CN106884436B - A kind of construction method of the waterproof connecting structure of foundation pit uplift pile and structure base slab - Google Patents

A kind of construction method of the waterproof connecting structure of foundation pit uplift pile and structure base slab Download PDF

Info

Publication number
CN106884436B
CN106884436B CN201710060574.1A CN201710060574A CN106884436B CN 106884436 B CN106884436 B CN 106884436B CN 201710060574 A CN201710060574 A CN 201710060574A CN 106884436 B CN106884436 B CN 106884436B
Authority
CN
China
Prior art keywords
pile
construction
waterproof
base slab
pile crown
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710060574.1A
Other languages
Chinese (zh)
Other versions
CN106884436A (en
Inventor
赵福元
张树
刘侠
朱子龙
吴晓杰
刘宏达
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing No 6 Municipal Construction Engineering Co Ltd
Original Assignee
Beijing No 6 Municipal Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing No 6 Municipal Construction Engineering Co Ltd filed Critical Beijing No 6 Municipal Construction Engineering Co Ltd
Priority to CN201710060574.1A priority Critical patent/CN106884436B/en
Publication of CN106884436A publication Critical patent/CN106884436A/en
Application granted granted Critical
Publication of CN106884436B publication Critical patent/CN106884436B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/16Arrangement or construction of joints in foundation structures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0018Cement used as binder
    • E02D2300/002Concrete

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The present invention relates to the construction methods of a kind of foundation pit uplift pile and the waterproof connecting structure of structure base slab comprising following construction procedure: (1) soil body is constructed at pile crown;(2) cushion construction;(3) pile crown amputates;(4) Slab Waterproof Construction;(5) assembling reinforcement;(6) concreting.The present invention abolishes pile crown to D/4 below bottom plate, and structure base slab uses rounding stage body to pour with when pile crown concreting.Rounding stage body, which pours, to protect baseplate reinforcing bar not to be etched, and prevent having convenience for construction and economic rationality due to the improper caused bottom plate infiltration of pile head waterproofing.

