CN206458480U CN201720120332.2U CN201720120332U CN206458480U CN 206458480 U CN206458480 U CN 206458480U CN 201720120332 U CN201720120332 U CN 201720120332U CN 206458480 U CN206458480 U CN 206458480U
Authority
CN
China
Prior art keywords
slip casting
section
grouting
tunnel
jurisdiction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720120332.2U
Other languages
Chinese (zh)
Inventor
何列
陈树茂
邓洋
袁逢逢
侯文凯
楚明泰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Tunnel Stock Co Ltd
Original Assignee
China Railway Tunnel Stock Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Tunnel Stock Co Ltd filed Critical China Railway Tunnel Stock Co Ltd
Priority to CN201720120332.2U priority Critical patent/CN206458480U/en
Application granted granted Critical
Publication of CN206458480U publication Critical patent/CN206458480U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The utility model is related to the slip casting structure in tunneling equipment correlative technology field, particularly a kind of tunnel excavating process.The utility model aims to solve the problem that the problem of synchronous grouting can not fill section of jurisdiction back gap in the prior art.The utility model inwardly includes rock stratum and section of jurisdiction layer successively from tunnel inner wall, to be formed to save the side and roof arch for unit;It is provided with support frame to form hollow sandwich between section of jurisdiction layer and rock stratum;Primary lining platform is provided with side and roof arch bottom, the slip casting preformed hole of hollow sandwich is communicated with the top of the section of jurisdiction layer of every section side and roof arch, slip casting preformed hole is flexibly connected grouting pipe, the other end connection slip casting machine of the pipeline.The beneficial effects of the utility model are:Do not increase grouting cost, smoothly, slurries utilization rate is high for slip casting process, and device structure is succinct, it is easy to maintenance and late maintaining, installs short with the take-down time, grouting pressure can be monitored at any time, ensure grouting quality, the mortar glass that adds water quickly forms casing play in contact surface, reduces mortar to cutterhead amount of flow.

Description

Slip casting structure in tunnel excavating process
Technical field
The utility model is related to tunnel piercing and sets slip casting knot in correlative technology field, particularly a kind of tunnel excavating process Structure.
Background technology
Tunnelling is common in the maintenance of subway, highway and railway.During tunnelling, especially in subway work, Shield machine is common equipment.
In practical work process, it was discovered by researchers that tunneled from quietly layer due to stopping pulpboard serious wear, stratum without Slurries flow to Tu Cang in convergence, shield machine and ground interlayer formation passage, tunneling process, cause synchronous grouting not fill effectively Section of jurisdiction back gap, simultaneous implantation mortar can not play secondary waterproof effect, and duct piece float upward is caused in follow-up work and is oozed Leak.
So, because shield driving stratum self-stability is high, synchronous grouting can not fill section of jurisdiction back gap, cause interval tunnel Road percolating water is serious.
The content of the invention
The purpose of this utility model can not fill section of jurisdiction back gap to solve synchronous grouting in the prior art There is provided the slip casting structure in a kind of tunnel excavating process in solution back gap for problem.
In order to solve the above technical problems, concrete scheme of the present utility model is:
The slip casting structure in a kind of tunnel excavating process is designed, inwardly includes rock stratum and section of jurisdiction successively from tunnel inner wall Layer, to be formed to save the side and roof arch for unit;It is provided with support frame to form hollow sandwich between the section of jurisdiction layer and rock stratum;Described Side and roof arch bottom is provided with primary lining platform, and hollow sandwich is communicated with the top and bottom of the section of jurisdiction layer of every section side and roof arch Slip casting preformed hole, the slip casting preformed hole is flexibly connected grouting pipe, the other end connection slip casting machine of the pipeline.
One or two slip casting preformed hole, the height of the slip casting preformed hole are arranged with the top of the section of jurisdiction layer of every section crown Spend position is higher than the tunnel total height 0.93.
The grouting pipe is provided with pan feeding valve.
The grouting pipe is also parallel with mixing tube, and valve is provided with the grouting pipe and the mixing tube, described Waterglass pump is installed on the end connection waterglass liquid liquid storehouse of mixing tube, the mixing tube.
Pressure gauge is installed on the grouting pipe.
The slip casting machine is installed in tunnel excavating process on the trailer of heading equipment.
A kind of grouting method using this slip casting structure, is comprised the following steps that:
(1)Once grouting:The shield tail of shield machine into hollow sandwich by when saving side and roof arch structure, noting in tunneling process The height for entering mortar A to mortar in hollow sandwich flushes in the Breadth Maximum of side and roof arch structure, and the injection pressure of the mortar A exists Between 2~3.5bar, 2.5~4 sides of grouting amount/ring form screed a;
(2)Secondary grouting:Tunneling process is in when saving 4~6 section position in front of side and roof arch when shield machine, mortar and water glass Glass presses mass parts 5~20:1 allotment mortar B, the mortar B is irrigated to hollow sandwich by pipeline, to hollow sandwich in fill out The height and position and duct height flush of thing are filled, the duct height is higher than the 0.93 of the side tunnel internal diameter whole height, Between 2~3.5bar of grouting pressure, the control of slurries setting time was at 5~10 minutes, and 2.5~4 cubes/ring of grouting amount forms sand Pulp layer b;
(3)Mend slurry:When shield machine is in when saving 9~12 section position in front of side and roof arch, to step(2)Hollow sandwich afterwards Interior 3~5 cubes of synchronization mortar A of supplement injection, to force supplement mortar to gap directly over shield machine direction and section of jurisdiction, are formed Screed c.
The synchronous mortar A makes as follows:In parts by weight, including 170~190 parts of cement:360~400 parts Flyash:50~70 parts of bentonites:600~100 parts of fine sands:360~500 parts of water, after mixing, the presetting period is 3~4 hours, Final set 7~9 hours.
The synchronous mortar A also passes through the stirring of 5~70 minutes before slip casting.
Relative to the central axis of side and roof arch feature cross-section, often save in side and roof arch, the entrance be staggered installation of in The one side of the central axis;Or the entrance is installed on the both sides of the central axis.
The beneficial effects of the utility model are:
(1)The equipment three stages slip casting can be relied on, does not increase grouting cost, smoothly, slurries utilization rate is high for slip casting process, Device structure is succinct, is easy to maintenance and late maintaining, installs short with the take-down time;
(2)I.e. section of jurisdiction perforate injection mortar adds water glass mixture driving simultaneously, be able to can be noted with smooth progress supplement slip casting Entering property is strong, and slurries utilization rate is high;In the course of work, it is every 10 section shut down once forced at the top of supplement mortar, substantially can be real The full target of existing slip casting;
(3)The setting of pipe valve also pressure gauge can monitor grouting pressure at any time, it is ensured that grouting quality;
(4)Grouting port can be installed or removed according to work step, met the slip casting in tunnel or overhauled design needs, the original such as slip casting machine Expect that the requirement of mechanism installation site is low, be adapted to the field working conditions of tunnelling;
(5)Relative to the central axis of side and roof arch feature cross-section, often save in side and roof arch, the entrance is staggered installation of In the one side of the central axis;Or the entrance is installed on the both sides of the central axis, the mortar glass that adds water is connecing Contacting surface quickly forms casing play, reduces mortar to cutterhead amount of flow.
Brief description of the drawings
Fig. 1 is the stereogram of the utility model tunnel structure;
Fig. 2 is the stereogram of the utility model other direction tunnel structure;
Fig. 3 is the utility model tunnel main view direction schematic diagram;
Fig. 4 is the utility model Tunnel Right apparent direction schematic diagram;
Each component names in figure:1. shield machine;2. section of jurisdiction layer;3. rock stratum;4. lining cutting platform;5. slip casting machine;6. connect glass The three-way pipeline of glass water;8. grouting layer.
Embodiment
Embodiment 1:A kind of slip casting structure in tunnel excavating process, referring to Fig. 1 to Fig. 4, from tunnel inner wall inwardly according to It is secondary including rock stratum and section of jurisdiction layer, to be formed to save the side and roof arch for unit;During support frame is provided between section of jurisdiction layer and rock stratum to be formed Empty interlayer;Primary lining platform is provided with side and roof arch bottom, in being communicated with the top and bottom of the section of jurisdiction layer of every section side and roof arch The slip casting preformed hole of empty interlayer, slip casting preformed hole is flexibly connected grouting pipe, the other end connection slip casting machine of the pipeline.
One or two slip casting preformed hole, the height position of slip casting preformed hole are arranged with the top of the section of jurisdiction layer of every section crown Put 0.93 higher than tunnel total height.
Grouting pipe is provided with pan feeding valve.
Grouting pipe is also parallel with mixing tube, and valve is provided with grouting pipe and mixing tube, and the end of mixing tube is connected Waterglass pump is installed on waterglass liquid liquid storehouse, mixing tube.
Pressure gauge is installed on grouting pipe.
Slip casting machine is installed in tunnel excavating process on the trailer of heading equipment.
A kind of grouting method using this slip casting structure, is comprised the following steps that:
(1)Once grouting:The shield tail of shield machine into hollow sandwich by when saving side and roof arch structure, noting in tunneling process The height for entering mortar A to mortar in hollow sandwich flushes in the Breadth Maximum of side and roof arch structure, mortar A injection pressure 2~ Between 3.5bar, 3 cubes/ring of grouting amount forms screed a;
(2)Secondary grouting:Tunneling process is in when saving 5 section position in front of side and roof arch when shield machine, mortar and waterglass By weight 5~20:1 allotment mortar B, mortar B is irrigated to hollow sandwich by pipeline, to hollow sandwich inner stuffing Height and position and duct height flush, duct height are higher than 0.93, grouting pressure 3bar of side tunnel internal diameter whole height, slurry The control of liquid setting time was at 5~10 minutes, and 2.5~4 sides of grouting amount/ring form screed b;
(3)Mend slurry:When shield machine is in when saving 10 section position in front of side and roof arch, to step(2)In hollow sandwich afterwards The synchronous mortar A of 3 cubes of supplement injection, to force supplement mortar to gap directly over shield machine direction and section of jurisdiction, forms mortar Layer c.
Synchronous mortar A makes as follows:In parts by weight, including 180 parts of cement:380 parts of flyash:60 parts of swellings Soil:700 parts of fine sands:400 parts of water, after mixing, the presetting period is 3~4 hours, final set 7~9 hours.
Synchronous mortar A also passes through the stirring of 5~70 minutes before slip casting.
Relative to the central axis of side and roof arch feature cross-section, often save in side and roof arch, entrance is staggered installation of in center The one side of axis;Or entrance is installed on the both sides of central axis.
In the present embodiment, mortar mix ratio is used for cement:Flyash:Bentonite:Fine sand:Water=180:380:60:700: 400, through field sampling, match ratio mortar initial set is 3-4 hours, final set 8 hours, and mortar workability is good.
The principle of method of work involved by the utility model is, the mortar glass injection that interlocks that adds water can accelerate synchronization Mortar coagulation time, the mortar glass that adds water quickly forms casing play in contact surface, reduces mortar to cutterhead amount of flow.
In specific implementation, the course of work is as follows:
1st, pipeline transformation:The original top two-way Grouting Pipe of synchronous grouting is removed during driving, connects and is hauling out shield On the injected hole of the endless tube piece of tail 5, bottom grouting pipeline is constant;Increase a threeway on casting head, inject waterglass, and increase A set of independent waterglass pump;
2nd, section of jurisdiction perforate:1 point, 11 points of section of jurisdiction top position mounting ball valves are arranged on after the installation of section of jurisdiction and perforate is carried out, Prevent from hauling out shield tail and punching causing shield tail gas leakage spillage, threeway head is installed after shield tail 3-5 rings are hauled out in section of jurisdiction same to section of jurisdiction progress Step slip casting adds water glass operation.
3rd, grouting pipeline is connected:After casting head is dragged to relevant position, using the threeway head connection synchronous grouting pipe of transformation, Waterglass Grouting Pipe.Double-fluid grouting machine is positioned on 1# trailers, and particular location is located at grouting operation panel opposite, is easy to alternately note Slurry operation.
4th, grout injection control:Ball valve is opened when shield starts driving and starts slip casting, synchronous mortar is initially injected, injection rate according to 0.5m3 is controlled(Pump hits number of times 50 times), waterglass pipeline is closed during synchronous grouting, waterglass is opened after being injected into designated parties amount Pipeline ball valve, injects waterglass, circulates successively.Synchronous grouting pressure and waterglass inject pressure according to 0.3Mpa controls.
5th, live Mix Ratio Test and slip casting record:Stood during the backing slip casting of section of jurisdiction by the shift engineer of engineering department scene Mortar depositing construction is instructed, slip casting side's amount and waterglass consumption is adjusted in time according to on-site actual situations.Scene is coordinated during slip casting Than the volume for testing timely adjustment waterglass.Shift engineer fills in slip casting record according to slip casting situation, and sets up section of jurisdiction backing Slip casting account is easy to analysis and summary in the future.
6th, injected hole sealing of hole:Sealing of hole is carried out to injected hole after the completion of the backing slip casting of section of jurisdiction.It is appropriate during sealing of hole to increase water glass Glass injection rate, such as failing sealing of hole can individually be blocked using double-fluid grouting machine.
7th, backing slip casting effect is checked:Once grouting compactness inspection can be carried out at interval of 5 rings after the completion of backing slip casting, is examined The section of jurisdiction injected hole perforate that checking method may be selected close to top is checked, if having no mortar after the wall of section of jurisdiction or having flowing water to prove slip casting Effect does not reach requirement.Secondary grouting be can proceed with untill full.
8th, supplement slip casting is forced after the wall of section of jurisdiction:To strengthen the slip casting effect of section of jurisdiction backing again, driving stops at interval of 10 rings Machine carries out once forcing to mend slurry.It is typically chosen in 1# trailers or connecting bridge rear is carried out.Slurries use mortar, directly using synchronous Slip casting machine carries out slip casting.If grouting pressure is big, stop injection, grouting pressure is according to 0.4Mpa controls.
To sum up, tunneled from quietly layer due to stopping pulpboard serious wear, stratum misconvergence, shield machine forms logical with ground interlayer Slurries flow to Tu Cang in road, tunneling process, cause synchronous grouting can not effectively fill section of jurisdiction back gap, simultaneous implantation mortar Secondary waterproof effect can not be played, causes duct piece float upward and percolating water.By left thread test, step back 3-5 rings in shield tail and pass through benefit Fill and added water glass into mortar, can effectively fill section of jurisdiction back gap, prevent from floating.10 rings are stepped back by shield tail again to mend again Fill into synchronous grouting, supplement envelope can be carried out to upper channel.
Embodiment 2:The method and principle be the same as Example 1 of the present embodiment, specific difference are:The mortar glass that adds water is 20:1 is sufficiently stirred for, and mortar 1000ml, pure water glass 50ml are taken using measuring cup, is added and is sufficiently stirred in bucket, and initial set is tested twice Time is all higher than 5 minutes.
Embodiment 3:The method and principle be the same as Example 1 of the present embodiment, specific difference are:The mortar glass that adds water is 5:1 is sufficiently stirred for, and mortar 1000ml, pure water glass 200ml are taken using measuring cup, is added and is sufficiently stirred in bucket, and initial set is tested twice Time about 60s.
Embodiment 4:The method and principle be the same as Example 1 of the present embodiment, specific difference are:The mortar glass that adds water is 10:1 does not stir and takes mortar 5L, pure water glass 500ml using 5L graduated cylinders, sequentially adds in bucket points for 5 times, and slurries setting time is about 4 points of halfs, after touch there is stereovision in mortar to hand, there is local lump, can play limitation mortar mobilization.
2. 3 stage of table synchronous grouting and synchronous grouting secondary supplement grouting program comparative analysis table
Embodiment 5:The method and principle be the same as Example 1 of the present embodiment, specific difference are:The mortar glass that adds water is 10:1 is sufficiently stirred for, and mortar 1000ml, pure water glass 100ml are taken using measuring cup, is added and is sufficiently stirred in bucket, and experiment twice exists Quick solidification between 50~60s.
Embodiment 6:The method and principle be the same as Example 1 of the present embodiment, specific difference are:The mortar glass that adds water is 10:1 is not stirred, and waterglass is carried out according to 1:1 dilution.Mortar 5L is taken using 5L graduated cylinders, waterglass 500ml is diluted, divides 5 times successively Add in bucket, slurries setting time is about 5 minutes, and mortar has stereovision to hand after touch, there is local lump, can play limitation sand Starch mobilization.
It is last it should be noted that, above person is only the utility model section Example, and is not used to limit the utility model, The winner according to structure of the present utility model and feature, slightly modifications, should also be included within the scope of the utility model.

Claims (6)

1. the slip casting structure in a kind of tunnel excavating process, it is characterised in that:From tunnel inner wall inwardly successively include rock stratum and Section of jurisdiction layer, to be formed to save the side and roof arch for unit;It is provided with support frame to form hollow sandwich between the section of jurisdiction layer and rock stratum; The side and roof arch bottom is provided with primary lining platform, is communicated with the top and bottom of the section of jurisdiction layer of every section side and roof arch hollow The slip casting preformed hole of interlayer, the slip casting preformed hole is flexibly connected grouting pipe, the other end connection slip casting machine of the pipeline.
2. the slip casting structure in tunnel excavating process as claimed in claim 1, it is characterised in that:In the section of jurisdiction layer of every section crown Top is arranged with one or two slip casting preformed hole, and the height and position of the slip casting preformed hole is higher than the tunnel total height 0.93。
3. the slip casting structure in tunnel excavating process as claimed in claim 1, it is characterised in that:The grouting pipe is provided with Pan feeding valve.
4. the slip casting structure in tunnel excavating process as claimed in claim 2, it is characterised in that:The grouting pipe is also in parallel There is mixing tube, valve, the end connection waterglass liquid liquid of the mixing tube are provided with the grouting pipe and the mixing tube Waterglass pump is installed on storehouse, the mixing tube.
5. the slip casting structure in tunnel excavating process as claimed in claim 1, it is characterised in that:Installed on the grouting pipe There is pressure gauge.
6. the slip casting structure in tunnel excavating process as claimed in claim 1, it is characterised in that:The slip casting machine is installed on tunnel In road tunneling process on the trailer of heading equipment.
CN201720120332.2U 2017-02-09 2017-02-09 Slip casting structure in tunnel excavating process Active CN206458480U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720120332.2U CN206458480U (en) 2017-02-09 2017-02-09 Slip casting structure in tunnel excavating process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720120332.2U CN206458480U (en) 2017-02-09 2017-02-09 Slip casting structure in tunnel excavating process

Publications (1)

Publication Number Publication Date
CN206458480U true CN206458480U (en) 2017-09-01

Family

ID=59694441

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720120332.2U Active CN206458480U (en) 2017-02-09 2017-02-09 Slip casting structure in tunnel excavating process

Country Status (1)

Country Link
CN (1) CN206458480U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106761837A (en) * 2017-02-09 2017-05-31 中铁隧道集团有限公司 Slip casting structure and supporting grouting method in tunnel excavating process
CN110566233A (en) * 2019-09-20 2019-12-13 成龙建设集团有限公司 method for duct piece wall post-grouting in shield tunnel construction of full-section hard rock stratum

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106761837A (en) * 2017-02-09 2017-05-31 中铁隧道集团有限公司 Slip casting structure and supporting grouting method in tunnel excavating process
CN110566233A (en) * 2019-09-20 2019-12-13 成龙建设集团有限公司 method for duct piece wall post-grouting in shield tunnel construction of full-section hard rock stratum

Similar Documents

Publication Publication Date Title
CN106761837B (en) Slip casting structure and matched grouting method in tunnel excavating process
WO2021223573A1 (en) Construction structure for communication and connection between newly added mined channel and existing station hall layer
CN206667278U (en) Lava crack Tunnel gushing treatment constructing structure
CN105804770B (en) The earth-filling method and its equipment in TBM method tunnel or tunnel construction
CN108166994B (en) A kind of construction method of the grouting reinforced region applied to water-rich sand layer shield tunnel
CN105040775B (en) Deep layer pressure-bearing artesian well plugging system and method
CN103603689A (en) Curtain grouting construction method for treating mined-out areas
CN103277120A (en) Post-unfreezing water burst prevention method of non-full-depth freezing vertical shaft
CN106592614B (en) The method for blocking of leakage point in foundation pit waterproof of man
CN107725056A (en) One kind passes through silly stratum tunnel loopful quick grouting construction method in advance
CN103410119A (en) Method for water interception curtain grouting in leakage concrete
CN103215922A (en) High-pressure high-flow centralized leakage grouting leaking stoppage method
CN101793154A (en) Method for grouting for stopping up water by using geological parameters of tunnel surrounding rocks and setting relief holes
CN206458480U (en) Slip casting structure in tunnel excavating process
CN112647960A (en) Advanced grouting reinforcement device and method for shield construction
CN108130901B (en) The construction method of Karst grouting
CN113266373A (en) Freezing wall and cement reinforcement combined enclosure system in large-section tunnel construction and excavation method thereof
CN103174135B (en) Repair method of unqualified post-grouting bored concrete pile
CN106223961B (en) A kind of coal mine return air main entry passing fault tunneling construction method
CN109853477B (en) Centralized leakage blocking structure and method for changing dynamic water into static water in gallery
CN108316950A (en) Tunnel vault concrete belt mould backfills filling system and its grouting method
CN111287769A (en) Tunnel surrounding rock advanced grouting reinforcement structure and construction method thereof
CN104747208B (en) Grouting reinforcement grout diffusion regulation method
CN110159307A (en) A kind of tunnel multilayer grouting process
CN110241788A (en) A kind of reservoir dam body culvert pipe reconstruction structure and construction method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant