CN206037457U - Geothermal energy wellhead assembly - Google Patents

Geothermal energy wellhead assembly Download PDF

Info

Publication number
CN206037457U
CN206037457U CN201621009412.2U CN201621009412U CN206037457U CN 206037457 U CN206037457 U CN 206037457U CN 201621009412 U CN201621009412 U CN 201621009412U CN 206037457 U CN206037457 U CN 206037457U
Authority
CN
China
Prior art keywords
cooling water
valve
hot water
flange
delivery pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621009412.2U
Other languages
Chinese (zh)
Inventor
陈银海
陈弘诠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yancheng City Hengtong Petroleum Machinery Manufacturing Co Ltd
Original Assignee
Yancheng City Hengtong Petroleum Machinery Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yancheng City Hengtong Petroleum Machinery Manufacturing Co Ltd filed Critical Yancheng City Hengtong Petroleum Machinery Manufacturing Co Ltd
Priority to CN201621009412.2U priority Critical patent/CN206037457U/en
Application granted granted Critical
Publication of CN206037457U publication Critical patent/CN206037457U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/10Geothermal energy

Landscapes

  • Check Valves (AREA)

Abstract

Geothermal energy wellhead assembly, including sleeve pipe, hot water output pipe way and cooling water backflow pipeline, the well head threaded connection of sheathed tube one end and geothermal well, the other end connect hot water output pipe simultaneously and say and cooling water backflow pipeline, the sleeve pipe is said with hot water output pipe and cooling water backflow pipeline's junction is provided with the flowmeter, the sleeve pipe is provided with flange formula gate valve, hot water output pipe says and cooling water backflow pipeline all is provided with ultrasonic wave calorimeter, manometer and a plurality of valve. The utility model discloses can carry heat, warm water in the geothermal well and use in the industry, simultaneously also can with the geothermal well water reflux that uses the postcooling to the geothermal well in, hot water output pipe say with the dual guarantee stagnant water of cooling water backflow pipeline homoenergetic realization.

Description

Geothermal energy resources wellhead assembly
Technical field
This utility model is related to geothermal energy resources wellhead assembly, belongs to geothermal well technical field.
Background technology
Geothermal well, refers to the thermal water of the geothermal energy or water temperature of 3500 meters or so of well depth more than 30 DEG C to be generated electricity Method and apparatus, underground heat point high temperature, in three class of gentle low temperature.It is high 150 DEG C, exist in vapour form, belong to high-temperature geothermal;90℃ ~150 DEG C, exist with forms such as the mixture of water and steam, belong to middle temperature underground heat;Higher than 25 DEG C, less than 90 DEG C, with warm water, temperature What the forms such as hot water, hot water were present, belong to low temperature underground heat.
High-temperature geothermal is adapted to generate electricity, and middle temperature underground heat can generate electricity, it can also be used to which housing heating, low temperature underground heat then can be used for washing Bath, medical treatment, it is also possible to for heating and chamber planting, aquaculture etc..
The water temperature of the usual geothermal well in geographical position of one band of Chinese East China is less than 90 degrees Celsius, is generally used for industrial On the way.And the collection for geothermal well, conveying technology are all also immature, particularly with the wellhead assembly of geothermal well, also without complete Ripe device.
Utility model content
In order to solve above-mentioned problem, the utility model discloses a kind of geothermal energy resources wellhead assembly, its concrete skill Art scheme is as follows:
Geothermal energy resources wellhead assembly, the wellhead assembly are installed on the well head of geothermal well, for the hot water in geothermal well is taken out Drink up, the cooling water that the heat energy of the hot water is formed after being utilized is transported in geothermal well by the wellhead assembly, the well head is filled Put including sleeve pipe, hot water delivery pipe road and cooling water reflux line, one end of described sleeve pipe is threadedly coupled with the well head of geothermal well, The other end connects hot water delivery pipe road and cooling water reflux line simultaneously, and described sleeve pipe is flowed back with hot water delivery pipe road and cooling water The junction of pipeline is provided with effusion meter, and described sleeve pipe is provided with flange type sluice valve, and the hot water delivery pipe road and cooling water are returned Flow tube road is provided with ultrasonic calorimeter, pressure gauge and several valves.
The effusion meter selects ultrasonic flowmeter, the ultrasonic calorimeter to select Double-sound-track ultrasonic heat meter.
Valve on several described hot water delivery pipe roads includes flange form butterfly valve, swing check valve and flange form ball The erection sequence of valve, the pressure gauge and several valves is:Connection end from hot water delivery pipe road and effusion meter is to heat The water side in water delivery pipe road is flange form butterfly valve, pressure gauge, swing check valve and flange type ball valve successively, and the hot water is defeated The ultrasonic calorimeter gone out on pipeline is located between pressure gauge and swing check valve, and the pressure gauge passes through a threeway plug valve Door is installed with hot water delivery pipe road.
Valve on several described cooling water reflux lines includes flange form butterfly valve and flange type ball valve, the pressure gauge Erection sequence with valve several described is:Water inlet end from cooling water reflux line is to cooling water reflux line and effusion meter Connection end be flange type ball valve, pressure gauge and flange form butterfly valve successively, the ultrasound wave heat on the cooling water reflux line Epi-position between pressure gauge and flange form butterfly valve, pacified with cooling water reflux line by a three-way cock valve by the pressure gauge Dress.
The cooling water reflux line extends transversely through excessively stream gauge, extends through the cooling water reflux line of the effusion meter other end End be provided with flange form butterfly valve.
It is provided with several cables to bore a hole and several suspension ring on the effusion meter, the cable punch inside diameter is φ 25mm, the cable perforation inner peripheral surface are provided with screw thread, and equipped with Gask-O-Seal and blind plugging.
Described sleeve pipe and flange type sluice valve and effusion meter, flange form butterfly valve, swing check valve and flange type ball valve with it is right The hot water delivery pipe road answered or the junction of cooling water reflux line are connected using flange, and the flange connections are adopted SW with outside ring is sealed.
The flange form butterfly valve is not more than 0.2 using hard sealing, flow resistance coefficient, can bidirectional bearing, and be provided with display its The indicator of butterfly plate position, the equal Jing blasting treatments of surfaces externally and internally of the flange form butterfly valve, scribbles two-layer epoxy resin enamelled coating, The gross thickness of two-layer epoxy resin enamelled coating is more than 0.3mm.
Operation principle of the present utility model is:
This utility model, the heat, warm water in geothermal well are pumped into well head by the immersible pump being arranged in geothermal well, heat, Warm water is entered in sleeve pipe, opens the flange type sluice valve on sleeve pipe, the flange form butterfly valve, swing type non-return on hot water delivery pipe road Valve and flange type ball valve, the flange form butterfly valve closed on cooling water reflux line and flange type ball valve, it is defeated that heat, warm water enter hot water Go out pipeline, and then be transported at commercial Application, will also open effusion meter before conveying and be arranged on super on hot water delivery pipe road Sound wave calorimeter, is easy to monitor at any time heat, the flow of warm water in pipeline, to commercial Application and suction geothermal well in it is hot, warm The flow of water provides reference.Piezometer on hot water delivery pipe road provides hydraulic parameters in pipeline.
After in heat, warm water, heat energy is utilized, heat, warm water become cooling water, and the immersible pump cut out inside geothermal well is closed Flange form butterfly valve, swing check valve and the flange type ball valve closed on hot water delivery pipe road, opens on cooling water reflux line Flange form butterfly valve and flange type ball valve, cooling water is input in sleeve pipe, and then is transmitted back in geothermal well.
Several cables on effusion meter are bored a hole and several suspension ring are deep into the diving inside geothermal well for fixation The cable and connecting line of the monitoring device inside the cable and connecting line, and geothermal well of pump.
The beneficial effects of the utility model are:
1. this utility model, sleeve pipe are threadedly coupled with geothermal well import, are conducive to the maintenance of later stage geothermal well and in sleeve pipe On carry out installation measure;
2. this utility model, from ultrasonic flowmeter, can detect the discharge in sleeve pipe in time, and can realize allowing Hot water delivery pipe road and cooling water reflux line are connected to the water side of effusion meter simultaneously, during using different pipelines, can be voluntarily Switching;
3. this utility model, is provided with ultrasonic calorimeter on hot water delivery pipe road and cooling water reflux line, can and Discharge in Shi Jiliang correspondence pipelines, provides reference data to commercial Application;
4. this utility model, is provided with pressure gauge, and pressure gauge on hot water delivery pipe road and cooling water reflux line Three-way cock valve is provided between corresponding pipeline, is easy to manometric installation, also allow for from hot water delivery pipe road and cold But water sample is taken out in water reflux line, the various performance parameters of water in test correspondence pipeline;
5. this utility model, all of flange connections are sealed using SW with outside ring, realize fully sealing, and energy Sealing is remedied in time, is easy to maintenance, reduce cost, reduce the trouble of dismounting;
6. this utility model, hot water delivery pipe road and cooling water reflux line are realized double at least provided with twice valve Sealing is ensured again, it is in maintenance or use, more secure;
7. this utility model, flange form butterfly valve have the advantages that anti-corrosion, environmental protection, flow resistance coefficient are little.
Description of the drawings
Fig. 1 is structural representation of the present utility model,
Reference numerals list:1 sleeve pipe, 2 flange type sluice valves, 3 cooling water reflux lines, 4 ultrasonic calorimeters, 5 flange type ball valves, 6 swing check valves, 7 three-way cock valves, 8 pressure gauges, 9 flange form butterfly valves, 10 is hot Water delivery pipe road, 11 suspension ring, the perforation of 12 cables.
Specific embodiment
With reference to the accompanying drawings and detailed description, further elucidate this utility model.It should be understood that following specific embodiment parties Formula is merely to illustrate this utility model rather than limits scope of the present utility model.
Fig. 1 is structural representation of the present utility model, visible with reference to accompanying drawing, this geothermal energy resources wellhead assembly, and the well head is filled The well head for being installed on geothermal well is put, for the hot water suction in geothermal well is come up, what the heat energy of the hot water was formed after being utilized Cooling water is transported in geothermal well by the wellhead assembly, and the wellhead assembly includes sleeve pipe 1, hot water delivery pipe road 10 and cooling water Reflux line 3, one end of described sleeve pipe 1 are threadedly coupled with the well head of geothermal well, and the other end connects hot water delivery pipe road 10 simultaneously The junction of cooling water reflux line 3, described sleeve pipe 1 and hot water delivery pipe road 10 and cooling water reflux line 3 is provided with stream Gauge, described sleeve pipe 1 are provided with flange type sluice valve 2, and the hot water delivery pipe road 10 and cooling water reflux line 3 are provided with super Sound wave calorimeter 4, pressure gauge 8 and several valves.This utility model, when heat, warm water is outwards pumped from geothermal well, closes The valve closed on cooling water reflux line 3, opens the valve on hot water delivery pipe road 10, and the heat, warm water in geothermal well is conveyed To hot water delivery pipe road 10, and then industrial use is transported to, after the heat, warm water that pump in geothermal well are used cooling, When needing to be back in geothermal well, the valve closed on hot water delivery pipe road 10 opens the valve on cooling water reflux line 3, Cooling water is flowed in sleeve pipe 1 from cooling water reflux line 3, and then is sent in geothermal well.
The effusion meter selects ultrasonic flowmeter, the ultrasonic calorimeter 4 to select Double-sound-track ultrasonic heat meter 4. Ultrasonic flowmeter metering is more convenient, economical, accurate.
Valve on several described hot water delivery pipe roads 10 includes flange form butterfly valve 9, swing check valve 6 and flange form The erection sequence of ball valve 5, the pressure gauge 8 and several valves is:From the connection of hot water delivery pipe road 10 and effusion meter The water side for holding hot water delivery pipe road 10 is flange form butterfly valve 9, pressure gauge 8, swing check valve 6 and flange type ball valve successively 5, the ultrasonic calorimeter 4 on the hot water delivery pipe road 10 is located between pressure gauge 8 and swing check valve 6, the pressure gauge 8 Installed by a three-way cock valve 7 and hot water delivery pipe road 10.Valve on hot water delivery pipe road 10 can accomplish sealing When complete sealing, three-way cock valve 7 is easy to from water sampling in hot water delivery pipe road 10.
Valve on several described cooling water reflux lines 3 includes flange form butterfly valve 9 and flange type ball valve 5, the pressure The erection sequence of power table 8 and several valves is:Water inlet end from cooling water reflux line 3 is to cooling water reflux line 3 Connection end with effusion meter is flange type ball valve 5, pressure gauge 8 and flange form butterfly valve 9 successively, on the cooling water reflux line 3 Ultrasonic calorimeter 4 be located between pressure gauge 8 and flange form butterfly valve 9, the pressure gauge 8 by three-way cock valve 7 with Cooling water reflux line 3 is installed.Cooling water reflux line 3 arranges multiple valves, when reusing hot water delivery pipe road 10, has realized Full sealing and seal up cooling water reflux line 3, it is ensured that heat, warm water are all conveyed by delivery pipeline, it is to avoid heat energy is unrestrained Take, pressure gauge 8 can monitor the water pressure in cooling water reflux line 3.
The cooling water reflux line 3 extends transversely through excessively stream gauge, extends through the cooling water return duct of the effusion meter other end The end in road 3 is provided with flange form butterfly valve 9.No elbow between cooling water reflux line 3 and effusion meter, when cooling water return duct When starting reflux cooling water in road 3, it is difficult to turn in effusion meter in time, cooling water is flushed under inertia force effect and extends through stream In the cooling water reflux line 3 of the gauge other end, the then break-in under the turbulence of cooling water and barrier effect is flowed in sleeve pipe 1, There is the cooling water reflux line 3 for extending through the effusion meter other end buffering to change the effect of cooling current direction, it is to avoid cooling water is rushed Damage effusion meter or sleeve pipe 1 is hit, when also mitigating cooling water backflow, the vibration of cooling water reflux line 3 and sleeve pipe 1.
Several cable perforation 12 and several suspension ring 11 are provided with the effusion meter, in the cable perforation 12 Footpath is φ 25mm, and the cable 12 inner peripheral surfaces of boring a hole are provided with screw thread, and equipped with Gask-O-Seal and blind plugging.It is arranged on The cable of the testing equipment of immersible pump and water below geothermal well is connected on ground and is connected with power supply, and cable is through electricity Wire through-hole 12, and be fixed in cable perforation 12 by Gask-O-Seal and blind plugging, prevent in Changes in weather(Wind, rain Deng), cause cable arbitrarily to swing, suspension ring 11 are also used for the detection of the immersible pump and water being fixedly mounted on below geothermal well and set Standby connecting line.
Described sleeve pipe 1 and flange type sluice valve 2 and effusion meter, flange form butterfly valve 9, swing check valve 6 and flange type ball valve 5 Connected using flange with the junction of corresponding hot water delivery pipe road 10 or cooling water reflux line 3, the flange connection Place is sealed using SW with outside ring.SW with outside ring seal flexibility is big, on-call maintenance and can make up packing less feelings Condition.
The flange form butterfly valve 9 is not more than 0.2 using hard sealing, flow resistance coefficient, can bidirectional bearing, and be provided with display its The indicator of butterfly plate position, the equal Jing blasting treatments of surfaces externally and internally of the flange form butterfly valve 9, scribbles two-layer epoxy resin coating Layer, the gross thickness of two-layer epoxy resin enamelled coating are more than 0.3mm.9 good airproof performance of flange form butterfly valve, and it is little to the flow resistance coefficient of water, Internal structure is not perishable.
Technological means disclosed in this utility model scheme are not limited only to the technological means disclosed in above-mentioned technological means, also Including the technical scheme being made up of above technical characteristic combination in any.
With it is above-mentioned according to desirable embodiment of the present utility model as enlightenment, by above-mentioned description, related work people Member can carry out various change and modification completely in the range of without departing from this utility model technological thought.This reality The content being not limited to new technical scope in description, it is necessary to determine its technology according to right Property scope.

Claims (8)

1. geothermal energy resources wellhead assembly, the wellhead assembly are installed on the well head of geothermal well, for the hot water in geothermal well is aspirated Come up, the cooling water that the heat energy of the hot water is formed after being utilized is transported in geothermal well by the wellhead assembly, it is characterized in that bag Sleeve pipe, hot water delivery pipe road and cooling water reflux line is included, one end of described sleeve pipe is threadedly coupled with the well head of geothermal well, another End connects hot water delivery pipe road and cooling water reflux line, described sleeve pipe and hot water delivery pipe road and cooling water reflux line simultaneously Junction be provided with effusion meter, described sleeve pipe is provided with flange type sluice valve, the hot water delivery pipe road and cooling water return duct Road is provided with ultrasonic calorimeter, pressure gauge and several valves.
2. geothermal energy resources wellhead assembly according to claim 1, is characterized in that the effusion meter selects ultrasonic flowmeter, The ultrasonic calorimeter selects Double-sound-track ultrasonic heat meter.
3. geothermal energy resources wellhead assembly according to claim 1, is characterized in that on several described hot water delivery pipe roads Valve includes flange form butterfly valve, swing check valve and flange type ball valve, the installation of the pressure gauge and several valves Sequentially it is:From the connection end of hot water delivery pipe road and effusion meter to the water side in hot water delivery pipe road be successively flange form butterfly valve, Pressure gauge, swing check valve and flange type ball valve, the ultrasonic calorimeter on the hot water delivery pipe road be located at pressure gauge and Between swing check valve, the pressure gauge is installed with hot water delivery pipe road by a three-way cock valve.
4. geothermal energy resources wellhead assembly according to claim 3, is characterized in that on several described cooling water reflux lines Valve include that the erection sequence of flange form butterfly valve and flange type ball valve, the pressure gauge and several valves is:From cold But the water inlet end of water reflux line to the connection end of cooling water reflux line and effusion meter be successively flange type ball valve, pressure gauge and Flange form butterfly valve, the ultrasonic calorimeter on the cooling water reflux line are located between pressure gauge and flange form butterfly valve, the pressure Power table is installed with cooling water reflux line by a three-way cock valve.
5. geothermal energy resources wellhead assembly according to claim 1, is characterized in that the cooling water reflux line is extended transversely through Excessively stream gauge, the end for extending through the cooling water reflux line of the effusion meter other end are provided with flange form butterfly valve.
6. geothermal energy resources wellhead assembly according to claim 1, is characterized in that being provided with several electricity on the effusion meter Wire through-hole and several suspension ring, the cable punch inside diameter are φ 25mm, and the cable perforation inner peripheral surface is provided with Screw thread, and equipped with Gask-O-Seal and blind plugging.
7. the geothermal energy resources wellhead assembly according to claim 4 or 5, is characterized in that described sleeve pipe with flange type sluice valve and stream Gauge, flange form butterfly valve, swing check valve and flange type ball valve and corresponding hot water delivery pipe road or cooling water return duct The junction in road is connected using flange, and the flange connections are sealed using SW with outside ring.
8. geothermal energy resources wellhead assembly according to claim 7, is characterized in that the flange form butterfly valve using hard sealing, stream Resistance coefficient is not more than 0.2, can bidirectional bearing, and be provided with the indicator for showing its butterfly plate position, the flange form butterfly valve it is interior The equal Jing blasting treatments of outer surface, scribble two-layer epoxy resin enamelled coating, and the gross thickness of two-layer epoxy resin enamelled coating is more than 0.3mm.
CN201621009412.2U 2016-08-31 2016-08-31 Geothermal energy wellhead assembly Expired - Fee Related CN206037457U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621009412.2U CN206037457U (en) 2016-08-31 2016-08-31 Geothermal energy wellhead assembly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621009412.2U CN206037457U (en) 2016-08-31 2016-08-31 Geothermal energy wellhead assembly

Publications (1)

Publication Number Publication Date
CN206037457U true CN206037457U (en) 2017-03-22

Family

ID=58301141

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621009412.2U Expired - Fee Related CN206037457U (en) 2016-08-31 2016-08-31 Geothermal energy wellhead assembly

Country Status (1)

Country Link
CN (1) CN206037457U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106225272A (en) * 2016-08-31 2016-12-14 盐城市恒通石油机械制造有限公司 Geothermal energy resources wellhead assembly

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106225272A (en) * 2016-08-31 2016-12-14 盐城市恒通石油机械制造有限公司 Geothermal energy resources wellhead assembly

Similar Documents

Publication Publication Date Title
CN203178161U (en) Fracturing fluid pipeline friction resistance measuring device
CN204372558U (en) A kind of bilayer sleeve heat supply pipeline leak detecting device
CN104504611A (en) Method for determining whether liquid is accumulated in gas well and liquid accumulation degree of gas well
CN112229764B (en) System and method for measuring parameters of flowing high-temperature and high-pressure automatic drilling fluid
CN206037457U (en) Geothermal energy wellhead assembly
CN207064807U (en) Leakage monitoring device in a kind of steam valve
CN202745854U (en) petroleum drilling hard shut-in simulation experiment device
CN204346881U (en) Metal erosion behavior monitoring system in Flow Corrosion medium
CN207263575U (en) The online shear force measuring device of drilling fluid
CN206091920U (en) Geothermal well is taken out and is irritated dual -purpose wellhead assembly
CN101624907A (en) Underground oil-water-gas mixed phase flow measuring device
CN106225272A (en) Geothermal energy resources wellhead assembly
CN209264362U (en) A kind of antifreeze water intake system of Automatic-boosting emptying
CN109708823A (en) A kind of experimental rig and test method for rotary seal structure test
CN202748299U (en) Corrosion testing device for oil well plug hanging ring
CN105841775B (en) Water-producing gas well accumulated liquid pre-judgment experimental device and method
CN211785431U (en) Drag reducer evaluation instrument for convenient slickwater fracturing
CN208206231U (en) anti-freezing liquid level display
CN206488836U (en) Device for carrying out low-temperature test to water supply standpipe and water meter
CN103114823A (en) Device and method utilizing icebound embolisms to plug drill hole in subsection mode
CN209724325U (en) Pressure-measuring-point ice is stifled during preventing hydrate from hiding simulated experiment and the structure of de-plugging
CN108279253B (en) Test bed for testing heat insulation effect of high-performance heat insulation oil pipe
CN206540634U (en) A kind of return water temperature detection device
CN206420537U (en) Gas flow standard device vacuum source limiting pressure control system
CN207019720U (en) Integrated measuring piecing devices for water-tight equipment

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170322

Termination date: 20200831

CF01 Termination of patent right due to non-payment of annual fee