CN206190323U - Colliery is fire dam reinforced structure in pit - Google Patents

Colliery is fire dam reinforced structure in pit Download PDF

Info

Publication number
CN206190323U
CN206190323U CN201621265774.8U CN201621265774U CN206190323U CN 206190323 U CN206190323 U CN 206190323U CN 201621265774 U CN201621265774 U CN 201621265774U CN 206190323 U CN206190323 U CN 206190323U
Authority
CN
China
Prior art keywords
fire dam
coal mine
slotting
underground coal
ruggedized construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621265774.8U
Other languages
Chinese (zh)
Inventor
张立辉
迟国铭
张永福
李斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Shenhua Energy Co Ltd
Shenhua Shendong Coal Group Co Ltd
Original Assignee
China Shenhua Energy Co Ltd
Shenhua Shendong Coal Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Shenhua Energy Co Ltd, Shenhua Shendong Coal Group Co Ltd filed Critical China Shenhua Energy Co Ltd
Priority to CN201621265774.8U priority Critical patent/CN206190323U/en
Application granted granted Critical
Publication of CN206190323U publication Critical patent/CN206190323U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model discloses a colliery is fire dam reinforced structure in pit. Colliery is fire dam reinforced structure in pit is including building the yu lianxiang roof and allying oneself with fire dam, the L type wall body between the bottom plate of lane, set up the undercutting on the bottom plate of antithetical couplet lane, L type wall body passes through the fire dam with formwork irrigation concrete forms between the undercutting. The utility model discloses a following technological effect: do not select any rare macromolecular material, low cost not only causes in the pit the water to suffer the pollution when having avoided traditional airtight reinforcement moreover, avoided a large amount of contact macromolecular materials to cause the health harm to the staff simultaneously, the design science uses the cheapest economic cost to reach the effect in optimal shutoff fire dam bottom crack. Not only effectively stop the collecting space area hazardous gas pedestrian tunnel of shoving, can in time discharge collecting space area ponding moreover, both solved the gas leakage problem, solved the problem of leaking simultaneously, had beyond measure economy and safe benefit.

Description

A kind of underground coal mine fire dam ruggedized construction
Technical field
The utility model is related to the closed technical field of coal mine down-hole tunnel, and more particularly to a kind of underground coal mine fire dam adds Fixing structure.
Background technology
The logical goaf closed wall bottom of underground coal mine often occurs the phenomenons such as leak, gas leakage, typically has following aspect former Cause.
(1) concrete shrinkage produces crack.In cooling, due to gradually radiating, volume produces contraction to concrete;In hardening During contraction can also be produced due to the evaporation of free moisture and the gelatification of cement gel.Both shrink to work as and are subject to Periphery anchor pole will produce very big shrinkage tensile stress when constraining, when this stress exceedes the tensile strength of concrete, coagulation Soil will produce the larger contraction fissure of depth.The more contact position for being distributed in coal side and fire dam in this crack, especially more Many is distributed in fire dam bottom.
(2) roadway floor is heaved, and crack occurs.After coal-face is pushed through, goaf large area is collapsed, roadway floor By mining influence, stress concentration is redistributed, and will be located at the closed overhead in connection lane on tunnel, causes closed wall and lane Road base plate departs from, and crack occurs.
(3) qualitative problems of construction produces crack.Fire dam construction wrong, can produce different cracks.As concrete due to Hypohydration, can produce desciccation crack;Do not shaken during concrete construction in place, then packing is low honeycomb occurs, forms honey combing Seam;Kerve debris are not cleaned out before closed bottom casting concrete, causes to connect that stubble is unreal, generation connects batch crack etc..
Above-mentioned various cracks directly turn on closed strong bottom crack, cause goaf to lead directly to mine laneway, and this can give Mine safety production brings major hidden danger.When crack occurs in fire dam bottom, a large amount of ponding in goaf can be gushed by crack Enter tunnel, if treatment is not in time, the continuity crack with leak can constantly expand, so as to damage the foundation of fire dam, finally may be used The breaking-up of whole road fire dam can be caused, hardly imaginable consequence occur.Moreover, if fire dam bottom there is crack not and When process, goaf accumulation a large amount of toxic and harmfuls can be shoved to tunnel by crack, the life to operating personnel in tunnel Life safety is caused a significant threat.
In the prior art, when leak, gas leak phenomenon occurs in underground coal mine fire dam bottom, traditional closed reinforcement means It is to note macromolecular material in former fire dam bear, or directly in former closed outside constructs one again away from former closed certain size The concrete closed wall in road.
When crack occurs in closed bottom, if solved by noting rare macromolecular material, macromolecular material is not only to well Lower water pollution is than larger, while and the staff to contacting macromolecular material also has a certain degree of harm;If logical Cross when the method solution of concrete closed wall together is constructed in former closed outside again, cost is high, causes unnecessary wave Take.
Therefore, it is highly desirable to overcome drawbacks described above.
Utility model content
In view of this, the utility model provides a kind of underground coal mine fire dam ruggedized construction, it is intended to overcome prior art In the presence of defect, on the premise of macromolecular material, control coal unit-economy cost is not used, solve fire dam bottom Crack occur causes the problem of fire dam leak, gas leakage harm shaft production safety and underground employee's life security.
Underground coal mine fire dam ruggedized construction provided by the utility model include be built in connection lane top board and connection lane base plate it Between fire dam, the fire dam is perpendicular to the lane base plate;Offered parallel to the fire dam on the lane base plate Slotting, the distance between edge and the fire dam in the slotting near the fire dam are D1, the depth of the slotting It is H2 to spend, and the width of the slotting is D2;The underground coal mine fire dam ruggedized construction also includes L-type wall, the L-type wall Formed by the support mold pouring concrete between the fire dam and the slotting;Wherein, the concrete on the lane base plate It is highly H1, width is D1;Concrete in the slotting is highly H1+H2, and width is D2.
Underground coal mine fire dam ruggedized construction as described above, alternatively, also including return pipe, the return pipe passes through institute State L-type wall and lead on the lane base plate.
Underground coal mine fire dam ruggedized construction as described above, alternatively, control valve is provided with the return pipe.
Underground coal mine fire dam ruggedized construction as described above, alternatively, the concrete grade is not less than 30.
Underground coal mine fire dam ruggedized construction as described above, alternatively, bottom land and the coal petrography of the slotting connect reality.
Underground coal mine fire dam ruggedized construction provided by the utility model realizes following technique effects.
1. it is somebody's turn to do " L " type fire dam reinforcement means and does not choose any rare macromolecular material, it is not only with low cost, and avoid Conventional containment causes the underground water body to be polluted when reinforcing, while avoid a large amount of contact macromolecular materials causing to work people The body harm of member.
2. " L " type fire dam reinforcement means design science is somebody's turn to do, and it is close to reach optimal closure with cheapest financial cost Close the effect in wall bottom crack.Not only effectively prevent goaf toxic and harmful to be shoved to row by fire dam bottom gap People tunnel, and can in time be discharged water in gob area by return pipe, fire dam bottom leakage problem has both been solved, while Fire dam bottom seepy question is solved, with beyond measure economy and safety benefit.
Brief description of the drawings
Preferred embodiment in the utility model will be described in detail by accompanying drawing below, it will help understand of the present utility model Objects and advantages, wherein:
Fig. 1 is the top view of underground coal mine fire dam ruggedized construction in the utility model embodiment.
Fig. 2 is the left view of underground coal mine fire dam ruggedized construction in the utility model embodiment.
Specific embodiment
The utility model is described in detail with reference to embodiment.Wherein identical parts identical accompanying drawing mark Note is represented.It should be noted that the word "front", "rear" for being used in description below, "left", "right", "up" and "down" are referred to Direction in accompanying drawing, word " interior " and " outward " are referred respectively to towards or away from the direction of particular elements geometric center.
Fig. 1 is the top view of underground coal mine fire dam ruggedized construction in the utility model embodiment;Fig. 2 is the utility model The left view of underground coal mine fire dam ruggedized construction in embodiment.With reference to shown in Fig. 1 and Fig. 2, the utility model embodiment is carried The underground coal mine fire dam ruggedized construction of confession, including the fire dam 30 between connection lane top board 10 and connection lane base plate 20 is built in, it is described Fire dam 30 is perpendicular to the lane base plate 20.The slotting 40 parallel to the fire dam is offered on the lane base plate 20, The bottom land of the slotting 40 preferably connects reality with coal petrography, and the edge in the slotting 40 near the fire dam 30 is closed with described The distance between wall 30 is D1, and the depth of the slotting 40 is H2, and the width of the slotting 40 is D2;The underground coal mine is closed Wall ruggedized construction also includes L-type wall 50, and the L-type wall 50 is by the formwork between the fire dam 30 and the slotting 40 Concrete perfusion is formed, and the label of the concrete is preferably no less than 30;Wherein, the concrete on the lane base plate 20 is high It is H1 to spend, and width is D1;Concrete in the slotting 40 is highly H1+H2, and width is D2.
In a preferred embodiment, for the situation that original closed upper water burst is serious, can be worn on L-type wall 50 and return water Pipe 60, the return pipe 60 is through the L-type wall and leads on the lane base plate 20, wherein, the return pipe 60 The water of the side of L-type wall 50 positioned at the both sides of the L-type wall 50, can be led to opposite side by two ends respectively.Enter one Step, is provided with control valve, the flow for controlling water on the return pipe 60.
Can be by following mistake using the construction method of underground coal mine fire dam ruggedized construction provided by the utility model Cheng Shixian.
1. before constructing, start away from original fire dam D1 positions to carry out slotting, slotting to roadway floor first in Ge Lian lanes Depth H 2, width D 1, groove is shown in that hard bottom side firmly connects reality with coal petrography.By electric conductor (wire netting, water pipe, cable etc.) before slotting Disconnect or remove, prevent stray electrical current from importing in enclosing tunnel.
2. after slotting is finished, by groove, debris complete liquidation of the slotting position on closed strong scope inner bottom plating it is clean, see To real bottom.
3. the formwork on the outside of groove, away from base plate H1, formwork irrigates mixed to closing in the range of preceding D1+D2 to formwork height immediately after finishing Solidifying soil, concrete perfusion height H1 at base plate, concrete perfusion height H2 at slotting.
4. concrete grade is not less than C30.When pouring wall, wall is consolidated with vibrating head, must not leave it is hollow and Sand holes, whole wall will disposably be irrigated and finished, to ensure the robustness of wall, tightness, by mould fix tightly after pouring Gu, mould is reclaimed after concrete solidifies completely.
5. original closed upper water burst is serious, is drawn with return pipe, and install control valve.
Underground coal mine fire dam ruggedized construction provided by the utility model realizes following technique effects.
1. it is somebody's turn to do " L " type fire dam reinforcement means and does not choose any rare macromolecular material, it is not only with low cost, and avoid Conventional containment causes the underground water body to be polluted when reinforcing, while avoid a large amount of contact macromolecular materials causing to work people The body harm of member.
2. " L " type fire dam reinforcement means design science is somebody's turn to do, and it is close to reach optimal closure with cheapest financial cost Close the effect in wall bottom crack.Not only effectively prevent goaf toxic and harmful to be shoved to row by fire dam bottom gap People tunnel, and can in time be discharged water in gob area by return pipe, fire dam bottom leakage problem has both been solved, while Fire dam bottom seepy question is solved, with beyond measure economy and safety benefit.
Finally it should be noted that:Above example is only used to illustrate the technical solution of the utility model, rather than its limitations; Although being described in detail to the utility model with reference to the foregoing embodiments, it will be understood by those within the art that: It can still modify to the technical scheme described in foregoing embodiments, or which part technical characteristic is carried out etc. With replacement;And these modifications or replacement, the essence of appropriate technical solution is departed from each embodiment technology of the utility model The scope of scheme.

Claims (5)

1. a kind of underground coal mine fire dam ruggedized construction, including the fire dam between connection lane top board and connection lane base plate is built in, it is described Fire dam is perpendicular to the lane base plate;Characterized in that, offering drawing parallel to the fire dam on the lane base plate Groove, the distance between edge and the fire dam in the slotting near the fire dam are D1, and the depth of the slotting is H2, the width of the slotting is D2;
The underground coal mine fire dam ruggedized construction also include L-type wall, the L-type wall by the fire dam with it is described Support mold pouring concrete is formed between slotting;Wherein, the concrete on the lane base plate is highly H1, and width is D1;It is described Concrete in slotting is highly H1+H2, and width is D2.
2. underground coal mine fire dam ruggedized construction according to claim 1, it is characterised in that described also including return pipe Return pipe is through the L-type wall and leads on the lane base plate.
3. underground coal mine fire dam ruggedized construction according to claim 2, it is characterised in that be provided with the return pipe Control valve.
4. the underground coal mine fire dam ruggedized construction according to any one in claim 1-3, it is characterised in that described mixed Solidifying soil label is not less than 30.
5. the underground coal mine fire dam ruggedized construction according to any one in claim 1-3, it is characterised in that described to draw The bottom land of groove connects reality with coal petrography.
CN201621265774.8U 2016-11-22 2016-11-22 Colliery is fire dam reinforced structure in pit Active CN206190323U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621265774.8U CN206190323U (en) 2016-11-22 2016-11-22 Colliery is fire dam reinforced structure in pit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621265774.8U CN206190323U (en) 2016-11-22 2016-11-22 Colliery is fire dam reinforced structure in pit

Publications (1)

Publication Number Publication Date
CN206190323U true CN206190323U (en) 2017-05-24

Family

ID=58724648

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621265774.8U Active CN206190323U (en) 2016-11-22 2016-11-22 Colliery is fire dam reinforced structure in pit

Country Status (1)

Country Link
CN (1) CN206190323U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115013057A (en) * 2022-03-28 2022-09-06 中国矿业大学(北京) Novel coal mine airtight wall capable of being constructed quickly and construction process thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115013057A (en) * 2022-03-28 2022-09-06 中国矿业大学(北京) Novel coal mine airtight wall capable of being constructed quickly and construction process thereof
CN115013057B (en) * 2022-03-28 2023-12-12 中国矿业大学(北京) Novel coal mine sealing wall quickly constructed and construction process thereof

Similar Documents

Publication Publication Date Title
CN107201910A (en) For shaking traffic tunnel fracture plugging and reinforcement means under bumpy weather
WO2008061415A1 (en) A hydraulic sliding insertion panel and its using method
CN104404983A (en) Horse riding type well device for pipe jacking construction and construction method thereof
CN206308569U (en) It is a kind of to reinforce the road structure for punishing the solution cavity that underlies
CN109778992A (en) A kind of ride well device and its construction method for pipeline construction
CN106522248A (en) Method for reinforcing soil slope and slope reinforcing device
CN108590680A (en) A kind of construction method that launching shaft foundation pit vertical section pours
CN106640107A (en) Tool of jacking pipe entering tunnel in foamed soil without need of foundation reinforcement outside pit and construction method thereof
CN114109442B (en) Tunnel karst crushing belt sliding collapse half-section curtain progressive grouting reinforcement treatment method
CN206190323U (en) Colliery is fire dam reinforced structure in pit
CN105178342B (en) Precipitation well casing and method for blocking reserved hole of foundation pit through precipitation well casing
CN113775344A (en) Tunnel in-situ unilateral extension construction method
CN203768925U (en) Seal device for dewatering well in foundation pit
CN103205986A (en) Concrete raft foundation construction-joint grouting device and construction method
CN206707721U (en) A kind of tunnel structure for passing through large-scale vertical solution cavity group
CN105568927B (en) The construction method of water-bag type concrete works movement joint sealing swaging die
CN204959781U (en) Dewatering well plugging device
CN206397506U (en) Push pipe enters hole frock in foam soil without cheating outer foundation stabilization
CN206581282U (en) Diaphram wall Ω type milling joints
CN202247924U (en) Assembled steel structure open caisson in pipe jacking construction
CN104963364A (en) Disposing method for topdown structural slab lower side wall construction joint
CN103452368B (en) A kind of slurry accident pool and construction method thereof
CN209066442U (en) A kind of inverse construction joint structure for building construction of deep basal pit
CN104727275B (en) Method for application of concrete work expansion joint vertical water sealing structure fixing element
CN113339003A (en) Construction method of tunnel integrated arch sheathing trolley

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant