CN206319260U - A kind of variable arc bridge floor stand device - Google Patents

A kind of variable arc bridge floor stand device Download PDF

Info

Publication number
CN206319260U
CN206319260U CN201621421589.3U CN201621421589U CN206319260U CN 206319260 U CN206319260 U CN 206319260U CN 201621421589 U CN201621421589 U CN 201621421589U CN 206319260 U CN206319260 U CN 206319260U
Authority
CN
China
Prior art keywords
steel pipe
bridge floor
floor stand
stand device
variable arc
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621421589.3U
Other languages
Chinese (zh)
Inventor
蒋小刚
谢伟
唐凯
刘丽
赵卫东
李佳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Bureau 5 Co Ltd
Original Assignee
Sinohydro Bureau 5 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Bureau 5 Co Ltd filed Critical Sinohydro Bureau 5 Co Ltd
Priority to CN201621421589.3U priority Critical patent/CN206319260U/en
Application granted granted Critical
Publication of CN206319260U publication Critical patent/CN206319260U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a kind of variable arc bridge floor stand device, including pile foundation and the steel pipe column being disposed there above;It is provided with above steel pipe column above branch pier top distribution beam, branch pier top distribution beam and is provided with Bailey beam, full hall supertronic support is provided with above Bailey beam;Steel pipe column includes the two root posts along bridge to setting;Column is to be provided with skewed horizontal load between the steel pipe joint being connected with each other, two root posts;Pre-buried ring flange in cushion cap, cushion cap is provided between pile foundation and steel pipe column is used for the fixation of steel pipe column;Connected between steel pipe joint and between two root posts transverse direction by connector;The utility model uses double steel pipe form, carries out becoming arc regulation using the spacing between steel pipe, the bridge floor discrepancy in elevation is adjusted by full hall supertronic scaffold;The utility model structure is simple in construction, easy to use, efficiency of construction is high, repeatable utilization, low cost.

Description

A kind of variable arc bridge floor stand device
Technical field
The utility model is related to bridge holder device, and in particular to a kind of variable arc bridge floor stand device.
Background technology
Bridge is larger positioned at relief, and when bridge floor is located on circular curve and easement curve, slope is larger in length and breadth for bridge floor, and by River course excessively stream limitation can not use full framing system;And full framing system rolled steel dosage is big, existing strutting system is not This requirement can be met;Cao Xinheng discloses a kind of universal cast-in-situ trestle for bridge(201110278421.7)Including dump bottom Seat, hydraulic jack, concrete filled steel tube column, the steady strain that three planes are equalled in length and breadth, spherical hinged-support, support girder, branch Sortie beam, bracing diagonal, distribution rib, beam bottom bulk punching block, support and pier top consolidation system, pier top segment template, pier top large-tonnage Fall frame hoist engine or chain block in hydraulic jack, beam, fall the composition such as frame cable wire;This support is not applied for bridge floor in length and breadth The larger situation in slope, it is impossible to which the profound arc for adjusting top bridge floor is poor.
Utility model content
The utility model offer is a kind of can to adjust the variable arc bridge floor stand device of the profound arc difference of bridge floor support.
The technical solution adopted in the utility model is:A kind of variable arc bridge floor stand device, including pile foundation and set Put steel pipe column above it;It is provided with above steel pipe column above branch pier top distribution beam, branch pier top distribution beam and is provided with Bailey beam, Full hall supertronic support is provided with above Bailey beam;Steel pipe column includes the two root posts along bridge to setting;Column is interconnection Skewed horizontal load is provided between steel pipe joint, two root posts;Pre-buried flange in cushion cap, cushion cap is provided between pile foundation and steel pipe column Disk is used for the fixation of steel pipe column;Connected between steel pipe joint and between two root posts transverse direction by connector.
Further, the connector is ring flange and Bolt.
Further, docked, connected using Bolt by termination steel plate between the skewed horizontal load and steel pipe column.
Further, it is provided with backing plate between the steel pipe joint.
Further, the Bailey beam and branch pier top distribution beam junction, pier stud both sides are provided with shelf bracket;Triangle support It is provided with below frame on angle steel plate, angle steel plate and is provided with bolt, pier stud both sides is provided with screw-thread steel.
Further, the Bailey beam top is provided with transverse distribution beam.
Further, the transverse distribution beam top is provided with longitudinal H profile steel.
Further, the full hall supertronic support buckles supporting structure using disk;Full hall supertronic support rod unit upper and lower part It is provided with adjusting screw rod.
Further, the full hall supertronic support is additionally provided with self-locking device.
The beneficial effects of the utility model are:
(1)The utility model uses steel pipe floor stand and Bailey beam structure, and steel pipe post floor space is few, does not influence river Flow through, it is only necessary to several strong points;Steel pipe floor stand uses pile foundation of bearing platform plinth, and pile foundation is goed deep into weathered rock formation, and ground is held Carry power and meet requirement;
(2)The utility model uses double steel pipe formula, and the Bailey beam overlapping part on its top is arranged on suitable bridge to steel pipe post Twin columns top, the distance between Bailey beam can between double columns along bridge to regulation;
(3)Full hall supertronic support uses disk buckle scaffold, and rod member upper and lower ends are provided with adjusting screw rod, can be with adjusting bracket Cope level, realize the regulation of the discrepancy in elevation above and below template.
Brief description of the drawings
Fig. 1 is the utility model using effect figure.
Fig. 2 is the utility model structural representation.
Fig. 3 is the utility model branch pier top distribution beam one end structural representation.
Fig. 4 is Bailey beam connection diagram in the utility model.
In figure:1- pile foundations, 2- steel pipe columns, 3- connectors, 4- branch pier top distribution beams, 5- Bailey beams, the full hall supertronic branch of 6- Frame, 7- full framings, 8- pier studs, 9- bolts, 10- screw-thread steels, 11- shelf brackets.
Embodiment
The utility model is described further with specific embodiment below in conjunction with the accompanying drawings.
As shown in Fig. 2 a kind of variable arc bridge floor stand device, including pile foundation 1 and the steel pipe being disposed there above Post 2;The top of steel pipe column 2 is provided with branch pier top distribution beam 4, and the top of branch pier top distribution beam 4 is provided with Bailey beam 5, the top of Bailey beam 5 It is provided with full hall supertronic support 6;Steel pipe column 2 includes the two root posts along bridge to setting;Column is the steel pipe joint being connected with each other, two Skewed horizontal load is provided between root post;Pre-buried ring flange in cushion cap, cushion cap is provided between pile foundation 1 and steel pipe column 2 to be used for The fixation of steel pipe column 2;Connected between steel pipe joint and between two root posts transverse direction by connector 3.
Further, the connector 3 is ring flange and Bolt.
Further, docked, connected using Bolt by termination steel plate between the skewed horizontal load and steel pipe column 2.
Further, it is provided with backing plate between the steel pipe joint.
Further, the Bailey beam 5 and the junction of branch pier top distribution beam 4, the both sides of pier stud 8 are provided with shelf bracket 11; The lower section of shelf bracket 11, which is provided with angle steel plate, angle steel plate, is provided with bolt 9, and the both sides of pier stud 8 are provided with screw-thread steel 10。
Further, the top of Bailey beam 5 is provided with transverse distribution beam.
Further, the transverse distribution beam top is provided with longitudinal H profile steel.
Further, the full hall supertronic support 6 buckles supporting structure using disk;The full rod member top of hall supertronic support 6 is with Portion is provided with adjusting screw rod.
Further, the full hall supertronic support 6 is additionally provided with self-locking device.
In use, whole device is all designed using standard knot, ring flange is assembled, Bolt docking;Steel pipe is 6m standards 3m, 1.5m and 1m steel pipe tender are set up in section, discrepancy in elevation regulation;Steel pipe specification is between D630mm × 8mm, steel pipe joint and two root posts Connected, connected between connector 3 by 1500mm nodes by connector 3 between transverse direction;Steel pipe joint is vertical, laterally use flange Disk is docked, and Bolt connection, the docking of oblique use termination steel plate, Bolt connection, rod member interval are padded using 1mm hassock plates; As shown in figure 3, branch pier top distribution beam 4 and the junction of Bailey beam 5, in the pre-buried outrigger of shelf bracket 11 in the both sides of pier stud 8, shelf bracket 11 lower ends use angle pre-embedded steel slab, and horizontal beam is using pre-buried fining twisted steel 10, the symmetrical tensioning of prestressing force in pier stud 8, it is ensured that Supporting & stablizing, meets stress requirement;Column sets Bailey beam 5 with the top of shelf bracket 11, and Bailey beam 5 uses standard component, in the same direction The spacing of two panels Bailey beam 5 is adjusted according to profound arc difference inside and outside bridge floor;Profound arc difference is adjusted in two columns interval;As shown in figure 4, The position irised out in figure is the poor adjusting position of profound arc;Transverse distribution beam is laid on the top of Bailey beam 5, is easy to bridge top weight to be averaged It is assigned on column;The longitudinal H profile steel of distribution beam top laying, top sets full hall supertronic scaffold 6 again;Full hall supertronic scaffold 6 buckle supporting structure using disk, and the jacking of screw up and down that disk buckles support can be adjusted up and down, be easy to adjust the inside and outside height of upper mould Difference;It is poor using profound arc inside and outside the longitudinal pitch adjustment bridge of column, adjust the jacking up and down of crura membranacea hand cradle 6 to adjust using the full hall in top Choose face or so discrepancy in elevation.
Guizhou Province Kerry to Leishan expressway works lower long slope hinge interchange circle C, the bridge blocks of circle D two are respectively positioned on bar In La He river courses, relief is big, and maximum pier is high about more than 40 meters, and bridge plane is respectively positioned on circular curve and easement curve, and bridge floor is indulged Horizontal wall inscription is larger, is limited by river course excessively stream, it is impossible to use full framing system;Utilize steel pipe floor stand and the pattern of Bailey beam Solve because relief is big in scope residing for bridge, river course excessively stream, pier are higher, be unfavorable for the problem of full framing is set up; Steel pipe floor stand, because steel pipe post takes ground cotton knot seldom, has substantially no effect on excessively stream in the system of support bottom;Only need Several strong points are wanted, the influence that physical features injustice is caused can be solved to greatest extent using pile foundation of bearing platform plinth 1, while pile foundation also may be used Success solves the problem of foundation bearing capacity is uneven, pile foundation deeply in weathered rock formation 2m and more than, foundation bearing capacity, which is met, to be required, Using effect is as shown in Figure 1;The combination form of the double steel pipe pattern of steel pipe floor stand and unilateral 3 Bailey beams in top, every two The position of piece Bailey beam lapping ends is to the top of twin columns two of steel pipe post along bridge;The distance between this two panels Bailey beam basis The design requirement set up can between two-tube along bridge to adjustable range, per adjacent two Bailey beam between distance shorter explanation support Profound arc is shorter, otherwise profound arc is longer, and this solves the problem of profound arc is poor inside and outside bridge;Full hall supertronic scaffold 6 is used Disk buckles supporting structure, rod member upper and lower ends be equipped with above and below adjusting screw rod, the cope level of adjusting bracket can be achieved, also just realizes The regulation of the discrepancy in elevation above and below template, therefore solve bridge or so discrepancy in elevation using the form of jacking up and down of supertronic disk buckle scaffold and ask Topic;Built using steel pipe post and top and profit is repeated several times using what standard component, easy-to-assemble feature completed all material With property, rolled steel dosage is greatly reduced;Through Guizhou Province Kerry to Leishan tell highway engineering lower long slope hinge interchange circle C, The engineering practice data statistics of circle D bridge constructions, circle C, circle D bridges each 2 × 4 16 bridge beams of allying the communists reuse the set twice respectively System, set up from support, pre-pressing bracket, concrete engineering construction, maintenance, dismounting, again row support set up, pre-pressing bracket share one Individual month;Concrete engineering construction, maintenance, dismounting, take less than five months, greatly improve construction speed, also greatly drop Low rolled steel dosage;Undergo rainwater season, it was demonstrated that steel pipe support form is not influenceed by river course excessively stream, safety coefficient is high.
Steel pipe post is set to along longitudinal bridge double steel pipe form by the utility model, is carried out using the spacing between double steel pipe Become arc regulation;The adjustable scope of outer arc is eliminated in the range of all being produced between this two sections of steel pipe columns along along bridge longitudinal direction; Top Bailey beam 5 is standard knot, and its length for occupying steel pipe scope determines the length for adjusting profound arc difference, occupies longer, arc length It is shorter, occupy shorter, arc length is longer;The regulation of the bridge floor discrepancy in elevation is carried out by screw rod of the full hall supertronic scaffold about 6;Screw rod is adjusted The slope in length and breadth of pavement structure can be adjusted according to design requirement and be molded afterwards;Overall discrepancy in elevation regulation can utilize the pile foundation 1 of bottom Elevation is adjusted.
The utility model is simple in construction, quick construction, can batch production batch production, it is adaptable to which the support of cast-in-place beam body becomes Arc, supertronic problem;Efficiency of construction is high, the number of turnover is more, repeatable utilization, low cost.

Claims (9)

1. a kind of variable arc bridge floor stand device, it is characterised in that:Including pile foundation (1) and the steel pipe being disposed there above Post (2);It is provided with above steel pipe column (2) above branch pier top distribution beam (4), branch pier top distribution beam (4) and is provided with Bailey beam (5), Full hall supertronic support (6) is provided with above Bailey beam (5);Steel pipe column (2) includes the two root posts along bridge to setting;Column is phase Skewed horizontal load is provided between the steel pipe joint connected, two root posts;Cushion cap is provided between pile foundation (1) and steel pipe column (2), Pre-buried ring flange is used for the fixation of steel pipe column (2) in cushion cap;Pass through connector between steel pipe joint and between two root posts transverse direction (3) connect.
2. a kind of variable arc bridge floor stand device according to claim 1, it is characterised in that:The connector (3) For ring flange and Bolt.
3. a kind of variable arc bridge floor stand device according to claim 1, it is characterised in that:The skewed horizontal load with Steel pipe column is docked between (2) by termination steel plate, is connected using Bolt.
4. a kind of variable arc bridge floor stand device according to claim 1, it is characterised in that:Between the steel pipe joint It is provided with backing plate.
5. a kind of variable arc bridge floor stand device according to claim 1, it is characterised in that:The Bailey beam (5) With branch pier top distribution beam (4) junction, pier stud (8) both sides are provided with shelf bracket (11);It is provided with below shelf bracket (11) Bolt (9) is provided with angle steel plate, angle steel plate, pier stud (8) both sides are provided with screw-thread steel (10).
6. a kind of variable arc bridge floor stand device according to claim 1, it is characterised in that:The Bailey beam (5) Top is provided with transverse distribution beam.
7. a kind of variable arc bridge floor stand device according to claim 6, it is characterised in that:The transverse distribution beam Top is provided with longitudinal H profile steel.
8. a kind of variable arc bridge floor stand device according to claim 1, it is characterised in that:The full hall supertronic branch Frame (6) buckles supporting structure using disk;Full hall supertronic support (6) rod member upper and lower part is provided with adjusting screw rod.
9. a kind of variable arc bridge floor stand device according to claim 8, it is characterised in that:The full hall supertronic branch Frame (6) is additionally provided with self-locking device.
CN201621421589.3U 2016-12-23 2016-12-23 A kind of variable arc bridge floor stand device Expired - Fee Related CN206319260U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621421589.3U CN206319260U (en) 2016-12-23 2016-12-23 A kind of variable arc bridge floor stand device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621421589.3U CN206319260U (en) 2016-12-23 2016-12-23 A kind of variable arc bridge floor stand device

Publications (1)

Publication Number Publication Date
CN206319260U true CN206319260U (en) 2017-07-11

Family

ID=59259282

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621421589.3U Expired - Fee Related CN206319260U (en) 2016-12-23 2016-12-23 A kind of variable arc bridge floor stand device

Country Status (1)

Country Link
CN (1) CN206319260U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106522107A (en) * 2016-12-23 2017-03-22 中国水利水电第五工程局有限公司 Variable-arc bridge floor support device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106522107A (en) * 2016-12-23 2017-03-22 中国水利水电第五工程局有限公司 Variable-arc bridge floor support device
CN106522107B (en) * 2016-12-23 2018-07-20 中国水利水电第五工程局有限公司 A kind of variable arc bridge floor stand device

Similar Documents

Publication Publication Date Title
CN108004928B (en) A kind of asymmetric rigid frame-continuous girder construction technology
CN201933419U (en) Arch bridge arch rib cast-in-situ bracket
CN107905124B (en) A kind of symmetrical expression rigid frame-continuous girder construction technology
CN107974942B (en) A kind of abrupt slope side rigid frame-continuous girder end bay construction method
CN107905111B (en) A kind of rigid frame-continuous girder end bay construction technology
CN110886227B (en) Main tower cast-in-place lower cross beam support system and construction method
CN208917702U (en) Fish-bellied type concrete box girder cast-in-place construction formwork-support
CN107524096A (en) A kind of continuous girders by suspension grouting 0# blocks cast-in-place support and erection method
CN209816668U (en) Superelevation cable tower entablature construction support
CN112726411A (en) Integral dragging construction method for single-hole large cantilever steel truss girder
CN205242268U (en) Anchor triangular bracket
CN205242278U (en) A triangle string basket method is hanged and is watered device for deck bridge construction
CN206319260U (en) A kind of variable arc bridge floor stand device
CN104562944B (en) Long span steel-concrete composite beam cable-stayed bridge limit steel case anchoring temporarily system
CN106522107B (en) A kind of variable arc bridge floor stand device
CN211472207U (en) Suspension beam system for hoisting prefabricated section box girder
CN106381810B (en) With the cast-in-place outstanding method for filling beam of beam-column type bracket
CN204780635U (en) Super wide nonprismatic continuous beam 0# piece concreties and relieves construction structures
CN110424243A (en) A kind of Long span Tied-Arch Bridge Main Bridge jack-up system and jack-up construction method
CN209854576U (en) Trolley for construction of cover plate culvert or channel
CN203475793U (en) Bracket type overhanging scaffold
CN207714150U (en) Assemble holder in adhesion type high-altitude
CN204530507U (en) Long span steel-concrete composite beam cable-stayed bridge limit steel case anchoring temporarily system
CN203741727U (en) Cast-in-place support for zero section of long cantilever of extradosed cable-stayed bridge
CN111501531A (en) Construction method of V-shaped thin-wall pier and 0# block main beam supporting system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170711

Termination date: 20211223

CF01 Termination of patent right due to non-payment of annual fee