CN206538787U - A kind of wall tears assembled piping lane aluminum dipping form chassis system open with the top plate whole morning poured - Google Patents

A kind of wall tears assembled piping lane aluminum dipping form chassis system open with the top plate whole morning poured Download PDF

Info

Publication number
CN206538787U
CN206538787U CN201720094075.XU CN201720094075U CN206538787U CN 206538787 U CN206538787 U CN 206538787U CN 201720094075 U CN201720094075 U CN 201720094075U CN 206538787 U CN206538787 U CN 206538787U
Authority
CN
China
Prior art keywords
piping lane
dipping form
aluminum dipping
assembled
poured
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720094075.XU
Other languages
Chinese (zh)
Inventor
王海强
黄旭腾
李晨
杨仲原
贾永州
张黎明
朱子卿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN201720094075.XU priority Critical patent/CN206538787U/en
Application granted granted Critical
Publication of CN206538787U publication Critical patent/CN206538787U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

A kind of wall tears assembled piping lane aluminum dipping form chassis system open with the top plate whole morning poured; assembled aluminium alloy chassis supports template inside whole piping lane as form bracing system; it is adjustable to shore and the common branch support aluminum dipping form of independent bracing members; the unilateral aluminum dipping form that the bilateral aluminum dipping form or abutment wall that the two ends of adjustable cross bar support support interior wall to pour respectively are poured; independent bracing members are supported as the later stage after assembled type trolley movement, are collectively forming wall and are torn assembled piping lane aluminum dipping form chassis system open with the top plate whole morning poured.The utility model forms mechanical balance using aluminum dipping form and chassis formation aluminium film tool-type platform die body system, takes full advantage of versatility, the agility of aluminum alloy mould plate construction, and is combined with assembled type trolley;Flexible structure is adjustable, and easy construction, the cycle is short, efficiency high, and stability is good, high capacity, and concrete is of fine quality after form removal, and job site is clean and tidy, low-carbon environment-friendly, and efficiency improves 40%, cost reduction by more than 10% in piping lane construction.

Description

A kind of wall tears assembled piping lane aluminum dipping form chassis system open with the top plate whole morning poured
Technical field
The utility model is related to piping lane construction formwork technical field, and in particular to a kind of wall and the whole early dismounting poured of top plate With formula piping lane aluminum dipping form chassis system and its construction method.
Background technology
With the development of national economy and stepping up for living standards of the people, people are required inhabitation and workplace Improve constantly, empirical evidence, the prosperity of construction industry is the inexorable trend of economic growth and social progress.The progress of construction industry is not only It is required that the quality of building, function are perfect, and require its attractive in appearance and harmless health etc..This will seek development multi-functional With efficient building material and product, the requirement of social progress is only in this way just adapted to.Using New Building Materials and product, The function of building can be significantly improved, increases the usable floor area of building, shock resistance is improved, is easy to mechanized construction and carries Construction cost can be reduced under high efficiency of construction, and square one.Cry more and more higher of the people to New Building Materials.
In traditional piping lane construction technology, typically using steel form, material and labo r usage are big in work progress, construct Journey is complicated, and long construction period, all transfer efficients are low, and site environment is poor, even the combined steel formwork assembled type trolley occurred in the recent period Also it can not avoid ensureing in terms of the waste on material, and its construction quality, construction safety, assembled type trolley track system Waste time and energy, in addition, being usually that wall is separately poured with top plate for existing assembled type trolley technology, construction is complicated, cost It is high.Therefore, it is badly in need of a kind of good construction quality, appearance looks elegant and spelling safety, small new of convenient, material labo r usage of constructing at present Type piping lane construction formwork system.
Aluminum alloy pattern plate since the U.S. is born, had the applicating history of 50 years from 1962.In the flourishing state such as the U.S., Canada In family and Mexico, Brazil, Malaysia, South Korea, the building of country of infant industry as India, obtain extensive Using.But the application in piping lane construction not yet occurs at present.
Utility model content
The utility model purpose is that provide a kind of wall tears assembled piping lane aluminum dipping form chassis system open with the top plate whole morning poured And engineering method, solve in conventional template technology that template is heavy, material labo r usage is big, work progress is complicated, all transfer efficients are low asks Topic, the problem of also solving scene pollution and the long cycle that template on-site consolidation or materials handling are brought.
In order to solve the above technical problems, the technical solution adopted in the utility model is:
A kind of wall and the top plate whole morning poured tear assembled piping lane aluminum dipping form chassis system open, including piping lane template and for supporting The assembled type trolley of template, it is characterised in that:
The assembled type trolley is led between wall positioned at adjacent located at having poured on the bottom plate of completion, and at least two The two parallel setting between wall is led of platform assembled type trolley;Each column assembled type trolley is by several assembled type trolley unit sections along piping lane Bearing of trend is connected to be formed, and the assembled type trolley unit section is made up of crossbeam, column and chassis, crossbeam and the column connection Form vehicle frame;Be provided with the top of the column it is adjustable shore, bottom is fixed on chassis;Wheel is installed under the chassis With adjustable collet;Horizontally disposed adjustable cross bar support, the adjustable cross bar branch are additionally provided with the assembled type trolley unit section Support runs through two ends elongation after assembled type trolley unit section and is connected with two side templates, and the adjustable cross bar support passes through adjustable link It is connected with assembled type trolley;
Also include the independent bracing members supported after assembled type trolley is moved as the later stage, the independent bracing members are located at parallel Between two assembled type trolleys set i.e. at piping lane axis centre, it is arranged at intervals, including column and sets along piping lane bearing of trend Early dismantling head at the top of column, the bottom of the column is fixed on bottom plate;
The piping lane template includes template and abutment wall outboard template inside piping lane;Template is poured including top plate inside the piping lane The top aluminum dipping form built, the bilateral aluminum dipping form that the interior wall of piping lane is poured, and the unilateral aluminum dipping form that the side wall of piping lane two is poured, its Described in bilateral aluminum dipping form and unilateral aluminum dipping form correspond to and lead wall setting;The bilateral aluminum dipping form and abutment wall outboard template and unilateral aluminum dipping form it Between by being connected to pull bar;
The assembled type trolley supports template inside whole piping lane as form bracing system, described adjustable to shore and independent The common branch support aluminum dipping form of bracing members, bilateral aluminum dipping form or side that the two ends that the adjustable cross bar is supported support interior wall to pour respectively The unilateral aluminum dipping form that wall is poured, is collectively forming wall and tears assembled piping lane aluminum dipping form chassis system open with the top plate whole morning poured.
As optimal technical scheme of the present utility model, the assembled type trolley also includes encorbelment jacking, the top of encorbelmenting Support is supported on the chamfering position of top aluminum dipping form, is vertically arranged, its bottom passes through the crossbeam of encorbelmenting that is fixed on assembled type trolley Diagonal brace is connected with assembled type trolley with encorbelmenting.
It is further preferred that corner connecting sewing is reserved between the chamfering position of top aluminum dipping form, the frame of aluminum dipping form, it is described It is attached between the frame of corner connecting sewing both sides by hole connecting plate, the hole connecting plate is opened in strip and two ends Hole, its one end is flexibly connected with the frame of side, and the other end is detachably connected with opposite side back cord.
Further preferably, template uses aluminum alloy mould plate inside the piping lane, and panel thickness of slab is 4mm, aluminum alloy mould plate Between use pin or bolt connection, template back arris use aluminum alloy trough steel joist;The abutment wall outboard template is located on the outside of piping lane, From-inner-to-outer is managed including the both sides that the corresponding basic aluminum dipping form for leading wall setting, level are located at outside basic aluminum dipping form and vertically located at double One group of channel-section steel keel outside square tube, the bottom of the channel-section steel keel is connected as one by horizontally disposed bottom girder, described The bottom of bottom girder is provided with the adjustable support bar of movable pulley.
Further preferably, one end of the adjustable link is articulated and connected with the support of adjustable cross bar, the other end and assembled The column of chassis is articulated and connected.
Further preferably, the both sides of the piping lane are side slope, and it is oblique that the abutment wall outboard template is provided with abutment wall with side slope Support, the abutment wall diagonal brace is identical with the structure that adjustable cross bar is supported, by spiral shell between middle fixing pipe and the regulation pipe at two ends Line is connected to be formed, and rotary handle is set in the fixing pipe of the centre.
Further preferably, at least provided with two adjustable cross bars in each assembled type trolley unit section of the assembled type trolley At least provided with two independent bracing members in support, the length range of each assembled type trolley unit section.
Further preferably, the assembled type trolley is the assembled type trolley of aluminum alloy material, is led between its crossbeam and column Cross connection fastener to be detachably connected, the wheel of bottom is universal wheel.
Further preferably, it is provided with guard rail on the channel-section steel keel of the abutment wall outboard template.
Relative to prior art, it is of the present utility model it is a technical advantage that:
1st, can have enough to meet the need, cost it is low:The utility model is by aluminum alloy mould plate and assembled type trolley combination application, sufficiently aluminium The uniqueness for advantage and the assembled type trolley construction that alloy templates are brought in construction is combined together, and constructing operation is convenient, the cycle Short, whole system is fabricated construction, it is easy to mounted and dismounted, and efficiency of construction is high, and material can be used in turn, a set of Templates specifications Construction, which may be reversed, to be used more than 300-500 times, is reduced cost, is belonged to green construction;
2nd, it is lightweight, easy to operate:Main material is aluminum alloy materials in system, light relative to steel product quality, is removed Fortune is convenient, and assembling is simple, average weight 30KG/m2, can completely by artificial assembled, workman's construction generally only need to a spanner or Adz-eye hammer, it is convenient and swift, it is not necessary to the assistance of any plant equipment, quick turnover can be brought in work progress, it is to avoid existing There is the confusion that big machinery operation simultaneously is caused in field, and aluminum alloy mould plate connection in addition uses pin or bolt connection, connection side Formula is simple, and skilled installer can install 20-30 square metres for each person every day, is contrasted with wooden model, and aluminum dipping form installer only needs to The 70-80% of wooden model installer, and skilled worker is not needed, simple training is carried out i.e. to workmen before need to only installing Can, it can dismantle temporarily, can be using the assembly of broken aluminum alloy mould plate even for the detail structure such as piping lane end or other anisotropic approach Connect, intensity is good, rigidity is big, it is to avoid bring injury and wave to concrete surface, site environment and resource in construction using plank sheathing Take;
3rd, stability is good, high capacity:Assembled type trolley supports template inside whole piping lane as form bracing system, can Tune is shored supports the bilateral that interior wall is poured respectively with the common branch support aluminum dipping form of independent bracing members, the two ends of adjustable cross bar support The unilateral aluminum dipping form that aluminum dipping form or abutment wall are poured, is collectively forming wall and tears assembled piping lane aluminum dipping form trolley body open with the top plate whole morning poured System, aluminum alloy mould plate system whole position is all assembled using aluminium alloy plate, after the completion of system is assembled, forms an overall frame Frame, stability is very good, and bearing capacity can reach every square metre of 60KN;
4th, pour appropriate guaranteed:Concrete surface effect after form removal, after aluminum alloy building template form removal, concrete surface Quality is smooth bright and clean, the requirement of facing and clear-water concrete is substantially can reach, without after-treatment;
To sum up, the utility model system considers improves 40% to the efficiency of construction of piping lane, cost relatively low 20%, and symbol Close the environmental protection and energy saving material that the green construction of Demand of Nation is advocated.
Brief description of the drawings
By the detailed description made in conjunction with the following drawings, of the present utility model above-mentioned and/or other aspects and advantage will Become more apparent upon and be easier to understand, these accompanying drawings are schematical, are not intended to limit the utility model, wherein:
Fig. 1 is the entirety that the wall that the utility model is related to tears assembled piping lane aluminum dipping form chassis system open with the top plate whole morning poured Structural representation;
Fig. 2 is the partial enlarged drawing of part A in Fig. 1;
Fig. 3 is the partial enlarged drawing of part A in Fig. 1;
Fig. 4 is the structural representation of independent bracing members.
Reference:1- bottom plates, 2- lead wall, 3- top plates, 4- abutment walls, 5- interior walls, 6- assembled type trolleys, 6.1- crossbeams, 6.2- columns, 6.3- diagonal braces, 6.4- is adjustable shores, 6.5- encorbelments jacking, 6.6- chassis, 6.7- wheels, 6.8- is adjustable collet, Cross bar support that 6.9- is adjustable, 6.10- adjustable links, 6.11- encorbelment crossbeam, 6.12- encorbelment diagonal brace, template inside 7- piping lanes, The basic aluminum dipping form of 8- abutment walls outboard template, 8.1-, 8.2- both sides' steel, 8.3- channel-section steel keels, 8.4- bottom girders, 8.5- movable pulleys, 9- sides Wall diagonal brace, 10- side slopes, 11- guard rails, 12- to pull bar, 13- hole connecting plates, 14- independences bracing members, 14.1- columns, 14.2- early dismantling heads, 15- rotary handles.
Embodiment
Hereinafter, wall of the present utility model is described with reference to the accompanying drawings tears assembled piping lane aluminum dipping form open with the top plate whole morning poured The embodiment of chassis system.
The embodiment recorded herein is specific embodiment of the present utility model, of the present utility model for illustrating Design, is explanatory and exemplary, should not be construed as the limit to the utility model embodiment and the utility model scope System.Except the implementation exception recorded herein, those skilled in the art can also be public based on the application claims and specification institute The content opened includes doing using the embodiment to recording herein using obvious other technical schemes, these technical schemes Go out the technical scheme of any obvious substitutions and modifications.
The accompanying drawing of this specification is schematic diagram, aids in illustrating design of the present utility model, it is schematically indicated each several part Shape and its correlation.The structure of each part for the ease of clearly showing the utility model embodiment is note that, respectively Do not drawn between accompanying drawing according to identical ratio.Identical reference marker is used to represent identical part.
As shown in figure 1, it is three cabin type piping lanes that the piping lane in the present embodiment, which is standard type, constructed using aluminium film tool-type platform mould 6m is unit section, with 5 unit sections to picking out 30m assembled type trolley 6;Along piping lane axis centre in middle cabin Adjustable independent bracing members 14 are set, for reinforced top aluminum alloy mould plate.
Assembled type trolley 6 is led between wall 2 positioned at adjacent located at having poured on the bottom plate 1 of completion, and at least two The two parallel setting between wall 2 is led of assembled type trolley 6;Each column assembled type trolley 6 is managed by several assembled type trolley unit sections edge Corridor bearing of trend is connected to be formed, and assembled type trolley unit section is made up of crossbeam 6.1, column 6.2 and chassis 6.6, crossbeam 6.1 and vertical The connection of post 6.2 forms vehicle frame;The top of column 6.2 be provided with it is adjustable shore 6.4, bottom is fixed on chassis 6.6;Chassis 6.6 Under the wheel 6.7 and adjustable collet 6.8 being fixed on the positioning are installed;It is additionally provided with assembled type trolley unit section horizontally disposed Adjustable cross bar support 6.9, adjustable cross bar support 6.9 runs through two ends elongation after assembled type trolley unit section consolidates with two side templates Even, adjustable cross bar support 6.9 is connected by adjustable link 6.10 with assembled type trolley 6, one end of adjustable link 6.10 and Adjustable cross bar support 6.9 is articulated and connected, and the column 6.2 of the other end and assembled type trolley 6 is articulated and connected;Such as Fig. 4, in addition to assembling The independent bracing members 14 supported after the movement of formula chassis as the later stage, independent bracing members 14 are located at parallel arrangement of two assembled platforms It is at piping lane axis centre, to be arranged at intervals along piping lane bearing of trend between car 6, including column 14.1 and the morning at the top of column Tear first 14.2 open, the bottom of column 14.1 is fixed on bottom plate 1.In each assembled type trolley unit section of assembled type trolley 6 at least Two adjustable cross bars supports 6.9 are set, for ensure firm two of side form can the level interval of adjustable cross bar support 6.9 be preferably At least provided with two independent bracing members 14 in 3m, the length range of each assembled type trolley unit section.Piping lane template includes piping lane Internal template 7 and abutment wall outboard template 8;Template 7 includes the top aluminum dipping form that top plate 3 is poured inside piping lane, and the interior wall 5 of piping lane is poured The bilateral aluminum dipping form built, and the unilateral aluminum dipping form that the side wall 4 of piping lane two is poured, wherein bilateral aluminum dipping form and unilateral aluminum dipping form are corresponded to Lead wall setting;By being connected to pull bar 12 between bilateral aluminum dipping form and abutment wall outboard template 8 and unilateral aluminum dipping form.Assembled platform Car 6 supports template 7 inside whole piping lane as form bracing system, adjustable to shore 6.4 and the common branch support of independent bracing members 14 Portion's aluminum dipping form, the one side that the bilateral aluminum dipping form or abutment wall 4 that the two ends of adjustable cross bar support 6.9 support interior wall 5 to pour respectively are poured Aluminum dipping form, is collectively forming wall and tears assembled piping lane aluminum dipping form chassis system open with the top plate whole morning poured.
Such as Fig. 2, assembled type trolley also includes jacking 6.5 of encorbelmenting, and jacking 6.5 of encorbelmenting is supported on the chamfering position of top aluminum dipping form Put, be it is vertically arranged, its bottom by be fixed on assembled type trolley encorbelment crossbeam 6.11 and encorbelment diagonal brace 6.12 with assembling Formula chassis 6 is connected.Corner connecting sewing, corner connection are reserved between the chamfering position of aluminum dipping form, the frame of aluminum dipping form at top It is attached between the frame for stitching both sides by hole connecting plate 13, hole connecting plate 13 is in strip and two ends perforate, one End is flexibly connected with the frame of side, and the other end is detachably connected with opposite side back cord, prevents template deformation at chamfering.
Template 7 uses aluminum alloy mould plate, material selection aluminium alloy 6061-T6 inside piping lane, and panel thickness of slab is 4mm, phase Pin or bolt connection are used between adjacent aluminum alloy mould plate, template back arris uses 63*40*4.8mm aluminum alloy trough steel joists;Outside abutment wall Side template 8 is on the outside of piping lane, and from-inner-to-outer includes the corresponding basic aluminum dipping form 8.1 for leading wall setting, level and is located at basic aluminum dipping form 8.1 Outside both sides' pipe 8.2 and vertical one group of channel-section steel keel 8.3 being located at outside both sides' pipe 8.2, the bottom of channel-section steel keel 8.3 leads to Cross horizontally disposed bottom girder 8.4 to be connected as one, the bottom of bottom girder 8.4 is provided with movable pulley 8.5.
Such as Fig. 3, the both sides of piping lane are side slope 10, and abutment wall outboard template 8 is provided with abutment wall diagonal brace 9, abutment wall with side slope 10 Diagonal brace 9 supports 6.9 structure identical with adjustable cross bar, and shape is threadedly coupled by between middle fixing pipe and the regulation pipe at two ends Into setting rotary handle 15 in middle fixing pipe.Assembled type trolley 6 is the assembled type trolley of aluminum alloy material, its crossbeam 6.1st, formed between column 6.2 and diagonal brace 6.3 using connection fastener or aluminum alloy square tube 280 × 140 × 8mm bolt connections, The wheel 6.7 of bottom is universal wheel.Guard rail 11 is provided with the channel-section steel keel 8.3 of abutment wall outboard template.
The wall that the utility model is related to tears the construction method of assembled piping lane aluminum dipping form chassis system open with the top plate whole morning poured, Comprise the following steps:The construction line-putting → lead the assembled debugging → coating release agent → assembled platform of wall concreting → assembled type trolley Car is in place → the independent bracing members of locating template → setting → colligation roof steel bar → casting concrete → concrete curing → release Adjust the dismounting of concrete curing → independent bracing members after vertical supporting bar, the demoulding → assembled type trolley inspection, walking → form removal. It is detailed below as follows:
1st, the construction line-putting
Piping lane axis, standard paragraphs piping lane wide 9.3m, high 3.6m, the wide 0.4m of abutment wall, interior wall are released according to drawing
Wide 0.25m, top plate thickness 0.4m.
2nd, wall concreting is led
Pipe rack concrete(Do not include bed course)Shaping is poured in two times, pours lead wall for the first time, and construction joint is located at bottom At plate above 350mm, poured using artificial spliced aluminum dipping form.
3rd, assembled type trolley assembly debugging
Aluminum dipping form tool-type platform mould composition is mainly made up of assembled type trolley, piping lane template, adjustable independent bracing members etc..
Avris piping lane dimension of opening be 2.8*2.0m, set a bogie frame, bogie frame using aluminum alloy square tube 280 × 140 × 8mm is constituted, and is connected with spiral fastener, and assembled type trolley puts up rectangle setting, along the side of three row's 6m length of piping lane direction Pipe often arranges 2, the square tube of vertically arranged two 2m length is as support, and together, center section is every by both side ends 1.2m as column Every 1.5m together.In order that assembled type trolley frame is stable to set four road crossbeams in the vertical square tube of per pass, crossbeam length is 0.9m, most One of crossbeam of lower floor installs universal wheel and adjustable collet as chassis, when assembled type trolley is artificial or is slided by other outer power During to construction location, stretch out below two adjustable collets and pad two 10*10cm lumps of wood, can so greatly improve construction period Adjustable cross bar branch is set at, convenient construction simpler than the rail mounted assembled type trolley that occurs now, per pass floor cross member two ends 30cm Support and template back arris bolt connection, while to prevent the support body sideways of assembled type trolley in work progress, in crossbeam surrounding Each to set adjustable diagonal bracing, the two ends of adjustable diagonal bracing are connected with column and adjustable cross bar carrying bolt respectively;
(2)Aluminum dipping form material is aluminium alloy 6061-T6, and panel thickness of slab is 4mm, and aluminum alloy mould plate is connected using pin and bolt Connect, standard aluminum alloy mould plate size is 2.0*2.0m, is readily transported after dispatching from the factory, transporting to behind scene can be assembled using non-standard section Height is poured into piping lane requirement, 3 pieces of template bolt connections for having spelled height are used afterwards into 6 meters of unit sections, and utilize template back arris With assembled type trolley frame expansion link bolt connection into assembled type trolley unit section, 6m assembled type trolley list is used in connection again after being formed Member is butted into suitable for reading set of template at 30m construction assembled chassis, piping lane top plate chamfering with the use of Bai Li fixtures and prevented successively Only deformation device, exactly removes 4cm in chamfering formwork frame, with the frame on the long hole connecting plate bolt connection both sides of 4mm;In order to Template is consolidated in casting concrete, one of expansion link blending bolt connection is set on bottom plate at 0.6m after back cord;
(3)Abutment wall outboard template is connected with row's 63*40*4.8mm aluminium alloys channel-section steel dragon after the back cord of both sides' pipe Adjustable abutment wall diagonal brace is connected with the outside of bone, each keel together, it is ensured that the abutment wall side form in concrete construction Stable, one of elongated square tube is welded as bottom girder in keel lower end, and universal wheel and adjustable support bar are set under square tube, as The slip of external mold and fixation, each keel upper end one high 1.5m of bolt connection steel pipe, and laterally setting three rows to lead to Long steel pipe connects the guard rail as protection operating personnel safety during construction with fastener, in template-setup spacing 0.6*0.8 mono- Place 12 to pull bar, template is had enough rigidity.
(4)Middle tube lane dimension is to set two assembled type trolleys, the support body of assembled type trolley and side in 3.6*2.8m, piping lane Side pipe corridor sets identical, and assembled type trolley frame is arranged symmetrically away from side wall side 60cm, middle to set adjustable along piping lane axis centre Independent bracing members, for reinforced top aluminum alloy mould plate, every 1.5m mono-, and set early dismantling head on top.
4th, assembled type trolley is in place
6m assembled type trolley unit section manually shifts leading after wall of having poured onto, and movement can also use electric traction row Walk, track travel can be set up when meeting ground out-of-flatness, 30m construction assembled chassis, regulation assembling are butted into Bai Li fixtures The expansion link of the vertical and level of formula bogie frame connection is in place, assembled type trolley is supported lifting plate formation piping lane headroom size, And heightening bottom retractable support makes Universal pulley hanging.
5th, coating release agent
Using undercoat roller during Cylinder coating brush using anti-solvent during brushing, " W " shape is used during the material of stand, it is then vertical horizontal Stand is equal, finally receives toward the direction, and per pass should not apply too thick, be typically advisable with 15 microns, treat first Before being not yet fully cured(Press...withing one's finger up has fingerprint, tack-free to be advisable)Second is directly applied, can so make two combination Well, otherwise peeling decortication can be drawn because the time that bottom solidifies is oversize.To solidification film surface for a long time, it is necessary to rubber by its dozen Mao Houzai is applied, and such as coating sectional repair is applied again as long as the office then is gone out into feather plucking around.Every time after the demoulding, should slightly it clear up.
6th, assembled type trolley is in place
Promote the wheel of assembled type trolley bottom to move it, fixed to the laggard driving wheel of destination locations;
7th, locating template
Construction assembled chassis checks the situation of Template Location afterwards in place, and checks whether there is piece imprecision, bolt Phenomenon is loosened, and hangs the perpendicularity that vertical line checks template, is set with ensureing that the physical dimension and outward appearance of piping lane after the completion of pouring meet Meter is required.
The 8th, independent bracing members are set
Independent bracing members are constituted by early dismantling head and bracing members, early dismantling head are first installed, then the aluminum alloy pattern plate between early dismantling head is installed Band, regulation early dismantling head fixes aluminum alloy pattern plate band template.
9th, assembling reinforcement
Reinforcing bar is processed and installed by design drawing, blanking is planned as a whole into the collocation of same specification reinforcing bar, it is to avoid waste, to expire during colligation The requirement of sufficient physical dimension and protective layer;The roof steel bar of each flowing water section of installation.
10th, casting concrete
Concrete concentrates feed using commerical ready-mixed concrete, and concrete pump truck pumping enters mould, and poker vibrator vibrates.Coagulation In native casting process, special messenger should be set to be responsible for running check, the shape for adjusting template and position;Support should be strengthened checking, tieed up Shield;Template is lost shape if any deformation, should be taken immediate steps, until concreting is finished.
11st, concrete curing
When concrete curing to intensity reaches more than 50%, form removal condition can be met, chassis possesses to be moved to next flowing water section It is dynamic.
12nd, loose adjustable vertical is to support bar, the demoulding
Concrete is reached after design strength, is loosened the adjustable vertical on construction assembled chassis to support bar, is fallen template To on assembled type trolley frame.
13rd, assembled type trolley inspection, walking
The elastic situation of each position bolt, pin is checked after the completion of one working cycles, various connecting pieces are examined again Fastening is looked into, on schedule maintenance facility, regulation retractable support is risen, exposes Universal pulley, dismantled construction assembled chassis and be changed into 6m Unit section, manually to next pouring location.
14th, concrete curing after form removal
Wall is pasted using plastic cloth immediately after form removal, conserved.
15th, independent bracing members are removed
When concrete roof intensity is up to more than 100%, independent bracing members are removed;So far, wall and top plate are integrally cast-in-place The construction for early tearing assembled piping lane aluminum dipping form chassis system open completes one cycle.
Preferred embodiment of the present utility model is the foregoing is only, it is all in this practicality not to limit the utility model Within new spirit and principle, any modification, equivalent substitution and improvements made etc. should be included in guarantor of the present utility model Within the scope of shield.

Claims (9)

1. a kind of wall and the top plate whole morning poured tear assembled piping lane aluminum dipping form chassis system open, including piping lane template and for branch hold mode The assembled type trolley of plate(6), it is characterised in that:
The assembled type trolley(6)Located at the bottom plate for having poured completion(1)On, lead wall positioned at adjacent(2)Between, and at least Have and two assembled type trolleys are set parallel in a cabin(6);Each column assembled type trolley(6)By several assembled type trolley unit sections Connect to be formed along piping lane bearing of trend, the assembled type trolley unit section is by crossbeam(6.1), column(6.2)And chassis(6.6)Group Into the crossbeam(6.1)And column(6.2)Connection forms vehicle frame;The column(6.2)Top adjustable shore is installed (6.4), bottom is fixed on chassis(6.6)On;The chassis(6.6)Under wheel is installed(6.7)With adjustable collet(6.8); Horizontally disposed adjustable cross bar support is additionally provided with the assembled type trolley unit section(6.9), the adjustable cross bar support(6.9) Two ends elongation is connected with two side templates after assembled type trolley unit section, the adjustable cross bar support(6.9)Pass through adjustable company Extension bar(6.10)With assembled type trolley(6)Connection;
Also include the independent bracing members supported after assembled type trolley is moved as the later stage(14), the independent bracing members(14)It is located at Parallel arrangement of two assembled type trolleys(6)Between i.e. at piping lane axis centre, be arranged at intervals along piping lane bearing of trend, including vertical Post(14.1)With the early dismantling head at the top of column(14.2), the column(14.1)Bottom be fixed on bottom plate(1)On;
The piping lane template includes template inside piping lane(7)With abutment wall outboard template(8);Template inside the piping lane(7)Including Top plate(3)The top aluminum dipping form poured, the interior wall of piping lane(5)The bilateral aluminum dipping form poured, and the side wall of piping lane two(4)Pour Unilateral aluminum dipping form, wherein the bilateral aluminum dipping form and unilateral aluminum dipping form correspond to and lead wall setting;On the outside of the bilateral aluminum dipping form and abutment wall Template(8)By to pull bar between unilateral aluminum dipping form(12)It is connected;
The assembled type trolley(6)Template inside whole piping lane is supported as form bracing system(7), it is described adjustable to shore (6.4)With independent bracing members(14)Common branch support aluminum dipping form, the adjustable cross bar support(6.9)Two ends support interior wall respectively (5)The bilateral aluminum dipping form or abutment wall poured(4)The unilateral aluminum dipping form poured, is collectively forming wall and matches somebody with somebody with the whole early dismounting poured of top plate Formula piping lane aluminum dipping form chassis system.
2. a kind of wall according to claim 1 tears assembled piping lane aluminum dipping form chassis system open with the top plate whole morning poured, it is special Levy and be:The assembled type trolley(6)Also include jacking of encorbelmenting(6.5), the jacking of encorbelmenting(6.5)It is supported on top aluminum dipping form Chamfering position, is vertically arranged, its bottom passes through the crossbeam of encorbelmenting that is fixed on assembled type trolley(6.11)With diagonal brace of encorbelmenting (6.12)With assembled type trolley(6)It is connected.
3. a kind of wall according to claim 1 tears assembled piping lane aluminum dipping form chassis system open with the top plate whole morning poured, it is special Levy and be:Corner connecting sewing, the corner connecting sewing both sides are reserved between the chamfering position of aluminum dipping form, the frame of aluminum dipping form at top Frame between pass through hole connecting plate(13)It is attached, the hole connecting plate(13)In strip and two ends perforate, its One end is flexibly connected with the frame of side, and the other end is detachably connected with opposite side back cord.
4. a kind of wall according to claim 1 tears assembled piping lane aluminum dipping form chassis system open with the top plate whole morning poured, it is special Levy and be:Template inside the piping lane(7)For aluminum alloy mould plate, panel thickness of slab is that pin or spiral shell are used between 4mm, aluminum alloy mould plate Tether and connect, template back arris uses aluminum alloy trough steel joist;The abutment wall outboard template(8)On the outside of piping lane, from-inner-to-outer bag Include the basic aluminum dipping form that correspondence leads wall setting(8.1), level be located at basic aluminum dipping form(8.1)Outside both sides pipe(8.2)And it is vertical Located at both sides' pipe(8.2)Outside one group of channel-section steel keel(8.3), the channel-section steel keel(8.3)Bottom pass through it is horizontally disposed Bottom girder(8.4)It is connected as one, the bottom girder(8.4)Bottom movable pulley is installed(8.5)With adjustable support bar.
5. a kind of wall according to claim 1 tears assembled piping lane aluminum dipping form chassis system open with the top plate whole morning poured, it is special Levy and be:The adjustable link(6.10)One end and adjustable cross bar support(6.9)It is articulated and connected, the other end and assembled platform Car(6)Column(6.2)It is articulated and connected.
6. a kind of wall according to claim 1 tears assembled piping lane aluminum dipping form chassis system open with the top plate whole morning poured, it is special Levy and be:The both sides of the piping lane are side slope(10), the abutment wall outboard template(8)With side slope(10)Between be provided with abutment wall Diagonal brace(9), the abutment wall diagonal brace(9)With the support of adjustable cross bar(6.9)Structure it is identical, by middle fixing pipe and two ends It is threadedly coupled and is formed between regulation pipe, rotary handle is set in the fixing pipe of the centre(15).
7. a kind of wall according to claim 1 tears assembled piping lane aluminum dipping form chassis system open with the top plate whole morning poured, it is special Levy and be:The assembled type trolley(6)Each assembled type trolley unit section in supported at least provided with two adjustable cross bars (6.9), at least provided with two independent bracing members in the length range of each assembled type trolley unit section(14).
8. a kind of wall according to claim 1 tears assembled piping lane aluminum dipping form chassis system open with the top plate whole morning poured, it is special Levy and be:The assembled type trolley(6)For the assembled type trolley of aluminum alloy material, its crossbeam(6.1)And column(6.2)Between lead to Cross connection fastener to be detachably connected, the wheel of bottom(6.7)For universal wheel.
9. a kind of wall according to claim 1-8 any one tears assembled piping lane aluminum dipping form chassis open with the top plate whole morning poured System, it is characterised in that:The abutment wall outboard template(8)Channel-section steel keel(8.3)On be provided with guard rail(11).
CN201720094075.XU 2017-01-24 2017-01-24 A kind of wall tears assembled piping lane aluminum dipping form chassis system open with the top plate whole morning poured Expired - Fee Related CN206538787U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720094075.XU CN206538787U (en) 2017-01-24 2017-01-24 A kind of wall tears assembled piping lane aluminum dipping form chassis system open with the top plate whole morning poured

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720094075.XU CN206538787U (en) 2017-01-24 2017-01-24 A kind of wall tears assembled piping lane aluminum dipping form chassis system open with the top plate whole morning poured

Publications (1)

Publication Number Publication Date
CN206538787U true CN206538787U (en) 2017-10-03

Family

ID=59939534

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720094075.XU Expired - Fee Related CN206538787U (en) 2017-01-24 2017-01-24 A kind of wall tears assembled piping lane aluminum dipping form chassis system open with the top plate whole morning poured

Country Status (1)

Country Link
CN (1) CN206538787U (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106677211A (en) * 2017-01-24 2017-05-17 中国建筑第二工程局有限公司 Early-dismantling fabricated pipe rack aluminum formwork trolley system capable of integrally pouring walls and top plate and construction method of system
CN107762140A (en) * 2017-10-23 2018-03-06 中国十九冶集团有限公司 Piping lane leads wall exterior sheathing and its erection method
CN107780660A (en) * 2017-11-16 2018-03-09 中国十七冶集团有限公司 Template construction method at a kind of piping lane top plate chamfering
CN107905254A (en) * 2017-11-16 2018-04-13 中铁四局集团有限公司 The construction method of mould trolley in a kind of pipe gallery formwork integrated hydraulic
CN108316349A (en) * 2018-03-23 2018-07-24 贵州中昇东浩科技有限公司 A kind of piping lane cast-in-place mould automatic mobile device
CN109024676A (en) * 2018-07-27 2018-12-18 广州市第二市政工程有限公司 A kind of formwork bracing system and its construction method of cast-in-place pipe gallery
CN110528577A (en) * 2019-09-05 2019-12-03 重庆建工住宅建设有限公司 A kind of cast-in-place aluminium film construction method of underground pipe gallery
CN110761324A (en) * 2019-10-22 2020-02-07 中国十七冶集团有限公司 Pipe gallery main part construction supporting trolley
CN111927085A (en) * 2020-07-29 2020-11-13 中国建筑土木建设有限公司 Modular multi-ribbed plastic formwork structure system and assembling and construction method thereof
CN113236262A (en) * 2021-06-29 2021-08-10 中铁八局集团第一工程有限公司 Cantilever tunneling machine tunnel transverse passage top-lifting swivel construction method

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106677211B (en) * 2017-01-24 2018-11-02 中国建筑第二工程局有限公司 Wall tears assembled piping lane aluminum dipping form trolley system and its construction method open with the top plate whole morning poured
CN106677211A (en) * 2017-01-24 2017-05-17 中国建筑第二工程局有限公司 Early-dismantling fabricated pipe rack aluminum formwork trolley system capable of integrally pouring walls and top plate and construction method of system
CN107762140B (en) * 2017-10-23 2019-10-25 中国十九冶集团有限公司 Piping lane leads wall exterior sheathing and its erection method
CN107762140A (en) * 2017-10-23 2018-03-06 中国十九冶集团有限公司 Piping lane leads wall exterior sheathing and its erection method
CN107780660A (en) * 2017-11-16 2018-03-09 中国十七冶集团有限公司 Template construction method at a kind of piping lane top plate chamfering
CN107905254A (en) * 2017-11-16 2018-04-13 中铁四局集团有限公司 The construction method of mould trolley in a kind of pipe gallery formwork integrated hydraulic
CN108316349A (en) * 2018-03-23 2018-07-24 贵州中昇东浩科技有限公司 A kind of piping lane cast-in-place mould automatic mobile device
CN109024676A (en) * 2018-07-27 2018-12-18 广州市第二市政工程有限公司 A kind of formwork bracing system and its construction method of cast-in-place pipe gallery
CN110528577A (en) * 2019-09-05 2019-12-03 重庆建工住宅建设有限公司 A kind of cast-in-place aluminium film construction method of underground pipe gallery
CN110761324A (en) * 2019-10-22 2020-02-07 中国十七冶集团有限公司 Pipe gallery main part construction supporting trolley
CN111927085A (en) * 2020-07-29 2020-11-13 中国建筑土木建设有限公司 Modular multi-ribbed plastic formwork structure system and assembling and construction method thereof
CN111927085B (en) * 2020-07-29 2021-12-07 中国建筑土木建设有限公司 Assembling and construction method of modular multi-ribbed plastic formwork structure system
CN113236262A (en) * 2021-06-29 2021-08-10 中铁八局集团第一工程有限公司 Cantilever tunneling machine tunnel transverse passage top-lifting swivel construction method
CN113236262B (en) * 2021-06-29 2023-08-15 中铁八局集团第一工程有限公司 Cantilever tunneling machine tunnel transverse channel roof-picking swivel construction method

Similar Documents

Publication Publication Date Title
CN106677211B (en) Wall tears assembled piping lane aluminum dipping form trolley system and its construction method open with the top plate whole morning poured
CN206538787U (en) A kind of wall tears assembled piping lane aluminum dipping form chassis system open with the top plate whole morning poured
CN107338727B (en) Integrally-disassembled and assembled anti-collision wall template and walking type rail hanging and moving system thereof
CN105625195B (en) Wave forms steel web SCC engineering methods movable hanging basket and its construction method
CN105736016B (en) Tunnel double-lining framework of steel reinforcement construction equipment and its application
CN100476076C (en) Mobile integral construction platform, construction method thereof and special sling for the same
CN101586330B (en) Receding construction method of cradle of continuous girder bridge made of prestressing concrete
CN101725111B (en) Totally enclosed cradle and construction method for suspending cast of concrete by using same
CN105401679B (en) Heavy grade cast-in-place concrete Sloping roof construction method
CN108360380A (en) A kind of bridge pier column construction operation platform and its construction method
CN109184190A (en) It climbs and carries integrated beam type hydraulic climbing platform and its installation method
CN206512605U (en) A kind of overall demolition, installation anticollision wall form and its walking track crane move system
CN201087323Y (en) Mobile integral construction platform
CN206873307U (en) Movable type bridge justifies pier stud work high above the ground operating platform
CN103388305A (en) Railway T-beam cast-in-site bridge deck forming machine
CN110468743A (en) A kind of traveling cradle and construction method for the transformation of old pier coping
CN103758045A (en) Box girder wet joint formwork construction method under space limitation condition
CN205636498U (en) Wet seam construction equipment
CN203795311U (en) Multi-leg high pier and slip form construction device
CN112726442A (en) Construction method of large-span thin-wall concrete sound barrier pouring trolley
CN208151872U (en) Scaffold formula Wavelike steel webplate hanging apparatus
CN110453689A (en) A kind of physa hole inwall template construction system and construction method
CN208009267U (en) A kind of middle cross beam tensioning protective platform
CN106284989A (en) The sliding form bracing system of double track and complete construction method
CN110080299A (en) A kind of shallow embedding mountain tunnel open-cut engineering method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171003

Termination date: 20180124

CF01 Termination of patent right due to non-payment of annual fee