Description

A kind of construction method of the waterproof connecting structure of foundation pit uplift pile and structure base slab
[technical field]
The present invention relates to a kind of construction methods of foundation pit, and in particular to a kind of waterproof company of foundation pit uplift pile and structure base slab The construction method of binding structure belongs to base pit engineering technical field.
[background technique]
Currently, engineering construction occurs, there are many case where bottom plate infiltration, and there are many influence factor, wherein the water-proofing treatment of pile crown And particularly important one.The side that traditional pile crown waterproof construction is combined using waterproof roll, water-repellent paint, sealing material Formula carries out water-proofing treatment, not only time-consuming and laborious, but also cannot be guaranteed waterproof effect.
Pile head waterproofing will solve three difficult points: 1. because pile crown is not to pour simultaneously with bottom plate, on pile crown periphery, stake top With the concrete construction joint of concrete floor connecting part.2. blinding concrete shrinks the gap generated between pile crown.3. pile crown Surrounding bed course is because there are the gaps that differential settlement generates for the reasons such as the compactness difference of following soil.
Therefore, in order to solve the above technical problems, foundation pit uplift pile and structure base slab it is necessory to provide a kind of innovation The construction method of waterproof connecting structure, to overcome the defect in the prior art.
[summary of the invention]
The purpose of the present invention is to provide the construction method of a kind of foundation pit uplift pile and the waterproof connecting structure of structure base slab, It does not need to carry out pile crown above-mentioned traditional pile crown waterproof construction in practice of construction, has convenience for construction and economical rationality Property.
To achieve the above object, the technical scheme adopted by the invention is as follows: a kind of waterproof of foundation pit uplift pile and structure base slab The construction method of connection structure, including following construction procedure:
(1) soil body is constructed at pile crown: the soil body at pile crown is tiltedly dug out an inverted round stage along the stake whole body with 45 ° of inclination angle Body;
(2) cushion construction: when carrying out construction of the structure base slab with underlayer, equally construction is around pile crown with a thickness of d's Bed course, bed course is constructed around pile body with 45 degree of inclination angles at pile crown;
(3) pile crown amputates: pile crown being amputated to D/4 below the absolute altitude of structure base slab lower surface, and waterproof construction and cleaning Base cleans up base's sundries, dust, lime-ash, base's acceptance(check);
(4) Slab Waterproof Construction: the construction of waterproof slab is carried out before concreting, waterproof material is with a thickness of h;
(5) assembling reinforcement: binding structure baseplate reinforcing bar, by resistance to plucking pile head Reinforcement and structure base slab master Muscle is connected in a welding manner;
(6) concreting: rest around structure base slab and pile crown is poured jointly to be formed one it is unified mixed Solidifying soil is whole, and the concrete height poured below the absolute altitude of structure base slab lower surface is exactly D.
The construction method of the waterproof connecting structure of foundation pit uplift pile and structure base slab of the invention is further are as follows: step 1) In, uplift pile diameter is set as D, and cushion thickness d, with a thickness of h, dig deep depth is waterproof material? It is exactly oblique dig to below the absolute altitude of structure base slab lower surfacePlace, when construction, are taken as integer, and the face tiltedly dug out is i.e. For the side of rounding stage body.
The construction method of the waterproof connecting structure of foundation pit uplift pile and structure base slab of the invention is also are as follows: in step 3), stake Waterproof at head is constructed around pile body with 45 ° of inclination angles.
Compared with prior art, the invention has the following beneficial effects: foundation pit uplift pile of the invention and structure base slabs The construction method of waterproof connecting structure is amputated pile crown to lower surface of base plate hereinafter, concrete pours by amputating part pile crown more It is poured at pile crown using rounding stage body when building, same casting concrete at pile crown, such construction joint has been left in distance structure bottom Plate lower surfaceThe lower part pile body at place avoids and construction joint is stayed in stake top is connected with concrete floor Position, effectively prevent structure base slab reinforcing bar and be corroded.
Meanwhile pile concrete is poured and is poured using rounding stage body, for 45 ° of bed courses, i.e., inclination angle is constructed in rounding stage body lower part Mat layer concrete is shunk, and the intrusion of water can be effectively prevented in the concrete more poured, but also can be effectively reduced uneven Settle the gap generated.
[Detailed description of the invention]
Fig. 1 is the structural schematic diagram of uplift pile of the invention.
In figure: 1. structural floorings;2. waterproof material;3. bed course;4. pile body steel bar stress;5 pile bodies;6. baseplate reinforcing bar.
[specific embodiment]
It please refers to shown in Figure of description 1, the present invention is the waterproof connecting structure of a kind of foundation pit uplift pile and structure base slab Construction method, including following construction procedure:
(1) soil body is constructed at pile crown: setting uplift pile diameter as D, cushion thickness d, waterproof material is with a thickness of h, by stake The soil body at head tiltedly digs out a rounding stage body along the stake whole body with 45 ° of inclination angle, and digging depth isAlso It is oblique dig to below the absolute altitude of structure base slab lower surfacePlace, when construction, are taken as integer, and the face tiltedly dug out is The side of rounding stage body.Reverse frustoconic, which pours, to protect baseplate reinforcing bar not to be etched, and prevent from leading since pile head waterproofing is improper The bottom plate of cause seeps water.
(2) cushion construction: when carrying out construction of the structure base slab with underlayer, equally construction is around pile crown with a thickness of d's Bed course, bed course is constructed around pile body with 45 degree of inclination angles at pile crown.
(3) pile crown amputates: pile crown being amputated to D/4 below the absolute altitude of structure base slab lower surface, and waterproof construction and cleaning Base cleans up base's sundries, dust, lime-ash, base's acceptance(check);Wherein, waterproof construction does not need to carry out at pile crown The complicated operational procedures such as sealing rod, waterstop and sealant construction, only need to be using the same waterproof with other parts under bottom plate Material and operational procedure, unlike, the construction of waterproofing work is carried out along pile body with 45 ° of inclination angles at pile crown.
(4) Slab Waterproof Construction: the construction of waterproof slab is carried out before concreting, waterproof material is with a thickness of h;
(5) assembling reinforcement: binding structure baseplate reinforcing bar, by resistance to plucking pile head Reinforcement and structure base slab master Muscle is connected in a welding manner;
(6) concreting: rest around structure base slab and pile crown is poured jointly to be formed one it is unified mixed Solidifying soil is whole, and the concrete height poured below the absolute altitude of structure base slab lower surface is exactly D.
The present invention is certain below uplift pile lower surface of base plate absolute altitude by pile crown by the way that pile crown has been amputated a part more Distance, while having poured the concrete at pile crown more, pile crown surrounding concrete is poured jointly with structure base slab, is guaranteeing resistance to plucking Under the early period of the uplift effect of stake resistance to plucking, the concrete more poured, which is wrapped in pile crown, can improve uplift pile and structure base slab junction Waterproof performance.
Above specific embodiment is only the preferred embodiment of this creation, all in this wound not to limit this creation Any modification, equivalent substitution, improvement and etc. done within the spirit and principle of work, should be included in this creation protection scope it It is interior.

Claims (3)

1. a kind of construction method of the waterproof connecting structure of foundation pit uplift pile and structure base slab, it is characterised in that: including applying as follows Work step is rapid:
(1) soil body is constructed at pile crown: the soil body at pile crown is tiltedly dug out a rounding stage body along the stake whole body with 45 ° of inclination angle;
(2) cushion construction: when carrying out construction of the structure base slab with underlayer, equally constructing around pile crown with a thickness of the bed course of d, Bed course is constructed around pile body with 45 degree of inclination angles at pile crown;
(3) pile crown amputates: pile crown is amputated to D/4 below the absolute altitude of structure base slab lower surface, and waterproof construction and cleaning base, It by base's sundries, dust, lime-ash, cleans up, base's acceptance(check);
(4) Slab Waterproof Construction: the construction of bottom waterproof is carried out before concreting, waterproof material is with a thickness of h;
(5) assembling reinforcement: binding structure baseplate reinforcing bar, by resistance to plucking pile head Reinforcement and structure base slab main reinforcement with The mode of welding is connected;
(6) it concreting: pours rest around structure base slab and pile crown to form a unified concrete jointly Whole, the concrete height poured below the absolute altitude of structure base slab lower surface is exactly D.
2. the construction method of the waterproof connecting structure of foundation pit uplift pile as described in claim 1 and structure base slab, feature exist In: in step 1), uplift pile diameter is set as D, cushion thickness d, with a thickness of h, dig deep depth is waterproof materialNamely tiltedly dig to below the absolute altitude of structure base slab lower surfacePlace, when construction, are taken as Integer, the face tiltedly dug out are the side of rounding stage body.
3. the construction method of the waterproof connecting structure of foundation pit uplift pile as described in claim 1 and structure base slab, feature exist In: in step 3), the waterproof at pile crown is constructed around pile body with 45 ° of inclination angles.
CN201710060574.1A 2017-01-25 2017-01-25 A kind of construction method of the waterproof connecting structure of foundation pit uplift pile and structure base slab Active CN106884436B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710060574.1A CN106884436B (en) 2017-01-25 2017-01-25 A kind of construction method of the waterproof connecting structure of foundation pit uplift pile and structure base slab

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710060574.1A CN106884436B (en) 2017-01-25 2017-01-25 A kind of construction method of the waterproof connecting structure of foundation pit uplift pile and structure base slab

Publications (2)

Publication Number Publication Date
CN106884436A CN106884436A (en) 2017-06-23
CN106884436B true CN106884436B (en) 2019-08-27

Family

ID=59176090

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710060574.1A Active CN106884436B (en) 2017-01-25 2017-01-25 A kind of construction method of the waterproof connecting structure of foundation pit uplift pile and structure base slab

Country Status (1)

Country Link
CN (1) CN106884436B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108560611B (en) * 2018-01-19 2020-07-14 江苏沪武建设集团有限公司 Anchoring structure for basement after inclined floating, resetting and leveling and construction method
CN108517898B (en) * 2018-03-26 2019-09-13 中交路桥北方工程有限公司 The construction method of uplift pile and bottom plate seam crossing waterproof construction
CN112575820A (en) * 2020-12-16 2021-03-30 中建三局第一建设工程有限责任公司 Construction structure and method for waterproof joints of steel pipe column and bottom plate of coastal deep foundation pit
CN113931213B (en) * 2021-10-19 2022-12-27 济南市规划设计研究院 Pile foundation flexible connection node only used for uplift resistance and construction method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004308330A (en) * 2003-04-09 2004-11-04 Nippon Steel Corp High floor type steel structure foundation beam structure
CN102493472A (en) * 2011-12-13 2012-06-13 中交第二公路工程局有限公司 Deepwater soft soil foundation reverse construction method low pile cap composite foundation construction process for bridge
CN203256816U (en) * 2013-04-08 2013-10-30 中国建筑第七工程局有限公司 Pile foundation bottom plate pile head waterproof structure
CN103953054A (en) * 2014-04-01 2014-07-30 中铁大桥局集团第一工程有限公司 Dry-sealed concrete pile foundation for protecting pile head reinforcement and construction method thereof

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004308330A (en) * 2003-04-09 2004-11-04 Nippon Steel Corp High floor type steel structure foundation beam structure
CN102493472A (en) * 2011-12-13 2012-06-13 中交第二公路工程局有限公司 Deepwater soft soil foundation reverse construction method low pile cap composite foundation construction process for bridge
CN203256816U (en) * 2013-04-08 2013-10-30 中国建筑第七工程局有限公司 Pile foundation bottom plate pile head waterproof structure
CN103953054A (en) * 2014-04-01 2014-07-30 中铁大桥局集团第一工程有限公司 Dry-sealed concrete pile foundation for protecting pile head reinforcement and construction method thereof

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
论灌注桩桩头与地下室底板连接部位的防水处理;关文俊;《科技情报开发与经济》;20080120;第18卷(第2期);第218-219页 *

Also Published As

Publication number Publication date
CN106884436A (en) 2017-06-23

Similar Documents

Publication Publication Date Title
CN106884436B (en) A kind of construction method of the waterproof connecting structure of foundation pit uplift pile and structure base slab
CN108411802A (en) A kind of underwater method for repairing pile foundation and scour hole
CN105178357A (en) Prefabricated subsurface structure under foundation trench open cutting condition and construction method for prefabricated subsurface structure under foundation trench open cutting condition
CN110080242A (en) The construction method of basement pile wall interaction structural system
CN111519665A (en) Gapless filling method for foundation post-cast strip
CN106088127A (en) Open caisson construction method
CN110258640B (en) Construction method of superposed wall system for cover-excavation top-down construction
CN209722598U (en) A kind of light-weight foamed soil structure of railway
CN208933989U (en) A kind of tower-crane foundation structure
CN104652495B (en) Internal support of foundation pit column and base plate node waterproof construction technology
CN112144581A (en) Large integral underground space waterproof construction structure and construction method thereof
CN106193644B (en) Basement reconstruction structure with raft foundation building
CN103790168A (en) Application method of soil nailing wall in deep foundation pit supporting
CN104890434A (en) Plastic-stone landscape making method
KR101380782B1 (en) Eco-composite type steel temporary construction and construction method thereof
CN104775429B (en) A kind of anchor head being placed in concrete slab and construction method thereof
CN209555958U (en) A kind of pile-raft foundation structure based on the adaptive deformation adjustment device of stake top
CN204645093U (en) Poured band of outer wall of basement advanced processing constructs
CN103572786A (en) Pile head joint waterproof processing device and construction method thereof
CN207727603U (en) Big cushion cap deep basal pit formwork supporting system
CN102926403B (en) Roof construction method by cover-excavation method
CN105155387A (en) Garden road structure
CN113802595B (en) Bearing platform construction process and bearing platform structure
CN105586980A (en) Construction method for wind tower foundation
CN108149707A (en) A kind of basement building structure and its construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant