CN206562836U - Fully-prefabricated assembled enclosure wall - Google Patents

Fully-prefabricated assembled enclosure wall Download PDF

Info

Publication number
CN206562836U
CN206562836U CN201720179342.3U CN201720179342U CN206562836U CN 206562836 U CN206562836 U CN 206562836U CN 201720179342 U CN201720179342 U CN 201720179342U CN 206562836 U CN206562836 U CN 206562836U
Authority
CN
China
Prior art keywords
prefabricated
pillar
enclosure wall
fully
wallboard
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720179342.3U
Other languages
Chinese (zh)
Inventor
郭长江
段延辉
郭玉拴
王海军
李红岩
李云周
刘红喜
王辉
申文君
杨伦合
郭勇凯
王国伟
王桂霞
朱红军
白利琴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Dongfang Building Industry Science And Technology Group Co Ltd
Henan Dongfang Construction Group Development Co Ltd
Hebi Dongjiang Construction Industry Science And Technology Co Ltd
Original Assignee
Henan Dongfang Building Industry Science And Technology Group Co Ltd
Henan Dongfang Construction Group Development Co Ltd
Hebi Dongjiang Construction Industry Science And Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Dongfang Building Industry Science And Technology Group Co Ltd, Henan Dongfang Construction Group Development Co Ltd, Hebi Dongjiang Construction Industry Science And Technology Co Ltd filed Critical Henan Dongfang Building Industry Science And Technology Group Co Ltd
Priority to CN201720179342.3U priority Critical patent/CN206562836U/en
Application granted granted Critical
Publication of CN206562836U publication Critical patent/CN206562836U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Fencing (AREA)

Abstract

The utility model is related to a kind of fully-prefabricated assembled enclosure wall, concrete prefabricated element including being assembled into enclosure wall, wherein concrete prefabricated element has pillar, cap, wallboard and beared down on one, the fit-up gap seam of certain size is reserved between adjacent concrete prefabricated components, fluid sealant is provided with reserved fit-up gap seam crossing;Wherein prefabricated pillar is fastened and connected by built-in fitting with institute's set aside pre-embedded bolt on cast-in-place pier base, and the connection between prefabricated pillar and wallboard matches connected structure to be set on pillar between groove and wallboard;Between prefabricated post and cap, prefabricating coping with the connection between wallboard be reserved steel bar suspension ring and the connected structure that matches between preformed hole, and the cement slurry for being perfused with to block in its junction.The full assembling construction in the fully-prefabricated assembled fence structure scene of the utility model, all carries out element precast installation, improves speed of application, quality is easily controllable, repeat and utilize, beneficial to environmental protection, meet national development requirement, be very suitable for promotion and implementation.

Description

Fully-prefabricated assembled enclosure wall
Technical field
The utility model belongs to technical field of building construction, more particularly to a kind of fully-prefabricated assembled enclosure wall, it is adaptable to The construction of the enclosure walls such as various family expenses, factory, building site, cell.
Background technology
Traditional enclosure wall is largely using the mixing enclosure wall of brick, iron skill formula enclosure wall.The wherein mixing fence structure of brick is to be onstructed complete Into rear, it is necessary to carry out the process construction such as plaster again, thus site operation is long in time limit, and influenceed very big by season and weather, applied Working medium amount is difficult to control to, and Wind-Pressure Resistance ability, and iron skill formula fence structure, is corroded for a long time by sleety weather, easily raw Rust, thus go along with sb. to guard him costly.
The content of the invention
The technical problems to be solved in the utility model is exactly to overcome above-mentioned the deficiencies in the prior art, and provides a kind of meeting Structure is safe and using on the basis of function, and construction speed is fast, quality is easily controllable, component presentation quality is good, good endurance, and Beneficial to the fully-prefabricated assembled enclosure wall of environmental protection.
In order to solve the above technical problems, the technical solution adopted in the utility model is:
A kind of fully-prefabricated assembled enclosure wall is designed, including is assembled into the concrete prefabricated element of enclosure wall, wherein concrete is pre- Component processed has pillar, cap, wallboard and beared down on one, and the fit-up gap that certain size is reserved between adjacent concrete prefabricated components connects Seam, fluid sealant is provided with reserved fit-up gap seam crossing;Wherein prefabricated pillar passes through institute on built-in fitting and cast-in-place pier base Set aside pre-embedded bolt is fastened and connected, and the connection between prefabricated pillar and wallboard is inserted for set matching between groove and wallboard on pillar Binding structure;Between prefabricated post and cap, prefabricating coping between wallboard connection for reserved steel bar suspension ring between preformed hole matching insert Binding structure, and the cement slurry for being perfused with to block in its junction.
Preferably, in above-mentioned fully-prefabricated assembled enclosure wall, prefabricated post, wallboard, bear down on one with any one in cap or The whole of any two or three, are at least spliced by two pieces.
Preferably, in above-mentioned fully-prefabricated assembled enclosure wall, the reserved fit-up gap of institute between adjacent concrete prefabricated components The size of seam is 10mm.
Preferably, in above-mentioned fully-prefabricated assembled enclosure wall, the fluid sealant is concrete special seal gum.
Preferably, in above-mentioned fully-prefabricated assembled enclosure wall, institute's set aside pre-embedded part is pre-embedded steel slab on prefabricated pillar.
Preferably, in above-mentioned fully-prefabricated assembled enclosure wall, the bolt connection position of the pre-embedded steel slab, which is provided with, mutually fits The steel plate washer matched somebody with somebody.
Preferably, in above-mentioned fully-prefabricated assembled enclosure wall, on the wherein one side of prefabricated pillar, or relative two On side, or two adjacent sides are provided with groove.
The beneficial effect of technical solutions of the utility model is:
1st, in structure, connection uses the attachment structure of connected structure or Superimposed fastener between precast concrete, And fitted seal glue or cement slurry closure fit-up gap, on the basis of meeting structure safety and using function, solve The problem of on-site concrete wet trade, it is to avoid the influence of season and weather to site operation, with construction speed is fast, quality Easily controllable, component presentation quality is good, good endurance, and enclosure wall can dismount, be conducive to recycling the features such as.
2nd, in structure, using full concrete earthen wall, finished product member flatness, dimensional discrepancy very little save the later stage Wall plastering process;Concrete curing is not influenceed by weather, temperature, shortens the duration, saves teletostage maintenance measure expense;Construction Workman is specialized, and quality is guaranteed.The defects such as traditional poor, poor durability of brick wall fence shock resistance are also avoid simultaneously, and are kept away The common fault of iron skill formula enclosing structure corrosion resistance difference is exempted from.
3rd, to sum up, the full assembling construction in the fully-prefabricated assembled enclosure wall scene of the utility model, all realizes the prefabricated of component, Site operation speed is improved, and quality is easily controllable, can reuse, so that beneficial to environmental protection, meeting national development will Ask, be very suitable for promotion and implementation.
Brief description of the drawings
Embodiment of the present utility model is described in further detail below in conjunction with the accompanying drawings, wherein:
Fig. 1 is the schematic diagram of the fully-prefabricated assembled fence structure of the utility model;
Fig. 2 is the attachment structure schematic diagram of prefabricated pillar and wallboard;
Fig. 3 is the structural representation one of prefabricated pillar;
Fig. 4 is the structural representation two of prefabricated pillar;
Fig. 5 is the structural representation three of prefabricated pillar;
Fig. 6 is the attachment structure schematic diagram of prefabricated pillar and cap;
Fig. 7 is prefabricated panel and the attachment structure schematic diagram beared down on one;
Fig. 8 is the attachment structure schematic diagram of prefabricated pillar and pier base;
Sequence number in figure:1st, cap, 2, bear down on one, 3, pillar, 3-1, groove, 4, wallboard, 5, pier base, 6, embedded bar Suspension ring, 7, pre-embedded bolt, 8, pre-embedded steel slab.
Embodiment
Illustrate embodiment of the present utility model with reference to the accompanying drawings and examples, but following examples are to use To describe the utility model in detail, scope of the present utility model is not limited in any way, it is involved in the examples below Instrument element unless otherwise instructed, be conventional instrument element.
Embodiment one:
Referring to Fig. 1, in figure, the fully-prefabricated assembled enclosure wall of the utility model, by taking single span as an example, often across by eight blocks of prefabricated components Composition, i.e., two caps 1, one bear down on one 2, two pillars 3, three blocks of wallboards 4.Each precast concrete presses layout design and pre- Stay and be embedded with bolt, steel plate, suspension ring, drip etc..10mm assembly building is reserved between the component and component of the assembling structure Gap.Assembly connection between each component is included between pillar and cap, between pillar and pier base, the level beared down on one between wallboard connects Connect, and pillar and wallboard vertical connection.Concrete component uses prefabrication, and finished product member flatness, dimensional discrepancy are very Small, concrete curing is not influenceed by weather, temperature, shortens the duration, and construction worker is specialized, and quality is guaranteed.And material Processing mechanization, steel bar meter is quality controllable.According to enclosure wall height and the actual size of span, prefabricated post, wallboard, bear down on one and post The whole of any one or any two or three in cap, at least can be spliced by two pieces, to reduce prefabricated components Volume, convenient transport.
Referring to Fig. 2, in figure, the vertical form that is linked and packed between prefabricated pillar and three blocks of wallboards is using on prefabricated pillar 3 Set groove 3-1 is plugged with the end of wallboard 4, and using the connected mode closure fit-up gap of concrete special seal gum.
Fig. 3-5, correspond to three kinds of forms of pillar 3, i.e. standard column, corner-pillar and door side column respectively.Wherein standard column is it In groove is set on relative two sides, corner-pillar is sets groove on wherein adjacent two sides, door side column is wherein side Face is provided with groove, and set groove 3-1 is connected to realize with adjacent wallboard 4.
Referring to Fig. 6-7, in figure, prefabricated pillar 3, wallboard 4 are employed in prefabricated post with cap 1, the connection between 2 of bearing down on one respectively Son and panel tops embedded bar suspension ring 6 respectively between cap and the bottom institute preformed hole that bears down on one carry out match grafting, after by top Injection cement slurry is blocked.
Referring to Fig. 8, in figure, between prefabricated pillar 3 and pier base 5 connection employ on pier base institute's pre-embedded bolt 7 with Prefabricated bottom of the pillar institute pre-embedded steel slab 8 is connected, for example, can be connected using 4 pre-embedded bolts with pre-embedded steel slab, and adopt successively Fit-up gap is blocked with concrete special seal gum.The bolt connection position of pre-embedded steel slab sets the steel pad for being additionally provided with and being adapted Piece.
The work progress of the fully-prefabricated assembled enclosure wall of the utility model is as follows:
First the set aside pre-embedded bolt 7 on cast-in-place pier base, further according to arrangement and method for construction successively lifting pillars 3, wallboard 4, is pressed Top 2 and cap 1, are reserved with the fit-up gap of certain size between component and component;After wallboard 4 is assembled, inside and outside it Seam crossing beats concrete special seal gum, and bear down on one 2 and cap 1 are then assembled again, from top cement injection slurry after assembling, makes Each prefabricated components formation overall structure.The fully-prefabricated assembled enclosure wall is on the basis of meeting structure safety and using function, solution Determined iron skill railing enclosure wall corrosion, while the problem of also solving brick wall fence situ wet operation, it is to avoid season and weather are to existing The influence of construction, with construction speed is fast, quality is easily controllable, the features such as reuse, be conducive to environmental protection.
The utility model is described in detail above in conjunction with drawings and examples, still, the skill of art Art personnel, can also be specific to each in above-described embodiment it is understood that on the premise of the utility model objective is not departed from Parameter is changed, and is formed multiple specific embodiments, is common excursion of the present utility model, no longer detailed one by one herein State.

Claims (7)

1. a kind of fully-prefabricated assembled enclosure wall, it is characterized in that:Concrete prefabricated element including being assembled into enclosure wall, wherein concrete Prefabricated components have pillar, cap, wallboard and beared down on one, and the fit-up gap of certain size is reserved between adjacent concrete prefabricated components Seam, fluid sealant is provided with reserved fit-up gap seam crossing;Wherein prefabricated pillar passes through on built-in fitting and cast-in-place pier base Institute's set aside pre-embedded bolt is fastened and connected, and the connection between prefabricated pillar and wallboard is set by pillar between groove and wall panel ends Match connected structure;Connection between prefabricated post and cap, between prefabricating coping and wallboard is between reserved steel bar suspension ring and preformed hole Match connected structure, and the cement slurry for being perfused with to block in its junction.
2. fully-prefabricated assembled enclosure wall according to claim 1, it is characterized in that:Prefabricated post, wallboard, bear down on one with cap Any one or any two or the whole of three, are at least spliced by two pieces.
3. fully-prefabricated assembled enclosure wall according to claim 1, it is characterized in that:Institute is pre- between adjacent concrete prefabricated components The size for staying fit-up gap seam is 10mm.
4. fully-prefabricated assembled enclosure wall according to claim 1, it is characterized in that:The fluid sealant is concrete Special seal Glue.
5. fully-prefabricated assembled enclosure wall according to claim 1, it is characterized in that:Institute's set aside pre-embedded part is pre- on prefabricated pillar Bury steel plate.
6. fully-prefabricated assembled enclosure wall according to claim 5, it is characterized in that:The bolt connection position of the pre-embedded steel slab It is provided with the steel plate washer being adapted.
7. the fully-prefabricated assembled enclosure wall according to any one of claim 1 to 6, it is characterized in that:Wherein the one of prefabricated pillar On side, either on two relative sides or two adjacent sides are provided with groove.
CN201720179342.3U 2017-02-27 2017-02-27 Fully-prefabricated assembled enclosure wall Expired - Fee Related CN206562836U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720179342.3U CN206562836U (en) 2017-02-27 2017-02-27 Fully-prefabricated assembled enclosure wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720179342.3U CN206562836U (en) 2017-02-27 2017-02-27 Fully-prefabricated assembled enclosure wall

Publications (1)

Publication Number Publication Date
CN206562836U true CN206562836U (en) 2017-10-17

Family

ID=60031323

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720179342.3U Expired - Fee Related CN206562836U (en) 2017-02-27 2017-02-27 Fully-prefabricated assembled enclosure wall

Country Status (1)

Country Link
CN (1) CN206562836U (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107740507A (en) * 2017-10-19 2018-02-27 江苏绿悦保温材料有限公司 A kind of bridge cut-off construction method of self heat insulation wall and armored concrete
CN108930347A (en) * 2018-09-25 2018-12-04 沈阳农业大学 A kind of heliogreenhouse assembled wall
CN109236033A (en) * 2018-09-14 2019-01-18 拓暄建设科技有限公司 A kind of building prefabrication Assembled enclosing wall and its production technology
CN109296256A (en) * 2018-11-29 2019-02-01 袁雪峰 Assembling type fence in concrete and construction method
CN109441221A (en) * 2018-12-29 2019-03-08 湖南天泽建材有限公司 The combination assembled multifunctional landscape enclosure wall of Reinforced Concrete Slab Column and its method of construction
CN109798020A (en) * 2019-03-19 2019-05-24 中国五冶集团有限公司 A kind of Prefabricated enclosure wall structure
CN110145058A (en) * 2019-06-21 2019-08-20 安徽海龙建筑工业有限公司 A kind of full assembled superconduction proton system radiation shield concrete containment system
CN110242100A (en) * 2019-06-05 2019-09-17 成都建工工业化建筑有限公司 Precast concrete reinforcing prop
CN110630088A (en) * 2019-08-29 2019-12-31 廊坊卓锐建材有限公司 Assembled antique artistic enclosing wall and construction method thereof
CN114197959A (en) * 2021-12-26 2022-03-18 福建省高华建设工程有限公司 Ecological intelligent combined enclosing wall
CN114837491A (en) * 2022-05-20 2022-08-02 山西建投远大建筑工业股份有限公司 Prefabricated enclosure of assembled

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107740507A (en) * 2017-10-19 2018-02-27 江苏绿悦保温材料有限公司 A kind of bridge cut-off construction method of self heat insulation wall and armored concrete
CN109236033A (en) * 2018-09-14 2019-01-18 拓暄建设科技有限公司 A kind of building prefabrication Assembled enclosing wall and its production technology
CN108930347A (en) * 2018-09-25 2018-12-04 沈阳农业大学 A kind of heliogreenhouse assembled wall
CN109296256A (en) * 2018-11-29 2019-02-01 袁雪峰 Assembling type fence in concrete and construction method
CN109441221A (en) * 2018-12-29 2019-03-08 湖南天泽建材有限公司 The combination assembled multifunctional landscape enclosure wall of Reinforced Concrete Slab Column and its method of construction
CN109798020A (en) * 2019-03-19 2019-05-24 中国五冶集团有限公司 A kind of Prefabricated enclosure wall structure
CN110242100A (en) * 2019-06-05 2019-09-17 成都建工工业化建筑有限公司 Precast concrete reinforcing prop
CN110242100B (en) * 2019-06-05 2024-05-14 成都建工工业化建筑有限公司 Precast concrete reinforced column
CN110145058A (en) * 2019-06-21 2019-08-20 安徽海龙建筑工业有限公司 A kind of full assembled superconduction proton system radiation shield concrete containment system
CN110630088A (en) * 2019-08-29 2019-12-31 廊坊卓锐建材有限公司 Assembled antique artistic enclosing wall and construction method thereof
CN114197959A (en) * 2021-12-26 2022-03-18 福建省高华建设工程有限公司 Ecological intelligent combined enclosing wall
CN114837491A (en) * 2022-05-20 2022-08-02 山西建投远大建筑工业股份有限公司 Prefabricated enclosure of assembled

Similar Documents

Publication Publication Date Title
CN206562836U (en) Fully-prefabricated assembled enclosure wall
CN106013811B (en) A kind of installation method of assembled architecture
CN106436893A (en) Fully-prefabricated structure and construction method thereof
CN203394170U (en) Prefabricated enclosing wall
CN205857448U (en) A kind of assembly concrete shear wall structure
CN101305140A (en) Bolt-a-blok-a system for unitized, post-tensioned masonry structures
CN102493603A (en) Prefabricated column of reserved concealed column channel, concealed column type complete assembled earthquake-resistant building and its method
CN105696817A (en) Multilayer cold-formed steel integrally prefabricated house and splicing method thereof
CN110552440B (en) Safe and environment-friendly construction process for high-strength assembled integral sandwich heat-insulating shear wall
CN206220238U (en) Fully-prefabricated assembled structure
CN111927248A (en) Integrally prefabricated external hanging bay window, connecting node and manufacturing method
CN106499045A (en) A kind of prefabricated composite construction parapet and construction method
CN202214829U (en) Vertical seam of external wallboards
CN208415293U (en) Integral prefabricated assembled main transformer foundation for indoor substation
CN208201918U (en) Assembled corrugated steel Combined concrete list storehouse pipe gallery
CN100451257C (en) Concrete complex building of steel meshwork framework, and construction procedure
CN202401667U (en) Prefabricated column with reserved embedded column porous channel and embedded column type full-assembly anti-seismic building
CN205475877U (en) Compound outer thermal insulation walling system of assembled self preservation temperature wallboard
CN202865996U (en) Room modular structure for nuclear power plant
CN103362235B (en) Integrally-poured building house with wallboards integrating thermal insulating and templates
CN102900233B (en) Dual face raw slurry clean water concrete construction
CN112853983A (en) Manufacturing and on-site assembling process of light segment prefabricated bridge pier
CN111927249A (en) Integrally prefabricated embedded bay window, connecting joint and manufacturing method
CN210178013U (en) Fully-prefabricated assembled house
CN203603542U (en) Fabricated electronic workshop

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171017

CF01 Termination of patent right due to non-payment of annual fee