CN206090534U - Foundation ditch and side slope envelope of prestressing force assembled dysmorphism stake wall - Google Patents

Foundation ditch and side slope envelope of prestressing force assembled dysmorphism stake wall Download PDF

Info

Publication number
CN206090534U
CN206090534U CN201621133376.0U CN201621133376U CN206090534U CN 206090534 U CN206090534 U CN 206090534U CN 201621133376 U CN201621133376 U CN 201621133376U CN 206090534 U CN206090534 U CN 206090534U
Authority
CN
China
Prior art keywords
standard component
assembled
joint
abnormity
piling wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621133376.0U
Other languages
Chinese (zh)
Inventor
刘全林
宋伟民
张扬
张衡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Qiangjin Foundation Engineering Co Ltd
Original Assignee
Shanghai Qiangjin Foundation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Qiangjin Foundation Engineering Co Ltd filed Critical Shanghai Qiangjin Foundation Engineering Co Ltd
Priority to CN201621133376.0U priority Critical patent/CN206090534U/en
Application granted granted Critical
Publication of CN206090534U publication Critical patent/CN206090534U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a foundation ditch and side slope envelope of prestressing force assembled dysmorphism stake wall utilizes prestressing force high -strength steel bar and high -strength concrete batch production prefabrication to become the standard component, and through foundation ditch and side slope envelope that the job site assembly formed, it has reasonable atress performance, satisfies ground foundation pit slope's fender soil, stagnant water, outward appearance and decorates and be used as permanently the requirement of outdoor wall structure down. T shape, rectangle and U font cross -section are makeed into according to atress and assembly requirements to standardized prefabricated component's (being called for short " standard component ") appearance, and the joint between the standard component includes hydraulic -coupling and vertical joint. The utility model discloses a site assembly construction maneuverability is strong, component assembly ization degree height, construction work efficiency are high, practice thrift engineering materials, engineering cost is low, engineering implementation is respond well.

Description

A kind of foundation ditch and side slope building enclosure of prestressing force assembled abnormity piling wall
Technical field
This utility model is related to technical field of civil engineering, and specifically a kind of foundation ditch and side slope vertically go along with sb. to guard him knot Structure.
Background technology
The piling wall type building enclosure adopted in base pit engineering or slope project is a kind of important feature shape of foundation pit enclosure Formula, is extensively applied from all parts of the world, and current foundation ditch and side slope go along with sb. to guard him piling wall frequently with drilling (rotary digging) perfusion post, SMW The shaped steel Soil-cement Wall of engineering method, prefabricated pile Soil-cement Wall and cast-in-place diaphram wall etc..
Bored concrete pile meant in engineering site by mechanical hole building, mud off, and stake holes is formed in foundation soil, and in which Steel reinforcement cage, in-site pouring concrete and the stake that formed are placed, different according to forming hole method, bored concrete pile can be divided into punching again and irrigate Several classes such as stake, cast-in-situ bored pile and digging hole filling pile.The construction of cast-in-situ bored pile, because of the difference of forms of protective wall selected by which, has mud Slurry retaining wall mode and a complete set of two kinds of pipe construction.Constructed bored concrete pile pole using mud off mode in soft soil layer and unstable soil layer The common faults such as constriction, collapse hole, stake holes deflection are also easy to produce, so as to affect the quality of concrete placed under water, and a large amount of circulation mud is produced Slurry, the discharge of mud will cause environmental pollution with processing;Although full-sleeve construction technology can protect stablizing for hole wall, but still not Can avoid completely carrying out the Water And Earth Pressures at balance pipe bottom using mud, due to being affected by the solid element such as hole depth, casing length, difficulty of construction Greatly, high cost, speed are slow.
The shaped steel Soil-cement Wall of SMW engineering methods, will H profile steel or steel pipe be inserted in Soil-cement Wall, will bear Both load and antiseepage dash combine, and make while having the supporting construction carried with two kinds of functions of sealing.To reduce Construction costs, the H profile steel or steel pipe being commonly inserted at present are both needed to extract recovery, therefore in its external coating antifriction material, but Antifriction material have impact on the bond strength of shaped steel and soil cement, while soil cement water-stop curtain during shaped steel is inserted out, can be destroyed, And produce the space of certain volume, cause deform it is unfavorable to the environmental conservation for closing on.
Steel sheet pile enclosure structure, using being the Larsen steel sheet pile with occlusion, is engaged to form entirety by the fore shaft on stake side, shape Into assembled building enclosure.But due to the restriction of its length and cross dimensions, it is only used for excavating shallower foundation ditch, such as depth is little In the foundation pit enclosure of 6m.As its bending rigidity is less, the deformation that stress is produced is larger, in more important environmental conservation region Should not adopt.
Soil cement is inserted into the building enclosure of pile for prestressed pipe or square pile, the double effects with gear soil and sealing.Due to The joint connection of its prefabricated pile is difficult to wait strong ties, or joint connection construction is excessively complicated, up to the present, can only be with single , used as foundation pit enclosure structure, single-unit stake is long maximum less than 15m, using the foundation ditch or side slope depth of the building enclosure for the prefabricated pile of section Degree also only has 6~8m, it is clear that being received with range of application for this building enclosure is necessarily constrained.Even if the interconnection technique of joint is asked Topic is solved, but as the cross section property of current pile tube or square pile determines that its bending resistance is limited, it is difficult to reach more rational Supporting benefit.
Diaphram wall is the primary structure form of Construction of Deep Foundation and Extra-Deep Foundation Pit, extensively should all over the world With.Diaphram wall is replacing many traditional deep foundations and deep footing groove enclosing structure at present, is applied to deep big foundation pit or city In city's municipal works and railway traffic engineering.Little, noise is vibrated during construction of diaphragm wall low, it is adaptable to urban architecture compact district Construct in domain;Wall stiffness is big, and barrier performance is good;It is applicable to various geological conditions;Can be permanently basic for superstructure;Energy Limited ground and the space in property line is enough made full use of, returns of investment are given full play to;Work efficiency height, short time limit, reliable in quality. Cast-in-place diaphram wall is current most popular version, but the construction ground in complex geological condition such as sandy soil stratum Lower diaphragm wall, the slurry trench stability problem being often relatively difficult to resolve in certainly continuous wall trench underground work progress, and landslip of the sides of the trench cause Concrete pouring quality problem, so as to produce surface dew muscle and hole, body of wall and joint localized seepage, wall steel bar basket structure The wall body mass defects such as damage, affect safety and the waterproof effect of continuous underground wall structure.
Continuous wall trench underground process typically carries out retaining wall using mud, needs to discharge mud after casting concrete, produces Substantial amounts of waste mud needs to process, and causes serious environmental pollution and the increase of cost.
The construction property of diaphram wall underwater casting determines that job site is difficult to ensure that the construction quality of body of wall, this It is mass defect that cast-in-place continuous underground wall structure is difficult to improve or make up.Therefore, engineering circles are needed searching one kind badly and can be substituted The continuous wall construction of Novel underground of cast-in-place diaphram wall, but at present this industry predicament not yet solved well.
Using precast reinforced concrete pile or wall, the stake and wall for replacing cast-in-place reinforced concrete structure will be underground engineering The direction in field.Currently for the precast concrete of superstructure, China Inst of Architectural Standard Design works out《Assembling Formula concrete structure technique code》, but the code is without reference to the technology and mark in terms of underground exterior-protected structure (JGJ1-2014) Standard, not with directive function.Shanghai construction engineering group is attempted in prefabricated diaphram wall method, such as new in Tung Wah hospital The prefabricated empty stomach wallboard in ground is applied in the Foundation Pit Support Engineering for building outpatient service and is assembled into continuous underground wall structure.Due to single width wall Board size larger (length reaches 20.5m), it is very difficult in lifting and transport.
Assembled in situ due to not accomplishing small members, limits the technology and does not obtain further popularization and application.
Using prefabricated tubular pile, such as PHC pile tubes, PRC pile tubes, precast square pile and prefabricated I-shaped stake are tied as pattern foundation pit supporting structure Structure, has many units at present and is tested, but be limited to the application of single-unit stake, this is because the type of attachment between stake does not have Efficiently solve, be embodied in the aspects such as assembled in situ connection construction difficulty, joint is unreliable, joint cost height, cause with use Application of the precast reinforced concrete piles wall fabricated construction in foundation pit enclosure structure is in experimental stage.
For the vertical building enclosure of foundation ditch stress characteristic and site operation the characteristics of, using be readily transported and lift it is little Size members are quickly assembled at the scene, are built a kind of piling wall of going along with sb. to guard him for not only having kept off native but also sealing, are reduced foundation pit enclosure cost, be us The direction of effort.
Utility model content
Technical problem to be solved in the utility model is, by the cross sectional shape and size that optimize prefabricated piling wall, full Sufficient its rational force request;Solve prefabricated standard component factorial construction difficulty big, single-piece transport difficult, piece weight are larger With lifting inconvenience, the difficult problem such as assembled in situ construction period is longer, for different supporting requirements and force request, there is provided a kind of pre- The stress assembled shaped pile wall base is cheated and side slope building enclosure.
To reach above-mentioned purpose, the technical solution adopted in the utility model is:
A kind of prestressing force assembled shaped pile wall base hole and side slope building enclosure, assembled abnormity piling wall is filled by standard component With forming;Standard component is formed by prestressed high-strength reinforced concrete and high-strength concrete prefabricated;Jointing between standard component Including horizontal joint and vertical joint;Using the mechanical adapter for docking one by one, joint between stress cage bar at horizontal joint Concrete end face adopts macromolecule resin glue bonding;Vertical joint is the tongue and groove joggle of embedded sealing adhesive tape or high-pressure rotary-spray stirring The embedded connection of stake.Its vertical abutment joint is made to occur without percolating water phenomenon.
This utility model is prefabricated into standard component, Jing job sites using prestressed high-strength reinforcing bar and high-strength concrete batch production The side slope building enclosure being assembled, with preferably stress cross sectional shape, meets the gear soil of geotechnical slope, sealing, appearance dress It is decorated with and the requirement as good and all lower outdoor wall construction.
Assembled abnormity piling wall section is T-shaped, rectangle or U-shaped.
The T-shaped assembled abnormity piling wall of section is assembled after standard component field combinations by real abdomen or empty stomach, is marked Quasi- part is that T-shaped standard component or T-shaped standard component mix composition with square type standard component.
Assembled that section takes the shape of the letter U abnormity piling wall is assembled after standard component field combinations by real abdomen or empty stomach, is marked Quasi- part mixes composition with U-shaped standard component for T-shaped standard component.
The rectangular assembled abnormity piling wall of section is assembled after standard component field combinations by real abdomen or empty stomach, is marked Quasi- part is square type standard component.
It is in be dislocatedly distributed that the level connection joint of horizontal joint is sewn on vertical position;The vertical connecting sewing of vertical joint is in upper and lower The straight joint distribution of alignment.
Some enhancing is provided with horizontal joint and anchors joint, it is that screw lock formula is mechanically connected to strengthen anchoring joint.
Connecting screw hole, connecting screw hole and Guan Liang, level are embedded with the assembled top exposed of abnormity piling wall and side Support beam or outer wall of basement connection.
The profile of standard component is made according to stress and matching requirements, is realized and is quick and precisely connected.
Assembly method is as follows:
(1) after T-shaped piling wall is the T-shaped standard component or T-shaped standard component and square type standard component field combinations by real abdomen or empty stomach Assembling
(2) U-shaped piling wall is assembled after T-shaped standard component and the U-shaped standard component field combinations by real abdomen or empty stomach;
(3) square type piling wall is assembled by the square type standard component of real abdomen or empty stomach.
Horizontal joint is in be dislocatedly distributed in vertical position;Vertical straight joint of the connecting sewing in consistency from top to bottom.
Some are additionally arranged at horizontal joint strengthens anchoring joint, and it is identical that its connection is connected with stress cage bar, is Screw lock formula is mechanically connected.
The exposed face of special-shaped piling wall has top surface and side, is embedded with connecting screw hole thereon, is easy to go along with sb. to guard him piling wall and Guan Liang, side The exterior wall connection of the horizontal support member or basement on slope.
Beneficial effect:This utility model is using the various standard components prefabricated to batch production, combination at the construction field (site) and dress Match somebody with somebody, form the more rational shaped pile wall construction of stress, have gear soil and water stopping function concurrently, alternative existing foundation ditch is gone along with sb. to guard him with side slope Piling wall.This utility model site operation is workable, component assembling degree high, working performance is high, ensure that structure Globality and construction quality, reduce construction costs, and engineering construction works well.
Description of the drawings
The utility model is described in further detail with reference to the accompanying drawings and detailed description.
Profiles of the Fig. 1 for this utility model T section stake diaphragm wall foundation pit enclosure structure;
Expanded views of the Fig. 2 for this utility model T section stake diaphragm wall foundation pit enclosure structure;
Profiles of the Fig. 3 for this utility model U-shaped section piling wall foundation pit enclosure structure;
Expanded views of the Fig. 4 for this utility model U-shaped section piling wall foundation pit enclosure structure;
Profiles of the Fig. 5 for this utility model T section stake separate type foundation pit enclosure structure;
Expanded views of the Fig. 6 for this utility model T section stake separate type foundation pit enclosure structure;
Fig. 7 is this utility model Rectangular Section Pile separate type foundation pit enclosure structure profile;
Fig. 8 is this utility model Rectangular Section Pile separate type foundation pit enclosure structure expanded view;
Fig. 9 is the T-shaped standard component assembling effect of this utility model assembled abnormity piling wall and tenon formula joint schematic diagram;
Figure 10 is that the T-shaped standard component assembling effect of this utility model assembled abnormity piling wall and the embedded joint of rotating spraying mixture pile show It is intended to;
Figure 11 is the T-shaped standard component of this utility model assembled abnormity piling wall and rectangle standard component assembling schematic diagram;
Figure 12 is that this utility model assembled abnormity one T-shaped standard component of piling wall and a quasi-moments shape standard component assembling are illustrated Figure;
Figure 13 is this utility model assembled abnormity piling wall T-shaped standard component assembling schematic diagram on an empty stomach;
Figure 14 is the T-shaped standard component of this utility model assembled abnormity piling wall and U-shaped standard component assembling schematic diagram;
Figure 15 is this utility model assembled abnormity piling wall T-shaped standard component and U-shaped standard component assembling schematic diagram on an empty stomach;
Figure 16 is the connection signal that the stress cage bar of the horizontal joint of this utility model assembled abnormity piling wall is docked one by one Figure;
Figure 17 is this utility model Rectangular Section Pile and circular mixing pile Composite Foundation Pit building enclosure cross-sectional view;
Figure 18 is this utility model Rectangular Section Pile and uniform thickness mixing pile Composite Foundation Pit building enclosure cross-sectional view;
Figure 19 is the stake of this utility model T section and circular mixing pile Composite Foundation Pit building enclosure cross-sectional view;
Figure 20 is the stake of this utility model T section and uniform thickness mixing pile Composite Foundation Pit building enclosure cross-sectional view;
Figure 21 is this utility model circle mixing pile and the compound diaphragm wall foundation pit enclosure structure cross-sectional view of T section stake;
Figure 22 is this utility model uniform thickness mixing pile and the compound diaphragm wall foundation pit enclosure structure cross-sectional view of T section stake;
In figure:The prefabricated standard component of 1-T-steel reinforced concrete, 2-horizontal joint, the connecting screw hole of 21-stress cage bar, 3-vertical abutment joint, 31-vertical tenon formula joint, the embedded joint of 32-vertical rotating spraying mixture pile, 33-vertical waterproof adhesive tape, 4- Pre-buried screw that Guan Liang, 41-enclosure wall are connected with outer wall of basement, the concrete prefabricated standard component of 5-square steel bar, 6-level The link position of joint, 7-screw lock formula machinery fitting, 8-high-strength steel bar, 9-screw lock steel bushing, 10-screw lock connecting rod, 11- High-strength resin glue, 12-connecting screw hole, the prefabricated standard component of 13-U-shaped armored concrete, 14-strengthen solidified earth, 15-strengthen and connect Connect muscle.
Specific embodiment
In order that technological means, creation characteristic, reached purpose and effect that this utility model is realized are easy to understand, under Face combines and is specifically illustrating, and this utility model is expanded on further.
A kind of foundation ditch and side slope building enclosure of prestressing force assembled abnormity piling wall, is for vertical side slope or vertical cut Wall of Deep Foundation Pit dash soil pressure and protection stability of slope and control deformation building enclosure.Knot is gone along with sb. to guard him based on vertical side slope The stress characteristic of structure requires that with sealing the assembled special-shaped wall that this utility model is developed has given full play to T-shaped piling wall, rectangular pile With the stress performance of U-board.
Referring to Fig. 1:By T-steel reinforced concrete prefabricated standard component 1, Jing horizontal joints 2 splice length and longitudinal seam 3 splices width Degree, and the piling wall structure of abnormity, such as T-shaped piling wall, rectangle piling wall and U-shaped piling wall structure are combined together to form with Guan Liang 4.
In this patent, the prefabricated standard component required for assembled abnormity piling wall is prefabricated by modulated dimension standard , it is a kind of new prefabricated component of special exploitation.Modular connection, horizontal joint 6, using screw lock are connected between standard component Formula mechanical fastener 7, bottom of the high-strength steel bar 8 with screw lock steel bushing 9 is fixed, and the other end fixes-screw lock connecting rod 10, then with even Connect screw 12 to lock, that is, realize the docking one by one of stress cage bar.Additionally, filling on the horizontal joint of two-stage nitration standard component high Strong resin 11 is bonded so that the horizontal joint between standard component realizes seamless binding, is met and is connected rigidity of the nape degree more than this stiffness of the body of component The requirement of degree, referring to Figure 16.
T-shaped standard component 1 is formed using high-strength concrete is prefabricated with high-strength steel bar 8.
Referring to Fig. 2, standard component applies prestressing force using pre-tensioning system.Its horizontal joint presses phase in the distribution of elevation location It is staggeredly arranged between adjacent every width wall, can so effectively improves the degree of safety of assembled building enclosure.
Referring to Fig. 2, the screw 41 being connected with the basement wall is embedded with the side panel of T-shaped standard component 1, two are improve The convenience of wall unification.
When the bottom soil layer preferably of foundation ditch, vertical building enclosure stress below the hole bottom surface of foundation ditch and deformation will be by Gradually reduce, when below certain depth, vertical building enclosure replaces the T-shaped piling wall on top using the stake of square type, forms a kind of U-shaped Building enclosure, referring to Fig. 3, Fig. 4.
The joint for having standard between the stake of square type and T-shaped piling wall realizes docking for stress cage bar;Its horizontal joint is in absolute altitude position The distribution put by being staggeredly arranged between adjacent every width wall, referring to Fig. 4.
Referring to Fig. 4, the screw 41 being connected with the basement wall is embedded with the side panel of T-shaped standard component 1, two are improve The convenience of wall unification.
When foundation ditch barrier properties are less demanding, the T-shaped stake 1 of separate type can be adopted compound with cement mixing method as perpendicular To building enclosure, referring to Fig. 5 and Fig. 6
When the cutting depth of foundation ditch it is shallower, or produce lateral Water And Earth Pressures it is less when, can adopt separate type rectangle Stake 5 as vertical building enclosure, referring to Fig. 7.Rectangular pile 5 is also a kind of standard component of factorial praluction, for ease of transporting and hanging Dress, its length dimension are controlled within the size for allowing transport, at the construction field (site) segmentation insertion, and horizontal joint is in ground-mounted After connection in insert into stratum, its horizontal joint elevation location distribution by being staggeredly arranged between adjacent every width wall, referring to figure 8。
It is made of using multi-shaft stirring stake diaphragm wall or equal thickness stirring wall, with rectangular pile to strengthen solidified earth churned pile wall 14 Standard component 5 is composited, and the gap between rectangular pile standard component 5 is filled by cement solidification soil, defines gear soil and sealing is gone along with sb. to guard him Structure, referring to Fig. 7.
The vertical joint 3 of T-shaped stake 1 adopts tongue and groove joggle 31, and seam is provided with sealing adhesive tape, referring to Fig. 9.
The vertical joint 3 of T-shaped stake 1 connects sealing using using high-pressure rotary-spray mixing pile 32 is embedded, referring to Figure 10.
Referring to Figure 11, assembled abnormity piling wall is assembled by a square type standard component 5 and T-shaped standard component 1.
In order to improve the rigidity of enclosure wall, body of wall deadweight is reduced, by assembled abnormity piling wall using T-shaped standard component 1 on an empty stomach It is assembled, vertical joint and empty stomach intracavity are filled into cement solidification soil, referring to Figure 12.
To reduce the weight of T-shaped standard component, the length of its two wing is reduced, as backbar, support the longer plan of one Rectangular slab 5 is assembled into the building enclosure of abnormity, referring to Figure 13.
T-shaped standard component 1 and U-shaped standard component 13 are assembled into into the building enclosure of abnormity, referring to Figure 14 and Figure 15, work is saved Journey material, reduces the cost of bracing engineering.
Rectangular Section Pile 5 is compounded to form into foundation pit enclosure structure with circular mixing pile 14, the features such as with constructing convenient, its Transverse section is referring to Figure 17;
Rectangular Section Pile 5 and uniform thickness mixing pile 14 are compounded to form into foundation pit enclosure structure, its cross-sectional view, referring to Figure 18;
T section stake is compounded to form into foundation pit enclosure structure with circular mixing pile 14, its cross-sectional view, referring to Figure 19;
T section stake and uniform thickness mixing pile 14 are compounded to form into foundation pit enclosure structure, its cross-sectional view, referring to Figure 20;
Cylinder mixing pile 14 and T section stake 1 are compounded to form into diaphragm wall foundation pit enclosure structure, its cross-sectional view, referring to Figure 21;
Uniform thickness mixing pile 14 and T section stake 1 are compounded to form into diaphragm wall foundation pit enclosure structure, its transverse section, referring to figure 22。
Ultimate principle of the present utility model, principal character and advantage of the present utility model has been shown and described above.One's own profession The technical staff of industry it should be appreciated that this utility model is not restricted to the described embodiments, described in above-described embodiment and description Simply illustrate principle of the present utility model, on the premise of without departing from this utility model spirit and scope, this utility model can also There are various changes and modifications, these changes and improvements are both fallen within the range of claimed this utility model.This utility model will Protection domain is asked to be defined by appending claims and its equivalent.

Claims (8)

1. a kind of foundation ditch and side slope building enclosure of prestressing force assembled abnormity piling wall, is characterized in that, assembled abnormity piling wall is It is assembled by standard component;Standard component is formed by prestressed high-strength reinforced concrete and high-strength concrete prefabricated;Between standard component Jointing include horizontal joint and vertical joint;Using the mechanical type for docking one by one between stress cage bar at horizontal joint Joint, joint concrete end face adopt macromolecule resin glue bonding;Vertical joint is the tongue and groove joggle or height of embedded sealing adhesive tape The embedded connection of pressure rotary-spraying mixing pile.
2. the foundation ditch and side slope building enclosure of a kind of prestressing force assembled abnormity piling wall according to claim 1, its feature Be, assembled abnormity piling wall section is T-shaped, rectangle or U-shaped.
3. the foundation ditch and side slope building enclosure of a kind of prestressing force assembled abnormity piling wall according to claim 2, its feature It is that the T-shaped assembled abnormity piling wall of section is assembled after standard component field combinations by real abdomen or empty stomach, and standard component is T-shaped standard component or T-shaped standard component mix composition with square type standard component.
4. the foundation ditch and side slope building enclosure of a kind of prestressing force assembled abnormity piling wall according to claim 2, its feature Be assembled that section takes the shape of the letter U abnormity piling wall be to be assembled after standard component field combinations by real abdomen or empty stomach, standard component is T-shaped standard component mixes composition with U-shaped standard component.
5. the foundation ditch and side slope building enclosure of a kind of prestressing force assembled abnormity piling wall according to claim 2, its feature It is that the rectangular assembled abnormity piling wall of section is assembled after standard component field combinations by real abdomen or empty stomach, standard component For square type standard component.
6. the foundation ditch and side slope building enclosure of a kind of prestressing force assembled abnormity piling wall according to claim 2, its feature It is that it is in be dislocatedly distributed that the level connection joint of horizontal joint is sewn on vertical position;The vertical connecting sewing of vertical joint is in consistency from top to bottom Straight joint distribution.
7. the foundation ditch and side slope building enclosure of a kind of prestressing force assembled abnormity piling wall according to claim 6, its feature It is that some enhancing is provided with horizontal joint to anchor joint, it is that screw lock formula is mechanically connected to strengthen anchoring joint.
8. the foundation ditch and side slope building enclosure of a kind of prestressing force assembled abnormity piling wall according to claim 2, its feature On the assembled top exposed of abnormity piling wall and side, to be embedded with connecting screw hole, connecting screw hole and Guan Liang, horizontal shore or Outer wall of basement connects.
CN201621133376.0U 2016-10-18 2016-10-18 Foundation ditch and side slope envelope of prestressing force assembled dysmorphism stake wall Active CN206090534U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621133376.0U CN206090534U (en) 2016-10-18 2016-10-18 Foundation ditch and side slope envelope of prestressing force assembled dysmorphism stake wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621133376.0U CN206090534U (en) 2016-10-18 2016-10-18 Foundation ditch and side slope envelope of prestressing force assembled dysmorphism stake wall

Publications (1)

Publication Number Publication Date
CN206090534U true CN206090534U (en) 2017-04-12

Family

ID=59976312

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621133376.0U Active CN206090534U (en) 2016-10-18 2016-10-18 Foundation ditch and side slope envelope of prestressing force assembled dysmorphism stake wall

Country Status (1)

Country Link
CN (1) CN206090534U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106320322A (en) * 2016-10-18 2017-01-11 上海强劲地基工程股份有限公司 Foundation pit and side slope envelope enclosure for prestress fabricated special-shaped pile wall
CN114575331A (en) * 2022-01-19 2022-06-03 中天建设集团有限公司 Prestressed special-shaped underground continuous wall and construction method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106320322A (en) * 2016-10-18 2017-01-11 上海强劲地基工程股份有限公司 Foundation pit and side slope envelope enclosure for prestress fabricated special-shaped pile wall
CN114575331A (en) * 2022-01-19 2022-06-03 中天建设集团有限公司 Prestressed special-shaped underground continuous wall and construction method thereof
CN114575331B (en) * 2022-01-19 2024-03-15 中天建设集团有限公司 Prestress special-shaped underground diaphragm wall and construction method thereof

Similar Documents

Publication Publication Date Title
CN106320322A (en) Foundation pit and side slope envelope enclosure for prestress fabricated special-shaped pile wall
CN101864773B (en) Deep foundation pit support process
CN106049506B (en) A kind of APS assembleds supporting pile structure and construction method
CN106677205A (en) Fabricated special-shaped steel pipe pile combined retaining wall
EP3118374A1 (en) Hollow cylindrical pier for fixing offshore platform structure to bed and method of installing and constructing same
CN110130363A (en) Assembled is implanted into foundation pit enclosure stake and pile wall interaction structure and its construction method
CN103321244A (en) Construction method for additionally arranged basement in existing building on sand foundation
CN104131567A (en) Novel waterstop prefabricated centrifugal rectangular pile retaining structure and construction method thereof
CN107338804A (en) A kind of hollow independent composite pile foundation of super-large diameter and its method of construction
CN103603379A (en) Anti-floating system combining anti-floating cement soil pile and anti-floating anchor rod and construction process of anti-floating system
CN109972630A (en) A kind of foundation pit enclosure structure and its construction method of the assembly of PC component
CN107012871A (en) A kind of suspension type goes along with sb. to guard him the deep reversed construction method for greatly enhancing foundation ditch fabricated construction
US20020071725A1 (en) Earth support and permanent structural foundation wall
CN106149745A (en) A kind of truss type steel tube grouting pile basis and construction method thereof
CN206090534U (en) Foundation ditch and side slope envelope of prestressing force assembled dysmorphism stake wall
JP3689840B2 (en) Seismic reinforcement method for existing structure foundation
CN205776157U (en) Assembled underground continuous wall
CN107620316A (en) A kind of rocky bed large volume deepwater foundation construction method
CN109610473A (en) A kind of construction method of the large-scale pool structure foundation pit supporting system of municipal administration
CN203613568U (en) Anti-floating cement soil pile and anti-floating anchor rod combined anti-floating system
CN105484270B (en) Reinforcement protection construction method of high steep old rubble retaining wall adjacent to deep foundation pit
JP3676441B2 (en) Pit and construction method of basement using it
CN2753797Y (en) Long-spiral pressure-poured concrete core-inserting combined pile
CN212656252U (en) Novel transmission line tower foundation
CN109989346A (en) Bridge major diameter precast concrete tubular column basis and its construction method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant