CN206267173U - A kind of high-strength light antiseepage antidetonation piping lane - Google Patents
A kind of high-strength light antiseepage antidetonation piping lane Download PDFInfo
- Publication number
- CN206267173U CN206267173U CN201621220305.4U CN201621220305U CN206267173U CN 206267173 U CN206267173 U CN 206267173U CN 201621220305 U CN201621220305 U CN 201621220305U CN 206267173 U CN206267173 U CN 206267173U
- Authority
- CN
- China
- Prior art keywords
- wallboard
- piping lane
- arched door
- base plate
- antiseepage
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Duct Arrangements (AREA)
Abstract
A kind of high-strength light antiseepage antidetonation piping lane, including arched door, it is bolted the wallboard being vertically arranged respectively in the two ends bottom of arched door, base plate is provided between the bottom of two wallboards, the both sides of base plate are connected by bolt with corresponding wallboard respectively, and sealing joint strip is respectively equipped between the junction of the junction of wallboard and arched door, wallboard and base plate.Rationally, intensity is high, short construction period, the low advantage of operating expenses for its structure and construction technology.
Description
Technical field:
The utility model is related to a kind of high-strength light antiseepage antidetonation piping lane.
Background technology:
Nowadays underground pipe gallery is used as the measure that road is excavated repeatedly is thoroughly solved by increasing city.It is special
It is not instruction (Office of the State Council sends out (2015) No. 61) public affairs built on propulsion Urban Underground pipe gallery in the General Office of the State Council
After cloth, its target is, to the year two thousand twenty, to build up a collection of underground pipe gallery with international most advanced level and put into effect.
The underground pipe gallery in national each province and city turns into focus between building for the moment.Traditional underground pipe gallery construction has two ways:First,
Field cast-in-place, two, prefabrication.
Field cast-in-place underground pipe gallery digging in-situ is wider, to ensure that enough construction operation spaces, therefore soil are left in both sides
Square excavated volume is big, and backfill amount is also larger;Because all working is completed at the scene, so side wall and top board are intended to configuration template,
And roof plate template has to be removed after concrete is fully achieved intensity, long construction period, artificial demand is big, Suo Youyuan
Material transports to scene with bulk form, pollutes environment, and concrete cast-in-site, requirement of manually vibrating is high, if it is unreal to vibrate,
Leakage hidden trouble can be left, and on-site concrete curing condition is poor, and the possibility that micro-crack occurs in concrete is larger, and the later stage can lead to
Cross micro-crack infiltration.
The prefabricated piping lane of tradition saves prefabricated piping lane and is spliced at the scene by one, and splicing seams are more, anti-at splicing seams
Water requirement is high, and difficulty is big, and particularly transporting and hoisting is difficult, it is necessary to mass transit vehicle and Large-scale Hoisting equipment, and construction cost is high;
To save prefabricated piping lane be overall prefabrication due to one, and mould is complicated, it is impossible to which production line balance, producing efficiency is low, and in advance
Tubulation corridor takes up room greatly, so bicycle time freight volume is small, influences construction speed.Although also occurring in that corrugated underground at this stage
Piping lane, but this piping lane needs to be put in again after holding hole successfully with shield machine, and time-consuming to take a lot of work arduously, long construction period is applied
Expenses of labour is very high, less economical.
Utility model content:
The utility model is in order to make up the deficiencies in the prior art, there is provided a kind of high-strength light antiseepage antidetonation piping lane, and it is tied
Rationally, intensity is high, and short construction period, operating expenses is low, solves problems of the prior art for structure and construction technology.
The utility model is that the technical scheme that solution above-mentioned technical problem is used is:
A kind of high-strength light antiseepage antidetonation piping lane, including arched door, are bolted perpendicular respectively in the two ends bottom of arched door
The straight wallboard for setting, is provided with base plate between the bottom of two wallboards, and the both sides of base plate pass through bolt and corresponding wallboard respectively
It is connected, sealing joint strip is respectively equipped between the junction of the junction of wallboard and arched door, wallboard and base plate.
Preferably, reinforcer is provided with wallboard outer surface and/or inner surface, the reinforcer includes being installed in surfaces of wall
The some cross reinforcings being staggered and vertical strengthening ribs.
Preferably, spaced apart interior reinforcer is provided with inside wallboard and arched door, the interior reinforcer includes that two strengthen
Post and the arched door reinforcement being engaged with arched door shape, the reinforcing prop are connected with wallboard inner side by bolt, and the arched door adds
Strong muscle is connected with arched door inner side by bolt;The cross-sectional area of the reinforcing prop is sequentially reduced setting from top to bottom.
Preferably, the outside of the wallboard is connected with the side of external arched door by bolt, the opposite side bottom of external arched door
Portion is bolted an external wallboard, and external base plate, the both sides difference of external base plate are provided between external wallboard and wallboard
It is connected with external wallboard and wallboard by bolt.
Preferably, the outside of the wallboard is connected with the side of external arc, the opposite side and wallboard of external arc
Between be provided with external base plate, the both sides of external base plate are connected by bolt with external arc and wallboard respectively.
Preferably, some blind screwed holes are provided with the inside of wallboard;Passage is provided with the top of arched door, passage is connected with to be stretched
Fiberglass breather pipe outside to ground;Automatic lifting maintenance step ladder, fire resistant doorsets, fire alarm system, gas are provided with inside piping lane
Warning system, fire fighting device and loading detection warning system.
Preferably, the base plate is arc, and the surfaces externally and internally of base plate, wallboard and arched door is respectively equipped with zinc coat, zinc-plated
Thickness degree is 80-300 microns, and the outer wall of outer surface zinc coat is coated with antiseptic waterproof dope layer, the inwall of inner surface zinc coat
It is coated with flame-retardant coating layer.
A kind of construction method of high-strength light antiseepage antidetonation piping lane, it is characterised in that:Comprise the following steps:
S1, arched door, wallboard and base plate are assembled into several piping lane monomers at the scene;
S2, excacation pitted surface;
S3, piping lane monomer is put into work pitted surface, piping lane monomer is headed into according to predetermined direction with dedicated hydraulic device
To in original soil;
When S4, the length headed into original soil in piping lane monomer account for the 70%-90% of total length, in the end sleeve of piping lane monomer
A bearing sleeve is filled, then the other end in bearing sleeve inserts another piping lane monomer, then proceed to use dedicated hydraulic device by piping lane list
Body is pushed into original soil according to predetermined direction, above-mentioned action is repeated, until the piping lane length of several piping lane monomer compositions reaches
It is required that length;
S5, the original soil in piping lane is transported.
Preferably, also comprise the following steps after S5:S6, the interior reinforcer of installation in piping lane.
Preferably, the bearing sleeve includes the body being engaged with piping lane monomer shape, body inwall middle part clamp one and pipe
The spacing shock absorbing ring that corridor monomer is abutted, if being provided with arterial highway seal groove on the body inwall of spacing shock absorbing ring both sides, in sealing
Sealing ring is respectively equipped with ring recess.
Compared with prior art, the utility model has the advantages that:Rationally, intensity is high, anti seismic efficiency for structure and construction technology
Fabulous, short construction period, operating expenses is low;The utility model uses assembling-type structure, is readily transported;Assembled is filled using scene
Match somebody with somebody, it is easy for installation during high-strength light antiseepage antidetonation piping lane directly directly pushed into original soil using dedicated hydraulic device during installation,
Structural stability after installation is good, it is only necessary to set a relatively small work pitted surface, and small for influence on ground,
Substantially influence is not produced on the activity on ground;Compared to corrugated underground pipe gallery, it is difficult to dig a hole in advance, construction period is more
Short, operating cost is lower.
Brief description of the drawings:
Fig. 1 is structural representation of the present utility model.
Fig. 2 is the structural representation of wallboard outer surface.
Fig. 3 is the structural representation of wallboard inner surface.
Fig. 4 is the structural representation with external arched door.
Fig. 5 is the structural representation with external arc.
Fig. 6 is the structural representation of bearing sleeve.
In figure, 1, arched door, 2, wallboard, 3, base plate, 4, sealing joint strip, 5, cross reinforcing, 6, vertical strengthening ribs, 7, blind spiral shell
Pit, 8, reinforcing prop, 9, arched door reinforcement, 10, external arched door, 11, external wallboard, 12, external base plate, 13, external arc,
14th, passage, 15, breather pipe, 16, body, 17, spacing shock absorbing ring, 18, seal groove, 19, sealing ring.
Specific embodiment:
For the technical characterstic for illustrating this programme can be understood, below by specific embodiment, and its accompanying drawing is combined, to this reality
It is described in detail with new.
As shown in figures 1 to 6, a kind of high-strength light antiseepage antidetonation piping lane, including arched door 1, distinguishes in the two ends bottom of arched door 1
The wallboard 2 being vertically arranged is bolted, base plate 3 is provided between the bottom of two wallboards 2, the both sides of base plate 3 pass through respectively
Bolt is connected with corresponding wallboard 2, is set respectively between the junction of the junction of wallboard 2 and arched door 1, wallboard 2 and base plate 3
There is sealing joint strip 4.
Reinforcer is provided with the outer surface of wallboard 2 and/or inner surface, the reinforcer includes being installed in the friendship on the surface of wallboard 2
Some cross reinforcings 5 and vertical strengthening ribs 6 that mistake is set.Reinforcer is connected with wallboard 2, can to greatest extent strengthen wallboard
2 intensity, can make it have larger intensity in pushing course in original soil, be unlikely to deform.
Spaced apart interior reinforcer is provided with inside wallboard 2 and arched door 1, the interior reinforcer includes the He of two reinforcing prop 8
The arched door reinforcement 9 being engaged with the shape of arched door 1, the reinforcing prop 8 is connected with the inner side of wallboard 2 by bolt, and the arched door adds
Strong muscle 9 is connected with the inner side of arched door 1 by bolt;The cross-sectional area of the reinforcing prop 8 is sequentially reduced setting from top to bottom.It is interior to add
High-strength light antiseepage antidetonation piping lane keeps a very big rigidity, deformation of not collapsing during strong part ensure that use
Etc. accident.The structure of reinforcing prop 8 ensure that and less with the state of material, reach a big intensity as far as possible.
The outside of the wallboard 2 is connected with the side of external arched door 10 by bolt, another side bottom of external arched door 10
An external wallboard 11 is bolted, external base plate 12, the two of external base plate 12 are provided between external wallboard 11 and wallboard 2
Side is connected by bolt with external wallboard 11 and wallboard 2 respectively.Using this kind of mode, assembled even storehouse type piping lane is formed, be easy to not
The layout of same pipeline.Can be selected according to the difference of piping lane gut line layout.External base plate 12 can be convex using the arc of base plate 3
Face setting, external arched door 10 and external wallboard 11 refer to the structure design inside and outside arched door 1 and wallboard 2, set interior reinforcer, with
Strengthen its anti-pressure ability.
The outside of the wallboard 2 is connected with the side of external arc 13, the opposite side of external arc 13 and wallboard 2 it
Between be provided with external base plate 12, the both sides of external base plate 12 are connected by bolt with external arc 13 and wallboard 2 respectively.Using this
The mode of kind, forms plum blossom and connects storehouse type piping lane, is easy to the layout of different pipelines.Can be selected according to the difference of piping lane gut line layout
Select.External base plate 12 can be set using the arc convex of base plate 3, and the settable reinforcement in the inside of external arc 13 strengthens its resistance to compression
Ability.
Some blind screwed holes 7 are provided with the inner side of wallboard 2, can be used for the later stage installs cable bearer in piping lane;In arched door 1
Top is provided with passage 14, can the effect of being effectively exhausted, passage 14 be connected with extend outside ground fiberglass ventilation
Pipe, fiberglass breather pipe is corrosion-resistant, long lifespan;Be provided with inside piping lane using fire-retardant high-strength composite or aluminium alloy be made from
Dynamic lift maintaining step ladder, fire resistant doorsets, fire alarm system, gas alarming system, fire fighting device and loading detection warning system, really
The safe handling of keeping corridor.
The base plate 3 is arc, can strengthen anti-pressure ability, and the surfaces externally and internally of base plate, wallboard and arched door sets respectively
There is zinc coat, galvanized layer thickness is 80-300 microns, and the outer wall of outer surface zinc coat is coated with antiseptic waterproof dope layer, inner surface
The inwall of zinc coat is coated with flame-retardant coating layer.
A kind of construction method of high-strength light antiseepage antidetonation piping lane, it is characterised in that:Comprise the following steps:
S1, arched door 1, wallboard 2 and base plate 3 are assembled into several piping lane monomers at the scene;
S2, excacation pitted surface;
S3, piping lane monomer is put into work pitted surface, piping lane monomer is headed into according to predetermined direction with dedicated hydraulic device
To in original soil;
When S4, the length headed into original soil in piping lane monomer account for the 70%-90% of total length, in the end sleeve of piping lane monomer
A bearing sleeve is filled, then the other end in bearing sleeve inserts another piping lane monomer, then proceed to use dedicated hydraulic device by piping lane list
Body is pushed into original soil according to predetermined direction, above-mentioned action is repeated, until the piping lane length of several piping lane monomer compositions reaches
It is required that length;
S5, the original soil in piping lane is transported.
Also comprise the following steps after S5:S6, the interior reinforcer of installation in piping lane, finally install interior reinforcer.
The bearing sleeve includes the body 16 being engaged with piping lane monomer shape, the inwall of body 16 middle part clamp one and piping lane list
The spacing shock absorbing ring 17 that body is abutted, spacing shock absorbing ring 17 can ensure that two adjacent piping lane monomers are continuously pushed into original soil
In, and bearing sleeve is motionless relative to piping lane monomer sites, if it is close to be provided with arterial highway on the inwall of body 16 of the both sides of spacing shock absorbing ring 17
Seal groove 18, sealing ring 19 is respectively equipped with seal groove 18.
The utility model uses assembling-type structure, is readily transported;Assembled uses assembled in situ, during installation, using special
During high-strength light antiseepage antidetonation piping lane is directly directly pushed original soil by hydraulic means, easy for installation, the structural stability after installation
It is good, it is only necessary to a relatively small work pitted surface to be set, and substantially influence is not produced on the activity on ground;Compared to
Corrugated underground pipe gallery, is difficult to dig a hole in advance, and construction period is shorter, and operating cost is lower.
Above-mentioned specific embodiment cannot function as the limitation to the utility model protection domain, for the skill of the art
For art personnel, any alternate modification or conversion made to the utility model implementation method all fall within guarantor of the present utility model
In the range of shield.
The utility model does not describe part in detail, is the known technology of those skilled in the art of the present technique.
Claims (10)
1. a kind of high-strength light antiseepage antidetonation piping lane, it is characterised in that:Including arched door, spiral shell is passed through respectively in the two ends bottom of arched door
Tether the wallboard for connecing and being vertically arranged, be provided with base plate between the bottom of two wallboards, the both sides of base plate respectively by bolt with it is relative
The wallboard answered is connected, and sealing joint strip is respectively equipped between the junction of the junction of wallboard and arched door, wallboard and base plate.
2. a kind of high-strength light antiseepage antidetonation piping lane according to claim 1, it is characterised in that:Wallboard outer surface and/
Or inner surface is provided with reinforcer, the reinforcer includes being installed in some cross reinforcings being staggered of surfaces of wall and erects
To reinforcement.
3. a kind of high-strength light antiseepage antidetonation piping lane according to claim 1 and 2, it is characterised in that:In wallboard and arched door
Inside is provided with spaced apart interior reinforcer, and the interior reinforcer includes that two reinforcing props and the arched door being engaged with arched door shape add
Strong muscle, the reinforcing prop is connected with wallboard inner side by bolt, and the arched door reinforcement is connected with arched door inner side by bolt;Institute
The cross-sectional area for stating reinforcing prop is sequentially reduced setting from top to bottom.
4. a kind of high-strength light antiseepage antidetonation piping lane according to claim 1, it is characterised in that:The outside of the wallboard with
The side of external arched door is connected by bolt, and another side bottom of external arched door is bolted an external wallboard, external
External base plate is provided between wallboard and wallboard, the both sides of external base plate are connected by bolt with external wallboard and wallboard respectively.
5. a kind of high-strength light antiseepage antidetonation piping lane according to claim 1, it is characterised in that:The outside of the wallboard with
The side of external arc is connected, and external base plate, the both sides of external base plate are provided between the opposite side and wallboard of external arc
It is connected with external arc and wallboard by bolt respectively.
6. a kind of high-strength light antiseepage antidetonation piping lane according to claim 1, it is characterised in that:If being provided with the inside of wallboard
Do blind screwed hole.
7. a kind of high-strength light antiseepage antidetonation piping lane according to claim 1, it is characterised in that:It is provided with the top of arched door logical
Stomata, passage is connected with the fiberglass breather pipe extended outside ground.
8. a kind of high-strength light antiseepage antidetonation piping lane according to claim 1, it is characterised in that:It is provided with automatic inside piping lane
Lift maintaining step ladder, fire resistant doorsets, fire alarm system, gas alarming system, fire fighting device and loading detection warning system.
9. a kind of high-strength light antiseepage antidetonation piping lane according to claim 1, it is characterised in that:The base plate is arc
Plate.
10. a kind of high-strength light antiseepage antidetonation piping lane according to claim 1, it is characterised in that:Base plate, wallboard and arched door
Surfaces externally and internally be respectively equipped with zinc coat, galvanized layer thickness is 80-300 microns, and the outer wall of outer surface zinc coat is coated with anti-corrosion
Water resistant coating layer, the inwall of inner surface zinc coat is coated with flame-retardant coating layer.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621220305.4U CN206267173U (en) | 2016-11-11 | 2016-11-11 | A kind of high-strength light antiseepage antidetonation piping lane |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621220305.4U CN206267173U (en) | 2016-11-11 | 2016-11-11 | A kind of high-strength light antiseepage antidetonation piping lane |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206267173U true CN206267173U (en) | 2017-06-20 |
Family
ID=59040201
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621220305.4U Expired - Fee Related CN206267173U (en) | 2016-11-11 | 2016-11-11 | A kind of high-strength light antiseepage antidetonation piping lane |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206267173U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106522266A (en) * | 2016-11-11 | 2017-03-22 | 山东省呈祥电工电气有限公司 | Light high-strength anti-seepage anti-seismic pipe gallery and construction method |
-
2016
- 2016-11-11 CN CN201621220305.4U patent/CN206267173U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106522266A (en) * | 2016-11-11 | 2017-03-22 | 山东省呈祥电工电气有限公司 | Light high-strength anti-seepage anti-seismic pipe gallery and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205662947U (en) | Coincide assembled underground pipe gallery system | |
CN204041081U (en) | A kind of constructing tunnel preliminary bracing device | |
CN105839666A (en) | Total-prefabricated superimposed assembly type underground pipe gallery and connecting node thereof | |
CN106013052A (en) | Steel sheet pile and open caisson combined underground garage and construction method thereof | |
CN104947684B (en) | Construction method based on assembled recyclable process soil nailing wall support | |
CN102304928A (en) | Big-span and big-load prestress trough-shaped laminated plate used as 6-level civil air defence basement roof plate | |
CN108385871A (en) | The precast wall body of fabricated structure | |
CN205716040U (en) | A kind of assembled corrugated steel composite steel-concrete piping lane | |
CN212506281U (en) | Prefabricated sectional type open caisson | |
CN204825881U (en) | A deep steel sheet net dado section of thick bamboo suitable for soft soil area bored concrete pile of driling | |
CN206267173U (en) | A kind of high-strength light antiseepage antidetonation piping lane | |
CN106522266A (en) | Light high-strength anti-seepage anti-seismic pipe gallery and construction method | |
CN109630162B (en) | Method for quickly connecting heavy steel and pipe curtain based on advanced support | |
CN103643681B (en) | A kind of Metro station excavation is inverse makes supporting and protection structure and construction method thereof | |
CN104947662B (en) | A kind of soil-nail wall support system based on the recyclable technique of assembled | |
CN104141317A (en) | Basement tower crane foundation construction method and structure adopting reverse construction method | |
CN104314105B (en) | The connection vertical piece structure of the basement wall and cast-in-place buttress and construction method | |
CN211447877U (en) | Structure of floor extension is increased to existing building below | |
CN105065060A (en) | Mine rolling-up curtain type supporting formwork and supporting method | |
CN204139642U (en) | The additional elevator structure of old cell unit reveal | |
CN102287022A (en) | Large-span heavy-load prestress groove-shaped laminated plate for civil defense basement ceiling plate | |
CN204676533U (en) | A kind of soil-nail wall support system based on the recyclable technique of assembling | |
CN207176737U (en) | A kind of mechanical underground parking of inclined shaft | |
CN202969414U (en) | Bridge-culvert foundation | |
CN106906923A (en) | The attachment means of fabricated shear wall horizontal joint and connection method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170620 Termination date: 20181111 |