CN206571467U - Pull rig fast assembling-disassembling cable trough - Google Patents

Pull rig fast assembling-disassembling cable trough Download PDF

Info

Publication number
CN206571467U
CN206571467U CN201720177709.8U CN201720177709U CN206571467U CN 206571467 U CN206571467 U CN 206571467U CN 201720177709 U CN201720177709 U CN 201720177709U CN 206571467 U CN206571467 U CN 206571467U
Authority
CN
China
Prior art keywords
chase
altitude
support frame
cable
power plant
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720177709.8U
Other languages
Chinese (zh)
Inventor
刘静
王维旭
黄治湖
赵鹏
胡楠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Petroleum Corp
Baoji Oilfield Machinery Co Ltd
CNPC National Oil and Gas Drilling Equipment Engineering Technology Research Center Co Ltd
Original Assignee
Baoji Oilfield Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Baoji Oilfield Machinery Co Ltd filed Critical Baoji Oilfield Machinery Co Ltd
Priority to CN201720177709.8U priority Critical patent/CN206571467U/en
Application granted granted Critical
Publication of CN206571467U publication Critical patent/CN206571467U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

Rig fast assembling-disassembling cable trough is pulled the utility model discloses one kind, it is included on power plant module and is installed with support frame I, the top of support frame I is hinged with the rear end of high-altitude chase II, the front end of high-altitude chase II is hinged with the rear end of high-altitude chase I, and the front end of high-altitude chase I is hinged with the beat ear mount on rig floor where host module;Transfer box is installed on host module drilling floor surface, cable is drawn from power plant module, sequentially passed through in high-altitude chase II and high-altitude chase I, access host module in the quick socket of transfer box, the connection corresponding with host module equipment again of the cable on transfer box;Support frame II is provided with power plant module, the medial surface of high-altitude chase I is forward to be provided with support frame III;Steel wire rope tensioning mechanism is provided between support frame III and high-altitude chase II and realizes that tensioning is fixed.Device of the present utility model, labor intensity is low, and operating efficiency is high, and moving time is short, cost is low.

Description

Pull rig fast assembling-disassembling cable trough
Technical field
The utility model belongs to petroleum drilling technology field, is related to one kind and pulls rig fast assembling-disassembling cable trough.
Background technology
With the large-scale tremendous development for pulling technology, the characteristic that rig is moved with its high modularization, rapid transporting is pulled, Favored by users, it is especially fine in the few length and breadth of land desert area market prospects of transport limitation.Pull the main frame of rig There is substantial amounts of cable connection between module and power plant module, how to realize the fast assembling-disassembling of these cables, it has also become influence is whole The key that set rig is quickly migrated.
Conventional " Z " font folding tube trunking is primarily present following deficiency:1) when rig is moved every time, cable need to be torn open repeatedly Solve, lay and fixed, labor intensity of operating staff is big, and inefficiency, the moving drilling machine cycle is long.2) chase lands paving If when being matched in desert Environment, if cable is laid on ground, surface temperature is higher, accelerates cable skin aging, shorten The service life of cable.3) during moving drilling machine, chase need to be transported individually, add delivery unit and cost.
Therefore, conventional " Z " font folding tube trunking can not meet the requirement of fast assembling-disassembling, be badly in need of a kind of dismounting side Just, accordion cable frame simple in construction.
Utility model content
The purpose of this utility model is to provide one kind and pulls rig fast assembling-disassembling cable trough, solves electric in the prior art Cable disassemble repeatedly cable skin aging acceleration, chase after laying, chase landing laying individually transport increase delivery unit and The problem of cost.
The utility model is included in power the technical scheme adopted is that one kind pulls rig fast assembling-disassembling cable trough Support frame I is installed with module, the top of support frame I is hinged with the rear end of high-altitude chase II, the front end of high-altitude chase II with The rear end of high-altitude chase I is hinged, and the front end of high-altitude chase I is hinged with the beat ear mount on rig floor where host module;In main frame Transfer box is installed, cable is drawn from power plant module, sequentially passes through high-altitude chase II and high-altitude chase on module drilling floor surface I, in access host module in the quick socket of transfer box, the cable connection corresponding with host module equipment again on transfer box;
Support frame II is provided with power plant module, the medial surface of high-altitude chase I is forward to be provided with support frame III;In support frame Steel wire rope tensioning mechanism is provided between III and high-altitude chase II and realizes that tensioning is fixed.
It is of the present utility model to pull rig fast assembling-disassembling cable trough, it is further characterized in that:
The structure of described steel wire rope tensioning mechanism is, including chain block, one end and the high-altitude chase of chain block II hooks point connection, and one jiao of the other end and the tripod of chain block is hooked by a shackle to be connected, and the two of tripod base Individual angle is connected by respective shackle with a steel wire rope respectively, and two steel wire ropes hook point with support frame III jointly and are connected.
Described beat ear mount is rotary shaft rotational structure, including as the bearing of main body, branch base rear end is fixedly installed It is provided with and ships and resell on another market in a pair of ear mounts, the vertical through hole of bearing, ships and resell on another market and be provided with supporting latch segment.
Described high-altitude chase I is longitudinally provided with Cable hanger, and the longitudinal both sides of high-altitude chase I are provided with guardrail.
Operating desk is fixedly installed on described support frame I, operating desk is configured with hanging ladder.
The beneficial effects of the utility model are, when moving drilling machine, it is only necessary to disconnect and connecting from host module rig floor end transfer box Cable is connect, cable trough is turned back to power plant module under crane auxiliary, with power plant module trailering transport, transfer box is with master Machine module is transported together;Connection cable between host module and power plant module is not required to remove after disconnecting at rig floor end, saves The time of cable is laid in dismounting, alleviates the labor intensity of operating personnel, reduces delivery unit and cost, shortens rig and remove Family's time;The built on stilts design of cable trough, extends the service life of cable.
Brief description of the drawings
Fig. 1 is the utility model device in working state schematic representation;
Fig. 2 is the utility model device in low level installment state schematic diagram;
Fig. 3 is the utility model device in travel position schematic diagram;
Fig. 4 is the steel wire rope tensioning mechanism schematic diagram in the utility model device;
Fig. 5 is the beat ear mount front-view schematic diagram in the utility model device;
Fig. 6 is the beat ear mount schematic top plan view in the utility model device.
In figure, 1. host modules, 2. transfer boxes, 3. beat ear mounts, 4. Cable hangers, 5. high-altitude chases I, 6. high blank pipes Wire casing II, 7. steel wire rope tensioning mechanisms, 8. operating desks, 9. support frames I, 10. hanging ladders, 11. power plant modules, 12. steel wire ropes, 13. Tripod, 14. chain blocks, 15. shackles, 16. guardrails, 17. support frames II, 18. ship and resell on another market, 19. latch segments, 20. bearings, 21. Ear mount, 22. support frames III.
Embodiment
The utility model is described in detail with reference to the accompanying drawings and detailed description.
Reference picture 1, Fig. 2, Fig. 3, structure of the present utility model are to be included on power plant module 11 to be installed with support frame I 9, operating desk 8 is fixedly installed on support frame I 9, operating desk 8 is configured with hanging ladder 10, the top of support frame I 9 and high-altitude chase II 6 rear ends are hinged, and the front end of high-altitude chase II 6 is hinged with the rear end of high-altitude chase I 5, the front end of high-altitude chase I 5 and host module 1 Beat ear mount 3 on the rig floor of place is hinged;Transfer box 2 is installed on the drilling floor surface of host module 1, cable draws from power plant module 11 Go out, sequentially pass through in high-altitude chase II 6 and high-altitude chase I 5, access host module 1 in the quick socket of transfer box 2, turn Connect the connection corresponding with host module 1 each equipment again of the other end is picked out on case 2 cable;
Support frame II 17 is provided with power plant module 11, the medial surface of high-altitude chase I 5 is forward to be provided with support frame III 22; When high-altitude chase II 6 and high-altitude chase I 5 fold into minimum state, high-altitude chase II 6 passes through support with power plant module 11 Frame II 17 and support frame I 9 are supported, and high-altitude chase I 5 is supported with high-altitude chase II 6 by support frame III 22 and pin joint;
When high-altitude chase II 6 and high-altitude chase I 5 are opened to maximum rating, the front end of high-altitude chase I 5 and beat ear Seat 3 is hinged realization support, now, steel wire rope tensioning mechanism 7 is provided between support frame III 22 and high-altitude chase II 6 and is realized Tensioning is fixed;Articulated structure between high-altitude chase I 5 and high-altitude chase II 6 can compensate for host module 1 and power plant module 11 The deviation of front and rear positioning.
High-altitude chase I 5 is longitudinally provided with Cable hanger 4, and Cable hanger 4 is only used for storing from transfer box during moving drilling machine The movable cable disconnected at 2;The longitudinal both sides of high-altitude chase I 5 are provided with guardrail 16, coordinate with Cable hanger 4 and realize to cable Protection.
Transfer box 2 is installed on host module 1, when before moving drilling machine operating personnel can on rig floor directly cable is fast Quick-break is opened, and is stored in the Cable hanger 4 on paramount blank pipe wire casing I 5.The danger of high-order homework is not present in whole operation process Property, it is safe and reliable.
Reference picture 4, the structure of steel wire rope tensioning mechanism 7 is, including a chain block 14, one end of chain block 14 with High-altitude chase II 6 hooks point connection, and 13 1 jiaos of the other end and the tripod of chain block 14 is hooked by a shackle 15 to be connected Connect, two angles on the base of tripod 13 are connected by respective shackle 15 with a steel wire rope 12 respectively, two steel wire ropes 12 are total to It is connected with point is hooked with support frame III 22;Operating personnel can adjust the tensioning degree of two steel wire ropes 12 by chain block 14.
Support frame I 9 can be fixed on power plant module 11 when rig is installed for the first time, the paving platform 8 and hanging ladder set thereon 10, facilitate operating personnel's operation steel wire rope tensioning mechanism 7, it is ensured that operating personnel's safety.
Reference picture 5, Fig. 6, beat ear mount 3 are rotary shaft rotational structure, including are used as the bearing 20 of main body, the rear end of bearing 20 It is fixedly installed in a pair of ear mounts 21, the vertical through hole of bearing 20 to be provided with and ships and resell on another market 18, shipping and reselling on another market 18 is provided with supporting latch segment 19, 18 ear mounts 21 because caused by being shaken when rig work that are used to preventing from shipping and reselling on another market of latch segment 19 are swung, and beat ear mount 3 can compensate for leading Position error between machine module 1 and power plant module 11.
Operation principle of the present utility model is,
When the first low level of rig is assembled, by the utility model cable trough after ground configuration fixes cable, whole utilization Crane is sling, and the rear end of high-altitude chase II 6 is hinged with advance mounted support frame I 9 on power plant module 11, by high-altitude pipeline The front end of groove I 5 is hinged with the rig floor beat ear mount 3 on host module 1;Then the cable trough beat ear mount 3 drive under with master The base integral lifting of machine module 1;Rig raising is installed in steel wire rope tensioning mechanism 7, regulation steel wire rope tensioning mechanism 7 afterwards in place Chain block 14, two steel wire ropes 12 is tensioned simultaneously, it is ensured that high-altitude chase I 5 and high-altitude chase II 6 keep stable shape State.
Before moving drilling machine, operator directly disconnects cable with transfer box 2 on rig floor, and folding and unfolding is to high blank pipe wire casing I 5 Cable hanger 4 in, then take the connection of the front end of high-altitude chase I 5 and beat ear mount 3 apart, high-order make is not present in the operational motion The danger of industry, it is safe and reliable;Sling high-altitude chase I 5 and high-altitude chase II 6 using crane, by high-altitude chase I 5 with High-altitude chase II 6 is folded on power plant module 11, and the cable trough is with the whole Transporting of power plant module 11;Transfer box 2 is with main frame mould Block 1 is transported.
When rig moves to new well head, the connection procedure of the utility model cable trough and rig substructure is moving drilling machine disintegration Inverse process.

Claims (5)

1. one kind pulls rig fast assembling-disassembling cable trough, it is characterised in that:It is included on power plant module (11) and is installed with Support frame I (9), support frame I (9) top is hinged with high-altitude chase II (6) rear end, high-altitude chase II (6) front end and high-altitude Chase I (5) rear end is hinged, and high-altitude chase I (5) front end is cut with scissors with the beat ear mount (3) on rig floor where host module (1) Connect;Transfer box (2) is installed on host module (1) drilling floor surface, cable is drawn from power plant module (11), sequentially passes through high blank pipe In wire casing II (6) and high-altitude chase I (5), access host module (1) in the quick socket of transfer box (2), on transfer box (2) Cable again it is corresponding with host module (1) equipment connection;
Support frame II (17) is provided with power plant module (11), high-altitude chase I (5) medial surface is forward to be provided with support frame III (22);Steel wire rope tensioning mechanism (7) is provided between support frame III (22) and high-altitude chase II (6) and realizes that tensioning is fixed.
2. according to claim 1 pull rig fast assembling-disassembling cable trough, it is characterised in that:Described steel wire tensioning The structure of mechanism (7) is, including chain block (14), and one end and the high-altitude chase II (6) of chain block (14) hook point and connected Connect, (13) one jiaos of the other end and the tripod of chain block (14) is hooked by a shackle (15) to be connected, tripod (13) bottom Two angles on side are connected by respective shackle (15) with a steel wire rope (12) respectively, two steel wire ropes (12) jointly with support Frame III (22) hooks point connection.
3. according to claim 1 pull rig fast assembling-disassembling cable trough, it is characterised in that:Described beat ear mount (3) it is rotary shaft rotational structure, including as the bearing (20) of main body, bearing (20) rear end is fixedly installed a pair of ear mounts (21) ship and resell on another market (18), are provided with the vertical through hole of bearing (20), ship and resell on another market (18) be provided with supporting latch segment (19).
4. according to claim 1 pull rig fast assembling-disassembling cable trough, it is characterised in that:Described high-altitude chase I (5) are longitudinally provided with Cable hanger (4), and high-altitude chase I (5) longitudinal direction both sides are provided with guardrail (16).
5. according to claim 1 pull rig fast assembling-disassembling cable trough, it is characterised in that:Described support frame I (9) On be fixedly installed operating desk (8), operating desk (8) is configured with hanging ladder (10).
CN201720177709.8U 2017-02-27 2017-02-27 Pull rig fast assembling-disassembling cable trough Active CN206571467U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720177709.8U CN206571467U (en) 2017-02-27 2017-02-27 Pull rig fast assembling-disassembling cable trough

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720177709.8U CN206571467U (en) 2017-02-27 2017-02-27 Pull rig fast assembling-disassembling cable trough

Publications (1)

Publication Number Publication Date
CN206571467U true CN206571467U (en) 2017-10-20

Family

ID=60058533

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720177709.8U Active CN206571467U (en) 2017-02-27 2017-02-27 Pull rig fast assembling-disassembling cable trough

Country Status (1)

Country Link
CN (1) CN206571467U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110467066A (en) * 2019-07-30 2019-11-19 宝鸡石油机械有限责任公司 One kind is whole to drag fortune drilling machine cable quickly retracting device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110467066A (en) * 2019-07-30 2019-11-19 宝鸡石油机械有限责任公司 One kind is whole to drag fortune drilling machine cable quickly retracting device

Similar Documents

Publication Publication Date Title
US9334668B2 (en) Modular drilling rig system
ITTO20120414A1 (en) HARVEST SYSTEM AND ASSEMBLY AND DISASSEMBLY METHOD.
US10577226B2 (en) Tank car lifting apparatus
US20150014266A1 (en) Revolving tower crane
BR102014003932A2 (en) pin puller for crane connections
CN206736700U (en) mobile telescopic bridge
US7234896B2 (en) Vertically folding service arm for a movable platform offshore drilling or servicing rig
CN204386487U (en) A kind of derrick lifting oil cylinder is installed and retraction mechanism
CN110159322A (en) A kind of clamping device and steel arch-shelf installation trolley for steel arch-shelf
CN206571467U (en) Pull rig fast assembling-disassembling cable trough
CN109138897A (en) Well head centralising device and with its well workover equip
CN204152426U (en) A kind of quick removal of home rig of hydraulic cylinder raising
CN210419034U (en) GIS metal can body assembly and disassembly tools
CN204625030U (en) The portable integrated side of a ship hangs
WO2017091142A1 (en) Apparatus, system and method for recovering and/or installing conductor casing
CN204984238U (en) Electrical power emergency repair ladder
CN105178876B (en) A kind of headframe
CN105178875B (en) A kind of rapid traverse fast-assembling rig
CN210764090U (en) Portable deep groove cable lifting device
CN210012511U (en) Foldable deep groove cable lifting device
CN201310308Y (en) Drive-pipe centralizing device
CN208996676U (en) One kind being suitable for light maintenance operation Portable folding type tubing string conveying device
CN209067244U (en) Multiple arch supporting trolley
CN208749374U (en) A kind of excavation stand hangs translation mechanism
CN210048361U (en) Deep groove cable lifting device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210107

Address after: 721002 No.2 Dongfeng Road, Jintai District, Baoji City, Shaanxi Province

Patentee after: Baoji Oilfield Machinery Co.,Ltd.

Patentee after: CHINA NATIONAL PETROLEUM Corp.

Patentee after: CNPC national oil and gas drilling equipment Engineering Technology Research Center Co., Ltd

Address before: 721002 No. 2 Dongfeng Road, Shaanxi, Baoji

Patentee before: Baoji Oilfield Machinery Co.,Ltd.