CN205934947U - Dark foundation pit dewatering tubular well structure - Google Patents

Dark foundation pit dewatering tubular well structure Download PDF

Info

Publication number
CN205934947U
CN205934947U CN201620811489.5U CN201620811489U CN205934947U CN 205934947 U CN205934947 U CN 205934947U CN 201620811489 U CN201620811489 U CN 201620811489U CN 205934947 U CN205934947 U CN 205934947U
Authority
CN
China
Prior art keywords
filter
pipe
chimney filter
material layer
foundation pit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620811489.5U
Other languages
Chinese (zh)
Inventor
郝喆
董革冰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liaoning University
Original Assignee
Liaoning University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Liaoning University filed Critical Liaoning University
Priority to CN201620811489.5U priority Critical patent/CN205934947U/en
Application granted granted Critical
Publication of CN205934947U publication Critical patent/CN205934947U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The utility model belongs to the technical field of civil engineering and specifically relates to a dark foundation pit dewatering tubular well structure, mainly used constructs dark foundation pit dewatering engineering. This structure includes: clay layer, cement pipe, chimney filter, filter material layer, specifically the structure is as follows: upper portion is cement pipe and clay layer, and clay layer sets up in the cement pipe outside, end wall pipe in the formation, the lower part is chimney filter and filter material layer, and the filter material layer sets up in the chimney filter outside, forms end wall pipe down. The chimney filter is equipped with steel reinforcement cage and bamboo, and the steel reinforcement cage is formed by connecting for the vertical muscle along the circumference equipartition with along the horizontal muscle of upper and lower equipartition, and adjacent indulging sets up bamboo between the muscle, chimney filter outsourcing filter screen and to twine the silk fixed, formation braided tubular structure. Adopt the utility model discloses can improve construction operating conditions greatly, equipment is simple, the improvement work efficiency for construction progress, engineering cost be with lower, frost boiling when stopping the drainage, emits mud, szyrt phenomenon, prevents that sining from appearing in side slope unstability or near ground, thereby reach the purpose of protection nearby buildings safety.

Description

A kind of deep foundation pit precipitation pipe well structure
Technical field
This utility model belongs to technical field of civil engineering, specially a kind of deep foundation pit precipitation pipe well structure, is mainly used in Deep Foundation Pit Dewatering engineering.
Background technology
Pipe well points, as one kind of drainage by well points method, are before excavation of foundation pit, along the surrounding or of excavation pit Well point filter pipe or the pipe well that some is deeper than hole bottom is buried in side, both sides, is connected with house steward or is directly connected with pumping equipment Therefrom draw water, make lowering of the underground water level to foundation ditch bottom 0.5~below 1.0m, existing well-points dewatering method presence:Complex process, The shortcomings of efficiency is low, engineering cost is higher, drawdown is not enough.
Content of the invention
The purpose of this utility model is to provide the depth that a kind of simple eye well displacement is big, can enter Mobile state precipitation from shallow to deep Base pit dewatering pipe well structure, for AQUIFER HYDRAULIC in the range of 1.0~200m/d, subsoil water is than more rich Area.
The technical solution of the utility model is:A kind of deep foundation pit precipitation pipe well structure is it is characterised in that this structure includes: Argillic horizon, pipe of concrete, chimney filter, filter material layer, concrete structure is as follows:
Top is pipe of concrete and argillic horizon, and argillic horizon is arranged at outside pipe of concrete, forms upper end wall pipe;Bottom is filter Pipe and filter material layer, filter material layer is arranged at outside chimney filter, forms lower end wall pipe.
Chimney filter is provided with steel reinforcement cage and bamboo stem, steel reinforcement cage be the vertical muscle being uniformly distributed along the circumference and vertically uniform horizontal bar connect and Become, bamboo stem is set between adjacent vertical muscle, chimney filter outsourcing filter screen simultaneously twines silk and fixes, and forms the tubular structure of establishment.
Advantage of the present utility model and beneficial effect are:
1st, constructing operation condition can be substantially improved using this utility model, equipment is simple, improve work efficiency, accelerate to construct into Degree, engineering cost is relatively low, prevents frost boiling during draining, emits mud, quicksand phenomenon, prevents slope instability or neighbouring ground from occurring collapsing Fall into, thus reaching the purpose of protection nearby buildings safety.
2nd, the applicable various hydrogeologic conditions of this utility model, reduce water level depth up to more than 5m.
Brief description
Fig. 1 is this utility model deep foundation pit precipitation pipe well structure schematic diagram.
In figure:1 argillic horizon;2 pipe of concretes;3 steel reinforcement cages;4 filter screens;5 horizontal bars;6 bamboo stem;7 filter material layers;8 vertical muscle.
Specific embodiment
Below, in conjunction with the drawings and specific embodiments, utility model is made and further describing in detail.
As shown in figure 1, this utility model deep foundation pit precipitation pipe well structure, main inclusion:Argillic horizon 1, pipe of concrete 2, steel Muscle cage 3, filter screen 4, horizontal bar 5, bamboo stem 6, filter material layer 7, vertical muscle 8 etc., concrete structure is as follows:
Top is pipe of concrete 2 and argillic horizon 1, and argillic horizon 1 is arranged at outside pipe of concrete 2, forms upper end wall pipe;Bottom For chimney filter and filter material layer 7, filter material layer 7 is arranged at outside chimney filter, forms lower end wall pipe.Chimney filter is provided with steel reinforcement cage 3 and bamboo stem 6, steel Muscle cage is the vertical muscle 8 being uniformly distributed along the circumference and vertically uniform horizontal bar is formed by connecting, and arranges bamboo stem 6, chimney filter between adjacent vertical muscle 8 Outsourcing filter screen simultaneously twines silk and fixes, and forms the tubular structure of establishment.
The deficiency existing for existing well-points dewatering method, the work of this utility model deep foundation pit precipitation well technical pattern is former Reason is as follows:
1st, dewatering well diameter 650mm, using impact drilled as holes.
2nd, dewatering well upper end wall pipe adopts pipe of concrete, its external diameter 470mm.Its quality should meet following requirements:The borehole wall must Must be qualified products, flexibility is not more than 3mm/m.Outer diameter tolerance is not more than ± 5mm, and wall thickness deviation is not more than ± 2mm, and inwall should Smooth, pipe shaft flawless, defect and internal injury, reinforcing bar must not expose, 1 meter of upper end wall pipe range(Or 8 meters).
3rd, chimney filter adds bamboo stem using internal diameter for 400mm steel reinforcement cage and works out, and steel reinforcement cage is uniformly distributed along the circumference for diameter 12mm 8 vertical muscle(8φ12)With diameter 12mm, spacing 250mm(φ12@250)Horizontal bar(Reinforcement)Combination, steel reinforcement cage outsourcing Two-layer 40 mesh filter screen simultaneously twines silk and fixes.
4th, after chimney filter is made and gone into the well, fill out outward 6~8mm filtrate(Gravel, rubble or cobble), filtrate requirement matter is hard, profile rolling Circle or half round as a ball.
5th, backfill clay outside pipe of concrete.

Claims (2)

1. a kind of deep foundation pit precipitation pipe well structure is it is characterised in that this structure includes:Argillic horizon(1), pipe of concrete(2), filter Pipe, filter material layer(7), concrete structure is as follows:
Top is pipe of concrete(2)And argillic horizon(1), argillic horizon(1)It is arranged at pipe of concrete(2)Outside, forms upper end wall pipe; Bottom is chimney filter and filter material layer(7), filter material layer(7)It is arranged at outside chimney filter, form lower end wall pipe.
2. according to the deep foundation pit precipitation pipe well structure described in claim 1 it is characterised in that chimney filter is provided with steel reinforcement cage(3)And bamboo Bar(6), steel reinforcement cage(3)For the vertical muscle being uniformly distributed along the circumference(8)Vertically uniform horizontal bar(5)It is formed by connecting, adjacent vertical muscle(8) Between arrange bamboo stem(6), chimney filter outsourcing filter screen(4)And twine silk and fix, form the tubular structure of establishment.
CN201620811489.5U 2016-07-29 2016-07-29 Dark foundation pit dewatering tubular well structure Active CN205934947U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620811489.5U CN205934947U (en) 2016-07-29 2016-07-29 Dark foundation pit dewatering tubular well structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620811489.5U CN205934947U (en) 2016-07-29 2016-07-29 Dark foundation pit dewatering tubular well structure

Publications (1)

Publication Number Publication Date
CN205934947U true CN205934947U (en) 2017-02-08

Family

ID=57923754

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620811489.5U Active CN205934947U (en) 2016-07-29 2016-07-29 Dark foundation pit dewatering tubular well structure

Country Status (1)

Country Link
CN (1) CN205934947U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107165181A (en) * 2017-07-11 2017-09-15 中交隧道工程局有限公司 It is a kind of that there is the subway foundation pit dewatering well for monitoring depressurization
CN107460885A (en) * 2017-09-22 2017-12-12 中国路桥工程有限责任公司 A kind of relief well of deep foundation pit and its construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107165181A (en) * 2017-07-11 2017-09-15 中交隧道工程局有限公司 It is a kind of that there is the subway foundation pit dewatering well for monitoring depressurization
CN107460885A (en) * 2017-09-22 2017-12-12 中国路桥工程有限责任公司 A kind of relief well of deep foundation pit and its construction method

Similar Documents

Publication Publication Date Title
CN102454167B (en) The construction method of especially big & deep open caisson
CN105672348A (en) Construction method for cropping bridge pile foundation at sandy gravel stratum of abyssal region
CN104278667A (en) Underground karst cave filling treatment method
CN103046565A (en) Draining method for ultra-deep batholith deep foundation pit
CN202194149U (en) Water-proof curtain
CN113279421B (en) Vacuum dewatering process for deep foundation pit
CN106567393A (en) Collapsible loess deep foundation pit support construction method
CN105735232A (en) Collapsible loess wellpoint presoaking dynamic compaction replacement method
CN201908323U (en) Water drainage and pressure relief device of underground structure baseboard
CN205934947U (en) Dark foundation pit dewatering tubular well structure
CN206204972U (en) A kind of prefabricated tubular pile as well-points dewatering
CN211081894U (en) Water-rich stratum tunnel is precipitation structure in coordination
CN207003421U (en) A kind of steel plate pilework for being seated hard rock top surface
CN103343690B (en) Construction method of shaft antiseep structure used when large section of inclined shaft passes through aquifer
CN104131566B (en) A kind of basement is without the construction method of horizontal support foundation ditch
CN203441498U (en) Anti-seepage structure for large-section water-bearing layer passing shaft of inclined shaft
CN215629929U (en) Novel site operation structure of anti-floating anchor rod
CN203238642U (en) Supporting retaining wall of foundation pit
CN204959787U (en) Novel tower crane combination formula basis
CN202730785U (en) Anti-floating blind ditch water drainage structure for underground structure
CN106088123A (en) A kind of sand geology steel tube well fall water level device and construction method thereof
CN111411639B (en) Shallow foundation pit dewatering construction method for water-rich pebble layer
CN204898684U (en) Super dark excavation supporting system
CN102094419A (en) Method for forming drilled pile in foundation with silty sand layer
CN101886385B (en) Construction process of long-auger jet-grouting mixing curtain pile

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant