CN106884436B - A kind of construction method of the waterproof connecting structure of foundation pit uplift pile and structure base slab - Google Patents
A kind of construction method of the waterproof connecting structure of foundation pit uplift pile and structure base slab Download PDFInfo
- Publication number
- CN106884436B CN106884436B CN201710060574.1A CN201710060574A CN106884436B CN 106884436 B CN106884436 B CN 106884436B CN 201710060574 A CN201710060574 A CN 201710060574A CN 106884436 B CN106884436 B CN 106884436B
- Authority
- CN
- China
- Prior art keywords
- pile
- construction
- waterproof
- base slab
- pile crown
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/10—Deep foundations
- E02D27/12—Pile foundations
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/16—Arrangement or construction of joints in foundation structures
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D31/00—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
- E02D31/02—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2300/00—Materials
- E02D2300/0004—Synthetics
- E02D2300/0018—Cement used as binder
- E02D2300/002—Concrete
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Environmental & Geological Engineering (AREA)
- Hydrology & Water Resources (AREA)
- Piles And Underground Anchors (AREA)
Abstract
The present invention relates to the construction methods of a kind of foundation pit uplift pile and the waterproof connecting structure of structure base slab comprising following construction procedure: (1) soil body is constructed at pile crown;(2) cushion construction;(3) pile crown amputates;(4) Slab Waterproof Construction;(5) assembling reinforcement;(6) concreting.The present invention abolishes pile crown to D/4 below bottom plate, and structure base slab uses rounding stage body to pour with when pile crown concreting.Rounding stage body, which pours, to protect baseplate reinforcing bar not to be etched, and prevent having convenience for construction and economic rationality due to the improper caused bottom plate infiltration of pile head waterproofing.
Description
[technical field]
The present invention relates to a kind of construction methods of foundation pit, and in particular to a kind of waterproof company of foundation pit uplift pile and structure base slab
The construction method of binding structure belongs to base pit engineering technical field.
[background technique]
Currently, engineering construction occurs, there are many case where bottom plate infiltration, and there are many influence factor, wherein the water-proofing treatment of pile crown
And particularly important one.The side that traditional pile crown waterproof construction is combined using waterproof roll, water-repellent paint, sealing material
Formula carries out water-proofing treatment, not only time-consuming and laborious, but also cannot be guaranteed waterproof effect.
Pile head waterproofing will solve three difficult points: 1. because pile crown is not to pour simultaneously with bottom plate, on pile crown periphery, stake top
With the concrete construction joint of concrete floor connecting part.2. blinding concrete shrinks the gap generated between pile crown.3. pile crown
Surrounding bed course is because there are the gaps that differential settlement generates for the reasons such as the compactness difference of following soil.
Therefore, in order to solve the above technical problems, foundation pit uplift pile and structure base slab it is necessory to provide a kind of innovation
The construction method of waterproof connecting structure, to overcome the defect in the prior art.
[summary of the invention]
The purpose of the present invention is to provide the construction method of a kind of foundation pit uplift pile and the waterproof connecting structure of structure base slab,
It does not need to carry out pile crown above-mentioned traditional pile crown waterproof construction in practice of construction, has convenience for construction and economical rationality
Property.
To achieve the above object, the technical scheme adopted by the invention is as follows: a kind of waterproof of foundation pit uplift pile and structure base slab
The construction method of connection structure, including following construction procedure:
(1) soil body is constructed at pile crown: the soil body at pile crown is tiltedly dug out an inverted round stage along the stake whole body with 45 ° of inclination angle
Body;
(2) cushion construction: when carrying out construction of the structure base slab with underlayer, equally construction is around pile crown with a thickness of d's
Bed course, bed course is constructed around pile body with 45 degree of inclination angles at pile crown;
(3) pile crown amputates: pile crown being amputated to D/4 below the absolute altitude of structure base slab lower surface, and waterproof construction and cleaning
Base cleans up base's sundries, dust, lime-ash, base's acceptance(check);
(4) Slab Waterproof Construction: the construction of waterproof slab is carried out before concreting, waterproof material is with a thickness of h;
(5) assembling reinforcement: binding structure baseplate reinforcing bar, by resistance to plucking pile head Reinforcement and structure base slab master
Muscle is connected in a welding manner;
(6) concreting: rest around structure base slab and pile crown is poured jointly to be formed one it is unified mixed
Solidifying soil is whole, and the concrete height poured below the absolute altitude of structure base slab lower surface is exactly D.
The construction method of the waterproof connecting structure of foundation pit uplift pile and structure base slab of the invention is further are as follows: step 1)
In, uplift pile diameter is set as D, and cushion thickness d, with a thickness of h, dig deep depth is waterproof material?
It is exactly oblique dig to below the absolute altitude of structure base slab lower surfacePlace, when construction, are taken as integer, and the face tiltedly dug out is i.e.
For the side of rounding stage body.
The construction method of the waterproof connecting structure of foundation pit uplift pile and structure base slab of the invention is also are as follows: in step 3), stake
Waterproof at head is constructed around pile body with 45 ° of inclination angles.
Compared with prior art, the invention has the following beneficial effects: foundation pit uplift pile of the invention and structure base slabs
The construction method of waterproof connecting structure is amputated pile crown to lower surface of base plate hereinafter, concrete pours by amputating part pile crown more
It is poured at pile crown using rounding stage body when building, same casting concrete at pile crown, such construction joint has been left in distance structure bottom
Plate lower surfaceThe lower part pile body at place avoids and construction joint is stayed in stake top is connected with concrete floor
Position, effectively prevent structure base slab reinforcing bar and be corroded.
Meanwhile pile concrete is poured and is poured using rounding stage body, for 45 ° of bed courses, i.e., inclination angle is constructed in rounding stage body lower part
Mat layer concrete is shunk, and the intrusion of water can be effectively prevented in the concrete more poured, but also can be effectively reduced uneven
Settle the gap generated.
[Detailed description of the invention]
Fig. 1 is the structural schematic diagram of uplift pile of the invention.
In figure: 1. structural floorings;2. waterproof material;3. bed course;4. pile body steel bar stress;5 pile bodies;6. baseplate reinforcing bar.
[specific embodiment]
It please refers to shown in Figure of description 1, the present invention is the waterproof connecting structure of a kind of foundation pit uplift pile and structure base slab
Construction method, including following construction procedure:
(1) soil body is constructed at pile crown: setting uplift pile diameter as D, cushion thickness d, waterproof material is with a thickness of h, by stake
The soil body at head tiltedly digs out a rounding stage body along the stake whole body with 45 ° of inclination angle, and digging depth isAlso
It is oblique dig to below the absolute altitude of structure base slab lower surfacePlace, when construction, are taken as integer, and the face tiltedly dug out is
The side of rounding stage body.Reverse frustoconic, which pours, to protect baseplate reinforcing bar not to be etched, and prevent from leading since pile head waterproofing is improper
The bottom plate of cause seeps water.
(2) cushion construction: when carrying out construction of the structure base slab with underlayer, equally construction is around pile crown with a thickness of d's
Bed course, bed course is constructed around pile body with 45 degree of inclination angles at pile crown.
(3) pile crown amputates: pile crown being amputated to D/4 below the absolute altitude of structure base slab lower surface, and waterproof construction and cleaning
Base cleans up base's sundries, dust, lime-ash, base's acceptance(check);Wherein, waterproof construction does not need to carry out at pile crown
The complicated operational procedures such as sealing rod, waterstop and sealant construction, only need to be using the same waterproof with other parts under bottom plate
Material and operational procedure, unlike, the construction of waterproofing work is carried out along pile body with 45 ° of inclination angles at pile crown.
(4) Slab Waterproof Construction: the construction of waterproof slab is carried out before concreting, waterproof material is with a thickness of h;
(5) assembling reinforcement: binding structure baseplate reinforcing bar, by resistance to plucking pile head Reinforcement and structure base slab master
Muscle is connected in a welding manner;
(6) concreting: rest around structure base slab and pile crown is poured jointly to be formed one it is unified mixed
Solidifying soil is whole, and the concrete height poured below the absolute altitude of structure base slab lower surface is exactly D.
The present invention is certain below uplift pile lower surface of base plate absolute altitude by pile crown by the way that pile crown has been amputated a part more
Distance, while having poured the concrete at pile crown more, pile crown surrounding concrete is poured jointly with structure base slab, is guaranteeing resistance to plucking
Under the early period of the uplift effect of stake resistance to plucking, the concrete more poured, which is wrapped in pile crown, can improve uplift pile and structure base slab junction
Waterproof performance.
Above specific embodiment is only the preferred embodiment of this creation, all in this wound not to limit this creation
Any modification, equivalent substitution, improvement and etc. done within the spirit and principle of work, should be included in this creation protection scope it
It is interior.
Claims (3)
1. a kind of construction method of the waterproof connecting structure of foundation pit uplift pile and structure base slab, it is characterised in that: including applying as follows
Work step is rapid:
(1) soil body is constructed at pile crown: the soil body at pile crown is tiltedly dug out a rounding stage body along the stake whole body with 45 ° of inclination angle;
(2) cushion construction: when carrying out construction of the structure base slab with underlayer, equally constructing around pile crown with a thickness of the bed course of d,
Bed course is constructed around pile body with 45 degree of inclination angles at pile crown;
(3) pile crown amputates: pile crown is amputated to D/4 below the absolute altitude of structure base slab lower surface, and waterproof construction and cleaning base,
It by base's sundries, dust, lime-ash, cleans up, base's acceptance(check);
(4) Slab Waterproof Construction: the construction of bottom waterproof is carried out before concreting, waterproof material is with a thickness of h;
(5) assembling reinforcement: binding structure baseplate reinforcing bar, by resistance to plucking pile head Reinforcement and structure base slab main reinforcement with
The mode of welding is connected;
(6) it concreting: pours rest around structure base slab and pile crown to form a unified concrete jointly
Whole, the concrete height poured below the absolute altitude of structure base slab lower surface is exactly D.
2. the construction method of the waterproof connecting structure of foundation pit uplift pile as described in claim 1 and structure base slab, feature exist
In: in step 1), uplift pile diameter is set as D, cushion thickness d, with a thickness of h, dig deep depth is waterproof materialNamely tiltedly dig to below the absolute altitude of structure base slab lower surfacePlace, when construction, are taken as
Integer, the face tiltedly dug out are the side of rounding stage body.
3. the construction method of the waterproof connecting structure of foundation pit uplift pile as described in claim 1 and structure base slab, feature exist
In: in step 3), the waterproof at pile crown is constructed around pile body with 45 ° of inclination angles.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710060574.1A CN106884436B (en) | 2017-01-25 | 2017-01-25 | A kind of construction method of the waterproof connecting structure of foundation pit uplift pile and structure base slab |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710060574.1A CN106884436B (en) | 2017-01-25 | 2017-01-25 | A kind of construction method of the waterproof connecting structure of foundation pit uplift pile and structure base slab |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106884436A CN106884436A (en) | 2017-06-23 |
CN106884436B true CN106884436B (en) | 2019-08-27 |
Family
ID=59176090
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710060574.1A Active CN106884436B (en) | 2017-01-25 | 2017-01-25 | A kind of construction method of the waterproof connecting structure of foundation pit uplift pile and structure base slab |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106884436B (en) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108560611B (en) * | 2018-01-19 | 2020-07-14 | 江苏沪武建设集团有限公司 | Anchoring structure for basement after inclined floating, resetting and leveling and construction method |
CN108517898B (en) * | 2018-03-26 | 2019-09-13 | 中交路桥北方工程有限公司 | The construction method of uplift pile and bottom plate seam crossing waterproof construction |
CN112575820A (en) * | 2020-12-16 | 2021-03-30 | 中建三局第一建设工程有限责任公司 | Construction structure and method for waterproof joints of steel pipe column and bottom plate of coastal deep foundation pit |
CN113931213B (en) * | 2021-10-19 | 2022-12-27 | 济南市规划设计研究院 | Pile foundation flexible connection node only used for uplift resistance and construction method |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004308330A (en) * | 2003-04-09 | 2004-11-04 | Nippon Steel Corp | High floor type steel structure foundation beam structure |
CN102493472A (en) * | 2011-12-13 | 2012-06-13 | 中交第二公路工程局有限公司 | Deepwater soft soil foundation reverse construction method low pile cap composite foundation construction process for bridge |
CN203256816U (en) * | 2013-04-08 | 2013-10-30 | 中国建筑第七工程局有限公司 | Pile foundation bottom plate pile head waterproof structure |
CN103953054A (en) * | 2014-04-01 | 2014-07-30 | 中铁大桥局集团第一工程有限公司 | Dry-sealed concrete pile foundation for protecting pile head reinforcement and construction method thereof |
-
2017
- 2017-01-25 CN CN201710060574.1A patent/CN106884436B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004308330A (en) * | 2003-04-09 | 2004-11-04 | Nippon Steel Corp | High floor type steel structure foundation beam structure |
CN102493472A (en) * | 2011-12-13 | 2012-06-13 | 中交第二公路工程局有限公司 | Deepwater soft soil foundation reverse construction method low pile cap composite foundation construction process for bridge |
CN203256816U (en) * | 2013-04-08 | 2013-10-30 | 中国建筑第七工程局有限公司 | Pile foundation bottom plate pile head waterproof structure |
CN103953054A (en) * | 2014-04-01 | 2014-07-30 | 中铁大桥局集团第一工程有限公司 | Dry-sealed concrete pile foundation for protecting pile head reinforcement and construction method thereof |
Non-Patent Citations (1)
Title |
---|
论灌注桩桩头与地下室底板连接部位的防水处理;关文俊;《科技情报开发与经济》;20080120;第18卷(第2期);第218-219页 * |
Also Published As
Publication number | Publication date |
---|---|
CN106884436A (en) | 2017-06-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106884436B (en) | A kind of construction method of the waterproof connecting structure of foundation pit uplift pile and structure base slab | |
CN108411802A (en) | A kind of underwater method for repairing pile foundation and scour hole | |
CN105178357A (en) | Prefabricated subsurface structure under foundation trench open cutting condition and construction method for prefabricated subsurface structure under foundation trench open cutting condition | |
CN110080242A (en) | The construction method of basement pile wall interaction structural system | |
CN111519665A (en) | Gapless filling method for foundation post-cast strip | |
CN106088127A (en) | Open caisson construction method | |
CN110258640B (en) | Construction method of superposed wall system for cover-excavation top-down construction | |
CN209722598U (en) | A kind of light-weight foamed soil structure of railway | |
CN208933989U (en) | A kind of tower-crane foundation structure | |
CN104652495B (en) | Internal support of foundation pit column and base plate node waterproof construction technology | |
CN112144581A (en) | Large integral underground space waterproof construction structure and construction method thereof | |
CN106193644B (en) | Basement reconstruction structure with raft foundation building | |
CN103790168A (en) | Application method of soil nailing wall in deep foundation pit supporting | |
CN104890434A (en) | Plastic-stone landscape making method | |
KR101380782B1 (en) | Eco-composite type steel temporary construction and construction method thereof | |
CN104775429B (en) | A kind of anchor head being placed in concrete slab and construction method thereof | |
CN209555958U (en) | A kind of pile-raft foundation structure based on the adaptive deformation adjustment device of stake top | |
CN204645093U (en) | Poured band of outer wall of basement advanced processing constructs | |
CN103572786A (en) | Pile head joint waterproof processing device and construction method thereof | |
CN207727603U (en) | Big cushion cap deep basal pit formwork supporting system | |
CN102926403B (en) | Roof construction method by cover-excavation method | |
CN105155387A (en) | Garden road structure | |
CN113802595B (en) | Bearing platform construction process and bearing platform structure | |
CN105586980A (en) | Construction method for wind tower foundation | |
CN108149707A (en) | A kind of basement building structure and its construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |