CN203430009U - Construction hanging basket - Google Patents

Construction hanging basket Download PDF

Info

Publication number
CN203430009U
CN203430009U CN201320478914.XU CN201320478914U CN203430009U CN 203430009 U CN203430009 U CN 203430009U CN 201320478914 U CN201320478914 U CN 201320478914U CN 203430009 U CN203430009 U CN 203430009U
Authority
CN
China
Prior art keywords
hanging basket
construction
vertical
operation layer
hung
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201320478914.XU
Other languages
Chinese (zh)
Inventor
罗朝平
马强
于巧巧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HUADING CONSTRUCTION DECORATION ENGINEERING Co Ltd
Original Assignee
HUADING CONSTRUCTION DECORATION ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HUADING CONSTRUCTION DECORATION ENGINEERING Co Ltd filed Critical HUADING CONSTRUCTION DECORATION ENGINEERING Co Ltd
Priority to CN201320478914.XU priority Critical patent/CN203430009U/en
Application granted granted Critical
Publication of CN203430009U publication Critical patent/CN203430009U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model relates to a construction hanging basket which comprises a plurality of transverse supporting rods and a plurality of vertical supporting rods, wherein the transverse supporting rods and the vertical supporting rods are respectively arranged at equal intervals and are perpendicularly fixed with one another to form an operating layer; the periphery of the operating layer is connected with hanging steel ropes; perpendicular vertical rods are fixed at four corners of the operating layer; fence plates are connected between the vertical rods. The construction hanging basket has the beneficial effects of simple structure, simplicity in operation and low cost and can well meet a technical requirement of ceiling construction and implement on-site construction safely and efficiently.

Description

Hanging Basket is hung in a kind of construction
Technical field
The utility model relates to a kind of construction and hangs Hanging Basket.
Background technology
In the practice of construction process of ceiling construction, the on-the-spot roof grid structure height of part reaches ten meters of left and right, and the conventional movable Scaffold of constructing does not reach this height, can not meet the needs of construction; And adopt full hall scaffold cost higher, uneconomical, be also unfavorable for the construction of ground, metope.
Utility model content
The purpose of this utility model is to provide a kind of construction and hangs Hanging Basket, the problems referred to above that exist to solve prior art.
The purpose of this utility model is to be achieved through the following technical solutions:
Hanging Basket is hung in a kind of construction, comprise some support rails and vertical supporting rod, described support rail is equidistantly arranged respectively with vertical supporting rod and the mutual vertical fixing operation layer that forms, described operation layer surrounding is connected with suspension cable wire, operation layer Corner Strapped has vertical posts, is connected with guardrail board between vertical posts.
Further, between described support rail and vertical supporting rod by fixation with steel wire.
Further, described operation layer surface is equipped with scaffold floor.
Further, described suspension cable wire top is provided with U-shaped card.
The beneficial effects of the utility model are: simple in structure, easy and simple to handle, with low cost, can well meet the technical requirements of ceiling construction, and carry out safely and efficiently site operation.
Accompanying drawing explanation
With reference to the accompanying drawings the utility model is described in further detail below.
Fig. 1 is the structural representation that Hanging Basket is hung in construction described in the utility model embodiment.
In figure:
1, support rail; 2, vertical supporting rod; 3, hang cable wire; 4, vertical posts; 5, guardrail board.
The specific embodiment
As shown in Figure 1, Hanging Basket is hung in a kind of construction described in the utility model embodiment, comprise some support rails 1 and vertical supporting rod 2, it is characterized in that: described support rail 1 is equidistantly arranged respectively with vertical supporting rod 2 and the mutual vertical fixing operation layer that forms, described operation layer surrounding is connected with and hangs cable wire 3, operation layer Corner Strapped has vertical posts 4, is connected with guardrail board 5 between vertical posts 4; Between described support rail 1 and vertical supporting rod 2 by fixation with steel wire; Described operation layer surface is equipped with scaffold floor; Described suspension cable wire 3 tops are provided with U-shaped card.
During concrete use, first fixed support cross bar 1 and vertical supporting rod 2, connect with steel wire, and then vertical posts 4 is installed, stable operation layer, and the length that Rod end is stretched out junction must not be less than 100mm.Every layer of operation layer is paved with wooden scaffold floor, and firm with galvanized wire colligation between fixed support cross bar 1 and vertical supporting rod 2, and operation layer is nonfloating rail plate 5 around, for guaranteeing construction safety.Finally connect and hang cable wire 3, fixing for Hanging Basket is hung.During construction, hang Hanging Basket and be suspended in completed ball type network frame structure, the whole load of Hanging Basket is passed to building structure, form complete stress system, the operation layer for workman provides safety and steady, meets the engineering requirement of ceiling construction.
The utility model is not limited to above-mentioned preferred forms; anyone can draw other various forms of products under enlightenment of the present utility model; no matter but do any variation in its shape or structure; every have identical with a application or akin technical scheme, within all dropping on protection domain of the present utility model.

Claims (4)

1. Hanging Basket is hung in a construction, comprise some support rails (1) and vertical supporting rod (2), it is characterized in that: described support rail (1) is equidistantly arranged respectively with vertical supporting rod (2) and the mutual vertical fixing operation layer that forms, described operation layer surrounding is connected with and hangs cable wire (3), described operation layer Corner Strapped has vertical posts (4), is connected with guardrail board (5) between vertical posts (4).
2. Hanging Basket is hung in construction according to claim 1, it is characterized in that: between described support rail (1) and vertical supporting rod (2) by fixation with steel wire.
3. Hanging Basket is hung in construction according to claim 2, it is characterized in that: described operation layer surface is equipped with scaffold floor.
4. Hanging Basket is hung in construction according to claim 3, it is characterized in that: described suspension cable wire (3) top is provided with U-shaped card.
CN201320478914.XU 2013-08-06 2013-08-06 Construction hanging basket Expired - Lifetime CN203430009U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320478914.XU CN203430009U (en) 2013-08-06 2013-08-06 Construction hanging basket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320478914.XU CN203430009U (en) 2013-08-06 2013-08-06 Construction hanging basket

Publications (1)

Publication Number Publication Date
CN203430009U true CN203430009U (en) 2014-02-12

Family

ID=50059057

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320478914.XU Expired - Lifetime CN203430009U (en) 2013-08-06 2013-08-06 Construction hanging basket

Country Status (1)

Country Link
CN (1) CN203430009U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103898840A (en) * 2014-03-31 2014-07-02 南京林业大学 Bridge aerial work platform and construction method thereof
CN106437179A (en) * 2016-11-16 2017-02-22 上海通用金属结构工程有限公司 Device for steel structure roof ceiling floor construction
CN106522565A (en) * 2016-11-16 2017-03-22 上海通用金属结构工程有限公司 Operation platform for steel structure roof ceiling board construction

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103898840A (en) * 2014-03-31 2014-07-02 南京林业大学 Bridge aerial work platform and construction method thereof
CN103898840B (en) * 2014-03-31 2015-09-16 南京林业大学 A kind of bridge high altitude operation platform and erection method thereof
CN106437179A (en) * 2016-11-16 2017-02-22 上海通用金属结构工程有限公司 Device for steel structure roof ceiling floor construction
CN106522565A (en) * 2016-11-16 2017-03-22 上海通用金属结构工程有限公司 Operation platform for steel structure roof ceiling board construction

Similar Documents

Publication Publication Date Title
CN108643544B (en) High-altitude overhanging construction platform support system and construction method
CN206513004U (en) A kind of movable hanger for being easy to roof inner slab to install
CN203334664U (en) Ultra-long cantilever truss structure high formwork supporting system
CN203430009U (en) Construction hanging basket
CN202451040U (en) Perpendicular high-altitude crawling ladder
CN204040515U (en) Cat ladder
CN203188130U (en) Prestress counter-tension pre-pressing bracket type scaffold supporting device
CN205116749U (en) A track strutting arrangement that is used for large -span steel construction wholly to slide
CN204475182U (en) Installation frock of railway pier mound top hanging flower basket
CN204212065U (en) Bridge crossing anticollision barrier punching block erection equipment
CN103615103A (en) Hanging type assembled movable platform
CN203200719U (en) Hanging type slope pouring template device
CN201722937U (en) Sliding platform for installation of net rack
CN205575534U (en) Lattice formula groined type support body lifting means
CN104533092A (en) Truss roof ceiling construction method
CN205034948U (en) Rack formula hanging beam device
CN201762664U (en) Bracket for mounting guardrail templates in bridge building
CN203345999U (en) Special multifunctional lifting frame for busbar bridge
CN107675892A (en) A kind of glass curtain wall monorail hoisting structure
CN203783106U (en) Hanging assembling moving platform
CN203846841U (en) Power transmission line iron tower and rest platform thereof
CN203229334U (en) Lifting framework for lifting and translating single steel member
CN203394008U (en) Suspension type hanging bracket used on plane truss
CN106401157A (en) Movable operation platform and high-altitude construction method
CN202530734U (en) Outside-overhanging scaffold

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20140212

CX01 Expiry of patent term