CN206143818U - Novel anticorrosive room build basis - Google Patents

Novel anticorrosive room build basis Download PDF

Info

Publication number
CN206143818U
CN206143818U CN201620925957.1U CN201620925957U CN206143818U CN 206143818 U CN206143818 U CN 206143818U CN 201620925957 U CN201620925957 U CN 201620925957U CN 206143818 U CN206143818 U CN 206143818U
Authority
CN
China
Prior art keywords
layer
concrete
basis
fixed
concrete layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620925957.1U
Other languages
Chinese (zh)
Inventor
肖光宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Changxin Hong Wah Construction And Installation Engineering Co Ltd
Original Assignee
Zhejiang Changxin Hong Wah Construction And Installation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Changxin Hong Wah Construction And Installation Engineering Co Ltd filed Critical Zhejiang Changxin Hong Wah Construction And Installation Engineering Co Ltd
Priority to CN201620925957.1U priority Critical patent/CN206143818U/en
Application granted granted Critical
Publication of CN206143818U publication Critical patent/CN206143818U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses a novel anticorrosive room build basis, including ground overburden, baffle, cement mortar dampproof course, concrete protection layer and anticorrosion, the inside of baffle is provided with the foundation pile, the baffle is installed in the outside of ground overburden, the below of cement mortar dampproof course is fixed with concrete layer, install the fixed plate between the concrete layer, the outside on concrete protection layer is provided with the cushion cap face, the antiseptic outside is connected with the reinforcing bar. This novel anticorrosive room build basis, the ground is whole firm, prevents the infiltration of groundwater effectively, and concrete layer be C30's anticorrosive concrete, and the non -corrosibility can be good, and concrete layer has the anticorrosion, has prolonged the life of reinforcing bar greatly, and the overlay table layer is fixed with the cement mortar dampproof course, and its upper end be epoxy asphalt glass cloth, has performance insulating, adiabatic, corrosion -resistant, high temperature resistant, high strength, and the holistic antiseptic effect of ground is good, life length, intensity height.

Description

Basis is built in a kind of new anti-corrosion room
Technical field
The utility model is related to basic technical field of anticorrosion, and basis is built in specially a kind of new anti-corrosion room.
Background technology
With greatly developing for building trade, the construction in house is more and more, and particularly modern people are continuous Pursuit high-quality life.Therefore, for the construction requirements in house are constantly being lifted, and the most important part in a house is just It is ground, if none of good ground, the service life in this house will be greatly shortened.
Basis is built in current room, and when in use generally existing an important problem, precisely due to the impact of underground water, Basis is built in room can constantly be corroded, and cause basic damage.Therefore, for the problems referred to above, on the basis of ground is built in original room Carry out innovative design.
Utility model content
The purpose of this utility model is to provide a kind of new anti-corrosion room to build basis, to solve above-mentioned background technology in carry Go out the impact due to underground water, basis is built in room can constantly be corroded, cause the problem of basis damage.
For achieving the above object, the utility model provides following technical scheme:Basis is built in a kind of new anti-corrosion room, including Ground coating, baffle plate, cement mortar damp-proof layer, concrete cover and preservative, the baffle plate is internally provided with foundation pile, Baffle plate is installed, the ground coating is internally connected with steel top board, the cement mortar on the outside of the ground coating Concrete layer is fixed with below damp-proof layer, fixed plate is installed between the concrete layer, the concrete cover it is interior Side is connected with concrete layer, and cushion cap face is provided with the outside of the concrete cover, and the bottom in the cushion cap face is fixed with steel Base plate, the inside of the concrete layer is provided with reinforcing bar, and on the outside of the preservative reinforcing bar is connected with.
Preferably, the corner of the ground coating is correspondingly arranged on foundation pile.
Preferably, it is fixed with bituminous epoxy glass cloth between the cement mortar damp-proof layer and steel top board.
Preferably, the thickness of the concrete cover is 100mm.
Preferably, the preservative is located at below concrete surface in the depth of 5m.
Compared with prior art, the beneficial effects of the utility model are:Basis is built in the new anti-corrosion room, with common room Build basis by contrast, using multiple foundation piles, and outer layer is with baffle plate, and ground is overall firmly, the concrete protective of 100mm thickness Layer is effectively prevented the infiltration of underground water, and concrete layer is the anticorrosive concrete of C30, and antiseptic property is good, and concrete layer has Preservative, substantially prolongs the service life of reinforcing bar, covers top layer and is fixed with cement mortar damp-proof layer, and its upper end for epoxy drip Blue or green glass cloth, with insulation, adiabatic, corrosion-resistant, high temperature resistant, the performance of high intensity, the overall anticorrosion ability of ground is good, uses Life-span length, intensity is high.
Description of the drawings
Fig. 1 is the utility model structure foundation schematic top plan view;
Fig. 2 is the utility model structure foundation coating cross-sectional view;
Fig. 3 is the utility model structural concrete layer schematic internal view.
In figure:1st, foundation pile, 2, ground coating, 3, baffle plate, 4, steel top board, 5, bituminous epoxy glass cloth, 6, cement mortar Damp-proof layer, 7, concrete layer, 8, fixed plate, 9, cushion cap face, 10, steel sole plate, 11, concrete cover, 12, reinforcing bar, 13, anti-corrosion Agent.
Specific embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is carried out Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of the utility model, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment for being obtained, belongs to the scope of the utility model protection.
Fig. 1-3 are referred to, the utility model provides a kind of technical scheme:Basis, including base are built in a kind of new anti-corrosion room Stake 1, ground coating 2, baffle plate 3, steel top board 4, bituminous epoxy glass cloth 5, cement mortar damp-proof layer 6, concrete layer 7, fixation Plate 8, cushion cap face 9, steel sole plate 10, concrete cover 11, reinforcing bar 12 and preservative 13, baffle plate 3 is internally provided with foundation pile 1, The outside of ground coating 2 is provided with baffle plate 3, and the corner of ground coating 2 is correspondingly arranged on foundation pile 1, ground is carried out solid Fixed, ground coating 2 is internally connected with steel top board 4, and the lower section of cement mortar damp-proof layer 6 is fixed with concrete layer 7, cement bonded sand Bituminous epoxy glass cloth 5 is fixed between slurry damp-proof layer 6 and steel top board 4, with insulation, adiabatic, corrosion-resistant, high temperature resistant, high-strength The performance of degree, is provided with fixed plate 8 between concrete layer 7, the inner side of concrete cover 11 is connected with concrete layer 7, coagulation The thickness of protective soil layer 11 is 100mm, is effectively prevented the infiltration of underground water, and the outside of concrete cover 11 is provided with cushion cap Face 9, the bottom in cushion cap face 9 is fixed with steel sole plate 10, and the inside of concrete layer 7 is provided with reinforcing bar 12, and the outside of preservative 13 connects Reinforcing bar 12 is connected to, the service life of reinforcing bar 12 is substantially prolongs, preservative 13 is located at the depth of 5m below the surface of concrete layer 7 It is interior.
Operation principle:When basis is built using the new anti-corrosion room, first the device is simply understood, entered first The construction of row ground, is fenced up in the earth's surface surrounding dug using baffle plate 3, and then foundation pile 1 is fixed on the inner side of enclosing 3, it It is laid in earth's surface using steel sole plate 10 afterwards, then cushion cap face 9 is laid out in the both sides stake of steel sole plate 10, afterwards casting concrete Protective layer 11, pours after finishing, and reinforcing bar 12 is embedded between concrete cover 11, then casting concrete layer 7, in building It is front that preservative 13 is placed between reinforcing bar 12, postpone the service life of reinforcing bar 12, when pouring when certain thickness, lay fixed plate 8, so repeat, when concrete layer 7 arrives certain altitude, laying cement mortar damp-proof layer 6 carries out protection against the tide, and in cement bonded sand The surface of slurry damp-proof layer 6 is fixed with corrosion resistant bituminous epoxy glass cloth 5, is finally laid on using certain thickness steel top board 4 The upper end of bituminous epoxy glass cloth 5, here it is the operation principle on basis is built in the new anti-corrosion room.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art, It is appreciated that these embodiments can be carried out various changes in the case of without departing from principle of the present utility model and spirit, repaiies Change, replace and modification, scope of the present utility model is defined by the appended claims and the equivalents thereof.

Claims (5)

1. basis, including ground coating are built in a kind of new anti-corrosion room(2), baffle plate(3), cement mortar damp-proof layer(6), coagulation Protective soil layer(11)And preservative(13), it is characterised in that:The baffle plate(3)Be internally provided with foundation pile(1), the ground covers Cap rock(2)Outside baffle plate is installed(3), the ground coating(2)Be internally connected with steel top board(4), the cement bonded sand Slurry damp-proof layer(6)Lower section be fixed with concrete layer(7), the concrete layer(7)Between fixed plate is installed(8), it is described mixed Solidifying protective soil layer(11)Inner side be connected with concrete layer(7), the concrete cover(11)Outside be provided with cushion cap face (9), the cushion cap face(9)Bottom be fixed with steel sole plate(10), the concrete layer(7)Inside reinforcing bar is installed(12), The preservative(13)Outside be connected with reinforcing bar(12).
2. basis is built in a kind of new anti-corrosion room according to claim 1, it is characterised in that:The ground coating(2) Corner be correspondingly arranged on foundation pile(1).
3. basis is built in a kind of new anti-corrosion room according to claim 1, it is characterised in that:The cement mortar damp-proof layer (6)With steel top board(4)Between be fixed with bituminous epoxy glass cloth(5).
4. basis is built in a kind of new anti-corrosion room according to claim 1, it is characterised in that:The concrete cover (11)Thickness be 100mm.
5. basis is built in a kind of new anti-corrosion room according to claim 1, it is characterised in that:The preservative(13)It is located at Concrete layer(7)In the depth of 5m below surface.
CN201620925957.1U 2016-08-22 2016-08-22 Novel anticorrosive room build basis Expired - Fee Related CN206143818U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620925957.1U CN206143818U (en) 2016-08-22 2016-08-22 Novel anticorrosive room build basis

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620925957.1U CN206143818U (en) 2016-08-22 2016-08-22 Novel anticorrosive room build basis

Publications (1)

Publication Number Publication Date
CN206143818U true CN206143818U (en) 2017-05-03

Family

ID=58627708

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620925957.1U Expired - Fee Related CN206143818U (en) 2016-08-22 2016-08-22 Novel anticorrosive room build basis

Country Status (1)

Country Link
CN (1) CN206143818U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110130213A (en) * 2019-05-25 2019-08-16 中恒宏瑞建设集团有限公司 A kind of safeguard structure for abutment

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110130213A (en) * 2019-05-25 2019-08-16 中恒宏瑞建设集团有限公司 A kind of safeguard structure for abutment
CN110130213B (en) * 2019-05-25 2020-11-06 福建省恒超建设发展有限公司 A protective structure for abutment

Similar Documents

Publication Publication Date Title
CN203755334U (en) Single-pipe tower prefabricated spiral steel pipe pile foundation
CN107059946A (en) A kind of basement drain plate and its construction
CN204343339U (en) A kind of temporary support columns waterproof base plate
CN211646494U (en) Waterproof construction of underground garage foundation slab
CN106884436B (en) A kind of construction method of the waterproof connecting structure of foundation pit uplift pile and structure base slab
CN206143818U (en) Novel anticorrosive room build basis
CN210508097U (en) Novel roof deformation joint structure
CN203229927U (en) Treatment structure for dam body upstream face superficial layer temperature crack
CN204645093U (en) Poured band of outer wall of basement advanced processing constructs
CN209555958U (en) A kind of pile-raft foundation structure based on the adaptive deformation adjustment device of stake top
CN104120837A (en) Construction method of waterproof roof
CN205975597U (en) Regional transmission tower improved generation bored concrete pile basis is used for corroding
CN205062611U (en) Garden way pavement layer structure
CN206205166U (en) It is a kind of can synchronous crossed construction outer wall of basement waterproofing protection structure
CN206887981U (en) Basis is built in a kind of new anti-corrosion room
CN204492031U (en) The water proof structure of planted roof deformation joint
CN209603196U (en) Sole plate post-poured strip structure
CN207092154U (en) A kind of basement drain plate
CN206328775U (en) Boiler room venting of dust explosion mouth structure
CN106869412B (en) A kind of device for preventing pitched roof waterproof roll and its upper structural layer from falling off
CN206545284U (en) A kind of subsided rest room
CN206467697U (en) Column foot and raft plate junction integrated water-proof structure
CN213329130U (en) Waterproof and corrosion-resistant structure of underground structure of building
CN207376663U (en) It is a kind of to pile up gravel aproll structure suitable for Passive low-energy building
CN209277906U (en) A kind of tunnel sidewalls and bottom plate junction waterproof construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170503

Termination date: 20180822