable on the drag hook the screw rod location; Can promote hanging basket, guarantee carrying out smoothly of operation;
In sum, the utility model can carry out construction operation to whole bottom surfaces of bridge, has avoided the construction blind area, can improve the quality of bridge construction.
Description of drawings
Fig. 1 is the front view of the utility model embodiment one.
Fig. 2 is the A-A sectional view of Fig. 1.
Fig. 3 is the B-B sectional view of Fig. 1.
Fig. 4 is the C place enlarged drawing of Fig. 2.
Fig. 5 is the front view of the utility model embodiment two.
Fig. 6 is the D-D sectional view of Fig. 5.
The specific embodiment
Below in conjunction with accompanying drawing the utility model is done further detailed explanation.
Embodiment one
By Fig. 1 to shown in Figure 4, the nacelle device of this bridge construction, comprise bridge nowel beam 1, be installed on the suspension rod 2 in six tie rod holes in nowel beam two ends; The suspension rod 2 at two ends in twos one group link to each other with a steel cable 3 through securing member such as fastener, below all steel cables 3, be provided with a hanging basket 4, hanging basket 4 is provided with the railing of six framework 4a and connecting frame; The front and back end of each framework 4a all is fixedly connected with suspension ring 5; Two rollers 6 all are housed on the steel cable 3 above each framework 4a, and each roller 6 is connected with a support 7, is connected with hook 8 on each support 7; Suspension ring 5 are hung on the corresponding hook 8, make hanging basket 4 movably be loaded on the steel cable 3; On nowel beam 1, also be provided with six lifting appliances; The drag hook 10 that each lifting appliance comprises screw rod 9 in the tie rod hole of being located between the two ends suspension rod 2, connect firmly with screw rod 9 lower ends, be loaded on nut 11 and top board 12 on the screw rod 9 through screw thread; Nut 11 is positioned at top board 12 belows and places on the nowel beam 1; On the nowel beam 1 of nut 11 both sides, also be respectively equipped with jack 13, the two ends of top board 12 place on the jack 13, and drag hook 10 hooks corresponding steel cable 3;
The utility model utilizes tie rod hole intrinsic on the nowel beam 1 that steel cable 3 is installed, and movably is loaded on hanging basket 4 on the steel cable 3; During operation, the operator spurs steel cable 3 in hanging basket 4, can make hanging basket 4 oppositely move, thereby construction operation is carried out in whole bottom surfaces of bridge, can improve the quality of bridge construction; When steel cable 3 because of using for a long time or hanging basket is reppeared and now hung down and nowel beam 1 during as arch, hanging basket 4 moves to the stage casing of steel cable 3, hanging basket 4 is far away apart from the top of nowel beam 1 at this moment; Can operate two jack 13 and make top board 12 liftings; Descend spin nut 11 to being adjacent to nowel beam 1 again,, draw steel cable 3 on the drag hook 10 screw rod 9 location; Can promote hanging basket 4, guarantee carrying out smoothly of operation.
Embodiment two
Like Fig. 5 and shown in Figure 6, the difference of present embodiment and embodiment one only is that hanging basket 4 movably is loaded on the steel cable 3 through the collar 16 that is fixedly arranged on its framework 4a and goes up connecting rod 15, connect firmly and be placed on the steel cable 3 with connecting rod 15; During operation, the operator spurs steel cable 3 in hanging basket 4, can make hanging basket 4 oppositely move equally, thereby construction operation is carried out in whole bottom surfaces of bridge, can improve the quality of bridge construction; This structure is simple relatively, but frictional force is bigger, with embodiment one advantage is arranged respectively.
The utility model is not limited to above-mentioned embodiment, also can be varied like the connected mode of hanging basket and steel cable, but, all fall into the protection domain of this patent as long as adopt the described scheme of claim 1.
Claims (4)
1. the nacelle device of a bridge construction; The nowel beam that comprises bridge; It is characterized in that also comprising the suspension rod that is installed in several tie rod holes of nowel beam two ends; The suspension rod at two ends in twos one group link to each other through steel cable, below all steel cables, be provided with a hanging basket, hanging basket movably is loaded on the steel cable through several structural members.
2. the nacelle device of bridge construction as claimed in claim 1; It is characterized in that said structural member comprises the roller that is loaded on the steel cable, the support that is connected with roller, the hook that is connected with support and the suspension ring that connect firmly with the framework of hanging basket, suspension ring are hung on the corresponding hook.
3. the nacelle device of bridge construction as claimed in claim 1, it is characterized in that said structural member comprise connecting rod on the framework that is fixedly arranged on hanging basket, with the collar that connecting rod connects firmly, cover is located on the steel cable.
4. like the nacelle device of the arbitrary described bridge construction of claim 1 to 3; It is characterized in that on the nowel beam, also being provided with several lifting appliances; The drag hook that each lifting appliance comprises screw rod in the tie rod hole of being located between the suspension rod of two ends, connect firmly with the screw rod lower end, be loaded on nut and top board on the screw rod through screw thread, nut is positioned at the top board below and places on the nowel beam, on the nowel beam of nut both sides, also is respectively equipped with jack; The two ends of top board place on the jack, and drag hook hooks corresponding steel cable.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011204510217U CN202323725U (en) | 2011-11-15 | 2011-11-15 | Hanging basket device for bridge construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011204510217U CN202323725U (en) | 2011-11-15 | 2011-11-15 | Hanging basket device for bridge construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202323725U true CN202323725U (en) | 2012-07-11 |
Family
ID=46435709
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011204510217U Expired - Fee Related CN202323725U (en) | 2011-11-15 | 2011-11-15 | Hanging basket device for bridge construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202323725U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104746861A (en) * | 2015-03-31 | 2015-07-01 | 中国建筑第六工程局有限公司 | Hanging basket structure for high crossbeam lower surface monitoring point arrangement and installation method |
CN107313360A (en) * | 2017-07-18 | 2017-11-03 | 南昌大学 | Overhead cable formula is without support bearing replacement operating platform |
-
2011
- 2011-11-15 CN CN2011204510217U patent/CN202323725U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104746861A (en) * | 2015-03-31 | 2015-07-01 | 中国建筑第六工程局有限公司 | Hanging basket structure for high crossbeam lower surface monitoring point arrangement and installation method |
CN107313360A (en) * | 2017-07-18 | 2017-11-03 | 南昌大学 | Overhead cable formula is without support bearing replacement operating platform |
CN107313360B (en) * | 2017-07-18 | 2022-12-06 | 南昌大学 | Sliding cable type support-free support replacing operation platform |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201268937Y (en) | Double-layer hanging cradle for working aloft | |
CN103663142B (en) | Tailing mechanism and translation tailing hoisting method | |
CN205855865U (en) | A kind of hoisting machine with anti-rock | |
CN201961956U (en) | Frame lifting appliance with adjustable lifting center of gravity | |
CN204899184U (en) | Hanging flower basket equipment | |
CN105060125B (en) | High tower structure of cable crane and its method for dismounting | |
CN102943561A (en) | Overhead working hanging basket anti-sway device | |
CN206437772U (en) | A kind of double special hanger of list | |
CN202323725U (en) | Hanging basket device for bridge construction | |
CN202327587U (en) | Hanger with adjustable height | |
CN202829301U (en) | Steel rail hoisting tool | |
CN205604697U (en) | Hook type high -place operation hanging basket | |
CN208684272U (en) | A kind of plain type electric crane | |
CN204675726U (en) | Purlin lifting auxiliary device | |
CN202718381U (en) | Transfer-free lifting device | |
CN104016220B (en) | The adjustable handling suspension bracket of waste heat boiler module | |
CN201358764Y (en) | Balance weight structure of vertical oil extractor | |
CN205348817U (en) | Safety belt pendant | |
CN210366631U (en) | Superimposed sheet hoist that facilitates use | |
CN203903768U (en) | Adjustable loading and unloading lifting bracket for waste heat boiler module | |
CN103058083B (en) | Bolt sphere truss gig | |
CN207375669U (en) | The electronic lifting bracket of cable tunnel inner column formula cable | |
CN105152104B (en) | Lifting telescopic hanging hurdle | |
CN204643670U (en) | Split type arm tower crane Shears structure | |
CN205741935U (en) | The mounting and positioning device of Wavelike steel webplate |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120711 Termination date: 20151115 |
|
EXPY | Termination of patent right or utility model |