CN206299163U - Mobile reinforcement processes factory building - Google Patents
Mobile reinforcement processes factory building Download PDFInfo
- Publication number
- CN206299163U CN206299163U CN201621440544.0U CN201621440544U CN206299163U CN 206299163 U CN206299163 U CN 206299163U CN 201621440544 U CN201621440544 U CN 201621440544U CN 206299163 U CN206299163 U CN 206299163U
- Authority
- CN
- China
- Prior art keywords
- track
- cutting machine
- steel bracket
- steel
- road wheel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
A kind of Mobile reinforcement processes factory building, left steel bracket and right steel bracket are provided with along its length in the left and right sides of ceiling, the bottom of left steel bracket is provided with left road wheel, the bottom of right steel bracket is provided with right road wheel, it is equipped with that the left lateral matched with left road wheel and right road wheel walks track and right lateral walks track in cast concrete base, left lateral walks track and right lateral walks the length of track more than left steel bracket and the length of right steel bracket, cutting machine track is set in ceiling inner concrete substrate, cutting machine is provided with cutting machine track, the side of cutting machine is distributed with Steel bar rack, placed on Steel bar rack and need to be cut reinforcing bar, the placement direction of reinforcing bar is vertical with cutting machine track.The utility model have simple structure, it is reasonable in design, reinforcing bar need not be carried out on a large scale, large-scale transfer, save manpower.
Description
Technical field
The utility model belongs to the similar building technical field of special purpose, and in particular to Mobile reinforcement processing factory
Room.
Background technology
The reinforcing bar of a large amount of different lengths is frequently necessary in large-sized concrete building, in order to complete work in the specified period
Journey, speeds up the work, and engineering staff can at the scene build reinforcement yard's canopy, existing for the cutting processing of reinforcing bar
Reinforcing steel processing shed be to be respectively arranged with steel structure framework on the equally distributed concrete column in the left and right sides, on steel structure framework
Ceiling is provided with, existing reinforcing steel processing shed is fixed on the ground, it is necessary to special reinforcing bar mobile device is to steel during screwing steel bars
Muscle shift on a large scale, on a large scale, expends a large amount of manpowers, and steel bar meter efficiency is low.
Utility model content
Technical problem to be solved in the utility model is the shortcoming for overcoming existing reinforcing steel processing shed, there is provided a kind of structure
Simply, the time saving and energy saving Mobile reinforcement processing factory building of reasonable in design, high working efficiency.
Solving the technical scheme that is used of above-mentioned technical problem is:A left side is provided with along its length in the left and right sides of ceiling
Steel bracket and right steel bracket, the bottom of left steel bracket are provided with left road wheel, and the bottom of right steel bracket is provided with right road wheel,
It is equipped with that the left lateral matched with left road wheel and right road wheel walks track and right lateral walks track in cast concrete base, left lateral walks rail
Road and right lateral walk the length of track more than left steel bracket and the length of right steel bracket, and cutting machine is set in ceiling inner concrete substrate
Track, is provided with cutting machine on cutting machine track, the side of cutting machine is distributed with Steel bar rack, is placed on Steel bar rack and needs to be cut
Disconnected reinforcing bar, the placement direction of reinforcing bar is vertical with cutting machine track.
Ceiling of the present utility model is color steel canopy.
Left steel bracket of the present utility model and right steel bracket and ceiling are connected as a single entity, by left road wheel and right road wheel
Track is walked in left lateral and right lateral to be walked walked back and forth on track, ceiling can just pushed open during lifting reinforcing bar, lifting reinforcing bar is not received
Ceiling is influenceed, and cutting machine track is set in ceiling inner concrete substrate, and cutting machine, the one of cutting machine are provided with cutting machine track
Side is distributed with Steel bar rack, is placed on Steel bar rack and needs to be cut reinforcing bar, and the placement direction of reinforcing bar is vertical with cutting machine track, plus
During work reinforcing bar, the reinforcing bar that need to only extract stacking out is processed, without carrying out shifting on a large scale, on a large scale to reinforcing bar, this
Utility model has the advantages that simple structure, reasonable in design, saving manpower.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model.
Fig. 2 is the right view of Fig. 1.
Fig. 3 is the partial enlarged drawing of A in Fig. 1.
Fig. 4 is the partial enlarged drawing of B in Fig. 1.
Specific embodiment
With reference to the accompanying drawings and examples to the utility model further describe, but the utility model be not limited to it is following
Implementation method.
In Fig. 1,2, a kind of Mobile reinforcement of the present embodiment processes factory building by left steel bracket 1, cutting machine 2, cutting machine
Track 3, ceiling 4, right steel bracket 5, left lateral walk track 6, left road wheel 7, right road wheel 8, right lateral and walk track 9, means for supporting reinforcement steel bar
10th, cast concrete base 12 is connected and composed.
The left and right sides is equipped with that left lateral walks track 6 and right lateral walks track 9, left steel bracket 1 respectively in cast concrete base 12
Bottom is evenly distributed with 4 left road wheels 7 on along its length, left road wheel 7 is walked track 6 and matched with left lateral, such as Fig. 3, right steel
The bottom of support 5 is evenly distributed with 4 right road wheels 8 on along its length, right road wheel 8 is walked track 9 and matched with right lateral, such as schemes
4, left lateral walks track 6 and right lateral walks the length of track 9 more than left steel bracket 1 and the length of right steel bracket 5, left steel bracket 1 and the right side
The upper end screw threads for fastening connector of steel bracket 5 is fixedly connected with ceiling 4, and ceiling is color steel canopy, left steel bracket 1 and right steel bracket
5 and ceiling 4 be connected as a single entity, track 6 is walked in left lateral by left road wheel 7 and right road wheel 8 and right lateral is walked on track 9 come reversion
Walk, ceiling can just be pushed open during lifting reinforcing bar, lifting reinforcing bar is not influenceed by ceiling, positioned at left steel bracket 1 and right steel bracket 5
Between be equipped with cutting machine track 3 in cast concrete base 12, cutting machine track 3 and left lateral walk track 6 and right lateral is walked track 9 and hung down
Directly, cutting machine 2 is provided with cutting machine track 3, cutting machine 2 can be moved back and forth on cutting machine track 3, cast concrete base
The side of cutting machine track 3 is provided with equally distributed Steel bar rack 10 on 12, and reinforcing bar 11, reinforcing bar are placed with Steel bar rack 10
11 directions placed are vertical with cutting machine track 3, and during screwing steel bars 11, the reinforcing bar that need to only extract stacking out is processed, without
Reinforcing bar is carried out shifting on a large scale, on a large scale.
Claims (2)
1. a kind of Mobile reinforcement processes factory building, it is characterised in that:A left side is provided with along its length in the left and right sides of ceiling (4)
Steel bracket (1) and right steel bracket (5), the bottom of left steel bracket (1) are provided with left road wheel (7), and the bottom of right steel bracket is set
There is right road wheel (8), the left lateral matched with left road wheel (7) and right road wheel (8) is equipped with cast concrete base (12)
Walk track (6) and right lateral walk track (9), left lateral walks track (6) and right lateral walks the length of track (9) more than left steel bracket (1) and
The length of right steel bracket (5), sets cutting machine track (3) on ceiling inner concrete substrate (12), set on cutting machine track (3)
The side for having cutting machine (2), cutting machine (2) is distributed with Steel bar rack (10), is placed on Steel bar rack (10) and needs to be cut reinforcing bar
(11), the placement direction of reinforcing bar (11) is vertical with cutting machine track (3).
2. Mobile reinforcement according to claim 1 processes factory building, it is characterised in that:Described ceiling (4) is color steel canopy.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621440544.0U CN206299163U (en) | 2016-12-27 | 2016-12-27 | Mobile reinforcement processes factory building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621440544.0U CN206299163U (en) | 2016-12-27 | 2016-12-27 | Mobile reinforcement processes factory building |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206299163U true CN206299163U (en) | 2017-07-04 |
Family
ID=59205828
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621440544.0U Active CN206299163U (en) | 2016-12-27 | 2016-12-27 | Mobile reinforcement processes factory building |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206299163U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2019183946A1 (en) * | 2018-03-30 | 2019-10-03 | 深圳市君盈建筑科技有限公司 | Steel bar prefabrication system |
CN116378482A (en) * | 2023-03-30 | 2023-07-04 | 中交第二航务工程局有限公司 | Assembled multifunctional mobile factory and cast-in-place concrete structure construction method |
-
2016
- 2016-12-27 CN CN201621440544.0U patent/CN206299163U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2019183946A1 (en) * | 2018-03-30 | 2019-10-03 | 深圳市君盈建筑科技有限公司 | Steel bar prefabrication system |
CN116378482A (en) * | 2023-03-30 | 2023-07-04 | 中交第二航务工程局有限公司 | Assembled multifunctional mobile factory and cast-in-place concrete structure construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204278192U (en) | The vertical assembling die of sectionalized house production line | |
CN203961992U (en) | Portable full framing chassis | |
CN206299163U (en) | Mobile reinforcement processes factory building | |
CN101786539A (en) | Conveying chain for tubular pile production | |
CN203247031U (en) | Hoisting device for curtain board transporting | |
CN202245016U (en) | Transfer trolley special for switch cabinet bus bars | |
CN102322138A (en) | The modular sliding formwork | |
CN203111921U (en) | Manual track transporting device used in solar greenhouse | |
CN202745385U (en) | Concrete pouring chute | |
CN203668772U (en) | Hoisting device for base construction formwork of high speed railway ballastless track | |
CN201407063Y (en) | Multifunctional tunnel operating platform frame | |
CN202864836U (en) | Heat preservation building block carrying trolley | |
CN202227705U (en) | Stretching device | |
CN202012701U (en) | Novel theodolite rack | |
CN202000263U (en) | Descending type movable die frame structure | |
CN202388173U (en) | Forklift upper frame welding tool | |
CN204886019U (en) | A cable pulley for trigeminy mouth of pipe department | |
CN202047828U (en) | Movable and light-weight trolley formwork base plate system | |
CN203514751U (en) | Convenient-to-move scaffold for building interior wall construction | |
CN202055496U (en) | Easy-to-adjust moving operation platform | |
CN202001022U (en) | Movable lining arch center formwork | |
CN204899034U (en) | Prefabricated wall post | |
CN202139842U (en) | Module type slip form | |
CN201367686Y (en) | Transporting device for installing louver frame | |
CN205502060U (en) | Device in pre -buried power plant dust remover basis rag bolt hole |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |