CN205935184U - Take single -side supporting formwork basement outer wall of flexible waterproof layer external mold - Google Patents

Take single -side supporting formwork basement outer wall of flexible waterproof layer external mold Download PDF

Info

Publication number
CN205935184U
CN205935184U CN201620847173.1U CN201620847173U CN205935184U CN 205935184 U CN205935184 U CN 205935184U CN 201620847173 U CN201620847173 U CN 201620847173U CN 205935184 U CN205935184 U CN 205935184U
Authority
CN
China
Prior art keywords
wall
basement
waterproof layer
flexible waterproof
external mold
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620847173.1U
Other languages
Chinese (zh)
Inventor
黎德琳
侯善民
张伟玉
吕恒柱
张军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NANJING KINGDOM ARCHITECTURE DESIGN CO Ltd
Original Assignee
NANJING KINGDOM ARCHITECTURE DESIGN CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NANJING KINGDOM ARCHITECTURE DESIGN CO Ltd filed Critical NANJING KINGDOM ARCHITECTURE DESIGN CO Ltd
Priority to CN201620847173.1U priority Critical patent/CN205935184U/en
Application granted granted Critical
Publication of CN205935184U publication Critical patent/CN205935184U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a take single -side supporting formwork basement outer wall of flexible waterproof layer external mold, including the basement outer wall, the bottom of basement outer wall is equipped with waterproof bottom plate, and both sides are equipped with integrated internal stay boundary beam and rigid support stake respectively, leave the clearance between rigid support stake and the basement outer wall, be filled with the infilled wall of constituteing by filled block in the clearance intussuseption, be equipped with one deck flexible waterproof layer between infilled wall and basement outer wall. The utility model discloses furthest has guaranteed the flexible waterproof effect, guarantee effectively that the basement receives the side limit effect of the soil body, avoids worker's after strain of the peripheral soil body to sink with uneven, cheat the groove simultaneously and can obtain in time sealing, be convenient for site security construction and civilization management.

Description

A kind of single side formwork outer wall of basement with flexible waterproof layer external mold
Technical field
This utility model is related to a kind of single side formwork outer wall of basement with flexible waterproof layer external mold, belongs to civil engineering skill Art field.
Background technology
Underground engineering rigidity pattern foundation pit supporting structure soil-baffling structure generally adopts diaphram wall, armored concrete or SMW engineering method row The forms such as stake, and general make between campshed formula supporting construction and outer wall of basement is:There is 1 meter between campshed and exterior wall The gap of left and right width, this gap is used as formwork erection outside exterior wall, pastes the working place of outside flexible waterproof layer, around foundation ditch one week It is all provided with.The form of construction work of this exterior wall bilateral formwork is typically used in tradition along in practice underground engineering.
For being provided with the tradition of internal stay along practice foundation pit supporting project, inner support and to enclose purlin be interim;Basement main body Structure along when making, from bottom to top must be removed temporary support, and change using basement flooring as permanent internal stay, concrete operation is such as upwards Under(So that 2 layers of basement 2 road support as a example):1 base plate → B2 supports and encloses purlin dismounting → B2 exterior wall → B2 external wall waterproof layer → B2 Gap backfill → B1 flooring and support replacement band reach 80% intensity → B1 and support and enclose purlin dismounting → B1 exterior wall → B1 external wall waterproof layer → B1 gap backfill → B0 flooring.Exterior wall bilateral formwork, successively construct, successively ram and fill out backfill.
But in most Practical Projects, because of various technology and administrative reason, exterior wall bilateral formwork is simultaneously successively poured into top Sticking flexible waterproof layer more afterwards, and backfill in the narrow space that support replacement block is divided into.This traditional exterior wall is tied with supporting Structure separate type(Wall shield separates)Construction, need about 1 meter wide, basement buried depth depth, by support replacement block be divided into dark, narrow and small Complete waterproof layer and backfill construction in space, be primarily present following disadvantage:
(1)It is difficult to ensure that wall face sufficiently dry to meet the requirement pasting waterproof layer;
(2)Waterproof layer is stopped it is impossible to coat the whole face of exterior wall by the unnet purlin that encloses of support replacement block, dismounting;
(3)Backfill mostly using near coal-mine topple over by the way of, or even backfill building waste, cause the waterproof layer constructed to meet with To destroying, flexible waterproof layer is made to lose efficacy;
(4)Near coal-mine topple over to dissipate fill out construction, and be support replacement block everywhere, remove unnet enclose purlin stop segmentation it is impossible to execution " point Layer backfill and tamp, compacting factor be not less than 0.94 " code requirement;
(5)Backfill operation is thinked little of, engineering time assurance is loose, exposes to the sun and rain for a long time outside exterior wall, is easily formed Permanent crack, damages exterior wall self waterproofing function;
(6)Exterior wall can not be backfilled in time with crater wall gap, and near coal-mine have potential safety hazard, is unfavorable for civilized construction and field pipes Reason.
Utility model content
Stay wide pit for traditional basement foundation ditch to carry out exterior wall bilateral formwork, rear patch waterproof roll and backfill construction Disadvantage on method and structure, coordinates basement agent structure-pattern foundation pit supporting structure integrated technique, and this utility model provides one kind Single side formwork outer wall of basement with flexible waterproof layer external mold.
The technical scheme that this utility model is taken is as follows:
A kind of single side formwork outer wall of basement with flexible waterproof layer external mold, including outer wall of basement, described underground is outdoor The bottom of wall is provided with waterproof base plate, is respectively provided on two sides with integrated internal stay side bar and Rigid Bracing Pile, described Rigid Bracing Pile and Leave gap between outer wall of basement, be filled with the filling wall being made up of filling block in gap, in filling wall and basement It is provided with one layer of flexible waterproof layer between exterior wall.
Anti-package is pasted on outer wall of basement bottom to described waterproof base plate upwards.
Described flexible waterproof layer is made up of waterproof roll, and two sides of described waterproof roll group are provided with glued membrane, and respectively Mutually bonding with filling wall and outer wall of basement.
If described filling wall is divided into dried layer by enclosing purlin.
Described gap is 600mm.
The beneficial effects of the utility model are:
(1)Exterior wall is accomplished without any letup with flexible water, no other factors impact, ensures flexible water effect to greatest extent;
(2)Loose backfilling material in Practical Project or building waste are replaced with the casing that recycling material is made, Lateral spacing effect that basement be subject to the soil body is effectively ensured, and no loosened soil outside wall, it is to avoid the post-construction deformation of the periphery soil body and uneven depression;
(3)While exterior wall pours, pit has been filled with, it is to avoid long-term expose it is ensured that greatly reducing while maintenance effect The adverse effect expanded with heat and contract with cold, exterior wall concrete self waterproofing effect obtains effective guarantee;
(4)In integrated support system, pit width is not required to be limited by waterproof roll and backfill operation side, 600 is wide, reduces pit earth volume;
(5)Enclose purlin need not remove, transmit permanent component, the block of Water And Earth Pressures directly as supporting construction to agent structure Body fills separation and the stiffening element of wall;
(6)Pit can be closed in time, is easy to site safety construction and civilization management.
Brief description
Fig. 1 is overall structure diagram of the present utility model.
Fig. 2 is the working procedure figure of this proof mechanism of water.
In figure:1- outer wall of basement, 2- waterproof base plate, 3- integration internal stay side bar, 4- main body beam slab, 5- rigid protection Stake, 7- flexible waterproof layer, 8- encloses purlin.
Specific embodiment
With specific embodiment, this utility model is described in detail below in conjunction with the accompanying drawings.
As shown in figure 1, a kind of single side formwork outer wall of basement with flexible waterproof layer external mold, it includes outer wall of basement 1, The bottom of described outer wall of basement 1 is provided with waterproof base plate 2, is respectively provided on two sides with integrated internal stay side bar 3 and Rigid Bracing Pile 5, Leave gap between described Rigid Bracing Pile 5 and outer wall of basement 1, be filled with the filling wall being made up of filling block in gap 6, it is provided with one layer of flexible waterproof layer 7 between filling wall 6 and outer wall of basement 1.
In this waterproof construction, anti-package is pasted on outer wall of basement 1 bottom to described waterproof base plate 2 upwards.Described flexible water Layer 7 is made up of waterproof roll, and two sides of described waterproof roll group are provided with glued membrane, and respectively with filling wall and outer wall of basement Phase bonding.If described filling wall 6 is enclosed purlin 8 and is divided into dried layer.Described gap is 600mm.
This utility model is that the innovation for the rigid foundation pit support method that must be provided with internal stay improves:Make part using inverse Basement agent structure floor girder and board as foundation pit supporting system internal stay to replace temporary support, no change asking of temporary support Topic, energy-conserving and environment-protective.Exterior wall in this integrated technique no longer adopts bilateral formwork way, and is improved to single side formwork, such as Fig. 1, Shown in Fig. 2:The prefabricated block that between building enclosure and outer wall of basement, filling is made using recycling material(Cancel backfill The building waste that may adopt in the native Practical Project in other words of element), and pre-installed and inverted adhered self-adhesion glued membrane waterproof roll is on block, protects Card outer wall flexible waterproof is successional simultaneously, and the block being stained with waterproof roll fills wall as the outboard template of exterior wall it is only necessary to prop up If inner side tool-typed formwork, exterior wall concrete is suitable to make molding.
As shown in Fig. 2 its Specific construction operation is:, by waterproof slab coiled material, anti-package is pasted on exterior wall bottom upwards;、 Construction basement bottom block filling wall;The 3rd, pre-installed and inverted adhered waterproof roll is pasted on block filling wall and takes with base plate coiled material Connect;4th, install bottom inner side of outer wall tool-typed formwork;5th, pour bottom exterior wall concrete, exterior wall concrete and waterproof roll adhere to automatically;6、 Bottom exterior wall concrete molding, same method construction other outer wall of floors of basement are to top;7th, exterior wall coiled material top is crimped on top board Coiled material receipts accomplished below head, pours pit cover plate.
Of the present utility model ultimate principle, principal character and advantage have been shown and described above.The ordinary skill of this area Personnel are not it should be appreciated that above-described embodiment limits protection domain of the present utility model, all employing equivalents etc. in any form The technical scheme that mode is obtained, all falls within protection domain of the present utility model.
This utility model is not directed to partly all same as the prior art or can be realized using prior art.

Claims (5)

1. a kind of single side formwork outer wall of basement with flexible waterproof layer external mold it is characterised in that:Including outer wall of basement(1), Described outer wall of basement(1)Bottom be provided with waterproof base plate(2), it is respectively provided on two sides with integrated internal stay side bar(3)With rigidity Fender pile(5), described Rigid Bracing Pile(5)And outer wall of basement(1)Between leave gap, be filled with gap by filling block The filling wall of composition(6), in filling wall(6)And outer wall of basement(1)Between be provided with one layer of flexible waterproof layer(7).
2. a kind of single side formwork outer wall of basement with flexible waterproof layer external mold according to claim 1 it is characterised in that: Described waterproof base plate(2)Anti-package is pasted on outer wall of basement upwards(1)Bottom.
3. a kind of single side formwork outer wall of basement with flexible waterproof layer external mold according to claim 1 it is characterised in that: Described flexible waterproof layer(7)Be made up of waterproof roll, two sides of described waterproof roll group are provided with glued membrane, and respectively with filling Wall and outer wall of basement phase bonding.
4. a kind of single side formwork outer wall of basement with flexible waterproof layer external mold according to claim 1 or 3, its feature exists In:Described filling wall(6)Enclosed purlin(8)If being divided into dried layer.
5. a kind of single side formwork outer wall of basement with flexible waterproof layer external mold according to claim 1 it is characterised in that: Described gap is 600mm.
CN201620847173.1U 2016-08-08 2016-08-08 Take single -side supporting formwork basement outer wall of flexible waterproof layer external mold Expired - Fee Related CN205935184U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620847173.1U CN205935184U (en) 2016-08-08 2016-08-08 Take single -side supporting formwork basement outer wall of flexible waterproof layer external mold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620847173.1U CN205935184U (en) 2016-08-08 2016-08-08 Take single -side supporting formwork basement outer wall of flexible waterproof layer external mold

Publications (1)

Publication Number Publication Date
CN205935184U true CN205935184U (en) 2017-02-08

Family

ID=57922625

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620847173.1U Expired - Fee Related CN205935184U (en) 2016-08-08 2016-08-08 Take single -side supporting formwork basement outer wall of flexible waterproof layer external mold

Country Status (1)

Country Link
CN (1) CN205935184U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106049667A (en) * 2016-08-08 2016-10-26 南京金宸建筑设计有限公司 Unilateral supporting formwork basement outer wall with flexible waterproof layer outer formwork
CN108625394A (en) * 2018-05-23 2018-10-09 中铁第四勘察设计院集团有限公司 A kind of underground structure and pier stud separated flexible node structure and its method of construction
CN111139863A (en) * 2019-12-31 2020-05-12 上海市政工程设计研究总院(集团)有限公司 Waterproof construction method for open cut semi-reverse construction method tunnel purlin enclosing node

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106049667A (en) * 2016-08-08 2016-10-26 南京金宸建筑设计有限公司 Unilateral supporting formwork basement outer wall with flexible waterproof layer outer formwork
CN106049667B (en) * 2016-08-08 2018-07-24 南京金宸建筑设计有限公司 A kind of single side formwork outer wall of basement with flexible waterproof layer external mold
CN108625394A (en) * 2018-05-23 2018-10-09 中铁第四勘察设计院集团有限公司 A kind of underground structure and pier stud separated flexible node structure and its method of construction
CN108625394B (en) * 2018-05-23 2023-10-27 中铁第四勘察设计院集团有限公司 Underground structure and pier column separated flexible node structure and construction method thereof
CN111139863A (en) * 2019-12-31 2020-05-12 上海市政工程设计研究总院(集团)有限公司 Waterproof construction method for open cut semi-reverse construction method tunnel purlin enclosing node

Similar Documents

Publication Publication Date Title
CN103410175B (en) A kind of water seepage control construction method for karst water-rich geological underground structure waterproof construction
CN101914925A (en) Basement by using optimized composite prefabricated arch wall as external wall
CN103711238B (en) Assembled ring muscle fastens and is anchored concrete shear wall structure system
CN107542115B (en) Underground engineering waterproof structure and construction method thereof
CN205935184U (en) Take single -side supporting formwork basement outer wall of flexible waterproof layer external mold
CN101418569B (en) Optimization complex arch wall combining prefabricated arch leaf, support and major structure
CN102444143B (en) Construction method for cancelling operation channel for facades of basement
CN105421497B (en) The waterproof construction method of sole plate and ground wall connecting node in combined fender construction system
CN106049667B (en) A kind of single side formwork outer wall of basement with flexible waterproof layer external mold
CN107119695A (en) Operation frame body for canceling basement exterior wall backfill and construction method
CN103590841A (en) Supporting method for primary support of underground excavated chamber
CN207228173U (en) A kind of underground project waterproof structure
CN104790435A (en) Post-subsidence pouring belt advancing waterstop impermeable concrete structure and construction technology thereof
CN213572062U (en) Subside post-cast strip assembled structure of backfilling in advance
CN102155006B (en) Steel structure open web combined dam
CN106759485A (en) A kind of prefabricated piping lane of two-piece unit formula and installation method
CN203247838U (en) Fully-buried basement side wall post-pouring belt advance water stop formwork
JPH08269984A (en) Construction of basement in outside waterproofing construction method
CN207265621U (en) A kind of power cable pipe trench structure
CN107288141B (en) A kind of seamless flexible water construction technology of contrary sequence method
CN206800665U (en) A kind of basement side wall late poured band structure
CN209603196U (en) Sole plate post-poured strip structure
CN109322332A (en) It is a kind of in advance to basis and post-cast strip method for waterproofing
CN207776228U (en) A kind of building-block structure suitable for loam wall external corner
CN206052793U (en) A kind of exterior wall pouring after settlement locking device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170208

Termination date: 20190808