CN206268599U - Pipeline installation system - Google Patents

Pipeline installation system Download PDF

Info

Publication number
CN206268599U
CN206268599U CN201621229805.4U CN201621229805U CN206268599U CN 206268599 U CN206268599 U CN 206268599U CN 201621229805 U CN201621229805 U CN 201621229805U CN 206268599 U CN206268599 U CN 206268599U
Authority
CN
China
Prior art keywords
type
hydraulic platform
suspension rod
jacking
suspension
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621229805.4U
Other languages
Chinese (zh)
Inventor
于晓明
张亮
陈渊鸿
刘立扬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction Group Co Ltd
Original Assignee
Shanghai Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Construction Group Co Ltd filed Critical Shanghai Construction Group Co Ltd
Priority to CN201621229805.4U priority Critical patent/CN206268599U/en
Application granted granted Critical
Publication of CN206268599U publication Critical patent/CN206268599U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model provides a kind of pipeline installation system, the utility model by monoblock type electromechanics prefabricated components finished product load segment and jacking type integral installation hydraulic platform, wherein, the electromechanical prefabricated components finished product load segment of the monoblock type, including:Suspension and support suspension rod, the suspension and support suspension rod is connected with main component;Cross-arm, the suspension and support suspension rod is vertically connected by screw bolt and nut with cross-arm, and the cross-arm uses Two bors d's oeuveres C-type steel;Take root in the gap that the Two bors d's oeuveres C-type steel is formed pipe clamp, one end of pipe clamp;Duct section, duct section is enclosed within the other end of the pipe clamp, monoblock type electromechanics prefabricated components finished product load segment is adjusted up and down by the screw bolt and nut between cross-arm and the suspension and support suspension rod, pipeline left and right adjusting is realized by the pipe clamp in the movement gap, improve efficiency of construction and construction quality.

Description

Pipeline installation system
Technical field
The utility model is related to a kind of pipeline installation system.
Background technology
Electromechanical installation has the characteristics of systemic strong, specialized fields is more, and ken is wide, coverage is big, as Whether the important component of architectural engineering, electromechanics installs the total quality for rationally directly influencing engineering.With the hair of society Exhibition, electromechanical engineering shows that scale big, system complex, quality requirement be high, short time limit development trend, the mutual system of various factors It is about increasingly severe, while people are low to building the attention rate also more and more higher of green energy conservation, existing Pipe installing efficiency, accurately Degree is not high.
Utility model content
The purpose of this utility model is to provide a kind of pipeline installation system and method, it is possible to increase the construction of Pipe installing Efficiency and quality.
To solve the above problems, the utility model provides a kind of pipeline installation system,
Including monoblock type electromechanics prefabricated components finished product load segment and jacking type integral installation hydraulic platform, wherein,
The monoblock type electromechanics prefabricated components finished product load segment, including:Suspension and support suspension rod, the suspension and support suspension rod and main body Component is connected;Cross-arm, the suspension and support suspension rod is vertically connected by screw bolt and nut with cross-arm, and the cross-arm uses Two bors d's oeuveres c-type Steel;Take root in the gap that the Two bors d's oeuveres C-type steel is formed pipe clamp, one end of pipe clamp;Duct section, duct section is enclosed within the pipe clamp In the other end;
The jacking type integral installation hydraulic platform, including:Jacking type hydraulic platform;
The motor being connected with the jacking type hydraulic platform;
It is arranged at the step and distribution box of the jacking type hydraulic platform side, the distribution box and the motor Connection;
It is arranged at deflecting roller, the rear walking wheel of the jacking type hydraulic platform bottom.Further, in said system, The Two bors d's oeuveres C-type steel is monoblock type Two bors d's oeuveres 6# channel-section steels.
Further, in said system, the jacking type integral installation hydraulic platform, also including being arranged at the jacking The mop of formula hydraulic platform bottom.
Further, in said system, the jacking type integral installation hydraulic platform, also including being arranged at the jacking Guardrail around the scope of operation of formula hydraulic platform.
Further, in said system, the system also includes the suspension rod base being fixed in agent structure, the branch Suspension bracket suspension rod is installed on the mounting hole of the suspension rod base by bolt.
Further, in said system, the suspension rod base is convex.
Further, in said system, the suspension rod base is fixed in the agent structure by expansion bolt.
Further, in said system, the jacking type integral installation hydraulic platform, also including being arranged at the jacking The scope of operation controlling switch of formula hydraulic platform, the controlling switch is connected with the motor.
Further, in said system, the duct section is 6 meters one section.
Further, in said system, the pipe clamp is p-type pipe clamp.
Compared with prior art, the utility model is by monoblock type electromechanics prefabricated components finished product load segment and jacking type entirety Hydraulic platform is installed, wherein, the monoblock type electromechanics prefabricated components finished product load segment, including:Suspension and support suspension rod, the suspension and support Suspension rod is connected with main component;Cross-arm, the suspension and support suspension rod is vertically connected by screw bolt and nut with cross-arm, and the cross-arm is adopted Use Two bors d's oeuveres C-type steel;Take root in the gap that the Two bors d's oeuveres C-type steel is formed pipe clamp, one end of pipe clamp;Duct section, duct section is enclosed within In the other end of the pipe clamp, by the screw bolt and nut between cross-arm and the suspension and support suspension rod to monoblock type electromechanics prefabricated components Finished product load segment is adjusted up and down, and pipeline left and right adjusting is realized by the pipe clamp in the movement gap, improve efficiency of construction and Construction quality.
Brief description of the drawings
Fig. 1 is the flow chart of the building electromechanical engineering assembled integral installation method of the embodiment of the utility model one;
Fig. 2 is the scheme of installation of the adjustable prefabricated hanger system of the embodiment of the utility model one;
Fig. 3 is the connection diagram of agent structure in Fig. 2 and suspension rod base;
Fig. 4 be the pipe clamp in Fig. 2 one end take root the Two bors d's oeuveres C-type steel formed gap in schematic diagram
Fig. 5 is the connection diagram of the suspension and support suspension rod in Fig. 2 and cross-arm;
Fig. 6 is the flow chart based on BIM Yu intelligent robot total powerstation setting-out flow chart of the embodiment of the utility model one;
Fig. 7 is the schematic diagram of the jacking type integral installation hydraulic platform of the embodiment of the utility model one;
Fig. 8 is the structure chart of the adjustable prefabricated hanger system of the embodiment of the utility model one.
Specific embodiment
To enable above-mentioned purpose of the present utility model, feature and advantage more obvious understandable, below in conjunction with the accompanying drawings and tool Body implementation method is described in further detail to the utility model.
As shown in Fig. 2~5,7 and 8, the utility model provides a kind of pipeline installation system, including:
Including monoblock type electromechanics prefabricated components finished product load segment and jacking type integral installation hydraulic platform 7, wherein,
The monoblock type electromechanics prefabricated components finished product load segment, including:Suspension and support suspension rod 1, the suspension and support suspension rod 1 and master Body component is connected;Cross-arm 3, is as shown in Figure 5 the connection diagram of the suspension and support suspension rod 1 in Fig. 2 and cross-arm, and the suspension and support hangs Bar 1 is vertically connected by bolt 32 and nut 33 with cross-arm 3, and the cross-arm 3 is using Two bors d's oeuveres C-type steel 31;Pipe clamp 4, as shown in Figure 4 Be 200 in Fig. 2 at one end of pipe clamp take root in the gap that the Two bors d's oeuveres C-type steel is formed, one end of the pipe clamp 4 is taken root In the gap that the Two bors d's oeuveres C-type steel is formed;Duct section 5, duct section is enclosed within the other end of the pipe clamp;
As shown in fig. 7, the jacking type integral installation hydraulic platform 7, including:Jacking type hydraulic platform 72;
The motor 74 being connected with the jacking type hydraulic platform 72;
It is arranged at the step 73 and distribution box 75 of the jacking type hydraulic platform side, the distribution box and the driving Motor connection;
It is arranged at deflecting roller 76, the rear walking wheel 77 of the bottom of jacking type hydraulic platform 72.
Preferably, above-mentioned pipeline installation system, the Two bors d's oeuveres C-type steel is monoblock type Two bors d's oeuveres 6# channel-section steels.
Preferably, as shown in fig. 7, above-mentioned pipeline installation system, the jacking type integral installation hydraulic platform, also including setting It is placed in the mop 78 of the bottom of jacking type hydraulic platform 72.
Preferably, as shown in fig. 7, above-mentioned pipeline installation system, the jacking type integral installation hydraulic platform, also including setting The guardrail 71 being placed in around the scope of operation of the jacking type hydraulic platform 72.
Preferably, be as shown in Figure 3 in Fig. 2 100 at agent structure 2 and suspension rod base 6 connection diagram, above-mentioned pipe Road installation system, the system also includes the suspension rod base 6 being fixed in agent structure 2, and the suspension and support suspension rod passes through bolt It is installed on the mounting hole of the suspension rod base.Preferably, as shown in figure 8, the suspension rod base 6 is convex.
Preferably, above-mentioned pipeline installation system, the suspension rod base is fixed in the agent structure by expansion bolt.
Preferably, above-mentioned pipeline installation system, the jacking type integral installation hydraulic platform, also including being arranged at the top The scope of operation controlling switch of lift-type hydraulic platform, the controlling switch is connected with the motor.
Preferably, the duct section is 6 meters one section.
Preferably, the pipe clamp is p-type pipe clamp.
As shown in figure 1, using a kind of building electromechanical engineering assembled integral installation method of above-mentioned pipeline installation system, bag Include Deepen Design (S100), prefabricated processing (S200), transport dispatching (S300), installation setting-out (S400), integral installation (S500):
Step S100, prefabricated components modularized design:After collision detection and pipeline global optimization is completed, various electromechanics System is combined, and modular division is carried out to electromechanical pipeline according to default modulus, and each modularizing member is carried out Numbering and in-depth, form the processing drawing of the adjustable prefabricated hanger system of each module, here, Deepen Design (S100) is wrapped Include prefabricated components Module Division, hanger system and design two parts, in order to strengthen the flexibility of prefabrication system, devising one kind can The prefabricated hanger system of regulation, in complete procedure, it is possible to achieve the level of integrated precast component and prefabricated pipeline and perpendicular To regulation;Preferably, each Professional Model integration, electromechanical in-depth model is obtained after carrying out pipeline layout, global optimization, entirely Specialty realizes that duct section is divided by mono- section of 6m, and duct section is numbered, formed the prefabricated hanger system of each module plus Work drawing;
Step S200, monoblock type electromechanics prefabricated components processing:Most of being operated in factory of prefabricated processing is carried out, according to institute The processing drawing of the adjustable prefabricated hanger system of each module is stated, it is pre- to carry out compact plant to electromechanical pipe fitting and suspension and support System and assembled, formation monoblock type electromechanics prefabricated components finished product load segment, according to processing numbering to integrated precast electromechanics structure Part is encoded, here, for the duct section for having heat-insulation layer, heat-insulation layer it is integral prefabricated enter the monoblock type electromechanics prefabricated components into In product load segment;
Step S300, prefabricated components dispatching and installation process protection:Larger problem is finished product in component delivery process The protection of component, monoblock type electromechanics prefabricated components are easily deformed in dispatching, stacking, installation process, and this is installed to electromechanics Quality produces the influence, or even appearance cannot to install phenomenon, in order to overcome the above difficult, by delivery process management and control and installs additional and can return The various ways such as the protection device of receipts are protected to monoblock type electromechanics prefabricated components finished product load segment;Here, in order to strengthen into Product are protected, there is provided a kind of repeatable component protection device for utilizing, protects component not receive in dispatching, stacking, installation process Damage, after completing factory process, entrucking carried out again after monoblock type electromechanics prefabricated components finished product load segment and protection device are integrated, As main stressing device in installation process, the protection device is reclaimed after installation is complete, be capable of achieving recycling;It is preferred that , monoblock type electromechanics prefabricated components finished product load segment is carried out into bulk transport, according to monoblock type electromechanics prefabricated components finished product The numbering of load segment presses system entrucking, it is to avoid because unknown, the system imperfection of numbering causes to stop work or does over again in assembling process;
Step S400, the setting-out based on BIM models and robotic total station:Monoblock type electromechanics prefabricated components finished product load segment The setting-out of mount point position be extremely important step in prefabricated electromechanical components integral installation, it is traditional electromechanical unwrapping wire mode to be installed Precision is not high, efficiency is low, the technology and experience dependence to unwrapping wire personnel are big, and this method employs a kind of based on BIM models Intelligent robot total powerstation carries out setting-out mode to the mount point position of monoblock type electromechanics prefabricated components finished product load segment, greatly improves Setting-out efficiency, precision is higher, simple to operate, easy left-hand seat;Preferably, as shown in fig. 6, the intelligent robot based on BIM is complete Instrument setting-out of standing is needed by S401 model treatments (data preparation), the selection of S402 layout points, the treatment of S403 coordinates and importing, S404 If standing, S404 setting-outs mark several steps;Preferably, using the intelligent robot total powerstation based on BIM models to monoblock type machine The mount point position of electric prefabricated components finished product load segment carries out setting-out, including:
In directly extracting each segmentation module in the model comprising electromechanical model and hanger system model suspension and support and Shaped piece position coordinate, setting-out coordinate file is derived through setting-out treatment software, and coordinate file and three-dimensional BIM models are integrated Setting-out manager is imported, selects suitable position to set station, each layout point is marked, lofting instrument is remembered to setting-out after setting-out is completed The automatic storage of record, the method only need to once set station, and high degree of automation, efficiency is very fast;
Step S500, assembled electromechanical components integral installation:Often moulding is complicated for integrated precast component, and weight is big, hangs Dress difficulty is big, in order to improve installation quality and efficiency, it is ensured that installation process safety, using jacking type integral installation hydraulic platform root According to the setting-out result of mount point position, monoblock type electromechanics prefabricated components finished product load segment is installed, this method is employed A kind of jacking type integral installation hydraulic platform, the platform directly can be transported to installation site, and complete prefabricated components by stockyard Disposable to install, installation effectiveness is high, manually less, it is safe.Herein, it is proposed that a kind of prefabricated electromechanical components integral installation side Method, devises a kind of adjustable hanger system, realizes that finished product member is protected using certain recoverable apparatus, in prefabricated components During integral installation, automatic unwrapping wire is realized with the intelligent robot total powerstation based on BIM, use a kind of and construction party The supporting jacking type hydraulic installalion platform of method, sums up a set of building prefabricated assembled integral installation method of electromechanical engineering, the party Method only need once mounting can complete multi-pipeline install, reduce work high above the ground, reduce in-site installation auxiliary facility, improve scene Installation effectiveness, accelerates progress, improves working security.
Preferably, using jacking type integral installation hydraulic platform according to the mount point position setting-out result, to monoblock type Electromechanical prefabricated components finished product load segment is installed, including:
Jacking type integral installation hydraulic platform is used according to the setting-out result, by monoblock type electromechanics prefabricated components finished product dress With 10~15cm under section jacking to designed elevation, suspension and support suspension rod is bolted with suspension rod base, continued monoblock type 3~5cm under electromechanical prefabricated components finished product load segment jacking to designed elevation, by screw bolt and nut by cross-arm vertically with the branch Suspension bracket suspension rod is connected, and monoblock type electromechanics prefabricated components finished product is filled by the screw bolt and nut between cross-arm and the suspension and support suspension rod Adjusted up and down with section, using monoblock type Two bors d's oeuveres C-type steel as the cross-arm for connecting suspension and support suspension rod, by the pipe clamp of fixed -piping section One end is taken root in the gap that the Two bors d's oeuveres C-type steel is formed, and duct section is enclosed within the other end of pipe clamp, by the movement gap In pipe clamp realize pipeline left and right adjusting, until each pipeline section concentric co-axial, two intersegmental connectors of pipeline are installed, complete overall After the integral installation of formula electromechanics prefabricated components finished product load segment, to the duct section in monoblock type electromechanics prefabricated components finished product load segment Levelness is tested and finely tuned, and makes all pipeline section holding levels, protection device is removed, to the secondary rust prevention by applying liquid material paint of duct section.
Preferably, as shown in Fig. 2 forming the processing drawing of the adjustable prefabricated hanger system of each module, including:
Suspension and support suspension rod is connected by bolt with the built-in fitting of main component, using monoblock type Two bors d's oeuveres 6# channel-section steels as connection The cross-arm of the suspension and support suspension rod, one end of the pipe clamp of fixed -piping section is taken root in the gap that the Two bors d's oeuveres C-type steel is formed, Duct section is enclosed within the other end of pipe clamp, it is possible to achieve prefabricated pipeline section left and right displacement, suspension and support suspension rod passes through screw bolt and nut Vertically it is connected with cross-arm, it is possible to achieve suspension bracket cross-arm is moved up and down.
Preferably, as shown in figure 4, the jacking type integral installation hydraulic platform, including:
Jacking type hydraulic platform;
The motor being connected with the jacking type hydraulic platform;
It is arranged at the step and distribution box of the jacking type hydraulic platform side, the distribution box and the motor Connection;
It is arranged at deflecting roller, rear walking wheel and the mop of the jacking type hydraulic platform bottom;
It is arranged at the guardrail around the scope of operation of the jacking type hydraulic platform.Here, workmen passes through the mop Deflecting roller, rear walking wheel are driven, and then whole jacking type integral installation hydraulic platform is moved to the position for needing installation Bottom, the scope of operation of the jacking type hydraulic platform is climbed to by the step, then electric to driving by distribution control box Machine is powered, and motor drives jacking type hydraulic platform jacking to the height for needing, convenient in the jacking type hydraulic flat Workmen carries out the integral installation operation of building electromechanical engineering assembled on platform, in addition, the guardrail has protection on the top The effect of the construction safety of workmen on lift-type hydraulic platform.
Preferably, the jacking type integral installation hydraulic platform, also including being arranged at the work of the jacking type hydraulic platform Industry face controlling switch, the controlling switch is connected with the motor, the convenient constructor on the jacking type hydraulic platform Member need the jacking of height to operate jacking type integral installation hydraulic platform.
Preferably, the pipe clamp is p-type pipe clamp.
Above-mentioned building electromechanical engineering assembled integral installation method, including monoblock type electromechanics prefabricated components design is designed and added Work, prefabricated components finished product protection, the setting-out based on BIM models and robotic total station, assembled electromechanical components integral installation, lead to Cross and electromechanical prefabricated components are realized with upper type be disposably integrally lifted into position, compared with conventional mounting mode, improve construction Efficiency and construction quality, shorten the duration, and not only finished product is attractive in appearance, and reduce workman's work high above the ground, improve work progress Security.
In sum, the utility model is by monoblock type electromechanics prefabricated components finished product load segment and jacking type integral installation liquid Flattening bench, wherein, the monoblock type electromechanics prefabricated components finished product load segment, including:Suspension and support suspension rod, the suspension and support suspension rod with Main component is connected;Cross-arm, the suspension and support suspension rod is vertically connected by screw bolt and nut with cross-arm, and the cross-arm uses Two bors d's oeuveres C-type steel;Take root in the gap that the Two bors d's oeuveres C-type steel is formed pipe clamp, one end of pipe clamp;Duct section, duct section is enclosed within the pipe In the other end of card, monoblock type electromechanics prefabricated components finished product is filled by the screw bolt and nut between cross-arm and the suspension and support suspension rod Adjusted up and down with section, pipeline left and right adjusting is realized by the pipe clamp in the movement gap, improve efficiency of construction and construction matter Amount.
Each embodiment is described by the way of progressive in this specification, and what each embodiment was stressed is and other The difference of embodiment, between each embodiment identical similar portion mutually referring to.
Obviously, those skilled in the art can carry out various changes to utility model and modification is new without deviating from this practicality The spirit and scope of type.So, if it is of the present utility model these modification and modification belong to the utility model claim and its Within the scope of equivalent technologies, then the utility model is also intended to including including these changes and modification.

Claims (10)

1. a kind of pipeline installation system, it is characterised in that whole including monoblock type electromechanics prefabricated components finished product load segment and jacking type Body installs hydraulic platform, wherein,
The monoblock type electromechanics prefabricated components finished product load segment, including:Suspension and support suspension rod, the suspension and support suspension rod and main component Connection;Cross-arm, the suspension and support suspension rod is vertically connected by screw bolt and nut with cross-arm, and the cross-arm uses Two bors d's oeuveres C-type steel;Pipe Take root in the gap that the Two bors d's oeuveres C-type steel is formed card, one end of pipe clamp;Duct section, duct section is enclosed within the another of the pipe clamp In end;
The jacking type integral installation hydraulic platform, including:Jacking type hydraulic platform;
The motor being connected with the jacking type hydraulic platform;
The step and distribution box of the jacking type hydraulic platform side are arranged at, the distribution box connects with the motor Connect;
It is arranged at deflecting roller, the rear walking wheel of the jacking type hydraulic platform bottom.
2. pipeline installation system as claimed in claim 1, it is characterised in that the Two bors d's oeuveres C-type steel is monoblock type Two bors d's oeuveres 6# grooves Steel.
3. pipeline installation system as claimed in claim 1, it is characterised in that the jacking type integral installation hydraulic platform, also Mop including being arranged at the jacking type hydraulic platform bottom.
4. pipeline installation system as claimed in claim 1, it is characterised in that the jacking type integral installation hydraulic platform, also Including the guardrail being arranged at around the scope of operation of the jacking type hydraulic platform.
5. pipeline installation system as claimed in claim 1, it is characterised in that the system also includes being fixed in agent structure Suspension rod base, the suspension and support suspension rod is installed on the mounting hole of the suspension rod base by bolt.
6. pipeline installation system as claimed in claim 5, it is characterised in that the suspension rod base is convex.
7. pipeline installation system as claimed in claim 1, it is characterised in that the suspension rod base is fixed on by expansion bolt In the agent structure.
8. pipeline installation system as claimed in claim 1, it is characterised in that the jacking type integral installation hydraulic platform, also Scope of operation controlling switch including being arranged at the jacking type hydraulic platform, the controlling switch is connected with the motor.
9. pipeline installation system as claimed in claim 1, it is characterised in that the duct section is 6 meters a section.
10. pipeline installation system as claimed in claim 1, it is characterised in that the pipe clamp is p-type pipe clamp.
CN201621229805.4U 2016-11-16 2016-11-16 Pipeline installation system Active CN206268599U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621229805.4U CN206268599U (en) 2016-11-16 2016-11-16 Pipeline installation system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621229805.4U CN206268599U (en) 2016-11-16 2016-11-16 Pipeline installation system

Publications (1)

Publication Number Publication Date
CN206268599U true CN206268599U (en) 2017-06-20

Family

ID=59040018

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621229805.4U Active CN206268599U (en) 2016-11-16 2016-11-16 Pipeline installation system

Country Status (1)

Country Link
CN (1) CN206268599U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106677534A (en) * 2016-11-16 2017-05-17 上海建工集团股份有限公司 Assembly integral building electromechanical engineering installation system and method
CN110080821A (en) * 2019-06-04 2019-08-02 中铁上海工程局集团第二工程有限公司 A kind of synthesis suspension and support installation method in the underground space

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106677534A (en) * 2016-11-16 2017-05-17 上海建工集团股份有限公司 Assembly integral building electromechanical engineering installation system and method
CN110080821A (en) * 2019-06-04 2019-08-02 中铁上海工程局集团第二工程有限公司 A kind of synthesis suspension and support installation method in the underground space

Similar Documents

Publication Publication Date Title
CN106677534A (en) Assembly integral building electromechanical engineering installation system and method
CN108468430B (en) Hoisting and sliding construction method for large-span unequal-height support steel truss structure
CN111306363A (en) Assembly type fire pump room hoisting construction method and construction structure based on BIM technology
CN104895035B (en) The large-scale ship reception chamber Efficient installation method of vertical ship lift and installation positioning assisting tooling device
CN206268599U (en) Pipeline installation system
CN107990052A (en) A kind of pipeline assembled hanger installation method
CN207063553U (en) A kind of machinery builds brick wall device by laying bricks or stones
CN110407097A (en) The construction method of the novel phase modifier of lifting based on portal frame and Lao Xinge device
CN102926538A (en) Reaction box and construction method of reaction wall
CN112663516A (en) Construction method of bridge thin-wall hollow pier column
CN106193330A (en) A kind of steel building construction land tenure foot bolt pre-embedded construction method
CN202033093U (en) Billet on-line weighing device
CN105013899B (en) Bending component forming method based on BIM technology
CN207606968U (en) A kind of compartmented Full-automatic production line for shield duct piece
CN112252476A (en) Large-scale steel pipe concrete column pouring construction structure and construction method
CN204023597U (en) A kind of trailer system of carrying large caisson
CN109441187A (en) A kind of full automatic vehicle that flexibility ratio is high is walked to position mobile mechanism with aid self
CN106948274A (en) A kind of adjacent high pier circulation of bridge pours climb construction machinery and construction technology
CN202064281U (en) Slip form frame
CN209381044U (en) Modularization movable multi-layer piles up steam-cured PC component production system
Askar et al. International journal of engineering sciences & research technology design of automatic wall plastering machine
CN207315632U (en) A kind of prefabricated circulating pump group assembly unit
CN204662408U (en) The large-scale ship reception chamber of vertical ship lift efficiently installs positioning assisting tooling device
CN205224420U (en) Anticorrosive industry factory building precast concrete stand