CN107780660A - Template construction method at a kind of piping lane top plate chamfering - Google Patents
Template construction method at a kind of piping lane top plate chamfering Download PDFInfo
- Publication number
- CN107780660A CN107780660A CN201711136276.2A CN201711136276A CN107780660A CN 107780660 A CN107780660 A CN 107780660A CN 201711136276 A CN201711136276 A CN 201711136276A CN 107780660 A CN107780660 A CN 107780660A
- Authority
- CN
- China
- Prior art keywords
- stupefied
- aluminium alloy
- template
- piping lane
- top plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The invention discloses template construction method at a kind of piping lane top plate chamfering, belong to building engineering construction method and technology field.The present invention step be:Step 1:Determine that chamfering is a length of 150mm isosceles right triangles in both sides first;Step 2:It is stupefied to make aluminium alloy horizontal stroke;Step 3:Make again aluminium alloy erect it is stupefied;Step 4:The horizontal stupefied and aluminium alloy of aluminium alloy is erected by the stupefied aluminum alloy mould plate skeleton for being processed into three kinds of specifications using rivet;Step 5:The aluminum alloy mould plate skeleton of above-mentioned three kinds of specifications is formed a whole;Step 6:Laid in the surface layer of whole skeleton using aluminium alloy plate;Step 7:Template fixed dam is welded close to the horizontal stupefied outside of piping lane top plate and close exterior wall to the combination aluminum alloy mould plate made;Step 8:Template system is reinforced using water-proof double-unit screw, then pours into a mould concrete.This invention ensures that concrete formation quality, substantially increases the identical structure position template number of turnover, and it have compressed the construction cost that full engineering uses punching block.
Description
Technical field
The present invention relates to building engineering construction method and technology field, at a kind of piping lane top plate chamfering
Template construction method.
Background technology
At present, top plate chamfering of being constructed in construction piping lane is typically directly installed using plank sheathing or plastic formwork, will
Template is laid from top plate side sideline to other side sideline, finally completes reinforcing and concreting, indivedual units in charge of construction
Whole gallery is constructed using punching block.The former does not do preferable template typesetting planning, and the coagulation of construction molding early stage
Native presentation quality is poor, although the latter's template typesetting is preferable, concrete formation quality is also good, for more structure changes and engineering
Measure little piping lane project to be less applicable, and involve great expense.
The content of the invention
1st, to solve the problems, such as
The problem of existing for prior art and deficiency, the invention provides template construction side at a kind of piping lane top plate chamfering
Method, concrete formation quality is ensure that, substantially increase the identical structure position template number of turnover, and have compressed full engineering and use
The construction cost of punching block.
2nd, technical scheme
To reach above-mentioned purpose, technical scheme provided by the invention is:
Template construction method at a kind of piping lane top plate chamfering of the present invention, using following steps:
Step 1:First, it is familiar with drawing and determines that chamfering is a length of 150mm isosceles right triangles in both sides;
Step 2:It is stupefied to make aluminium alloy horizontal stroke;
Step 3:Make again aluminium alloy erect it is stupefied;
Step 4:The horizontal stupefied and aluminium alloy of aluminium alloy is erected by the stupefied aluminum alloy mould plate bone for being processed into three kinds of specifications using rivet
Frame;
Step 5:The aluminum alloy mould plate skeleton of above-mentioned three kinds of specifications is formed a whole;
Step 6:Laid in the surface layer of whole skeleton using aluminium alloy plate;
Step 7:Mould is welded close to the horizontal stupefied outside of piping lane top plate and close exterior wall to the combination aluminum alloy mould plate made
Plate fixed dam;
Step 8:After aluminum alloy formwork system completes, template system is reinforced using water-proof double-unit screw, so
After pour into a mould concrete, form removal is reused.
Further, the horizontal stupefied and aluminium alloy of aluminium alloy in described step two and step 3, which erects, stupefied uses 40x60mm
Aluminum alloy square tube makes.
Further, the horizontal stupefied length of described aluminium alloy be 2040mm, aluminium alloy erect stupefied length be 402mm,
305mm, 212mm three kinds of specifications.
Further, the aluminum alloy mould plate skeleton in described step four be 402x2040mm, 305x2040mm,
212x2040mm three kinds of specifications.
Further, the aluminium alloy thickness of slab in described step six is 3mm.
Further, the specification of the template fixed dam in described step seven is 12x50x2040mm.
3rd, beneficial effect
Compared to prior art, beneficial effects of the present invention are:
Template construction method at a kind of piping lane top plate chamfering proposed by the invention, substantially increases concrete formation matter
Amount, substantially increases the identical structure position template number of turnover, and have compressed the construction cost that full engineering uses punching block.By right
The improvement of aluminum alloy formwork system, the occlusion degree of the aluminum alloy formwork system after adding original wood formwork system and improving, subtracts
Reinforcing difficulty is lacked, ensure that Forming Quality of the concrete in seam areas, so as to improve concrete impression quality.
Brief description of the drawings
Fig. 1 is the template system side view of the present invention;
Fig. 2 is the schematic diagram of combination aluminum alloy mould plate one of the present invention;
Fig. 3 is the schematic diagram of combination aluminum alloy mould plate two of the present invention;
Fig. 4 is the schematic diagram of combination aluminum alloy mould plate three of the present invention.
In figure:1st, aluminium alloy horizontal stroke is stupefied;2nd, aluminium alloy erects stupefied;3rd, aluminium alloy plate;4th, water-proof double-unit screw;5th, template fixes gear
Plate.
Embodiment
The present invention is further described below with reference to specific embodiments and the drawings:
Embodiment 1
Template construction method at a kind of piping lane top plate chamfering of the present embodiment, using following steps:
Step 1:First, it is familiar with drawing and determines that chamfering is a length of 150mm isosceles right triangles in both sides;
Step 2:Make aluminium alloy horizontal stroke stupefied 1;
Step 3:Aluminium alloy is made again erects stupefied 2;
Step 4:Aluminium alloy horizontal stroke stupefied 1 is erected by the stupefied 2 aluminum alloy mould plate bones for being processed into three kinds of specifications with aluminium alloy using rivet
Frame;
Step 5:The aluminum alloy mould plate skeleton of above-mentioned three kinds of specifications is formed a whole;
Step 6:Laid in the surface layer of whole skeleton using aluminium alloy plate 3;
Step 7:Mould is welded close to the horizontal stupefied outside of piping lane top plate and close exterior wall to the combination aluminum alloy mould plate made
Plate fixed dam 5;
Step 8:After aluminum alloy formwork system completes, template system is reinforced using water-proof double-unit screw 4,
Then concrete is poured into a mould, form removal is reused.
As Figure 1-4, template construction method at a kind of piping lane top plate chamfering of the present embodiment, mould at piping lane top plate chamfering
Plate includes aluminium alloy horizontal stupefied 1, the short lumps of wood, aluminium alloy and erects stupefied 2, and described aluminium alloy horizontal stroke stupefied 1 and aluminium alloy erect stupefied 2 and be combined into template
System keel bracket;Described aluminium alloy plate 3 and above-mentioned keel bracket system are combined.
In Fig. 1, it includes the water-proof double-unit screw 4 used in template fixed dam 5 and reinforcing process, ultimately forms one
Aluminum alloy formwork system.
Template construction method at a kind of piping lane top plate chamfering of the present embodiment, its concrete technical scheme are:First, it is familiar with figure
Paper determines that chamfering is that both sides are the equilateral right angled triangles of 150mm, makes aluminium alloy horizontal stroke stupefied 1, aluminium alloy horizontal stroke stupefied 1 on this basis
(such as Fig. 2,3,4) make for 40x60mm aluminum alloy square tubes, length 2040mm;Secondly, then with 40x60mm aluminum alloy square control
Stupefied 2 are erected as aluminium alloy, tri- kinds of specifications of length 402mm, 305mm, 212mm (such as Fig. 2,3,4) are stupefied by aluminium alloy horizontal stroke using rivet
1 erects the stupefied 2 aluminum alloy mould plate skeletons for being processed into tri- kinds of specifications of 402x2040mm, 305x2040mm, 212x2040mm with aluminium alloy
Shown in (such as Fig. 2,3,4);Again, the aluminum alloy mould plate skeleton of three kinds of specifications is formed a whole, in this overall skeleton
Surface layer is laid using 3mm thickness aluminium alloy plate 3, and specific moulding is as shown in Figure 1;Finally, the combination aluminium alloy mould to making
The template fixed dam 5 of horizontal stupefied outside welding 12x50x2040mm specification of the plate close to piping lane top plate and close to exterior wall.Aluminium alloy
After template system completes, template system is reinforced using water-proof double-unit screw 4, then casting concrete, remove mould
Plate is reused.After the cast of cylindrical frame post concrete is carried out, module and Screw arbor with nut at both-ends are taken out during form removal, circulation makes
With if module can directly be moved up more than 2m, reinforce formwork casting concrete again by height.
In certain construction work, the method is used to the construction of top plate chamfering, finds that concrete quality is good at chamfering after form removal
It is good, disposable qualification rate 100%, save the artificial and material that later stage repairing needs.This method construction is safe, is mould at chamfering
Plate construction provides a kind of more effective construction method.
Template construction method at a kind of piping lane top plate chamfering proposed by the invention, substantially increases concrete formation matter
Amount, substantially increases the identical structure position template number of turnover, and have compressed the construction cost that full engineering uses punching block.By right
The improvement of aluminum alloy formwork system, the occlusion degree of the aluminum alloy formwork system after adding original wood formwork system and improving, subtracts
Reinforcing difficulty is lacked, ensure that Forming Quality of the concrete in seam areas, so as to improve concrete impression quality.
Schematically the present invention and embodiments thereof are described above, this describes no restricted, institute in accompanying drawing
What is shown is also one of embodiments of the present invention, and actual structure is not limited thereto.So if common skill of this area
Art personnel are enlightened by it, without departing from the spirit of the invention, without designing and the technical scheme for creativeness
Similar frame mode and embodiment, protection scope of the present invention all should be belonged to.
Claims (6)
- A kind of 1. template construction method at piping lane top plate chamfering, it is characterised in that:Using following steps:Step 1:First, it is familiar with drawing and determines that chamfering is a length of 150mm isosceles right triangles in both sides;Step 2:It is stupefied (1) to make aluminium alloy horizontal stroke;Step 3:Aluminium alloy is made again to erect stupefied (2);Step 4:Aluminium alloy horizontal stroke stupefied (1) and aluminium alloy are erected to the aluminum alloy mould plate bone for stupefied (2) being processed into three kinds of specifications using rivet Frame;Step 5:The aluminum alloy mould plate skeleton of above-mentioned three kinds of specifications is formed a whole;Step 6:Laid in the surface layer of whole skeleton using aluminium alloy plate (3);Step 7:The combination aluminum alloy mould plate made is consolidated close to the horizontal stupefied outside welding template of piping lane top plate and close exterior wall Determine baffle plate (5);Step 8:After aluminum alloy formwork system completes, template system is reinforced using water-proof double-unit screw (4), so After pour into a mould concrete, form removal is reused.
- 2. template construction method at a kind of piping lane top plate chamfering according to claim 1, it is characterised in that:Described step Two and the aluminium alloy horizontal stroke stupefied (1) in step 3 and aluminium alloy erect stupefied (2) and made using 40x60mm aluminum alloy square tubes.
- 3. template construction method at a kind of piping lane top plate chamfering according to claim 2, it is characterised in that:Described aluminium closes Jin Heng stupefied (1) length is 2040mm, and the length that aluminium alloy erects stupefied (2) is 402mm, 305mm, 212mm three kinds of specifications.
- 4. template construction method at a kind of piping lane top plate chamfering according to claim 3, it is characterised in that:Described step Aluminum alloy mould plate skeleton in four is 402x2040mm, 305x2040mm, 212x2040mm three kinds of specifications.
- 5. template construction method at a kind of piping lane top plate chamfering according to claim 1, it is characterised in that:Described step Aluminium alloy plate (3) thickness in six is 3mm.
- 6. template construction method at a kind of piping lane top plate chamfering according to claim 1, it is characterised in that:Described step The specification of template fixed dam (5) in seven is 12x50x2040mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711136276.2A CN107780660A (en) | 2017-11-16 | 2017-11-16 | Template construction method at a kind of piping lane top plate chamfering |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711136276.2A CN107780660A (en) | 2017-11-16 | 2017-11-16 | Template construction method at a kind of piping lane top plate chamfering |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107780660A true CN107780660A (en) | 2018-03-09 |
Family
ID=61433273
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711136276.2A Pending CN107780660A (en) | 2017-11-16 | 2017-11-16 | Template construction method at a kind of piping lane top plate chamfering |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107780660A (en) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202831615U (en) * | 2012-07-23 | 2013-03-27 | 靳培军 | Digitized alloy steel frame plastic formwork |
CN106088148A (en) * | 2016-08-04 | 2016-11-09 | 中国华冶科工集团有限公司 | Pipe gallery template and application thereof |
CN107165192A (en) * | 2017-06-16 | 2017-09-15 | 中建七局安装工程有限公司 | A kind of pipe gallery segmentation brake type shaped steel door frame and its construction |
CN206538787U (en) * | 2017-01-24 | 2017-10-03 | 中国建筑第二工程局有限公司 | A kind of wall tears assembled piping lane aluminum dipping form chassis system open with the top plate whole morning poured |
-
2017
- 2017-11-16 CN CN201711136276.2A patent/CN107780660A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202831615U (en) * | 2012-07-23 | 2013-03-27 | 靳培军 | Digitized alloy steel frame plastic formwork |
CN106088148A (en) * | 2016-08-04 | 2016-11-09 | 中国华冶科工集团有限公司 | Pipe gallery template and application thereof |
CN206538787U (en) * | 2017-01-24 | 2017-10-03 | 中国建筑第二工程局有限公司 | A kind of wall tears assembled piping lane aluminum dipping form chassis system open with the top plate whole morning poured |
CN107165192A (en) * | 2017-06-16 | 2017-09-15 | 中建七局安装工程有限公司 | A kind of pipe gallery segmentation brake type shaped steel door frame and its construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104594500B (en) | Integrated slab column formwork structure system and construction method | |
CN107130791A (en) | Combining aluminum alloy mould plate is used for the construction method of assembly concrete precast construction | |
CN108312291A (en) | A kind of concrete 3D printing building structure and its method of construction | |
CN105804395B (en) | Stair continuously poured in one molding construction method based on monoblock type typified form | |
CN207841654U (en) | A kind of concrete 3D printing building structure | |
CN106245821B (en) | A kind of lightweight steel construction lightweight concrete prefabrication and assembly construction wall and its construction method | |
CN206784951U (en) | A kind of concreting floorslab thickness control device | |
CN208072950U (en) | A kind of combination set shaped steel formwork | |
CN110273539A (en) | A kind of combination set shaped steel formwork and its modeling method | |
CN105569333B (en) | A kind of construction formwork and construction method of overhang layer exterior wall preformed hole | |
CN106320704A (en) | Steel reinforced concrete structure formwork sleeve threaded rod pulling construction method | |
CN107806019A (en) | Large-span suspension bridge gate Sarasota construction method | |
CN106113230B (en) | The non-type prefabricated for bench, template system and its construction method can be had enough to meet the need | |
CN110905113A (en) | Construction method of large-span concrete dome structure | |
CN206396966U (en) | A kind of assembled laminated floor slab plate seam node component | |
CN106285002A (en) | Cast-in-place walls difference of height tool-type hoisting die construction method | |
CN108582426A (en) | A kind of producing device and production method of stiffened column | |
CN108677722A (en) | Hollow High Pier with Thin Wall stub top section construction technology | |
CN107762001A (en) | A kind of assembly concrete variable cross-section newel post type shearing wall member and its construction method | |
CN207376882U (en) | A kind of assembly concrete variable cross-section newel post type shearing wall member and its making mold | |
CN207582946U (en) | Plate typified form drops in a kind of assembled toilet structure | |
CN107780660A (en) | Template construction method at a kind of piping lane top plate chamfering | |
CN110453916A (en) | By the arc beam construction method of adjustable arc beams regularization formwork erecting structure | |
CN207144477U (en) | The clear-water concrete exposed joint strip template of Measurement of Elevator tower | |
CN109779226A (en) | A kind of opposite sex chimney construction security platform structure and its construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |