CN206616765U - Large span is without depending on huge bandy truss pull bar - Google Patents

Large span is without depending on huge bandy truss pull bar Download PDF

Info

Publication number
CN206616765U
CN206616765U CN201620541663.9U CN201620541663U CN206616765U CN 206616765 U CN206616765 U CN 206616765U CN 201620541663 U CN201620541663 U CN 201620541663U CN 206616765 U CN206616765 U CN 206616765U
Authority
CN
China
Prior art keywords
truss
bandy
pull rod
huge
colossal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620541663.9U
Other languages
Chinese (zh)
Inventor
孙浩
宫健
邵新宇
陈宇
陈玲
孙攀
周学伟
赵钊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Science and Industry Corp Ltd
Original Assignee
China Construction Steel Structure Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Steel Structure Corp Ltd filed Critical China Construction Steel Structure Corp Ltd
Priority to CN201620541663.9U priority Critical patent/CN206616765U/en
Application granted granted Critical
Publication of CN206616765U publication Critical patent/CN206616765U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a kind of large span without huge bandy truss pull bar, including the bandy truss being connected between two colossal columns is depended on, reinforcing pull rod is respectively equipped between bandy truss and two colossal columns.Reinforcing pull rod is drawn between the colossal column above the lower edge and bandy truss of bandy truss.Reinforcing pull rod uses section for Φ 203*12 steel pipe, and connection otic placode is set respectively in the node location of colossal column and bandy truss, and reinforcing pull rod is connected with connection otic placode using bearing pin.Set by designing reinforcing pull rod drawing, it is possible to achieve large span solves below heavy steel member without support installation problem without huge bandy truss Fast Installation is depended on, while reducing setting up for a large amount of support jigs, reduces engineering time and construction cost.

Description

Large span is without depending on huge bandy truss pull bar
Technical field
The utility model is related to a kind of huge bandy truss, more particularly to a kind of large span is drawn without huge bandy truss is depended on Bar.
Background technology
Huge bandy truss planar dimension is huge, and internal cavity division numbers are more and butt weld quantity is more, construction segmentation Mainly consider following factor:
(1) the lifting weight of segmenting unit, if on-site hoisting requirement can be met;
(2) weight and three-dimensional dimension of segmenting unit, if meet highway transportation requirement;
(3) the splicing welding joint position between segmenting unit, if facilitate Site Welding.
Consider and the live concatenation unit of huge bandy truss is divided after various factors, it is considered to installation process The influence constructed to construction segmentation.
As shown in figure 1, without the nearly 40m of huge truss bottom headroom height is depended on, if setting up scaffold or tire when installing truss Frame, in the prior art, the truss high-altitude dissipate spelling order and are:First by two sections of lower booms overhead connection install, by web member with it is upper Chord member, into " K " font, proceeds by " K " font type lifting component, lifting sequence is in installation on ground after the completion of lower boom docking Close up successively from truss two ends to centre.
The shortcoming of above-mentioned prior art is:
Because free height is higher below bandy truss, the method for setting up support frame from the first floor is comparatively laborious, and need to expend big The support frame of amount, it is necessary to measure cost it is higher, and the relatively cumbersome and duration of constructing is longer.
The content of the invention
The purpose of this utility model is to provide a kind of large span without depending on huge bandy truss pull bar.
The purpose of this utility model is achieved through the following technical solutions:
Large span of the present utility model is without depending on huge bandy truss pull bar, including the band being connected between two colossal columns Shape truss, reinforcing pull rod is respectively equipped between the bandy truss and two colossal columns.
It can be seen from the technical scheme that above-mentioned the utility model is provided the utility model embodiment provide large span without Huge bandy truss pull bar is depended on, quick-assembling, economy expense can be achieved, and with good security, it is adaptable to it is super It is being segmented of long, super-heavy component, fixed and weld, and to particularly useful without huge bandy truss construction is depended on below large span, Equally there is good reference value to other similar Construction of Steel Structure, the efficiency of installation can be not only improved, moreover it is possible to for construction The abundant time is won, standardization can be also realized, the purpose of cost efficiency is reached.
Brief description of the drawings
Fig. 1 is large span of the prior art without the structural representation for depending on huge bandy truss.
Fig. 2 a show for the large span that the utility model embodiment is provided without the plan structure for depending on huge bandy truss pull bar It is intended to.
Fig. 2 b locally tie for the large span that the utility model embodiment is provided without the facade for depending on huge bandy truss pull bar Structure schematic diagram.
Fig. 3 a, Fig. 3 b are respectively the structural representation of two sides of reinforcing pull rod in the utility model embodiment.
In figure:
1st, bandy truss, 2, colossal column, 3, huge diagonal brace, 4, truss top time post, 5, truss bottom hung column, 6, building Layer Vierendeel girder, 7, reinforcing pull rod.
Embodiment
The utility model embodiment will be described in further detail below.
Large span of the present utility model is without depending on huge bandy truss pull bar, and its preferably embodiment is:
Including the bandy truss being connected between two colossal columns, set respectively between the bandy truss and two colossal columns There is reinforcing pull rod.
The reinforcing pull rod is drawn between the colossal column above the lower edge and bandy truss of the bandy truss.
The drawing of the firm pull bar sets lower edge and web member connecting node position of the position as bandy truss.
The reinforcing pull rod uses section for Φ 203*12 steel pipe, in the node position of the colossal column and the bandy truss Put and connection otic placode is set respectively, the reinforcing pull rod is connected with the connection otic placode using bearing pin.
Specific embodiment:
As shown in Fig. 2 a, Fig. 2 b, large span of the present utility model is without depending on huge bandy truss pull bar, with reinforcing pull rod by purlin Frame lower edge oblique pull is on the colossal column of both sides.To avoid reinforcing pull rod from influenceing the lifting construction of truss web and upper cord member, reinforcing pull rod Draw and be located at the truss lower edge left and right sides, when the lifting of truss lower edge is in place, is drawn and carried out on the colossal column at two ends using pull bar It is fixed, it is because a level post and girder steel are arranged at truss bottom, secondary post and girder steel and the truss lower edge of bottom is laggard in installation on ground Row lifting, both sides truss lower edge lifting is completed and the truss lower edge lifting of interlude is carried out after the completion of being fixed with pull bar, and pull bar is drawn If position is truss lower edge and web member connecting node position.
Reinforcing pull rod section form and joint form:
As shown in Figure 3 a, 3 b, reinforcing pull rod uses section for Φ 203*12 steel pipe, in colossal column and panel point position Connection otic placode is set, and pull bar is connected with truss and colossal column using bearing pin.
Large span of the present utility model is set by designing reinforcing pull rod drawing, realized big without huge bandy truss pull bar is depended on Span has won the initiative of construction without huge bandy truss Fast Installation is depended on, and solves highway transportation and welding side The problem in face, saves working measure expense, and is provided convenience condition for site operation.Also in installation rate, construction coordination Unprecedented perfect adaptation has been reached, and good practicality effect is served to Promoting Standardized construction.Solve large-scale Problem is installed without support below steel member, while reducing setting up for a large amount of support jigs, reduces the engineering time and is constructed into This.
It is described above, only the utility model preferably embodiment, but protection domain of the present utility model is not This is confined to, any one skilled in the art can readily occur in the technical scope that the utility model is disclosed Change or replacement, should all cover within protection domain of the present utility model.Therefore, protection domain of the present utility model should It is defined by the protection domain of claims.

Claims (3)

1. a kind of large span is without depending on huge bandy truss pull bar, including the bandy truss being connected between two colossal columns, its It is characterised by, reinforcing pull rod is respectively equipped between the bandy truss and two colossal columns;
The reinforcing pull rod is drawn between the colossal column above the lower edge and bandy truss of the bandy truss.
2. large span according to claim 1 is without depending on huge bandy truss pull bar, it is characterised in that the reinforcing pull rod Draw the lower edge for setting position as bandy truss and web member connecting node position.
3. large span according to claim 1 or 2 is without depending on huge bandy truss pull bar, it is characterised in that the steel is drawn Bar uses section for Φ 203*12 steel pipe, and engaging lug is set respectively in the node location of the colossal column and the bandy truss Plate, the reinforcing pull rod is connected with the connection otic placode using bearing pin.
CN201620541663.9U 2016-06-06 2016-06-06 Large span is without depending on huge bandy truss pull bar Active CN206616765U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620541663.9U CN206616765U (en) 2016-06-06 2016-06-06 Large span is without depending on huge bandy truss pull bar

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620541663.9U CN206616765U (en) 2016-06-06 2016-06-06 Large span is without depending on huge bandy truss pull bar

Publications (1)

Publication Number Publication Date
CN206616765U true CN206616765U (en) 2017-11-07

Family

ID=60228611

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620541663.9U Active CN206616765U (en) 2016-06-06 2016-06-06 Large span is without depending on huge bandy truss pull bar

Country Status (1)

Country Link
CN (1) CN206616765U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114673366A (en) * 2022-05-10 2022-06-28 陕西建工机械施工集团有限公司 Sectional steel beam high-altitude bracket-free sectional butt joint installation method
CN115262986A (en) * 2022-07-22 2022-11-01 中国建筑第八工程局有限公司 Installation method of large-span steel truss

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114673366A (en) * 2022-05-10 2022-06-28 陕西建工机械施工集团有限公司 Sectional steel beam high-altitude bracket-free sectional butt joint installation method
CN115262986A (en) * 2022-07-22 2022-11-01 中国建筑第八工程局有限公司 Installation method of large-span steel truss

Similar Documents

Publication Publication Date Title
CN204040435U (en) High-altitude steel structure welding Hanging Basket
CN204040464U (en) A kind of slab form supporting construction
CN206903022U (en) A kind of steel bar truss floor support plate
CN204960296U (en) Adjustable shaped steel stencil assembly
CN109487912A (en) A kind of construction method of super-span truss-string-structure
CN206616765U (en) Large span is without depending on huge bandy truss pull bar
CN203684526U (en) PBL stiffened rectangular steel tube concrete space truss
CN204418510U (en) Floor support plate steel bar girder structure
CN202000265U (en) Concrete construction formwork for high pier of bridge
CN201634347U (en) Ultra-large tower crane and lower support assembly thereof
CN203213019U (en) Cast-in-situ construction bracket system of long cantilever bent cap
CN203373751U (en) Triangular surrounding purlin for inner supporting system for foundation pit supporting
CN202913338U (en) Steel truss full-welded truss piece
CN103397638A (en) Tie bar for supporting system in high-rigidity integral prestressed fabricated foundation pit support
CN201865206U (en) Connection node structure of edge beam and reinforced concrete prefabricated column bracket
CN208792806U (en) A kind of floor of steel structure transformation node
CN203393721U (en) Inner support main purlin component
CN209685126U (en) A kind of steel vestibule integrally promotes lifting lug device
CN203361631U (en) Variable-diameter fabricated sliding mode platform of sliding mode system
CN203188612U (en) Beam frame type building template system
CN208280636U (en) A kind of elevator well safety device
CN203066043U (en) Diversion tunnel top arch concrete lining steel formwork support
CN203334291U (en) High-rigidity monolithic pre-stressing assembled-type pull rod for foundation pit supporting inner-supporting system
CN203394079U (en) Large overweight box-type beam mounting assisting parallel truss
CN206034905U (en) Board combination design mould falls in bathroom

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 3801, 38 / F, Zhongjian science and engineering building, No. 3331, Weilan Coast Community Center Road, Yuehai street, Nanshan District, Shenzhen City, Guangdong Province

Patentee after: China Construction Engineering Group Co.,Ltd.

Address before: 518040 Guangdong city of Shenzhen province Futian District Che Kung Temple tipping building 17 layer

Patentee before: China Construction Steel Structure Corp.,Ltd.