CN206418747U CN201620718259.4U CN201620718259U CN206418747U CN 206418747 U CN206418747 U CN 206418747U CN 201620718259 U CN201620718259 U CN 201620718259U CN 206418747 U CN206418747 U CN 206418747U
Authority
CN
China
Prior art keywords
telescopic joint
cantilever
holder
telescope motor
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620718259.4U
Other languages
Chinese (zh)
Inventor
赵平
董鸽
尤卫华
杨小记
寇民道
张占军
葛泮忠
王建设
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Queshan County In Henan Province Architectural Design Studio
Original Assignee
Queshan County In Henan Province Architectural Design Studio
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Queshan County In Henan Province Architectural Design Studio filed Critical Queshan County In Henan Province Architectural Design Studio
Priority to CN201620718259.4U priority Critical patent/CN206418747U/en
Application granted granted Critical
Publication of CN206418747U publication Critical patent/CN206418747U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a kind of construction coherent-wall scaffolding cantilever arrangement, including holder, the both sides of holder are provided with fixed pin, fixed pin is provided with bolt hole, and bolt is fixed with bolt hole, holder is provided with groove, and groove and is fixed with head tree, head tree is provided with the first telescopic joint, and the first telescopic joint includes telescope motor.The utility model, holder both sides are provided with the stability that fixed pin improves coherent-wall scaffolding, include telescope motor in first telescopic joint, can be freely lifted discrete post, connecting rod is connected with second telescopic joint to be connected with external fixture, the lateral separation that 3rd telescopic joint can adjust cantilever with building facilitates workman to construct, cantilever adds the security of cantilever arrangement provided with guardrail and protection network, cantilever is provided with the 4th telescopic joint and long-handled hook, long-handled hook can be made closely to be connected with building, cantilever is set not rocked in work progress, work task efficiency can be improved.

Description

A kind of construction coherent-wall scaffolding cantilever arrangement
Technical field
The utility model is related to scaffold cantilever arrangement technical field, more particularly to a kind of construction coherent-wall scaffolding hangs Arm assembly.
Background technology
Scaffold is job site for operative and solves vertically and horizontally to transport the various supports set up, architecture field Generic term, refer on construction site be used in exterior wall, inside fitting or the higher place that can not directly construct of floor height, mainly for Operation or perimeter security net are gone along with sb. to guard him and high-altitude installation component etc. above and below workmen, are a kind of common instruments in construction, At present, in the construction in many places, scaffold is mostly root in the pole type scaffold on ground, although this pin hand Frame is widely used, but the problem of have a lot, first, the scaffold volume of this structure is larger, and consumable quantity is big, especially right For skyscraper, this consumption is especially huge, in addition, the scaffold of this mode, time-consuming to take during building Power, during building, slightly neglects, and very big potential safety hazard is will result in when in use.
Utility model content
The purpose of this utility model is that, in order to solve shortcoming present in prior art, and a kind of construction proposed is attached Foundation hand cradle cantilever arrangement.
To achieve these goals, the utility model employs following technical scheme:
A kind of construction coherent-wall scaffolding cantilever arrangement, including holder, the both sides of the holder are provided with fixed pin, described Fixed pin is main vertical provided with being fixed with groove, and groove provided with bolt, the holder is fixed with bolt hole, and bolt hole Post, the head tree is provided with the first telescopic joint, and the first telescopic joint includes telescope motor, and the telescope motor is electrically connected with Controller, first telescopic joint is provided with discrete post, and the output shaft of telescope motor is connected with discrete post, the discrete post Side is provided with the second telescopic joint, and the second telescopic joint is connected with connecting rod, and the opposite side of the discrete post is provided with the 3rd telescopic joint, And the 3rd telescopic joint be connected with cantilever, the cantilever, which is provided with guardrail, and guardrail, is provided with protection network, and the side of the cantilever is set There is the 4th telescopic joint, and the 4th telescopic joint is connected with long-handled hook.
It is preferred that, telescope motor is included in second telescopic joint, the 3rd telescopic joint and the 4th telescopic joint.
It is preferred that, the telescope motor included in second telescopic joint, the 3rd telescopic joint and the 4th telescopic joint with control Device is electrically connected with.
It is preferred that, the holder is provided with two to four fixed pin.
In the utility model, holder both sides are provided with the stability that fixed pin improves coherent-wall scaffolding, the first telescopic joint It can be freely lifted discrete post including telescope motor, connecting rod is connected with the second telescopic joint to be connected with external fixture Connect, the lateral separation that the 3rd telescopic joint can adjust cantilever with building facilitates workman to construct, cantilever is provided with guardrail and protection network The security of cantilever arrangement is added, cantilever is provided with the 4th telescopic joint and long-handled hook, long-handled hook can be made closely to be connected with building, Cantilever is not rocked in work progress, work task efficiency can be improved.
Brief description of the drawings
Fig. 1 be the utility model proposes a kind of construction coherent-wall scaffolding cantilever arrangement structural representation.
In figure:Pin, 3 bolts, 4 head trees, 5 first telescopic joints, 6 discrete posts, 7 second telescopic joints, 8 companies are fixed in 1 holder, 2 Extension bar, 9 the 3rd telescopic joints, 10 cantilevers, 11 guardrails, 12 protection networks, 13 the 4th telescopic joints, 14 long-handled hooks, 15 controllers.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is carried out Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of the utility model, rather than whole Embodiment.
Reference picture 1, a kind of construction coherent-wall scaffolding cantilever arrangement, including holder 1, the both sides of holder 1 are provided with fixation Pin 2, fixed pin 2 is provided with groove, and groove and is fixed with provided with bolt 3, holder 1 is fixed with bolt hole, and bolt hole Head tree 4, head tree 4 is provided with the first telescopic joint 5, and the first telescopic joint 5 includes telescope motor, and telescope motor is electrically connected with Controller 15, the first telescopic joint 5 is provided with discrete post 6, and the output shaft of telescope motor is connected with discrete post 6, and the one of discrete post 6 Side is provided with the second telescopic joint 7, and the second telescopic joint 7 is connected with connecting rod 8, and the opposite side of discrete post 6 is provided with the 3rd telescopic joint 9, And the 3rd telescopic joint be connected with cantilever 10, cantilever 10, which is provided with guardrail 11, and guardrail 11, is provided with protection network 12, the one of cantilever 10 Side is provided with the 4th telescopic joint 13, and the 4th telescopic joint 13 is connected with long-handled hook 14, and the both sides of holder 1 are provided with fixed pin 2 and improve attached wall It can be freely lifted discrete post 6 comprising telescope motor in the stability of scaffold, the first telescopic joint 5, connect on the second telescopic joint 7 Being connected to connecting rod 8 can be connected with external fixture, and the 3rd telescopic joint 9 can adjust cantilever 10 and the lateral separation of building is convenient Workman constructs, and cantilever 10 adds the security of cantilever arrangement provided with guardrail 11 and protection network 12, and cantilever 10 is provided with the 4th Telescopic joint 13 and long-handled hook 14, can be such that long-handled hook 14 is closely connected with building, cantilever 10 is not rocked in work progress, can To improve work task efficiency.
In the utility model, telescope motor is included in the second telescopic joint 7, the 3rd telescopic joint 9 and the 4th telescopic joint 13, the The telescope motor included in two telescopic joints 7, the 3rd telescopic joint 9 and the 4th telescopic joint 13 is electrically connected with controller 15, holder 1 Provided with two to four fixed pin 2, the both sides of holder 1 are provided with the stability that fixed pin 2 improves coherent-wall scaffolding, the first telescopic joint It can be freely lifted discrete post 6 comprising telescope motor in 5, connecting rod 8 is connected with the second telescopic joint 7 can be with external stability Thing is connected, and the lateral separation that the 3rd telescopic joint 9 can adjust cantilever 10 with building facilitates workman to construct, and cantilever 10 is provided with guardrail 11 and protection network 12 add the security of cantilever arrangement, cantilever 10 is provided with the 4th telescopic joint 13 and long-handled hook 14, can make to scratch Hook 14 is closely connected with building, cantilever 10 is not rocked in work progress, can improve work task efficiency.
Operation principle:Holder 1 is fixed on wall, and fixed pin 2 is fixed on ground by bolt 3, is passed through Controller 15 controls the telescope motor in the first telescopic joint 5, the second telescopic joint 7, the 3rd telescopic joint 9 and the 4th telescopic joint 13, enters Row is transversely or longitudinally moved, so as to facilitate workman to be constructed.
It is described above, only the utility model preferably embodiment, but protection domain of the present utility model is not This is confined to, any one skilled in the art is in the technical scope that the utility model is disclosed, according to this practicality New technical scheme and its utility model design are subject to equivalent substitution or change, should all cover in protection model of the present utility model Within enclosing.

Claims (4)

1. a kind of construction coherent-wall scaffolding cantilever arrangement, including holder(1), it is characterised in that the holder(1)Both sides Provided with fixed pin(2), the fixed pin(2)It is provided with bolt hole, and bolt hole and is fixed with bolt(3), the holder(1)On Provided with being fixed with head tree in groove, and groove(4), the head tree(4)It is provided with the first telescopic joint(5), and first is flexible Section(5)Including telescope motor, the telescope motor is electrically connected with controller(15), first telescopic joint(5)It is provided with and divides Column(6), and the output shaft of telescope motor and discrete post(6)Connection, the discrete post(6)Side be provided with the second telescopic joint (7), and the second telescopic joint(7)It is connected with connecting rod(8), the discrete post(6)Opposite side be provided with the 3rd telescopic joint(9), and 3rd telescopic joint is connected with cantilever(10), the cantilever(10)It is provided with guardrail(11), and guardrail(11)It is interior to be provided with protection network (12), the cantilever(10)Side be provided with the 4th telescopic joint(13), and the 4th telescopic joint(13)It is connected with long-handled hook(14).
2. a kind of construction coherent-wall scaffolding cantilever arrangement according to claim 1, it is characterised in that described second stretches Casing coupling(7), the 3rd telescopic joint(9)With the 4th telescopic joint(13)Inside include telescope motor.
3. a kind of construction coherent-wall scaffolding cantilever arrangement according to claim 2, it is characterised in that described second stretches Casing coupling(7), the 3rd telescopic joint(9)With the 4th telescopic joint(13)The telescope motor inside included is and controller(15)It is electrically connected with.
4. a kind of construction coherent-wall scaffolding cantilever arrangement according to claim 1, it is characterised in that the holder (1)Provided with two to four fixed pin(2).
CN201620718259.4U 2016-07-10 2016-07-10 A kind of construction coherent-wall scaffolding cantilever arrangement Expired - Fee Related CN206418747U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620718259.4U CN206418747U (en) 2016-07-10 2016-07-10 A kind of construction coherent-wall scaffolding cantilever arrangement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620718259.4U CN206418747U (en) 2016-07-10 2016-07-10 A kind of construction coherent-wall scaffolding cantilever arrangement

Publications (1)

Publication Number Publication Date
CN206418747U true CN206418747U (en) 2017-08-18

Family

ID=59578972

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620718259.4U Expired - Fee Related CN206418747U (en) 2016-07-10 2016-07-10 A kind of construction coherent-wall scaffolding cantilever arrangement

Country Status (1)

Country Link
CN (1) CN206418747U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112814351A (en) * 2021-01-04 2021-05-18 邓维记 Lifting construction equipment hanging point device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112814351A (en) * 2021-01-04 2021-05-18 邓维记 Lifting construction equipment hanging point device

Similar Documents

Publication Publication Date Title
CN201649678U (en) Semi-automatic safety protective shed for high-rise building construction
CN205063308U (en) Outer hanging protection frame and outer hanging protective structure
CN206418747U (en) A kind of construction coherent-wall scaffolding cantilever arrangement
CN205822747U (en) Architectural engineering scaffold
CN203066844U (en) Folding protective-type climbing ladder
CN211200109U (en) Hanging bracket for bridge construction
CN107840255A (en) A kind of both arms safe tower crane machine
CN203430009U (en) Construction hanging basket
CN210369827U (en) Scaffold for building external wall construction
CN204877244U (en) Long ladder of suspension type
CN213952912U (en) Overhanging type scaffold
CN204059909U (en) With the horizontal truss of avoiding structure
CN210459915U (en) Combined operation platform
RU150737U1 (en) CONSTRUCTION HAND AND FLOORING WITH HATCH
CN210451082U (en) Hanging rod installation device in building
CN205172411U (en) Portable novel tub of tower cat ladder
CN206705575U (en) A kind of building tower crane with safety hanging cradle
CN213742162U (en) Scaffold for house building construction
CN202659158U (en) Vertical height adjustable drilling device
CN214462317U (en) Building construction platform with protective structure
CN208220158U (en) A kind of scaffold of architectural engineering
CN205259554U (en) A mount for installation of light steel joist gypsum -lath furred ceiling
CN210828267U (en) Externally-hung drilling construction platform
CN220167444U (en) Building engineering is with climbing frame
CN211775557U (en) Folding cantilever operation platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170818