CN206487475U - A kind of tunneling boring boom-type roadheader grills set job platform - Google Patents

A kind of tunneling boring boom-type roadheader grills set job platform Download PDF

Info

Publication number
CN206487475U
CN206487475U CN201720151261.2U CN201720151261U CN206487475U CN 206487475 U CN206487475 U CN 206487475U CN 201720151261 U CN201720151261 U CN 201720151261U CN 206487475 U CN206487475 U CN 206487475U
Authority
CN
China
Prior art keywords
landing slab
development machine
large arm
machine large
job platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720151261.2U
Other languages
Chinese (zh)
Inventor
汪茂祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 16th Bureau Group Co Ltd
Metro Engineering Co Ltd of China Railway 16th Bureau Group Co Ltd
Original Assignee
China Railway 16th Bureau Group Co Ltd
Metro Engineering Co Ltd of China Railway 16th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 16th Bureau Group Co Ltd, Metro Engineering Co Ltd of China Railway 16th Bureau Group Co Ltd filed Critical China Railway 16th Bureau Group Co Ltd
Priority to CN201720151261.2U priority Critical patent/CN206487475U/en
Application granted granted Critical
Publication of CN206487475U publication Critical patent/CN206487475U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

Job platform is set the utility model discloses a kind of tunneling boring boom-type roadheader grills, including development machine large arm, the first landing slab is connected with the left of development machine large arm, the second landing slab is connected with the right side of development machine large arm, second landing slab is provided with projection, the top of raised top and the top of the second landing slab with development machine large arm is concordant, reinforcement has been fixedly connected with first landing slab and the second landing slab, reinforcement includes spaced biside plate, side plate bottom connects one end of diagonal brace, the other end of diagonal brace is supported on base, base is fixedly connected in the development machine large arm, and base is located at the lower section of reinforcement.Simply, it is practical, quickly it can open and pack up, it is safe, the front and rear walking of development machine and left-right rotation and the oscilaltion of large arm can also be utilized, carrys out mobile platform, platform movement is flexible, workman's erect-position operation is very convenient, the constructing tunnel time is saved, construction speed is accelerated, operating efficiency is improved.

Description

A kind of tunneling boring boom-type roadheader grills set job platform
Technical field
The utility model is related to technical field of tunnel construction, it particularly relates to a kind of tunneling boring boom-type roadheader lattice Gratings sets job platform.
Background technology
Tunnel uses shallow mining method, is tunneled using tunneling boring boom-type roadheader, and tunnel diameter is 6.8m.Grid Set up, linked network and spray anchor need long 4m, width 5m and high 5m platform, so as to workman's erect-position operation.After driving terminates every time, tunnel There are many dregs before face, soft and out-of-flatness, therefore it was not only difficult but also time-consuming to set up before face interim portal frame, and because The portal frame set up is higher, it is easy to rock, or even topples over, and workman's operation on portal frame is very dangerous.So setting up interim Portal frame is as platform, and stability and security are very poor.
Use steel construction bogie frame, although stability and security very well, but weigh three tons, very heavy, pick can only be utilized Enter machine cutterhead picking-up bogie frame to move forward and backward in tunnel.After driving terminates every time, bogie frame is moved from development machine rear portion To face;After spray anchor terminates, then bogie frame moved to development machine rear portion, unidirectional mobile once distance is 20m(Because of development machine The long 16m of fuselage).Because bogie frame is easy to unstability, and left-right collision development machine in moving process, so movement is extremely difficult And it is very slow, it is movable once to need 6 hours altogether, have a strong impact on construction speed.Development machine producer also forbids to utilize Cutterhead lifts by crane load.
The problem of in above-mentioned correlation technique, effective solution is not yet proposed at present.
Utility model content
For the above-mentioned technical problem in correlation technique, the utility model proposes a kind of tunneling boring boom-type roadheader grid Job platform is set up, it is flexible, safe.
To realize above-mentioned technical purpose, what the technical solution of the utility model was realized in:
A kind of tunneling boring boom-type roadheader grills set job platform, including development machine large arm, the development machine large arm Left side be connected with the right side of the first landing slab, the development machine large arm and be connected with the second landing slab, described second Landing slab is provided with projection corresponding with the thickness of the first landing slab, the projection in the side roof part close to the development machine large arm Top and the second landing slab top of the top with development machine large arm it is concordant, on first landing slab and the second landing slab The reinforcement of U-shaped is fixedly connected with, the reinforcement includes spaced biside plate, and the side plate is each perpendicular to the driving A connecting plate is fixedly connected with the top of the left and right sides of machine large arm, the side plate, the side plate is big away from the development machine One end of the detachably connected diagonal brace in one end bottom of arm, the other end of the diagonal brace is supported on base, and the base is fixed It is connected in the development machine large arm, and the base is located at the lower section of the reinforcement.
Further, first landing slab and second landing slab include by square tubes soldering into rectangular frame, institute State and some reinforcements are fixedly connected with rectangular frame, checkered steel plate is fixedly connected with the top of the rectangular frame.
Further, the rectangular frame size is 2500 × 1500mm.
Further, the size of the checkered steel plate is 2500 × 1500 × 3mm.
Further, the reinforcement and base are channel-section steel.
Further, the diagonal brace is round steel, and the round steel length is 1600mm, a diameter of 40mm.
The beneficial effects of the utility model:Simply, it is practical, quickly it can open and pack up, it is safe, pick can also be utilized Enter the front and rear walking of machine and left-right rotation and the oscilaltion of large arm, carry out mobile platform, platform movement is flexible, workman's erect-position operation It is very convenient, the constructing tunnel time is saved, construction speed is accelerated, operating efficiency is improved.
Brief description of the drawings
, below will be to embodiment in order to illustrate more clearly of the utility model embodiment or technical scheme of the prior art In required for the accompanying drawing that uses be briefly described, it should be apparent that, drawings in the following description are only of the present utility model Some embodiments, for those of ordinary skill in the art, on the premise of not paying creative work, can also be according to this A little accompanying drawings obtain other accompanying drawings.
Fig. 1 is that the tunneling boring boom-type roadheader grills according to the utility model embodiment set the whole of job platform Body structural representation;
Fig. 2 is front side direction schematic diagram when construction operation platform according to Fig. 1 is packed up;
Fig. 3 is top view when construction operation platform according to Fig. 2 is packed up;
Fig. 4 is the structural representation of the second landing slab according to Fig. 1;
Fig. 5 is the structural representation at the diagonal brace link position according to Fig. 4.
In figure:
1st, development machine large arm;2nd, the first landing slab;3rd, the second landing slab;4th, side plate;5th, connecting plate;6th, reinforcement;7th, tiltedly Support;8th, checkered steel plate;9th, it is raised;10th, diagonal brace link position.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is carried out Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of the utility model, rather than whole Embodiment.Based on the embodiment in the utility model, the every other embodiment that those of ordinary skill in the art are obtained all belongs to The scope protected in the utility model.
As Figure 1-5, a kind of tunneling boring boom-type roadheader grid according to the utility model embodiment is set up Job platform, including development machine large arm 1, the left side of the development machine large arm 1 are connected with the first landing slab 2, the driving The right side of machine large arm 1 is connected with the second landing slab 3, and second landing slab 3 is pushed up in the side close to the development machine large arm 1 Portion is provided with corresponding with the thickness of the first landing slab 2 raised 9, the top of raised 9 top and the second landing slab 3 with The top of development machine large arm 1 is concordant, and the reinforcement 6 of U-shaped is fixedly connected with the landing slab 3 of the first landing slab 2 and second, The reinforcement 6 includes spaced biside plate 4, and the side plate 4 is each perpendicular to the left and right sides of the development machine large arm 1, The top of the side plate 4 is fixedly connected with a connecting plate 5, and the side plate 4 is removable in one end bottom away from the development machine large arm 1 Connect one end of diagonal brace 7 with unloading, the other end of the diagonal brace 7 is supported on base, and the base is fixedly connected on the development machine In large arm 1, and the base is located at the lower section of the reinforcement 6.
In a specific embodiment of the present utility model, first landing slab 2 and second landing slab 3 include by Square tubes soldering into rectangular frame, be fixedly connected with some reinforcements 6 in the rectangular frame, the top of the rectangular frame is fixed It is connected with checkered steel plate 8.
In a specific embodiment of the present utility model, the rectangular frame size is 2500 × 1500mm.
In a specific embodiment of the present utility model, the size of the checkered steel plate 8 is 2500 × 1500 × 3mm.
In a specific embodiment of the present utility model, the reinforcement 6 and base are channel-section steel.
In a specific embodiment of the present utility model, the diagonal brace 7 is round steel, and the round steel length is 1600mm, A diameter of 40mm.
Above-mentioned technical proposal of the present utility model is understood for convenience, below by way of new to this practicality in specifically used mode The above-mentioned technical proposal of type is described in detail.
It is described in the utility model to be fixedly connected and fixed installation mode be conventional using mode connects for screw, bonding, clamping etc. Technological means is replaced, and movable connection method can be replaced with conventional technical means such as hinge, pin joint, rotary shafts.
The purpose of this utility model is to provide a job platform, the i.e. left and right sides in boom-type roadheader large arm 1, point Not Zhi Zuo a construction operation platform, so as to workman's erect-position, carry out grid erection, linked network and spray anchor operation.Open and apply when using Work job platform, not the used time pack up construction operation platform.
This construction operation platform is simple, practical, quickly can rise and put down, job safety on construction operation platform.May be used also So that using walking and large arm left-right rotation and oscilaltion before and after development machine, construction operation platform is moved, and construction operation is put down Platform movement is flexible, and workman's erect-position operation is very convenient.
Make two platforms in left and right
(1)Make the first landing slab
With 50 × 50 × 4mm of model square tube(Length × width x thickness), rectangular frame, square are made by welding manner Shape frame size is 2500 × 1500mm(Length × wide, a length of tunnel axis direction);
With two 50 × 37 × 4.5mm of model channel-section steel(Waist height × leg is wide × and waist is thick), it is parallel by welding manner It is fixed on the reinforcement 6 as U-shaped on rectangular frame.In order to connect diagonal brace 7, the high face of channel-section steel waist(It is provided with the one of connecting plate 5 Side)Welded towards at the top of rectangular frame, U-shaped mouth is towards rectangular frame bottom;
2500 × 1500 × 3mm(Length × width x thickness)Checkered steel plate be welded at the top of rectangular frame.
(2) the second landing slab is made
The sidepiece that second landing slab 3 is connected with development machine large arm uses 50 × 100 × 4mm of model square tube(It is long × wide × thick), other parts are identical with the first landing slab 2;
Second landing slab 3 uses the square tube that width is 100mm, it is therefore an objective to when the landing slab of left and right two is packed up, two platforms Plate level can be overlapped together one on the other.First landing slab 2 is first packed up, and position is packed up under after the platform of the second landing slab 3, Position is upper.
(3)Determine two landing slab installation sites
Front end of the front end of first landing slab 2 and the second landing slab 3 with development machine large arm 1 is concordant, the platform of left and right two Plate correspondence is installed in the left and right sides of development machine large arm 1 (left and right is determined with development machine direction of advance).
(4)Landing slab and development machine large arm connection method
Each landing slab is connected with two cylindrical hinges and development machine large arm 1.Each hinge has two pipes and one is inserted Pin bank is into 38 × 31 × 3.5mm of pipe model(External diameter × internal diameter × wall thickness), latch is 28mm round steel.Two pipe difference It is welded in large arm and platform, connects two pipes with latch, then latch is pinned with split pin.First landing slab 2 and the second platform Plate 3 can be rotated by hinge around large arm, and when the first landing slab 2 and the second landing slab 3 are packed up, the first landing slab 2 and second landing slab 3 top down, bottom-up, the top of the first landing slab 2 and the top contact of development machine large arm 1, the The bottom of one landing slab 2 is in contact with the top of the second landing slab 3.
(5)Diagonal brace is made with being connected
Using length diagonal brace 7 is made for 1600mm, φ 40mm round steel.The wide place of leg in round steel one end and channel-section steel termination (That is biside plate 4)16mm circular hole is bored respectively, and round steel and channel-section steel are linked together with φ 12mm latches, then is pinned with split pin Latch.
(6)Determine diagonal brace position of the fulcrum with making diagonal brace fulcrum
The fulcrum of diagonal brace 7 is determined along corresponding reinforcement 6 in the left and right sides bottom of development machine large arm 1(That is base)Position Put, each landing slab is in diagonal brace link position 10(That is one end bottom of the side plate 4 away from the development machine large arm 1)Place is connected with two Diagonal brace 7, each diagonal brace 7 is supported on a base, each on the side of left and right two of development machine large arm 1 to make two diagonal braces respectively Fulcrum, it is 100mm, 50 × 50 × 4mm of model channel-section steel that a length, which is respectively welded, in each position of the fulcrum, and channel-section steel has two kinds A kind of arrangement, arrangement is that channel-section steel is placed vertically, and its opening direction deviates from the left and right sides of development machine large arm 1, and Welded and blocked with iron block in the lower end position of opening, during support, diagonal brace 7 is supported on the top of iron block, and another arrangement is Closure upwards, and is welded in the top of opening by channel-section steel horizontal positioned, its opening direction with iron block, and iron block is located on channel-section steel away from pick Enter one end of machine large arm 1, during support, diagonal brace 7 is supported in the opening of channel-section steel and positioned between development machine large arm 1 and iron block.
(7)Two platforms are opened with packing up
Before grid erection, two landing slabs in left and right are opened manually, and support diagonal brace, workman can erect-position operation.Two When landing slab is opened, the width of development machine large arm 1 is added, overall width is 4800mm, fully meets construction requirement.It is complete in spray anchor process Cheng Hou, then two landing slabs in left and right are manually packed up, level is overlapped together.Because a landing slab width is 1500mm, driving The width of machine large arm 1 is 1800mm, so after two landing slabs are packed up, being not take up the horizontal and vertical space of development machine, not influenceing machine The normal tunneling construction of tool.
In summary, by means of above-mentioned technical proposal of the present utility model, constructing tunnel saves many times, accelerates Construction speed, improves operating efficiency, and the operation of workman's erect-position is also very safe.Compare and set up interim portal frame and both saved a lot Time, security is improved again;Compare using steel construction bogie frame, save the plenty of time.
Preferred embodiment of the present utility model is the foregoing is only, it is all at this not to limit the utility model Within the spirit and principle of utility model, any modification, equivalent substitution and improvements made etc. should be included in the utility model Protection domain within.

Claims (6)

1. a kind of tunneling boring boom-type roadheader grills set job platform, including development machine large arm(1), it is characterised in that institute State development machine large arm(1)Left side be connected with the first landing slab(2), the development machine large arm(1)Right side be flexibly connected There is the second landing slab(3), second landing slab(3)Close to the development machine large arm(1)A side roof part be provided with first Landing slab(2)The corresponding projection of thickness(9), the projection(9)Top and the second landing slab(3)Top and development machine Large arm(1)Top it is concordant, first landing slab(2)With the second landing slab(3)On be fixedly connected with the reinforcement of U-shaped (6), the reinforcement(6)Including spaced biside plate(4), the side plate(4)It is each perpendicular to the development machine large arm(1)'s Left and right sides, the side plate(4)Top be fixedly connected with a connecting plate(5), the side plate(4)Big away from the development machine Arm(1)The detachably connected diagonal brace in one end bottom(7)One end, the diagonal brace(7)The other end be supported on base, it is described Base is fixedly connected on the development machine large arm(1)On, and the base is located at the reinforcement(6)Lower section.
2. tunneling boring boom-type roadheader grills according to claim 1 set job platform, it is characterised in that described One landing slab(2)With second landing slab(3)Including by square tubes soldering into rectangular frame, it is fixed in the rectangular frame to connect Connect some reinforcements(6), checkered steel plate is fixedly connected with the top of the rectangular frame(8).
3. tunneling boring boom-type roadheader grills according to claim 2 set job platform, it is characterised in that the square Shape frame size is 2500 × 1500mm.
4. tunneling boring boom-type roadheader grills according to claim 2 set job platform, it is characterised in that the flower Line steel plate(8)Size be 2500 × 1500 × 3mm.
5. tunneling boring boom-type roadheader grills according to claim 3 set job platform, it is characterised in that described to add Strengthening tendons(6)It is channel-section steel with base.
6. tunneling boring boom-type roadheader grills according to claim 3 set job platform, it is characterised in that described oblique Support(7)For round steel, the round steel length is 1600mm, a diameter of 40mm.
CN201720151261.2U 2017-02-20 2017-02-20 A kind of tunneling boring boom-type roadheader grills set job platform Active CN206487475U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720151261.2U CN206487475U (en) 2017-02-20 2017-02-20 A kind of tunneling boring boom-type roadheader grills set job platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720151261.2U CN206487475U (en) 2017-02-20 2017-02-20 A kind of tunneling boring boom-type roadheader grills set job platform

Publications (1)

Publication Number Publication Date
CN206487475U true CN206487475U (en) 2017-09-12

Family

ID=59764996

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720151261.2U Active CN206487475U (en) 2017-02-20 2017-02-20 A kind of tunneling boring boom-type roadheader grills set job platform

Country Status (1)

Country Link
CN (1) CN206487475U (en)

Similar Documents

Publication Publication Date Title
CN204252286U (en) A kind of rectangular steel-tube concrete column-steel beam connecting joint
CN103831507B (en) Longspan steel truss girder bridge overall purlin sheet welds node weld method entirely
CN202690071U (en) Multifunctional tunnel working trolley
CN110145347A (en) A kind of temporary support for drivage face equipment and its working method
CN205955754U (en) Tunnel lock foot stock / tub with strut steelframe connecting elements
CN106120799A (en) Underground utilities are exempted to change across foundation ditch and are moved construction method
CN102785243B (en) Multi-directional regulating mechanical hand
CN208416455U (en) A kind of rock drilling robot for tunnel support construction equipment
CN203679102U (en) Full-automatic hydraulic mesh bending device
CN106087698B (en) Portable construction operation platform of bored pile
CN207314833U (en) A kind of construction Novel scissors blade square column shuttering fastening member
CN115196492A (en) Vertical transportation and hoisting device for arc-shaped prefabricated parts in super-large-diameter shield tunnel
CN202668552U (en) Multidirectional adjusting mechanical hand
CN208184749U (en) A kind of shield well side wall haunch every template node structure
CN206487475U (en) A kind of tunneling boring boom-type roadheader grills set job platform
CN206263294U (en) A kind of structural beam slab bottom drilling device for bonded rebar
CN207111142U (en) Temporary supporting device for laneway tunneling
CN201560798U (en) Horizontal directional drilling machine framework
CN108505539A (en) A kind of beam outrigger platform and its erection method
CN205532657U (en) Blow and compress anchor rod grout device
CN204754945U (en) Mine method tunnel preliminary bracing lining cutting grid steel support make
CN107227966A (en) Temporary supporting device for laneway tunneling
CN101417770B (en) Turnable positioner for turning over large-sized extruding press housing window and construction method using the same
CN207740020U (en) It is a kind of to have the device for grabbing arch and rock drilling function
CN107939422B (en) Device with arch grabbing and rock drilling functions