CN205894293U - Beam column node fixed knot constructs in middle of prefabricated assembly structure - Google Patents

Beam column node fixed knot constructs in middle of prefabricated assembly structure Download PDF

Info

Publication number
CN205894293U
CN205894293U CN201620752442.6U CN201620752442U CN205894293U CN 205894293 U CN205894293 U CN 205894293U CN 201620752442 U CN201620752442 U CN 201620752442U CN 205894293 U CN205894293 U CN 205894293U
Authority
CN
China
Prior art keywords
steel
precast beam
prefabricated post
prefabricated
ties
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620752442.6U
Other languages
Chinese (zh)
Inventor
高路恒
徐卫星
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nantong Textile Vocational Technology College
Original Assignee
Nantong Textile Vocational Technology College
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nantong Textile Vocational Technology College filed Critical Nantong Textile Vocational Technology College
Priority to CN201620752442.6U priority Critical patent/CN205894293U/en
Application granted granted Critical
Publication of CN205894293U publication Critical patent/CN205894293U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a beam column node fixed knot constructs in middle of prefabricated assembly structure, including prefabricated post and precast beam, prefabricated post vertically is equipped with the prefabricated post muscle of outside extension, the precast beam transversely is equipped with the precast beam muscle, the node of the handing -over of prefabricated post and precast beam still is equipped with bilateral ties support frame, bilateral ties support frame is including the steel corner brace and the steel ties that connect structure as an organic whole, steel corner brace is two and set up to be in respectively steel ties's both sides, the support of taking one's place when steel corner brace is used for respectively supporting the precast beam hoist and mount, steel ties installs on prefabricated post, as the fulcrum that bears of support frame. The utility model discloses rational in infrastructure, the precision height of taking one's place is installed to the precast beam, and hoisting construction is fast, and the ties support frame can have enough to meet the need the use, and the breast supports and uses relative ratio tradition hoist and mount method will lack a lot, saves engineering construction cost, has better economic benefits.

Description

Bean column node fixed structure in the middle of a kind of prefabricated construction
Technical field
This utility model be related to a kind of bean column node fixed structure and in particular to a kind of prefabricated construction in the middle of beam column Node fixed structure.
Background technology
In recent years, the prefabricated assembled continuous development with new building technology and material and progress, prefabrication It is widely used.In the country that many building industrializations are flourishing, prefabrication experienced long-term experiment and Application, the prefabrication product of modernization can highly integrated building various functions, and the form built Very exquisite with component.China's construction demand amount is big, construction speed fast, necessary development prefabrication, then right Prefabricated construction joint structure requires and hoisting also more and more higher.Traditional prefabricated construction hoisting cost is relatively Height, lifting speed is low with precision, and this brings very big difficulty to construction, and the adjustment of hoisting process error occupies substantial amounts of Duration of a project, therefore, prefabrication lifting wants to realize industry modernization, and hanging method is also needed to innovate further to grind Study carefully.
Utility model content
Utility model purpose: the purpose of this utility model is to solve deficiency of the prior art, providing a kind of structure Reasonable in design, precast beam installs high precision in place, and construction hoisting speed is fast, and tie bracing frame can be used in turn, and beam bottom supports To be lacked much using traditional hanging method that compares, save beam column section in the middle of a kind of prefabricated construction of Construction Cost Point structure.
Technical scheme: bean column node fixed structure in the middle of a kind of prefabricated construction described in the utility model, including Prefabricated post and precast beam, described prefabricated post is longitudinally provided with the prefabricated post muscle stretching out, and described precast beam is transversely provided with precast beam Muscle, is additionally provided with bilateral tie bracing frame, described bilateral tie bracing frame bag at the node of the handing-over of described prefabricated post and precast beam Include the steel angle brace connecting as one structure and steel column hoop, described steel angle brace is two and is separately positioned on the two of described steel column hoop Side, described steel angle brace is respectively used to support the support in place during precast beam lifting, and steel column hoop is arranged in prefabricated post, as support The carrying fulcrum of frame.
Further, the triangular prism of the closing that described steel angle brace is made up of 5 blocks of steel plates, steel column hoop is by 4 pieces of steel plate groups The quadrangular of the upper and lower opening becoming, and steel angle brace and steel column hoop share two blocks of steel plates.
Further, the thickness of described steel plate is not less than 40mm.
Further, in a pre-installation, on its shaft, installation control line got well by bullet to described bilateral tie bracing frame.
Further, described bilateral tie bracing frame is just removable when node strength reaches the 50% of concrete design strength Remove.
Beneficial effect: this utility model is rational in infrastructure, precast beam installs high precision in place, and construction hoisting speed is fast, tie Bracing frame can be used in turn, and beam bottom supports will be lacked much using traditional hanging method that compares, and save Construction Cost, tool There is good economic benefit.
Brief description
Fig. 1 is the overall schematic of this utility model node structure;
Fig. 2 is this utility model bilateral tie support frame structure schematic diagram.
Specific embodiment
Bean column node fixed structure in the middle of a kind of prefabricated construction as depicted in figs. 1 and 2, including prefabricated post 5 He Precast beam 3, described prefabricated post 5 is longitudinally provided with the prefabricated post muscle 6 stretching out, and described precast beam 3 is transversely provided with precast beam muscle 4, It is additionally provided with bilateral tie bracing frame, described bilateral tie bracing frame includes at the node of handing-over of described prefabricated post 5 and precast beam 3 Connect as one steel angle brace 1 and the steel column hoop 2 of structure, described steel angle brace 1 is two and is separately positioned on the two of described steel column hoop 2 Side, described steel angle brace 1 is respectively used to support the support in place during precast beam 3 lifting, and steel column hoop 2 is arranged in prefabricated post 5, as The carrying fulcrum of bracing frame.
The triangular prism of the closing that described steel angle brace 1 is made up of 5 blocks of steel plates, steel column hoop 2 by 4 blocks of steel plates form upper and lower The quadrangular of opening, two arms of angle can freely launch, and steel angle brace 1 and steel column hoop 2 share two blocks of steel plates.
Described bilateral tie bracing frame in a pre-installation, on shaft bullet got well installation control line it is ensured that beam lifting after Precision in place.
Described bilateral tie bracing frame rigidity is larger, and alignment error adjusted value is easily controlled, alignment error general control Within 5mm.
Described bilateral tie bracing frame turnaround speed is fast, (typically takes Concrete Design when node strength reaches preset value The 50% of intensity), can first member-retaining portion conventional steel support, bilateral tie bracing frame is dismountable, realizes early removing system mesh Mark.
In the middle of a kind of above-mentioned prefabricated construction, the installation method of bean column node fixed structure, comprises the steps:
(1) prefabricated post lifting: prefabricated post lifting strict control column should lift quality, and Horizontal position errors are less than 5mm, hang down Straight error is less than 3mm;
(2) play precast beam lifting absolute altitude control line: prefabricated post lifting fixation finishes, eject precast beam lifting absolute altitude in shaft Control line, under special circumstances it is also contemplated that error transfer factor value;
(3) tie bracing frame and beam lower supporter are installed: carry out precast beam and hang according to shaft control line, error transfer factor value size Fill work in place;
(4) precast beam lifts, fixes;
(5) precast beam Hoisting Position is reviewed, is adjusted;
(6) bean column node formwork erection;
(7) bean column node concreting, maintenance;
(8) tie bracing frame is removed, is had enough to meet the need.
This utility model is rational in infrastructure, and precast beam installs high precision in place, and construction hoisting speed is fast, and tie bracing frame is permissible It is used in turn, beam bottom supports will be lacked much using traditional hanging method that compares, and save Construction Cost, have good economic Benefit.
The above, be only preferred embodiment of the present utility model, not this utility model is made any formal Restriction although this utility model is disclosed above with preferred embodiment, but be not limited to this utility model, any ripe Know professional and technical personnel, in the range of without departing from technical solutions of the utility model, when in the technology of available the disclosure above Hold and make a little Equivalent embodiments changing or be modified to equivalent variations, as long as without departing from technical solutions of the utility model Hold, any simple modification, equivalent variations and modification above example made according to technical spirit of the present utility model, all still Belong in the range of technical solutions of the utility model.

Claims (3)

1. in the middle of a kind of prefabricated construction bean column node fixed structure it is characterised in that: include prefabricated post (5) and precast beam (3), described prefabricated post (5) is longitudinally provided with the prefabricated post muscle (6) stretching out, and described precast beam (3) is transversely provided with precast beam muscle (4), it is additionally provided with bilateral tie bracing frame at the node of handing-over of described prefabricated post (5) and precast beam (3), described bilateral tie props up Support includes steel angle brace (1) and the steel column hoop (2) connecting as one structure, and described steel angle brace (1) is two and is separately positioned on The both sides of described steel column hoop (2), described steel angle brace (1) is respectively used to support the support in place during precast beam (3) lifting, steel column hoop (2) it is arranged in prefabricated post (5), as the carrying fulcrum of bracing frame.
2. in the middle of a kind of prefabricated construction according to claim 1 bean column node fixed structure it is characterised in that: institute State the triangular prism of the closing that steel angle brace (1) is made up of 5 blocks of steel plates, the upper and lower opening that steel column hoop (2) is made up of 4 blocks of steel plates Quadrangular, and steel angle brace (1) and steel column hoop (2) share two blocks of steel plates.
3. in the middle of a kind of prefabricated construction according to claim 2 bean column node fixed structure it is characterised in that: institute The thickness stating steel plate is not less than 40mm.
CN201620752442.6U 2016-07-18 2016-07-18 Beam column node fixed knot constructs in middle of prefabricated assembly structure Expired - Fee Related CN205894293U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620752442.6U CN205894293U (en) 2016-07-18 2016-07-18 Beam column node fixed knot constructs in middle of prefabricated assembly structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620752442.6U CN205894293U (en) 2016-07-18 2016-07-18 Beam column node fixed knot constructs in middle of prefabricated assembly structure

Publications (1)

Publication Number Publication Date
CN205894293U true CN205894293U (en) 2017-01-18

Family

ID=57773789

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620752442.6U Expired - Fee Related CN205894293U (en) 2016-07-18 2016-07-18 Beam column node fixed knot constructs in middle of prefabricated assembly structure

Country Status (1)

Country Link
CN (1) CN205894293U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106013434A (en) * 2016-07-18 2016-10-12 江苏工程职业技术学院 Prefabricated assembled structural intermediate beam column node fixing structure and installation method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106013434A (en) * 2016-07-18 2016-10-12 江苏工程职业技术学院 Prefabricated assembled structural intermediate beam column node fixing structure and installation method

Similar Documents

Publication Publication Date Title
CN106013435B (en) A kind of prefabricated construction end bean column node fixed structure and installation method
CN106013434B (en) Bean column node fixed structure and installation method among a kind of prefabricated construction
CN106065681B (en) It is a kind of based on BIM technology overall assembled building in superimposed sheet hoard strip construction method
CN203007846U (en) Y-type block template and support system
CN101845882B (en) Combined device of a mould frame for hanging and casting cement for high-rise buildings and handling and hanging box for building materials
CN108708394A (en) A kind of tunneling boring exempts from the overlapping assembled comprehensive pipe gallery structure and construction method of support
CN106193589A (en) Concrete superelevation heavy type beam and superimposed sheet combinative structure method for supporting
CN205894292U (en) Prefabricated assembly structure tip beam column node fixed knot constructs
CN103485574B (en) A kind of granulation tower tower top structure of reinforced concrete method
CN113846753B (en) Efficient construction method for shock insulation support
CN205894293U (en) Beam column node fixed knot constructs in middle of prefabricated assembly structure
CN202064281U (en) Slip form frame
CN207436503U (en) Efficient construction of precast floorslab hangs membrane module
CN106836255B (en) The integral prefabricated structure of basement bottom board catch pit steel mesh and method of construction
CN206873305U (en) A kind of Long span variable cross-section precast segmental beam assembling construction structure
CN203755173U (en) Formwork device used for hydraulic climbing of bridge high pier
CN202401753U (en) Sliding die device
CN207847086U (en) A kind of tall and big beam form support frame
CN102720360B (en) Combination device of secondary high building supported lifted and poured cement formwork and building material lifting and lifting box
CN205296829U (en) Superelevation super large cross -section batter post integrally lift up formula template reinforcerment system
CN204645350U (en) Be inverted two-way abdomen gusset Prestressed Concrete Superimposed Sheet Of Steel Bar Truss
CN204626965U (en) For the steel stair template of poured up at a time between architectural stair
CN207538506U (en) The independent supporting rack of efficient construction of precast floorslab
CN209760761U (en) Construction platform and elevator core section of thick bamboo construction structures in a core section of thick bamboo
CN207436515U (en) The hoisting beam of efficient construction of precast floorslab

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170118

Termination date: 20170718