CN206071621U - A kind of new steel structure shed - Google Patents

A kind of new steel structure shed Download PDF

Info

Publication number
CN206071621U
CN206071621U CN201621076620.4U CN201621076620U CN206071621U CN 206071621 U CN206071621 U CN 206071621U CN 201621076620 U CN201621076620 U CN 201621076620U CN 206071621 U CN206071621 U CN 206071621U
Authority
CN
China
Prior art keywords
girder
arched
shed
arched girder
track
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621076620.4U
Other languages
Chinese (zh)
Inventor
万永新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201621076620.4U priority Critical patent/CN206071621U/en
Application granted granted Critical
Publication of CN206071621U publication Critical patent/CN206071621U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

The utility model discloses a kind of new steel structure shed, including two track girders (1) and arched girder (2), it is characterised in that:Dismountable bottom girder (3) is provided with by bolt between described two track girders (1), described arched girder (2) includes the bow member girder (2.1) that biphase counter structure is semi-arched, it is dismountable bolt connection between biphase corresponding bow member girder (2.1), connecting plate (2.2) is provided between described arched girder (2), described arched girder (2) is provided with steel wire, is bolted between described connecting plate (2.2) and arched girder (2).The setting of this utility model shed bottom girder has greatly reinforced the holding capacity of whole shed, what between two arched girders, the setting of many connecting plates also increased shed bears dynamics, and be between all parts and be detachably connected, quickly can assemble, convenient storage and transport, when tunnel is rushed to repair, personnel and equipment are located in shed, safe.

Description

A kind of new steel structure shed
Technical field
This utility model is related to shed technical field, specifically refers to a kind of new steel structure shed.
Background technology
When repairing is speedily carried out rescue work in tunnel or hazardous location, emergency personnel's on-line operation is dangerous high, particularly collapses in tunnel Sunken location, if do not carry out safety measure can cause damage to personal safety and property.Shed is a kind of common device, shed Structure mostly be steel construction assembling and build, but arch shed structure of the prior art mainly includes two track girders and being arranged on two rails The two is directly assembled by the arched girder on road beam in assembling, and the shed holding capacity of this kind of structure is little, security performance is low, And component too greatly without or big, the bad storage and transport that take up room during transport.
Utility model content
The technical problems to be solved in the utility model is to overcome above technical problem, there is provided a kind of simple structure, holding capacity Greatly, the convenient storage of security performance height, component and a kind of new steel structure shed for transporting.
To solve above-mentioned technical problem, the technical scheme that this utility model is provided is:A kind of new steel structure shed, including Two track girders and arched girder, are provided with dismountable bottom girder by bolt between two described track girders, and described arched girder includes Bow member girder of the biphase counter structure for semi-arched, is dismountable bolt connection between biphase corresponding bow member girder, described Arched girder between be provided with connecting plate, described arched girder is provided with steel wire, passes through between described connecting plate and arched girder Bolt connection.
This utility model advantage compared with prior art is:The setting of this utility model shed bottom girder is greatly reinforced The holding capacity of whole shed, the setting of many connecting plates between two arched girders also increase the dynamics of bearing of shed, and each It is between part and is detachably connected, quickly can assemble, convenient to store and transport, when tunnel is rushed to repair, personnel and equipment is located at It is in shed, safe.
Used as improvement, the structure of the track girder is that centre is provided with for installing the bulge-structure of arched girder groove, described The bottom of arched girder be connected with the fit depressions on track girder, be used to bottom girder be installed another with described bulge-structure one end End is provided with anchor hole, the bottom of arched girder is inserted directly in the groove on track girder during concrete installation, convenience quick for installation, Track girder can be fixed on the ground by the anchor hole on connecting plate when lateral forces are larger, strengthen the intensity of whole shed.
Description of the drawings
Fig. 1 is a kind of overall structure diagram of new steel structure shed of this utility model.
Fig. 2 is a kind of axonometric chart of the track girder of new steel structure shed of this utility model.
Fig. 3 is a kind of sectional view of the track girder of new steel structure shed of this utility model.
Fig. 4 is a kind of structural representation of the bottom girder of new steel structure shed of this utility model.
Fig. 5 is a kind of structural representation of the bow member girder of new steel structure shed of this utility model.
Fig. 6 is a kind of structural representation of the arched girder of new steel structure shed of this utility model.
As shown in the figure:1st, track girder, 2, arched girder, 2.1, bow member girder, 2.2, connecting plate, 3, bottom girder.
Specific embodiment
Below in conjunction with the accompanying drawings this utility model is described in further detail.
With reference to accompanying drawing, a kind of new steel structure shed, including two track girders 1 and arched girder 2, described two track girders 1 it Between dismountable bottom girder 3 is provided with by bolt, described arched girder 2 includes the bow member girder that biphase counter structure is semi-arched 2.1, it is dismountable bolt connection between biphase corresponding bow member girder 2.1, between described arched girder 2, is provided with connecting plate 2.2, described arched girder 2 is provided with steel wire, is bolted between described connecting plate 2.2 and arched girder 2.
The structure of the track girder 1 is that centre is provided with for installing the bulge-structure of 2 groove of arched girder, described arched girder 2 bottom is connected with the fit depressions on track girder 1, is set for installing 3 other end of bottom girder with described bulge-structure one end There is anchor hole.
When speedily carrying out rescue work, first in the assembled part in safe location, personnel, mechanical safety work inside, cooperative mechanical are can guarantee that Pushing tow advances the scope of operation, rear to continue assembled to position of speedily carrying out rescue work, the operation inside of emergency personnel's motor vehicles and machines, cleaning landslide, and Pushing tow propulsion (can be slided assembled good bow member part) in orbit, and when implementing pushing tow, matrix rail need to be only installed in forward operation face Road, it is when certain length is reached, when pushing tow is difficult, assembled in proper order at the scope of operation for cleaning out, push ahead.
Above this utility model and embodiments thereof are described, this description does not have restricted, shown in accompanying drawing Be also one of embodiment of the present utility model, actual structure is not limited thereto.If generally speaking this area Those of ordinary skill is enlightened by which, in the case where objective is created without departing from this utility model, without it is creative design with The similar frame mode of the technical scheme and embodiment, all should belong to protection domain of the present utility model.

Claims (2)

1. a kind of new steel structure shed, including two track girders (1) and arched girder (2), it is characterised in that:Two described track girders (1) dismountable bottom girder (3) is provided with by bolt between, described arched girder (2) is semi-arched including biphase counter structure Bow member girder (2.1), is dismountable bolt connection between biphase corresponding bow member girder (2.1), described arched girder (2) it Between be provided with connecting plate (2.2), described arched girder (2) is provided with steel wire, described connecting plate (2.2) and arched girder (2) it Between be bolted.
2. a kind of new steel structure shed according to claim 1, it is characterised in that:The structure of the track girder (1) is Centre is provided with for installing the bulge-structure of arched girder (2) groove, on the bottom of described arched girder (2) and track girder (1) Fit depressions connect, and are provided with anchor hole for installing bottom girder (3) other end with described bulge-structure one end.
CN201621076620.4U 2016-09-23 2016-09-23 A kind of new steel structure shed Expired - Fee Related CN206071621U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621076620.4U CN206071621U (en) 2016-09-23 2016-09-23 A kind of new steel structure shed

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621076620.4U CN206071621U (en) 2016-09-23 2016-09-23 A kind of new steel structure shed

Publications (1)

Publication Number Publication Date
CN206071621U true CN206071621U (en) 2017-04-05

Family

ID=58440324

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621076620.4U Expired - Fee Related CN206071621U (en) 2016-09-23 2016-09-23 A kind of new steel structure shed

Country Status (1)

Country Link
CN (1) CN206071621U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108868815A (en) * 2018-08-20 2018-11-23 云南省红河州水利水电勘察设计研究院 A kind of support system excavated for tunnel
CN112753597A (en) * 2021-01-21 2021-05-07 沧州市牧疆南北农牧机械有限公司 Novel portable boar house

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108868815A (en) * 2018-08-20 2018-11-23 云南省红河州水利水电勘察设计研究院 A kind of support system excavated for tunnel
CN112753597A (en) * 2021-01-21 2021-05-07 沧州市牧疆南北农牧机械有限公司 Novel portable boar house

Similar Documents

Publication Publication Date Title
CN206071621U (en) A kind of new steel structure shed
CN204715774U (en) Multi-functional revolution transport vehicle
CN103669218B (en) Novel steel-concrete combined section steel box girder module and assembling method thereof
CN201850506U (en) Lower chord checking mechanism for steel truss bridge
CN107053979B (en) Combined automatic transfer vehicle
CN201762651U (en) Tunnel inverted arch trestle bridge
CN208605187U (en) A kind of shield machine is secondary to originate tunneling construction reaction frame
CN205804185U (en) A kind of quick support system of Cast-in-situ Beam rack construction
CN103085831B (en) Rail vehicle traction beam
CN203684060U (en) Temporary steel-frame bridge
CN202130527U (en) Auxiliary vehicle device of novel beam transport car
CN108952768A (en) A kind of stage apparatus of Shield tunnel secondary grouting
CN201694749U (en) Solar automatic power supply system for gantry crane
CN208455483U (en) A kind of large span composite material-metallic combination truss-type bridges push stringer
CN208151837U (en) A kind of assembled H profile steel trestle plate
CN203593063U (en) Heavy type caterpillar tractor
CN204644820U (en) Protective device built by pavement concrete
CN204590599U (en) A kind of corner internal corner formwork for aluminum alloy mould plate system
CN103434992A (en) Hydraulic push type trolley handling system for bridge crane
CN203766581U (en) Carriage pivoting support for mining dump vehicle
CN108791581B (en) Traction type transfer trolley with pulley block
CN203361016U (en) Bridge inspection car capable of passing through tensile anchor seat
CN213653066U (en) Light sleeper combination for shield construction
CN202730566U (en) A continuously welded rail track laying work vehicle
CN204980839U (en) Inboard top surface reinforcement girder hoist device of defeated coal strage way of box

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170405