CN103397638A - Tie bar for supporting system in high-rigidity integral prestressed fabricated foundation pit support - Google Patents

Tie bar for supporting system in high-rigidity integral prestressed fabricated foundation pit support Download PDF

Info

Publication number
CN103397638A
CN103397638A CN2013102983065A CN201310298306A CN103397638A CN 103397638 A CN103397638 A CN 103397638A CN 2013102983065 A CN2013102983065 A CN 2013102983065A CN 201310298306 A CN201310298306 A CN 201310298306A CN 103397638 A CN103397638 A CN 103397638A
Authority
CN
China
Prior art keywords
plate
shaped steel
foundation pit
connecting holes
shackle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013102983065A
Other languages
Chinese (zh)
Inventor
高尔荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Bolei Heavy Duty Machine Tool Manufacturing Co Ltd
Original Assignee
Zhejiang Bolei Heavy Duty Machine Tool Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Bolei Heavy Duty Machine Tool Manufacturing Co Ltd filed Critical Zhejiang Bolei Heavy Duty Machine Tool Manufacturing Co Ltd
Priority to CN2013102983065A priority Critical patent/CN103397638A/en
Publication of CN103397638A publication Critical patent/CN103397638A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

The invention discloses a tie bar for a supporting system in a high-rigidity integral prestressed fabricated foundation pit support. The tie bar comprises a long-bar-shaped H-beam, rectangular flange plates are welded and fixed at two ends of the H-beam, four connecting holes are formed in each flange plate and divided into an upper row and a lower row, the two connecting holes in each row are in up-down one-to-one correspondence, two to four lifting lug plates are arranged in side grooves of the H-beam, three edges of each rectangular lifting lug plate are welded and fixed with a web and flanges of the H-beam respectively, and each lifting lug plate is provided with a lifting hole. Each side groove of the H-beam is partitioned into multiple sections by the lifting lug plates, and at least one drain hole is formed in the web of the H-beam in each section. According to the technical scheme, holes in standard assembling sizes are designed to be connected with other angle braces, diagonal braces or columns, the drain holes are provided so as to achieve the purpose of water draining in rainy days or construction environments with water, corrosion to parts is reduced, and the lifting lug plates are arranged for the convenience of lifting and can be used repeatedly.

Description

The pull bar that high rigidity integrated prestress assembling pattern foundation pit supporting structure inner support system is used
Technical field
The present invention relates to high rigidity integrated prestress assembling pattern foundation pit supporting structure inner support system, relate in particular to the pull bar that a kind of high rigidity integrated prestress assembling pattern foundation pit supporting structure inner support system is used.
Background technology
In the Soft Soil Foundation Pit engineering, steel concrete or steel pipe support supporting and protection structure, in order to reduce the distortion of foundation ditch, increase stability, and method commonly used is at present: increase the reinforced concrete fortifield village purlin quantity of size, increase steel pipe support in the street, reduce spacing etc.But this will increase the consumption of constructional materials greatly, also reduce effective construction space in foundation ditch.Due to the steel support structure that adopts at present, mainly using single shaped steel or steel pipe as brace summer, between every shaped steel or steel pipe, do not form effectively and connect, can not be as combining structure work, so their support rigidity is lower, the power that can bear is relatively limited, for the larger foundation ditch of span, adopts existing steel shotcrete support to be difficult to control its distortion.These support members are owing to being all much to make by the site operation requirement, the connection dimension that there is no standard, can't reach between all parts and exchange and general purpose, after causing foundation pit construction to complete, most of support components all become expendable consumed product, can not reuse.
Summary of the invention
In order to solve above-mentioned technical problem, the purpose of this invention is to provide the pull bar that a kind of high rigidity integrated prestress assembling pattern foundation pit supporting structure inner support system is used, be suitable for and other support component composite assemblies, can reuse.
To achieve the above object, the present invention has adopted following technical scheme:
the pull bar that high rigidity integrated prestress assembling pattern foundation pit supporting structure inner support system is used, the H shaped steel that comprises elongated rod shape, the two ends of H shaped steel are welded and fixed the flanged plate of rectangle, flanged plate is provided with four connecting holes, four connecting holes are divided into two rows, two corresponding settings one by one up and down of every row, in the lateral grooves of H shaped steel, be provided with 2 to 4 shackle plates, three limits of the shackle plate of rectangle are welded and fixed with web and the wing plate of H shaped steel respectively, shackle plate has lifting hole(eyelet), the lateral grooves of described H shaped steel is divided into multistage by shackle plate, on the H shape steel web of every section, all have at least one drain hole.
As preferably, in the lateral grooves of described H shaped steel, be provided with 2 shackle plates, shackle plate is 1/6~1/4 of H shaped steel overall length to the distance of nearest flanged plate.
As preferably, described flanged plate is that thickness is the steel plate of 14~18mm; The diameter of connecting hole is 26~30mm, and the spacing of two neighbouring connecting holes is 80~120mm, and the spacing of two connecting holes that left and right is adjacent is 80~120mm.
The present invention, owing to having adopted above technical scheme, is a welded construction, and take H shaped steel as main material, two ends are welded with flanged plate, on flanged plate, be equipped with standard fitted position hole, with other angle braces, support or column are connected.On H shaped steel middle pectoral plate, be provided with drain hole, so that at rain weather or in the water construction environment, reach the purpose of draining, reduce the corrosion of these parts.Heavier because of this component weight, can't must use lifting appliance with manually realizing assembling, be the safety of guaranteeing to guarantee in hoisting process lifting, shackle plate in the lateral grooves of H shaped steel with three welding, guarantee its intensity.
The accompanying drawing explanation
Fig. 1 is structural representation of the present invention;
Fig. 2 is the A-A sectional view of Fig. 1;
Fig. 3 is the B-B sectional view of Fig. 1;
Fig. 4 is the lateral view of Fig. 1.
The specific embodiment
Below in conjunction with accompanying drawing, the specific embodiment of the present invention is made a detailed explanation.
Embodiment 1:
as Fig. 1, Fig. 2, Fig. 3, the pull bar that high rigidity integrated prestress assembling pattern foundation pit supporting structure inner support system shown in Figure 4 is used, the H shaped steel 1 that comprises elongated rod shape, the two ends of H shaped steel 1 are welded and fixed the flanged plate 2 of rectangle, flanged plate 2 is provided with four connecting holes 21, four connecting holes 21 are divided into two rows, two corresponding settings one by one up and down of every row, in the lateral grooves of H shaped steel 1, be provided with 2 to 4 shackle plates 3, three limits of the shackle plate 3 of rectangle are welded and fixed with web and the wing plate of H shaped steel 1 respectively, shackle plate 3 has lifting hole(eyelet) 31, the lateral grooves of described H shaped steel 1 is divided into multistage by shackle plate 3, on H shaped steel 1 web of every section, all have at least one drain hole 11.
In the present embodiment, in the lateral grooves of described H shaped steel 1, be provided with 2 shackle plates 3, shackle plate 3 is 1/6~1/4 of H shaped steel 1 overall length to the distance of nearest flanged plate 2.Described flanged plate 2 is the steel plate of 14~18mm for thickness; As shown in Figure 4, the diameter of connecting hole 21 is 26~30mm, and the spacing of two neighbouring connecting holes 21 is 80~120mm, and the spacing of two connecting holes 21 that left and right is adjacent is 80~120mm.
The invention provides the pull bar that a kind of high rigidity integrated prestress assembling pattern foundation pit supporting structure inner support system is used.Inner support system installation site is propped up in the middle and upper part of foundation ditch and is divided or top, thereby the system of installing is suspended in foundation ditch, or with upright supports aloft, the effect of pull bar is exactly by all angle braces, symmetry and support angle brace, the column that supports use is connected into to an integral body, does not tilt.According to the total length difference, can design Multiple Type, meet the assembling of different spacing.
It is emphasized that: above is only preferred embodiment of the present invention, not the present invention is done to any pro forma restriction, every foundation technical spirit of the present invention, to any simple modification, equivalent variations and modification that above embodiment does, all still belongs in the scope of technical solution of the present invention.

Claims (3)

1. the pull bar used of high rigidity integrated prestress assembling pattern foundation pit supporting structure inner support system, it is characterized in that, the H shaped steel (1) that comprises elongated rod shape, the two ends of H shaped steel (1) are welded and fixed the flanged plate (2) of rectangle, flanged plate (2) is provided with four connecting holes (21), four connecting holes (21) are divided into two rows, two corresponding settings one by one up and down of every row, in the lateral grooves of H shaped steel (1), be provided with 2 to 4 shackle plates (3), three limits of the shackle plate of rectangle (3) are welded and fixed with web and the wing plate of H shaped steel (1) respectively, shackle plate (3) has lifting hole(eyelet) (31), the lateral grooves of described H shaped steel (1) is divided into multistage by shackle plate (3), on H shaped steel (1) web of every section, all have at least one drain hole (11).
2. the pull bar used of high rigidity integrated prestress assembling pattern foundation pit supporting structure inner support system according to claim 1, it is characterized in that, in the lateral grooves of described H shaped steel (1), be provided with 2 shackle plates (3), shackle plate (3) is 1/6~1/4 of H shaped steel (1) overall length to the distance of nearest flanged plate (2).
3. the pull bar used of high rigidity integrated prestress assembling pattern foundation pit supporting structure inner support system according to claim 1, is characterized in that, described flanged plate (2) is the steel plate of 14~18mm for thickness; The diameter of connecting hole (21) is 26~30mm, and the spacing of neighbouring two connecting holes (21) is 80~120mm, and the spacing of two connecting holes (21) that left and right is adjacent is 80~120mm.
CN2013102983065A 2013-07-15 2013-07-15 Tie bar for supporting system in high-rigidity integral prestressed fabricated foundation pit support Pending CN103397638A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013102983065A CN103397638A (en) 2013-07-15 2013-07-15 Tie bar for supporting system in high-rigidity integral prestressed fabricated foundation pit support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013102983065A CN103397638A (en) 2013-07-15 2013-07-15 Tie bar for supporting system in high-rigidity integral prestressed fabricated foundation pit support

Publications (1)

Publication Number Publication Date
CN103397638A true CN103397638A (en) 2013-11-20

Family

ID=49561333

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013102983065A Pending CN103397638A (en) 2013-07-15 2013-07-15 Tie bar for supporting system in high-rigidity integral prestressed fabricated foundation pit support

Country Status (1)

Country Link
CN (1) CN103397638A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107755979A (en) * 2017-10-11 2018-03-06 广东昭信照明科技有限公司 A kind of mounting rod and its manufacture method
CN110732848A (en) * 2019-10-31 2020-01-31 南通振华重型装备制造有限公司 manufacturing process of ultra-large track suspension rod
CN114837195A (en) * 2022-05-20 2022-08-02 中交二航局第四工程有限公司 Construction method for supporting foundation pit of deep mud layer of high slope

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101310079A (en) * 2005-11-16 2008-11-19 斯博泰科有限公司 Temporary soil sheathing apparatus
JP2008282469A (en) * 2007-05-10 2008-11-20 Nec Tokin Corp Magnetic head mechanism
CN202141316U (en) * 2011-06-24 2012-02-08 东风设计研究院有限公司 Bottom wall board module section of drying furnace
CN202866006U (en) * 2012-09-24 2013-04-10 森松(江苏)海油工程装备有限公司 H-type steel column rigid splicing connecting system with module steel structure
CN202988526U (en) * 2012-09-24 2013-06-12 森松(江苏)海油工程装备有限公司 Adjustable equalizing beam system used in industrial device module lifting
CN203334291U (en) * 2013-07-15 2013-12-11 浙江博雷重型机床制造有限公司 High-rigidity monolithic pre-stressing assembled-type pull rod for foundation pit supporting inner-supporting system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101310079A (en) * 2005-11-16 2008-11-19 斯博泰科有限公司 Temporary soil sheathing apparatus
JP2008282469A (en) * 2007-05-10 2008-11-20 Nec Tokin Corp Magnetic head mechanism
CN202141316U (en) * 2011-06-24 2012-02-08 东风设计研究院有限公司 Bottom wall board module section of drying furnace
CN202866006U (en) * 2012-09-24 2013-04-10 森松(江苏)海油工程装备有限公司 H-type steel column rigid splicing connecting system with module steel structure
CN202988526U (en) * 2012-09-24 2013-06-12 森松(江苏)海油工程装备有限公司 Adjustable equalizing beam system used in industrial device module lifting
CN203334291U (en) * 2013-07-15 2013-12-11 浙江博雷重型机床制造有限公司 High-rigidity monolithic pre-stressing assembled-type pull rod for foundation pit supporting inner-supporting system

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107755979A (en) * 2017-10-11 2018-03-06 广东昭信照明科技有限公司 A kind of mounting rod and its manufacture method
CN107755979B (en) * 2017-10-11 2023-05-02 广东昭信照明科技有限公司 Mounting rod and manufacturing method thereof
CN110732848A (en) * 2019-10-31 2020-01-31 南通振华重型装备制造有限公司 manufacturing process of ultra-large track suspension rod
CN110732848B (en) * 2019-10-31 2021-07-09 上海振华重工(集团)股份有限公司南通分公司 Manufacturing process of ultra-large track suspension rod
CN114837195A (en) * 2022-05-20 2022-08-02 中交二航局第四工程有限公司 Construction method for supporting foundation pit of deep mud layer of high slope

Similar Documents

Publication Publication Date Title
CN103397638A (en) Tie bar for supporting system in high-rigidity integral prestressed fabricated foundation pit support
CN206616765U (en) Large span is without depending on huge bandy truss pull bar
CN203373751U (en) Triangular surrounding purlin for inner supporting system for foundation pit supporting
CN203393721U (en) Inner support main purlin component
CN203334291U (en) High-rigidity monolithic pre-stressing assembled-type pull rod for foundation pit supporting inner-supporting system
CN103388336B (en) Main purline part for inner support
CN203334290U (en) Supporting rod
CN203420270U (en) Fish belly sill part of foundation pit supporting and protecting inner support system
CN203393723U (en) Connection end for whole prestressed fabricated support system in foundation pit support
CN203393722U (en) Pair-supporting part
CN203373754U (en) Angle brace bracket of inner support system of high-rigidity integrated prestress assembled type foundation pit support
CN103382720B (en) Support rod
CN203383563U (en) Fast assembled communication iron tower
CN103437367B (en) A kind of fish belly sill parts of pattern foundation pit supporting structure inner support system
CN103397641B (en) A kind of triangle for pattern foundation pit supporting structure inner support system encloses purlin
CN203373755U (en) Enclosing purlin part
CN203420276U (en) Fish-belly beam part of inner supporting system for supporting foundation pit
CN203420271U (en) Purlin part
CN103437362B (en) The fish belly sill parts of pattern foundation pit supporting structure inner support system
CN203420275U (en) Purline component
CN103388335B (en) Bracing part
CN203393726U (en) Connecting part
CN103437368B (en) One encloses purlin parts
CN203546729U (en) Connecting component of steel strand anchorage device mounting device
CN103452109A (en) Steel stranded wire anchor gear installing device for foundation pit supporting inner supporting system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20131120

RJ01 Rejection of invention patent application after publication