CN206418494U - Steel reinforcement cage plants pile foundation structure - Google Patents
Steel reinforcement cage plants pile foundation structure Download PDFInfo
- Publication number
- CN206418494U CN206418494U CN201621443240.XU CN201621443240U CN206418494U CN 206418494 U CN206418494 U CN 206418494U CN 201621443240 U CN201621443240 U CN 201621443240U CN 206418494 U CN206418494 U CN 206418494U
- Authority
- CN
- China
- Prior art keywords
- cage
- steel reinforcement
- rock stratum
- reinforcement cage
- deep hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The utility model provides a kind of steel reinforcement cage and plants pile foundation structure, and it includes:Rock stratum deep hole, in cylinder;Steel reinforcement cage, including coaxially connected the first cage body and the second cage body, the cage bottom of the second cage body bottom is in inversed taper platform shape;And the second cage body insertion rock stratum deep hole;Steel pipe, including the first pipe shaft outside rock stratum deep hole and the second pipe shaft in embedded rock stratum deep hole;And the steel tubing portions are set in outside the steel reinforcement cage;Concrete, is poured in the space limited by the rock stratum deep hole and steel tube place.By the implementation of this programme, it may be implemented in the landform of rock stratum, and the security for improving basis improves the quality of casting concrete simultaneously.
Description
Technical field
The utility model is related to technical field of civil engineering, specifically, and the utility model is related to a kind of steel reinforcement cage and plants stake
Foundation structure.
Background technology
With the fast development that China's traffic base is built, substantial amounts of concrete-bridge, and project scale have been risen in various regions
It is increasing, the requirement more and more higher to foundation bearing capacity, therefore bridge foundation construction problem is particularly important.Bridge foundation construction
In, landform can be investigated and adapt to select the foundation working process for meeting structural requirement, at present, when in laying bridge support
When meet with when shoal area, exposed rock formation area or construction time meet with flood, it is general that support base is used as using cast-in-situ bored pile
Plinth.In the construction method of cast-in-situ bored pile, there is the descending reinforcing cage engineering time long and easy during steel reinforcement cage is installed
Because friction between hole wall and the problem of native, sand of slump etc..This problem not only influences construction speed, is even more that can reduce holding for stake
Power is carried, the concrete quality poured is produced corruptions.
Utility model content
The purpose of this utility model aims to provide one kind and is anchored in rock stratum, and safe steel reinforcement cage plants pile foundation.
To achieve these goals, the utility model provides following technical scheme:
A kind of steel reinforcement cage plants pile foundation structure, and it includes:Rock stratum deep hole, in cylinder;Steel reinforcement cage, including it is coaxially connected
First cage body and the second cage body, the cage bottom of the second cage body bottom is in inversed taper platform shape;And the second cage body insertion rock stratum depth
Hole;Steel pipe, including the first pipe shaft outside rock stratum deep hole and the second pipe shaft in embedded rock stratum deep hole;And the steel tubing portions
It is set in outside the steel reinforcement cage;Concrete, is poured in the space limited by the rock stratum deep hole and steel tube place.
Further, the steel reinforcement cage is made up of the tie hoop of cage bar and spiral surrounding main ribs.
Further, the steel reinforcement cage also includes upper cage end and lower cage end, and the upper cage end and lower cage end are respectively by putting more energy into
Stirrup lateral circular main ribs are constituted.
Wherein, the pipe diameter is more than steel reinforcement cage diameter.
Wherein, the outer diameter of steel pipes is identical with the rock stratum deep hole diameter.
Wherein, the height of second cage body is less than the height of rock stratum deep hole.
Wherein, the steel pipe inner concrete pours height higher than first cage body.
Compared with prior art, scheme of the present utility model has advantages below:
A kind of foundation structure provided in the utility model, passes through rock stratum deep hole, steel reinforcement cage, steel pipe and concrete structure
Into.Wherein, the steel reinforcement cage includes first, second cage body, and the cage bottom of the second cage body bottom is in inversed taper platform shape, and it is conducive to reinforcing bar
The aiming of cage decentralization, and reduce the friction between rock stratum deep hole hole wall;Further, the steel reinforcement cage also includes by hoop of putting more energy into
The upper and lower cage end that muscle lateral circular cage bar is constituted, this structure is conducive to reinforced steel cage, improves the lifting and decentralization of steel reinforcement cage
Stability.The steel pipe includes first, second pipe shaft, the second pipe shaft insertion rock stratum deep hole, wherein the height of the second pipe shaft takes
Certainly in specific landform demand, but the second pipe shaft insertion rock stratum deep hole design not only increase pile foundation entirety stability be even more
Improve the security of pile foundation.
The additional aspect of the utility model and advantage will be set forth in part in the description, and these are by from following description
In become obvious, or by it is of the present utility model practice recognize.
Brief description of the drawings
The above-mentioned and/or additional aspect of the utility model and advantage from the following description of the accompanying drawings of embodiments will
Become substantially and be readily appreciated that, wherein:
Fig. 1 plants the schematic diagram of pile foundation structure for the steel reinforcement cage of the utility model one embodiment.
Fig. 2 is the structural representation of the utility model one embodiment, the structural relation of its main presentation steel reinforcement cage.
Embodiment
Embodiment of the present utility model is described below in detail, the example of the embodiment is shown in the drawings, wherein from beginning
Same or similar element or element with same or like function are represented to same or similar label eventually.Below by ginseng
The embodiment for examining accompanying drawing description is exemplary, is only used for explaining the utility model, and can not be construed to of the present utility model
Limitation.
It in the construction of Practical Project, can meet in shoal area, such as flood period, basis will be soaked and rushed
Brush, the problem of causing larger on support stability influence;Equally construction area coating is thin residing for, when inclination of strata degree is big,
Selection to bracket basis form is also particularly significant.In view of the presence of above mentioned problem, with reference to Fig. 1, the utility model provide with
Lower foundation structure, to improve the security of construction, it includes:
Rock stratum deep hole 1, steel reinforcement cage 2, steel pipe 3, concrete 4;
Wherein, the rock stratum deep hole 1 is in cylinder, and it is drilled through by drilling machine;The diameter of the rock stratum deep hole is to drill
The size of machine setting is defined, after the cleaning to all dregs in bottom hole and hole is completed, the diameter of rock stratum deep hole may have it is trickle partially
Difference, but the specific implementation of the foundation structure provided the present embodiment does not cause obstruction.
Wherein, the steel reinforcement cage 2 includes the first cage body 21 and the second cage body 22;The cage body of first cage body 21 and second
22 are made up of the tie hoop 202 of cage bar 201 and spiral surrounding main ribs, and main ribs 201 vertically lay by interval;It is described
The cage bottom 221 of the bottom of second cage body 22 is in inversed taper platform shape, and it is easy to the alignment with rock stratum deep hole 1 when steel reinforcement cage 2 is overall to transfer, and
Improving efficiency of construction reduces the friction of steel reinforcement cage 2 and rock stratum deep hole 1, reduces coming off for soil sand between hole, more conducively improves stake
The steadiness on basis.Wherein, first cage body 21 is in outside rock stratum deep hole 1, and second cage body 22 is embedded in rock stratum deep hole 1
It is interior.Further, the height of the second cage body 22 is less than the height of rock stratum deep hole 1, i.e., transferred when by steel reinforcement cage 2 to rock stratum deep hole 1
When, the bottom of the steel reinforcement cage 2 is not contacted with the bottom hole of the rock stratum deep hole 1, leaves certain spacing.
Preferably, the steel reinforcement cage 2 also includes upper cage end 23, lower cage end 24, and the upper cage end 23 and lower cage end 24 are distinguished
By putting more energy into, the lateral circular main ribs 201 of stirrup 203 are constituted.Wherein, to the design at the cage end of steel reinforcement cage 2, beneficial to further reinforcing
Steel reinforcement cage 2, improves the stability that steel reinforcement cage 2 is transferred.
Wherein, the steel pipe 3 includes the first pipe shaft 31 and the second pipe shaft 32, and is set in outside the steel reinforcement cage 2;Tool
Body, first pipe shaft 31 is set in the outside of the first cage body 21 of steel reinforcement cage 2, and rock stratum is unanimously in first cage body 21
Outside deep hole 1;Second pipe shaft 32 is set in the outside on the top of the second cage body 22 of steel reinforcement cage 2, and consistent with the second cage body 22
In embedded rock stratum deep hole, i.e. the second pipe shaft 32 is that steel pipe 3 follows up the part of rock stratum, it is preferable that the follow-up of steel pipe 3 length (the
The height of two pipe shafts 32) it is more than or equal to 50cm.
Further, the external diameter of steel pipe 3 is identical with the diameter dimension of the rock stratum deep hole 1, and it utilizes steel pipe 3 and rock stratum
(steel pipe 3 provides outside active force to rock stratum deep hole 1 to the interaction force of deep hole 1, and rock stratum deep hole 1 provides inside to steel pipe 3
Active force) reinforce pile foundation.
Further, the present embodiment also provides a kind of laying structure, makes the internal diameter of the steel pipe 3 micro- more than steel reinforcement cage 2
Diameter dimension, this laying structure makes steel pipe 3 be more conducive to be set in outside steel reinforcement cage 2, and makes to have poured between steel pipe 2 and steel reinforcement cage 3
Concrete 4, and it is indirect contact with each other, reinforce pile foundation beneficial to further.
Wherein, the concrete 4 is poured in the space limited by the steel pipe 3 and rock stratum deep hole 1, i.e., described coagulation
All volumes that soil 4 is filled up after the insertion rock stratum deep hole 1 of steel reinforcement cage 2, and extend in the pipe shaft 31 of steel pipe 3 first.
Further, the concrete 4 in the pipe shaft 31 of steel pipe 3 first pours height higher than the cage of steel reinforcement cage 2 first
The height of body 21, and be defined by stablizing the steel pipe 3;Its specific pipe inner concrete is poured absolute altitude and made with practice of construction demand
Adaptive change, the present embodiment is not described herein the understanding for having no effect on those skilled in the art to this programme to this.
Described above is only some embodiments of the present utility model, it is noted that for the common skill of the art
For art personnel, on the premise of the utility model principle is not departed from, some improvements and modifications can also be made, these improve and
Retouching also should be regarded as protection domain of the present utility model.
Claims (7)
1. a kind of steel reinforcement cage plants pile foundation structure, it is characterised in that it includes:
Rock stratum deep hole, in cylinder;
Steel reinforcement cage, including coaxially connected the first cage body and the second cage body, the cage bottom of the second cage body bottom is in inversed taper platform shape;
And second cage body is embedded in the rock stratum deep hole;
Steel pipe, including the first pipe shaft outside rock stratum deep hole and the second pipe shaft in embedded rock stratum deep hole;And the steel pipe portion
Divide and be set in outside the steel reinforcement cage;
Concrete, is poured in the space limited by the rock stratum deep hole and steel tube place.
2. steel reinforcement cage according to claim 1 plants pile foundation structure, it is characterised in that the steel reinforcement cage is by cage bar and spiral shell
The tie hoop revolved around main ribs is constituted.
3. steel reinforcement cage according to claim 1 plants pile foundation structure, it is characterised in that the steel reinforcement cage also includes upper cage end
With lower cage end, the upper cage end and lower cage end are made up of stirrup lateral circular cage bar of putting more energy into respectively.
4. steel reinforcement cage according to claim 1 plants pile foundation structure, it is characterised in that the pipe diameter is more than steel reinforcement cage
Diameter.
5. steel reinforcement cage according to claim 1 plants pile foundation structure, it is characterised in that the outer diameter of steel pipes and the rock stratum
Deep hole diameter is identical.
6. steel reinforcement cage according to claim 1 plants pile foundation structure, it is characterised in that the height of second cage body is less than
The height of rock stratum deep hole.
7. steel reinforcement cage according to claim 1 plants pile foundation structure, it is characterised in that the steel-pipe pile inner concrete is poured
Highly it is higher than first cage body.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621443240.XU CN206418494U (en) | 2016-12-26 | 2016-12-26 | Steel reinforcement cage plants pile foundation structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621443240.XU CN206418494U (en) | 2016-12-26 | 2016-12-26 | Steel reinforcement cage plants pile foundation structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206418494U true CN206418494U (en) | 2017-08-18 |
Family
ID=59576232
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621443240.XU Active CN206418494U (en) | 2016-12-26 | 2016-12-26 | Steel reinforcement cage plants pile foundation structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206418494U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110468866A (en) * | 2019-07-11 | 2019-11-19 | 中冶交通建设集团有限公司 | Pile foundation in water construction method |
-
2016
- 2016-12-26 CN CN201621443240.XU patent/CN206418494U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110468866A (en) * | 2019-07-11 | 2019-11-19 | 中冶交通建设集团有限公司 | Pile foundation in water construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107246006B (en) | The pile-filling method of concrete-pile | |
CN2934352Y (en) | Root key type drilling perfusion stake construction device | |
CN208167713U (en) | A kind of film bag grouting and reinforcing type filling pile structure | |
CN103122632A (en) | Construction method for drilling hole and casting pile in plastic flow stratum or karst cave stratum | |
CN100476082C (en) | Post-grouting construction method for long helical bore grouting pile and grouting device thereof | |
CN105604001A (en) | Stiffening core cement-soil tubular pile, construction method and cylindrical rotary stirring drilling tool | |
CN103510510A (en) | Reinforced long spiral drilling concrete grouting pile and construction method thereof | |
CN105672307A (en) | Expanded-base combination end pile bearing foundation | |
CN204959787U (en) | Novel tower crane combination formula basis | |
CN206418494U (en) | Steel reinforcement cage plants pile foundation structure | |
CN206752454U (en) | One kind perfusion embedded pile | |
CN102808403A (en) | Precast tubular pile and construction method thereof | |
CN206971210U (en) | A kind of long casing in pile foundation construction | |
CN205501998U (en) | Expand end combination end -bearing pile basis | |
CN206220114U (en) | A kind of eight High-Rise Pile Cap Foundations | |
CN104929108A (en) | Construction method of hard soil field PCC pile | |
CN206015511U (en) | One implant post steel pipe column | |
CN208251078U (en) | A kind of bottom-expanding sinking-pipe pilework | |
CN206034430U (en) | Single pile reducing inlays rock secant pile | |
CN204282348U (en) | A kind of reinforced concrete cast-in-situ pile tube | |
CN104110032B (en) | Major diameter cavity long spire thin wall filling pile pipe casing | |
CN108547284A (en) | A kind of bottom-expanding sinking-pipe pilework and construction method | |
CN207538839U (en) | The structure that a kind of quick solution tunnel collapses | |
CN205501993U (en) | Back slip casting bored concrete pile structure | |
CN205975582U (en) | Improve device of hollow pile bearing capacity |