CN205894278U - Solid superstructure beam -columns system's integral basement of coincide assembly - Google Patents
Solid superstructure beam -columns system's integral basement of coincide assembly Download PDFInfo
- Publication number
- CN205894278U CN205894278U CN201620872129.6U CN201620872129U CN205894278U CN 205894278 U CN205894278 U CN 205894278U CN 201620872129 U CN201620872129 U CN 201620872129U CN 205894278 U CN205894278 U CN 205894278U
- Authority
- CN
- China
- Prior art keywords
- cast
- basement
- prefabricated
- overlapping
- place
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
The utility model provides a composite beam is through the cast -in -place whole that connects into that solid superstructure beam -columns system's integral basement of coincide assembly, basement bottom plate are cast in situ concrete bottom plate or prefabricated superimposed bottom plate entirely, and basement wall is prefabricated coincide sandwich wall, and the basement is middle to be equipped with a plurality of cast -in -place posts, installs the composite beam on the cast -in -place post, and prefabricated coincide solid floor is adopted on basement roof and burden n layer, and wherein n is the natural number, on the prefabricated coincide sandwich wall top and cast -in -place post of prefabrication coincide solid floor and side wall. The utility model discloses shortcoming between them is overcome to the advantage that prefabricated of high quality, fast, efficient, the feature of environmental protection of full play mill can be good and cast -in -place wholeness is good, structural strength is high, maximizes favourable factors and minimizes unfavourable ones, realizes on -the -spot no modular construction, and the earth volume is little, and cost of labor and material cost hang down, and construction speed is fast, and the quality is controllable, no environmental pollution, and specifications is good.
Description
Technical field
This utility model belongs to construction engineering technical field and in particular to a kind of overlapping of solid superstructure post and lintel system is assembled
Monoblock type basement.
Background technology
It is known that traditional architecture basement engineering is all using cast-in-place concrete structure, this is accomplished by excavating sufficiently large
Subterranean excavation, with ensure live raw material stacking, concrete transportation, formwork, pour, vibrate, maintenance, folding mould etc. are applied on a large scale
Work working place, the therefore earthwork amount of digging are big, and backfill amount is also big.Because all working is all to complete at the scene, all wallboards and top
Plate is intended to configuration template, and template could will be removed after concrete is fully achieved intensity, therefore, template, scaffold demand
Greatly, long construction period, manually many, all raw material all transports to scene with bulk form, pollutes environment, causes waste of raw materials,
Cost of labor is high, and concrete cast-in-site manually vibrates, operation easier, greatly it is desirable to height, is slightly vibrated unreal, will be stayed
Leakage hidden trouble.Additionally, cast-in-place concrete quality is uncontrollable, curing condition is poor, and the probability that micro-crack in concrete is big,
Later stage rainwater can pass through micro-crack seepage, affects construction quality.
Content of the invention
Technical problem to be solved in the utility model is: solves the problems, such as above-mentioned prior art, and provides one kind
The overlapping assembled integral basement of solid superstructure post and lintel system, give full play to that prefabrication quality is good, speed fast, efficiency high,
Good environmental protection and the high advantage of cast-in-place good integrity, structural strength, the shortcoming overcoming both, maximize favourable factors and minimize unfavourable ones, and realize scene no
Modular construction, earth volume is little, and, with the cost of material is low, construction speed is fast, quality controllable, non-environmental-pollution, technology for cost of labor
Function admirable.
The technical solution adopted in the utility model is: a kind of overlapping assembled integral underground of solid superstructure post and lintel system
Room, basement bottom board is full cast-in-place concrete base plate or prefabricated overlapping base plate, and basement side wall is prefabricated overlapping sandwich wall, underground
It is provided with some cast-in-place posts in the middle of room, cast-in-place post is provided with composite beam, basement roof and negative n-layer adopt the solid building of prefabricated overlapping
Plate, wherein n are natural number, the composite beam on the prefabricated overlapping sandwich wall top and cast-in-place post of prefabricated overlapping solid floor and side wall
Integral by cast-in-place connection.
In technique scheme, described composite beam includes precast beam part and Cast-in-situ Beam part.
In technique scheme, described prefabricated overlapping solid floor includes laminated floor slab preformed layer and laminated floor slab is cast-in-place
Layer, the precast beam that the prefabricated termination overlapping solid floor is overlapped on composite beam is partly gone up, and is connected with piece reinforcing bar and/or construction
Reinforcing bar, the laminated floor slab in-situ layer of prefabricated overlapping solid floor is whole by cast-in-place concrete together with the Cast-in-situ Beam part of composite beam
Body connects molding.
In technique scheme, described composite beam adopts bright beam or/and dark beam.
In technique scheme, described prefabricated overlapping base plate includes base plate preformed layer and base plate in-situ layer.
In technique scheme, described prefabricated overlapping sandwich wall includes prefabricated siphonal lobe wall, prefabricated internal lobe wall and cast-in-place sandwiched
Layer.
The fabricated basement of overlapping of the present utility model overlaps a cast-in-place part by a prefabrication part, scene,
Give full play to that prefabrication quality is good, speed fast, efficiency high and the high advantage of cast-in-site good integrity, structural strength, overcome
Both shortcomings, maximize favourable factors and minimize unfavourable ones, and change that traditional cast-in-place basement earth volume is big, constructional difficulties, high cost, cycle length, efficiency
, it is achieved that scene no templating is constructed, earth volume is little, people for the original backward state that low, waste of raw materials is many, environmental pollution is serious
, with the cost of material is low, construction speed is fast for work cost, and quality controllable, non-environmental-pollution is high-quality and efficient, and has excellent water proofing property
Energy.
With area as 10431m2Basement as a example, 40 days conventional art durations, 10 days this utility model durations, tradition
Skilled industrial worker 156 people, this utility model only needs 82 people, and template used amount greatly reduces, and scaffold consumption also reduces, artificial measures
Reduce, masonry plastering reduces, speed of application improves four times, civilized construction, good environmental protection.Taking construction costs as a example, form fixer
Journey cost can reduce by 100 yuan/m2, cast in place reinforced bar, concrete works cost reduce by 127 yuan/m2, waterproofing work cost minimizing 87/
m2, masonry and plastering engineering cost reduce by 29 yuan/m2, scaffolding work expense 30 yuan/m of minimizing2, other measures Project Cost
Reduce by 25 yuan/m2.Therefore, overlapping assembled basement of the present utility model reduces engineering than conventional art construction basement and makes
398 yuan/m of valency2.
Of the present utility model be produced as flexible intelligent production line operation, production efficiency is high, low cost, this utility model
Convenient transportation, efficiently, low cost;Construction of the present utility model is simple to operation, and construction quality is controlled, and integrated cost is low, outward
See smooth, water resistance is good, and total quality is excellent.
Brief description:
Fig. 1 is this utility model overall structure diagram;
Fig. 2 is prefabricated overlapping solid floor mounting structure schematic diagram.
Reference: 1 basement bottom board, 2 basement side walls, 3 cast-in-place posts, 4 composite beams, 5 laminated floor slabs
Preformed layer, 6 laminated floor slab in-situ layers, 7 truss.
Specific embodiment:
Referring to Fig. 1, Fig. 2, the overlapping assembled integral basement of solid superstructure post and lintel system of the present utility model, basement
Base plate is full cast-in-place concrete base plate or prefabricated overlapping base plate, and basement side wall is prefabricated overlapping sandwich wall, sets in the middle of basement
There are some cast-in-place posts, cast-in-place post is provided with composite beam, basement roof and negative n-layer adopt prefabricated overlapping solid floor, wherein n
For natural number, the composite beam on prefabricated overlapping solid floor and the prefabricated overlapping sandwich wall top and cast-in-place post of side wall passes through cast-in-place
Connect integral, described composite beam includes precast beam part and Cast-in-situ Beam part, described prefabricated overlapping solid floor includes folding
Close floor preformed layer and laminated floor slab in-situ layer, the termination of prefabricated overlapping solid floor is overlapped on the precast beam part of composite beam
On, and it is connected with piece reinforcing bar and/or distributing bar, the laminated floor slab in-situ layer of prefabricated overlapping solid floor is showed with composite beam
Pour beam portion and divide together by cast-in-place concrete global formation, described composite beam adopts bright beam or/and dark beam, described is prefabricated folded
Close base plate and include base plate preformed layer and base plate in-situ layer, described prefabricated overlapping sandwich wall includes prefabricated siphonal lobe wall, prefabricated internal lobe wall
With cast-in-place sandwiched layer.
Claims (6)
1. a kind of overlapping assembled integral basement of solid superstructure post and lintel system it is characterised in that: basement bottom board is entirely existing
Pouring concrete base plate or prefabricated overlapping base plate, basement side wall is prefabricated overlapping sandwich wall, is provided with some cast-in-place in the middle of basement
Post, cast-in-place post is provided with composite beam, and basement roof and negative n-layer adopt prefabricated overlapping solid floor, and wherein n is natural number,
Composite beam on prefabricated overlapping solid floor and the prefabricated overlapping sandwich wall top and cast-in-place post of side wall by cast-in-place connect into whole
Body.
2. solid superstructure post and lintel system according to claim 1 overlapping assembled integral basement it is characterised in that: institute
The composite beam stated includes precast beam part and Cast-in-situ Beam part.
3. solid superstructure post and lintel system according to claim 1 overlapping assembled integral basement it is characterised in that: institute
State prefabricated overlapping solid floor and include laminated floor slab preformed layer and laminated floor slab in-situ layer, the termination of prefabricated overlapping solid floor is taken
The precast beam being connected on composite beam is partly gone up, and is connected with piece reinforcing bar and/or distributing bar, laminated floor slab in-situ layer and composite beam
Cast-in-situ Beam part be connected by cast-in-place concrete together fixed-type.
4. solid superstructure post and lintel system according to claim 1 overlapping assembled integral basement it is characterised in that: institute
The composite beam stated adopts bright beam or/and dark beam.
5. solid superstructure post and lintel system according to claim 1 overlapping assembled integral basement it is characterised in that: institute
The prefabricated overlapping base plate stated includes base plate preformed layer and base plate in-situ layer.
6. solid superstructure post and lintel system according to claim 1 overlapping assembled integral basement it is characterised in that: institute
State prefabricated overlapping sandwich wall and include prefabricated siphonal lobe wall, prefabricated internal lobe wall and cast-in-place sandwiched layer.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620872129.6U CN205894278U (en) | 2016-08-12 | 2016-08-12 | Solid superstructure beam -columns system's integral basement of coincide assembly |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620872129.6U CN205894278U (en) | 2016-08-12 | 2016-08-12 | Solid superstructure beam -columns system's integral basement of coincide assembly |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205894278U true CN205894278U (en) | 2017-01-18 |
Family
ID=57782147
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620872129.6U Active CN205894278U (en) | 2016-08-12 | 2016-08-12 | Solid superstructure beam -columns system's integral basement of coincide assembly |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205894278U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106121033A (en) * | 2016-08-12 | 2016-11-16 | 长沙远大住宅工业集团股份有限公司 | A kind of overlapping assembled integral basement of solid superstructure post and lintel system |
WO2018028040A1 (en) * | 2016-08-12 | 2018-02-15 | 长沙远大住宅工业集团股份有限公司 | Stacked and assembled integrated basement of multistory post-and-beam system |
-
2016
- 2016-08-12 CN CN201620872129.6U patent/CN205894278U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106121033A (en) * | 2016-08-12 | 2016-11-16 | 长沙远大住宅工业集团股份有限公司 | A kind of overlapping assembled integral basement of solid superstructure post and lintel system |
WO2018028040A1 (en) * | 2016-08-12 | 2018-02-15 | 长沙远大住宅工业集团股份有限公司 | Stacked and assembled integrated basement of multistory post-and-beam system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205894281U (en) | Integral basement of coincide assembly of arch without beam system | |
WO2017206411A1 (en) | Full-prefabricated superimposed assembly-type underground pipe gallery and connection node thereof | |
CN105839667B (en) | The construction manufacture craft of complete prefabricated overlapping assembled underground pipe gallery | |
WO2017206412A1 (en) | Superimposed assembly-type underground pipe gallery system and construction and manufacturing process | |
CN205662947U (en) | Coincide assembled underground pipe gallery system | |
CN107313517B (en) | Connecting node for laminated wall and laminated floor slab in middle layer | |
CN101787710B (en) | Integrally-assembled buttressed retaining wall and construction method thereof | |
CN106088318A (en) | The overlapping assembled integral basement that flat slab system is combined with post and lintel system | |
CN104805866A (en) | Prefabricated comprehensive pipe gallery and construction method | |
CN106088320A (en) | A kind of overlapping assembled integral basement of superstructure post and lintel system | |
CN101418569B (en) | Optimization complex arch wall combining prefabricated arch leaf, support and major structure | |
CN106121035A (en) | A kind of overlapping assembled integral basement of flat slab system | |
CN103590486B (en) | Anti-seismic energy saving three-dimensional mortise and tenon joint net fixing one-piece cast building structure and construction method | |
CN205742265U (en) | Complete prefabricated overlapping assembled underground pipe gallery and connection node thereof | |
CN204753627U (en) | Prefabricated comprehensive piping lane | |
CN205894280U (en) | Hollow superstructure beam -columns system's integral basement of coincide assembly | |
CN106088316A (en) | A kind of overlapping assembled integral basement of hollow building cover post and lintel system | |
CN106088317A (en) | The overlapping assembled integral basement that post and lintel system is combined with flat slab system | |
CN205894278U (en) | Solid superstructure beam -columns system's integral basement of coincide assembly | |
CN201746850U (en) | Assembled monolithic cantilever retaining wall | |
CN209040349U (en) | A kind of ring muscle fastening shear wall structure being easily installed | |
CN206956949U (en) | Overlap wall and intermediate layer laminated floor slab connecting node | |
CN106088319A (en) | A kind of overlapping assembled integral basement of the system of hollow building cover without beam | |
CN205894279U (en) | Integral basement of coincide assembly of hollow superstructure system of no roof beam | |
CN103362235B (en) | Integrally-poured building house with wallboards integrating thermal insulating and templates |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |