CN206438389U - Pier stud connecting bracket component - Google Patents

Pier stud connecting bracket component Download PDF

Info

Publication number
CN206438389U
CN206438389U CN201720051505.XU CN201720051505U CN206438389U CN 206438389 U CN206438389 U CN 206438389U CN 201720051505 U CN201720051505 U CN 201720051505U CN 206438389 U CN206438389 U CN 206438389U
Authority
CN
China
Prior art keywords
pier stud
connecting bracket
bracket component
fixed cross
regulation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720051505.XU
Other languages
Chinese (zh)
Inventor
徐金华
王超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Business College
Original Assignee
Hubei Business College
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Business College filed Critical Hubei Business College
Priority to CN201720051505.XU priority Critical patent/CN206438389U/en
Application granted granted Critical
Publication of CN206438389U publication Critical patent/CN206438389U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model provides a kind of pier stud connecting bracket component, including at least two fixed cross beams arranged in parallel, the regulation crossbeam of the distance between two fixed cross beams of regulation is respectively provided between two ends of the fixed cross beam, the fixed cross beam and regulation crossbeam constitute a framework, and the framework is used for lock ring outside pier stud.Described pier stud is directly sleeved on pier stud with connecting bracket component, it is easy for installation, its height and position can adjust to coordinate corresponding support at any time, fast and easy is removed simultaneously, pier stud after dismounting will not only cause damage with connecting bracket component to pier stud surface, it can also reuse, save construction cost.

Description

Pier stud connecting bracket component
Technical field
The utility model is related to Architectural Equipment, and in particular to a kind of pier stud connecting bracket component.
Background technology
In bridge superstructure construction, often constructed, when floor stand is close to pier stud, needed using floor stand The sustaining wall between pier stud is set to ensure the stability of support, it is existing it is general using when pier stud is constructed in advance by steel plate, One end of the connectors such as reinforcing bar shift to an earlier date it is pre- nuzzle in pier stud, subsequently other end and support are connected and fixed again.But, Existing built-in fitting there is problems, be fixed because built-in fitting is embedded in pier stud interior location, be connected from different supports When, it is impossible to according to the height of support diverse location stressing conditions de-regulation built-in fitting to strengthen the connection between built-in fitting and support Stability, versatility is poor, after striking, and the built-in fitting being retained on pier stud removes difficulty greatly, even if removing built-in fitting Hollow vestige, the aesthetic property on destruction pier stud surface, while the built-in fitting after removing typically can not can be also left on pier stud surface afterwards Reuse, construction cost increase.
Utility model content
The utility model provides a kind of position-adjustable versatility height, installs with removing convenient and recyclable, while not A kind of pier stud connecting bracket component of pier stud surface aesthetic can be influenceed.
The technical scheme that the utility model is used is:A kind of pier stud connecting bracket component, including at least two mutually It is respectively provided between the fixed cross beam be arrangeding in parallel, two ends of the fixed cross beam between two fixed cross beams of regulation Distance regulation crossbeam, the fixed cross beam and regulation crossbeam constitute a framework, the framework be used for lock ring outside pier stud.
After being designed more than, the utility model has advantages below compared with prior art:
Pier stud is directly sleeved on pier stud with connecting bracket component, easy for installation, and its height and position can adjust to coordinate at any time Corresponding support, while removing fast and easy, the pier stud after dismounting will not only be caused with connecting bracket component to pier stud surface Damage, can also be reused, and save construction cost.
As an improvement, the fixed cross beam is Two bors d's oeuveres shaped steel, the one side of the Two bors d's oeuveres shaped steel is close to pier stud outer surface, in addition Simultaneously it is used to be connected with support, Two bors d's oeuveres shaped steel is contacted with pier stud surface and connecting bracket is more practical, Two bors d's oeuveres shaped steel and pier stud Contact surface and separated with the joint face of support, stress does not concentrate the intensity for advantageously ensuring that fixed cross beam.
As an improvement, the Two bors d's oeuveres shaped steel includes the first steel plate and the second steel plate that are parallel to each other, first steel plate and Connected between second steel plate by two connecting plates being parallel to each other, the connection that two connecting plates are added between Two bors d's oeuveres shaped steel is steady It is qualitative.
As an improvement, being respectively equipped with reinforcement between two ends of first steel plate and two ends of the second steel plate Muscle.Reinforcement is used for the intensity for increasing Two bors d's oeuveres shaped steel end, it is to avoid regulation regulation crossbeam excessively causes the end of Two bors d's oeuveres shaped steel to become Shape.
As an improvement, the end of the fixed cross beam is equipped with through hole, the end of the regulation crossbeam is equipped with screw rod;Institute The screw rod for stating regulation crossbeam two ends is each passed through described through hole, and the end of the screw rod is combined with locking nut, fixed cross beam Connected mode between regulation crossbeam is simple, is easy to regulation regulation crossbeam.
As an improvement, the regulation crossbeam is fining twisted steel, with fining twisted steel as regulation crossbeam, intensity is big and square Just regulation framework makes fixed cross beam and pier stud intimate surface contact.
Brief description of the drawings
Fig. 1 is the utility model stereogram
Fig. 2 is the utility model top view
Shown in figure, 1, pier stud connecting bracket component, 1.1, Two bors d's oeuveres shaped steel, the 1.2, first steel plate, the 1.3, second steel plate, 1.4th, fining twisted steel, 1.5, reinforcement, 1.6, connecting plate.
Embodiment
As depicted in figs. 1 and 2, a kind of pier stud connecting bracket component 1, including at least two fixations arranged in parallel The regulation that the distance between two fixed cross beams of regulation are respectively provided between crossbeam, two ends of the fixed cross beam is horizontal Beam, the fixed cross beam and regulation crossbeam constitute a framework, and the framework is used for lock ring outside pier stud.The fixed cross beam is Two bors d's oeuveres shaped steel 1.1, the one side of the Two bors d's oeuveres shaped steel is close to pier stud outer surface, and one side is used to be connected with support in addition, the Two bors d's oeuveres Shaped steel 1.1 includes the first steel plate 1.1 and the second steel plate 1.2 that are parallel to each other, the steel plate 1.2 of the first steel plate 1.1 and second it Between connected by two connecting plates being parallel to each other 1.6, the Two bors d's oeuveres shaped steel use H588 shaped steel.
The end of the fixed cross beam is equipped with through hole, and the end of the regulation crossbeam is equipped with screw rod;The regulation is horizontal The screw rod at beam two ends is each passed through described through hole, and the end of the screw rod is combined with locking nut.The regulation crossbeam is essence Roll screw-thread steel 1.4, shape after the end of the fining twisted steel 1.4 is fixed through the through hole and fixed cross beam by locking nut Into a framework, the framework is rectangular frame, in use, the rectangular frame is enclosed in rectangular pier columns, then passes through regulation Fining twisted steel, which changes the distance between two Two bors d's oeuveres shaped steel, makes Two bors d's oeuveres shaped steel and pier stud intimate surface contact.In the Two bors d's oeuveres type The end of steel is provided with two pairs of reinforcements 1.5, and the reinforcement 1.5 is perpendicular to the first steel plate 1.2 and the second steel plate 1.3 and positioned at essence The both sides of screw-thread steel 1.4 are rolled, reinforcement 1.5 ensures that the end of Two bors d's oeuveres shaped steel 1.1 will not in the fining twisted steel 1.4 described in adjustment Generation gross distortion.
After the completion of rectangular pier columns are implemented, Two bors d's oeuveres section steel suspended is first filled to required height when using, preformed hole on pier stud is utilized In firm rod temporary support Two bors d's oeuveres shaped steel, two Two bors d's oeuveres shaped steel install fining twisted steel steel again after being installed in place, finally by tune Locking nut position on whole fining twisted steel makes two Two bors d's oeuveres shaped steel be clamped on pier stud surface, adjusts pier stud connecting bracket During the height and position of component, fining twisted steel and the locking nut of Two bors d's oeuveres shaped steel junction are unclamped, by pier stud connecting bracket group Locking nut is tightened again after height and position needed for part is moved to, pier stud is easy to adjust with the height of connecting bracket component, Quickly, after the completion of construction, then pier stud removed with connecting bracket component, because the distance between Two bors d's oeuveres shaped steel is adjustable, Therefore different rectangular pier columns can be applicable, versatility is stronger while saving construction cost.
Preferably, can also be put using pier stud with connecting bracket component between Two bors d's oeuveres shaped steel and the contact surface of pier stud A rubber blanket is put, the rubber blanket is used to increase the frictional force between Two bors d's oeuveres shaped steel and pier stud contact surface, is also beneficial to simultaneously Protect pier stud outer surface, it is to avoid pier stud outer surface is scratched when Two bors d's oeuveres shaped steel glides, influence pier stud is attractive in appearance.
Above example is only to illustrate the technical solution of the utility model, rather than its limitations.Although with reference to foregoing reality Example is applied the utility model is described in detail, it will be understood by those within the art that, it still can be to preceding The technical scheme described in embodiment stated is modified, or to wherein each several part technical characteristic progress equivalent substitution, and this A little modifications are replaced, and the essence of appropriate technical solution is departed from the scope of the utility model embodiment technical scheme.

Claims (6)

1. a kind of pier stud connecting bracket component, it is characterised in that:Including at least two fixed cross beams arranged in parallel, institute The regulation crossbeam of the distance between two fixed cross beams of regulation is respectively provided between two ends for stating fixed cross beam, it is described Fixed cross beam and regulation crossbeam constitute a framework, and the framework is used for lock ring outside pier stud.
2. a kind of pier stud connecting bracket component according to claim 1, it is characterised in that:The fixed cross beam is Two bors d's oeuveres Shaped steel (1.1), the one side of the Two bors d's oeuveres shaped steel is close to pier stud outer surface, and one side is used to be connected with support in addition.
3. a kind of pier stud connecting bracket component according to claim 2, it is characterised in that:The Two bors d's oeuveres shaped steel (1.1) Including the first steel plate (1.2) and the second steel plate (1.3) being parallel to each other, first steel plate (1.2) and the second steel plate (1.3) it Between pass through two connecting plates being parallel to each other (1.6) and connect.
4. a kind of pier stud connecting bracket component according to claim 3, it is characterised in that:First steel plate (1.2) Two ends and the second steel plate (1.3) two ends between be respectively equipped with reinforcement (1.5).
5. a kind of pier stud connecting bracket component according to claim 1, it is characterised in that:The end of the fixed cross beam Through hole is equipped with, the end of the regulation crossbeam is equipped with screw rod;The screw rod at the regulation crossbeam two ends is each passed through described Through hole, the end of the screw rod is combined with locking nut.
6. a kind of pier stud connecting bracket component according to claim 5, it is characterised in that:The regulation crossbeam is finish rolling Screw-thread steel (1.4).
CN201720051505.XU 2017-01-17 2017-01-17 Pier stud connecting bracket component Expired - Fee Related CN206438389U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720051505.XU CN206438389U (en) 2017-01-17 2017-01-17 Pier stud connecting bracket component

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720051505.XU CN206438389U (en) 2017-01-17 2017-01-17 Pier stud connecting bracket component

Publications (1)

Publication Number Publication Date
CN206438389U true CN206438389U (en) 2017-08-25

Family

ID=59634773

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720051505.XU Expired - Fee Related CN206438389U (en) 2017-01-17 2017-01-17 Pier stud connecting bracket component

Country Status (1)

Country Link
CN (1) CN206438389U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108643047A (en) * 2018-05-18 2018-10-12 中铁十六局集团第四工程有限公司 A kind of lower support built-in fitting of large bridge bracket

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108643047A (en) * 2018-05-18 2018-10-12 中铁十六局集团第四工程有限公司 A kind of lower support built-in fitting of large bridge bracket

Similar Documents

Publication Publication Date Title
CN207079735U (en) A kind of beam-column node structure
CN103243651B (en) Method for fixedly installing and leveling base of metal upright column of bridge guardrail
CN206784186U (en) Bent cap beam support
CN104532735A (en) Assembly type steel bridge and building method thereof
CN106150055B (en) The installation method of the flat hanging installment work rack of concrete embedded part essence and built-in fitting
CN107034989A (en) A kind of prefabrication prefabricated components exempt to support installation method
CN209457425U (en) A kind of ancient architecture wall recovery support
CN101280625A (en) Non-welding assembly shuttering system
CN206438389U (en) Pier stud connecting bracket component
CN206256383U (en) A kind of large-span steel box girder assembling moulding bed
CN214460540U (en) Safety support device for wharf cofferdam
CN212224668U (en) System is assembled on super large box steel column regularization ground
CN102080353B (en) Detachable bracket and installation method thereof
KR200477671Y1 (en) Safety balustrade easy to installation
CN105604225A (en) Buckling assembly type dry hanging stone curtain wall vertical steel skeleton connection system and construction method thereof
CN104790567A (en) Flexible connecting system, external wall panel and external wall plate installing node
CN209874513U (en) Auxiliary device for accurately positioning embedded steel plate of support
CN108166379B (en) Replaceable transverse wind-resistant structure and method suitable for cable-stayed bridge and suspension bridge
CN201671355U (en) Template early-dismantling system of bowl-scaffold support
CN205046843U (en) Reinforcing apparatus's stair template of marking time in middle of installation
CN204571013U (en) Node installed by a kind of Flexible connection system, side fascia and side fascia
CN210067436U (en) Formwork support for steel structure floor slab construction
CN204645668U (en) The top support structure of shape steel support installed by a kind of rack
CN109436990B (en) Elevator well adjusting device
CN112962945A (en) Corner bracket structure and construction method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170825

Termination date: 20200117