CN205894121U - Emergent anti structure of floating of basement - Google Patents
Emergent anti structure of floating of basement Download PDFInfo
- Publication number
- CN205894121U CN205894121U CN201620754294.1U CN201620754294U CN205894121U CN 205894121 U CN205894121 U CN 205894121U CN 201620754294 U CN201620754294 U CN 201620754294U CN 205894121 U CN205894121 U CN 205894121U
- Authority
- CN
- China
- Prior art keywords
- hole
- basement
- aqueduct
- pressure release
- relief hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
The utility model relates to a pressure release hole that the anti emergent anti structure of floating of basement who floats of building, it runs through basement bottom plate layer and bed course when emergent is related to to and the leading water pipe that is used for groundwater to pilot a ship into harbour, the external drain pipe of leading water pipe. Basement bottom plate layer includes a stagnant water hole that lies in pressure release hole upper portion, filtering body was wrapped up to the leading water pipe bottom, leading water pipe bottom and cross filtering body and insert and switch on groundwater along the pressure release hole, the leading water pipe global with the pressure release hole between the clearance in pack plug formation and seal up, setting valve between leading water pipe and the drain pipe, and the valve lies in that the stagnant water is downthehole not to be exposed, is detachably connected between valve and the drain pipe. Be used for the groundwater pressure release and recharge the basement increasing load through directly seting up the pressure release hole, treat the water -level recovery after, set up the stagnant water hole, insert the pressure release hole with the leading water pipe and switch on groundwater, after treating that the construction of basement roof earthing is accomplished, fill the stagnant water hole with expansion concrete. The utility model is suitable for a basement is emergent anti to float.
Description
Technical field
This utility model is related to build anti-floating construction field, and a kind of basement especially relating to basement anti-floating is emergent anti-
Floating structure.
Background technology
In order to reduce the investment cost of basement structure, at present, design of basement measure of anti float mainly leans on underground ceiling
Earthing on plate, and pile foundation arranges anti-group of stake or the way of anti-group of both anchor poles combination is more universal, design typically requires underground
Room construction must finish in top plate earth-covering construction and can stop the outer precipitation of foundation ditch.During practice of construction, basement structure exists
Outer wall waterproof backfills after finishing already, and a lot of designs do not have the quantity of the outer Yield rainfall relation well of clear and definite foundation ditch yet, therefore most reservation
A few Yield rainfall relation well of the post-cast strip termination of lower chamber outer wall as the Yield rainfall relation of foundation ditch, in especially big typhoon, heavy rain climatic environment
Under, depend merely on the requirement that these Yield rainfall relation wells much do not reach Yield rainfall relation, it mainly still relies on untight post-cast strip to let out
The subsoil water that pressure rises.But in the municipal administration greening incipient stage in later stage, basement post-pouring zone pours already and finishes, these Yield rainfall relation wells
Also closed by backfill, if earthing construction is not now had started on basement roof, in this case, as quick in level of ground water on
Rise, basement does not reserve relief hole yet, whole basement arises that the danger of floating.Basement is taken to fill in traditional method
Water and the provisional preloading of top board are as emergent means, but in case of emergency, this measure was difficult to ensure that on the obvious time, often
Occur pouring water or preloading work is also undone, basement begins to be occurred floating, and causes basement heavy damage, economic loss is miserable
Weight.In addition, prior art also has in advance in Interior design pressure release discharge structure, that is, by opening up in basement bottom board
Relief hole, pressure release in the hole draws drain pipe, thus preventing basement floating-up, but this kind of structure is typically using being arranged on ground
In the catch pit of lower room given design, and the limited amount of catch pit, under conventional design catch pit is generally disposed in closely
The peripheral position of chamber outer wall, and basement floating-up to destroy maximum be regional location therebetween, therefore its anti-floating pressure release effect is less
Preferable.And using pressure release discharge structure of constructing in advance, cost input is larger, the later stage is without emergency in addition it is also necessary to letting out
Laminated structure carries out filling up construction, drags slow Construction Schedule.For this reason, there being one kind to be designed quickly can realize ground in emergency situations
The technical scheme of lower room anti-floating.
Content of the invention
For overcoming above-mentioned deficiency, the purpose of this utility model is to provide a kind of basement emergent float Structure to this area,
Making it solve the construction of existing basement anti-floating emergency measure wastes time and energy, and input cost and the higher technology of later stage processing cost are asked
Topic.Its objective is to be achieved through the following technical solutions.
This basement is met an urgent need and is run through the relief hole of basement backplane level and bed course when float Structure includes emergent, and insertion
Pressure release in the hole is used for the aqueduct of diversion, the external drain pipe of aqueduct.Its structural feature is that described basement bottom board layer includes
One sealing hole being located at relief hole top, the depth in sealing hole be basement bottom board thickness degree 1 to two/3rd/
One, its aperture is more than the aperture of described relief hole;Filtering bodies are wrapped up in described aqueduct bottom, and aqueduct bottom and filtering bodies edge are let out
Subsoil water is inserted and turns in pressure hole, and in the gap between aqueduct side face and relief hole, filling plug forms sealing;Described draw
Between water pipe and drain pipe, valve is set, and valve does not expose positioned at described sealing in the hole, is detachable between valve and drain pipe
Formula connects.Compared with prior art, substantive difference is when running into basement and having floating hidden danger this technical scheme, directly over the ground
Lower room opens up relief hole, so that subsoil water quickly pours in down a chimney to underground interior, realizes pressure release and increases basement load double acting,
Construction is simple, can eliminate the problem of basement floating-up in the short time.The purpose in above-mentioned sealing hole is to form one sealing
Seam, prevents vertical relief hole after subsequent construction closure, and subsoil water directly leaks into underground interior along the hole wall of relief hole.
Above-mentioned valve is arranged at sealing in the hole and does not expose, and facilitates follow-up sealing hole plugging construction.
Described sealing hole and described relief hole are by concentric holes so that the sealing seam being formed between sealing hole and relief hole stops
Water effect is more reliable.
The aperture of described relief hole is 100~150mm, is hardly damaged basement floor structure it is ensured that constructs is reliable and secure.
The pipeline section that described aqueduct is located at described sealing hole welds seal ring, and the ring diameter of seal ring is than described relief hole
Little more than the 50mm in aperture.By seal ring, prevent subsoil water indoor to underground along aqueduct leaktightness of wall of tubes.
When described drain pipe removal, expansion sealing strip or Grouting Pipe, described sealing are buried in described sealing hole bottom hole edge
The expansive concrete of basement bottom board floor absolute altitude one described in packing ratio in space between hole and relief hole and aqueduct.Pass through
This structure, improves sealing and plugging effect.
Described filtering bodies are flax silk group, or the flax silk group for geotextiles parcel.Rely on geotextiles parcel flax silk group, thus anti-
Susceptible to plugging problem during the original soil layer that only flax silk group insertion subsoil water is located.
Described plug is flax silk and the combination of closure slurry.Quick plugging construction is realized by this structure.
The pipeline section side face that described aqueduct is located at below plug is provided with inlet opening.Diversion bank of tubes is conducive to by this structure
Water.
This utility model structure is simple, operation, easy construction, and application flexibility is strong.Both can as the phase after construction because
Basement Yield rainfall relation well or a kind of reserved not enough supplementary device of relief hole are it is also possible to conduct is situations such as typhoon, extra torrential rain
Under, because of the non-earthing of basement roof, and it is used for preventing a kind of emergent means of basement floating-up.Not only avoid traditional meeting an urgent need to do
Method wastes time and energy, the big problem of basement floating-up risk, and greatly reduces the cost that the emergent anti-floating of tradition spends, and is suitable as
The building float Structure such as basement uses, and is particularly suitable for emergent anti-floating.
Brief description
Fig. 1 is the cross-sectional view that this utility model opens up relief hole.
Fig. 2 is the cross-sectional view that this utility model opens up sealing hole.
Fig. 3 is that this utility model installs aqueduct, the cross-sectional view of drain pipe.
Fig. 4 is that this utility model pours the cross-sectional view expanding the solidifying soil of rolling reserved valve operation space.
Fig. 5 is the cross-sectional view after the completion of this utility model construction.
The figures above sequence number and title: 1, basement bottom board layer, 2, bed course, 3, original soil layer, 4, relief hole, 5, sealing hole,
6th, aqueduct, 601, seal ring, 7, valve, 8, drain pipe, 9, geotextiles, 10, flax silk group, 11, plug, 12, expand coagulation
Soil, 13, working place.
Specific embodiment
In conjunction with accompanying drawing, taking anti-floating construction of specifically meeting an urgent need as a example, this utility model is described further.
First, the number of openings calculating relief hole is reasonably distributed according to actual basement, the quantity of relief hole is that basis is let out
The area COMPREHENSIVE CALCULATING in the aperture of pressure hole and aqueduct, estimated peak level and basement determines, through measuring and calculating, the coastal south
Generally 600 square metres about settings of one layer of basement one.Pressure release hole number calculates after determining, should be in basement bottom board layer table
In the face of it is positioned, typically preferably it is arranged on basement pillar diagonal centre position, relief hole should be put down in basement bottom board layer
All it is distributed.Can be spudded in after the completion of positioning relief hole, and its order of spudding in symmetrically is carried out to edge direction for basement zone line,
A bench drill machine can sequentially carry out, also can multiple stage rig symmetrically carry out simultaneously.Relief hole is after concrete core drilling rig coring
Formed, as shown in figure 1, the diameter general control of relief hole is in 100~150mm, its depth will pass through basement bottom board layer
And drill through bed course, then carry brill, pressure release in the hole is slowly withdrawn by the concrete cylindrical block of coring, form relief hole.Relief hole
After formation, subsoil water will be gushed, and in emergency circumstances this relief hole plays pressure release level of ground water and recharge basement increases
The dual function of load.Whne level of ground water be reduced to basement bottom board layer surface equal when, you can opened with concrete core drilling rig
Bore sealing hole.The hole heart alignment of the Kong Xinyu relief hole in sealing hole, both are concentric holes, and the diameter in sealing hole typically should compare pressure release
Big more than the 100mm in hole, sealing hole drill hole depth be base plate thickness 1 to two/3rd/, its effect is in relief hole
Between form one sealing seam, prevent vertical relief hole after closure, subsoil water directly leaks into ground along the hole wall of relief hole
Lower interior.
Aqueduct is buried and the time of sealing of hole flexibly can be grasped according to construction period, flood season situation.During sealing of hole as far as possible
Avoid flood season and typhoon weather, subsoil water return to basement bottom board layer surface or following blocked when be optimal.Sealing of hole is
Constructed by material fit such as aqueduct, drain pipe, expansion sealing strip or Grouting Pipe, flax silk, leak stopping slurry and expansive concretes
Become, wherein aqueduct is to be made with rustless steel or copper pipe material, to prevent tube wall from soaking and corrosion, aqueduct for a long time
Caliber should be less more than 50mm than relief hole.Aqueduct upper weld seal ring, prevents subsoil water from penetrating into along diversion tube wall
In basement bottom board layer surface, tube wall periphery has the inlet opening of 5~8mm in the 50mm scope of bottom, is beneficial to draining.
Before aqueduct is inserted into relief hole, should first be clogged to relief hole bottom hole with the flax silk group of geotextiles parcel, or directly
Connect and be wrapped in aqueduct bottom, be inserted into aqueduct, make the flax silk group press-in that geotextiles are wrapped up to original soil layer (level of ground water
Put), this flax silk rolls into a ball the drainage layer as aqueduct, prevents clod from blocking the inlet opening of diversion bottom of the tube.Aqueduct tackles pressure release
Hole, the hole heart position in sealing hole, and by outside support, aqueduct is fixed temporarily, prevent aqueduct double swerve.Draw
Water pipe upper end is tightly connected valve, then connects drain pipe by valve, makes subsoil water be introduced to underground by aqueduct and drain pipe
Carry out pump drainage in the gutter of room or sump, be connected by thread seal or snap joint wherein between valve and drain pipe,
Thus facilitating drain pipe to dismantle.Next, flax silk is inserted in layering in space between relief hole and aqueduct, flax silk is made to be filled to
At the height of diversion tube wall inlet opening, prevent the flax silk that relief hole top is inserted from blocking draining hole wall.
After aqueduct insertion relief hole, subsoil water can be discharged from the drain pipe of aqueduct and connection;At this moment, concrete is let out
The Groundwater pressure of pressure in the hole can reduce, then layered tamping flax silk and closure slurry in the empty wall with aqueduct for the relief hole
Body, answers uniform mixing before flax silk and closure slurry filling, after filling in the space between relief hole and aqueduct, is polished with head
Reinforcing bar carries out inserting in fact, often fills out one layer and inserts in fact once, till non-leakage.Generally, 100mm left and right thickness slurry is with regard to energy
Play stagnant water effect.
After the water outlet of basement pressure release in the hole is blocked, subsoil water is all derived in aqueduct, pressure release in the hole no subsoil water
Ooze out.At this moment, pour expansive concrete in sealing in the hole.Before pouring, should bury in the bottom hole edge in sealing hole and expand
Sealing rod or Grouting Pipe, to stitch the secondary sealing defence after the first line of defence as subsoil water by sealing, then pour than former
The higher leveled expansive concrete of underplate concrete label.Make it should be noted that reserving a breach at the valve of aqueduct when pouring
Working place for valve.Treat that the earthing on basement roof is completed by design requirement, and after reaching design strength, you can close
The valve of aqueduct, and remove the drain pipe being connected with valve, finally reserved working place expansive concrete at valve
Pour closely knit, just complete the process construction of whole float Structure to this.
Above content is intended to technological means of the present utility model are described, not limits technical scope of the present utility model.This
Skilled person with reference to existing common knowledge, this utility model is done conspicuously improved, also fall into this utility model protection
Within the scope of.
Claims (8)
1. the emergent float Structure of a kind of basement, it runs through basement backplane level (1) and the relief hole of bed course (2) when including emergent
(4), and insertion pressure release in the hole is used for the aqueduct (6) of diversion, the external drain pipe of aqueduct (8) is it is characterised in that describedly
Lower room backplane level (1) includes a sealing hole (5) being located at relief hole (4) top, and the depth in sealing hole is basement bottom board layer
/ to two/3rd of thickness, its aperture is more than the aperture of described relief hole;Filtering bodies are wrapped up in described aqueduct bottom,
Subsoil water is inserted and turned on to aqueduct bottom and filtering bodies along relief hole, fills in the gap between aqueduct side face and relief hole
Plug (11) forms sealing;Setting valve (7) between described aqueduct and drain pipe, and valve is located at described sealing in the hole not
Expose, be connected for dismountable type between valve and drain pipe (8).
2. basement according to claim 1 meets an urgent need float Structure it is characterised in that described sealing hole (5) and described pressure release
Hole (4) is concentric holes.
3. basement according to claim 1 meets an urgent need float Structure it is characterised in that the aperture of described relief hole (4) is
100~150mm, big more than the 100mm in aperture of the aperture ratio relief hole of described sealing hole (5).
4. basement according to claim 1 meets an urgent need float Structure it is characterised in that described aqueduct (6) is located at described stopping
Pipeline section welding seal ring (601) in water hole (5), the ring diameter 50mm more than less than the aperture of described relief hole (4) of seal ring.
5. basement according to claim 1 meets an urgent need float Structure it is characterised in that described sealing hole (5) bottom hole edge buries
If expansion sealing strip or Grouting Pipe, described in packing ratio in the space between described sealing hole and relief hole (4) and aqueduct (6)
The expansive concrete (12) of lower room backplane level (1) absolute altitude one.
6. basement according to claim 1 meets an urgent need float Structure it is characterised in that described filtering bodies are flax silk group (10),
Or the flax silk group wrapped up for geotextiles (9).
7. basement according to claim 1 meet an urgent need float Structure it is characterised in that described plug (11) be flax silk and
The combination of closure slurry.
8. basement according to claim 1 meets an urgent need float Structure it is characterised in that described aqueduct (6) is located at plug
(11) the pipeline section side face below is provided with inlet opening.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620754294.1U CN205894121U (en) | 2016-07-15 | 2016-07-15 | Emergent anti structure of floating of basement |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620754294.1U CN205894121U (en) | 2016-07-15 | 2016-07-15 | Emergent anti structure of floating of basement |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205894121U true CN205894121U (en) | 2017-01-18 |
Family
ID=57772726
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620754294.1U Expired - Fee Related CN205894121U (en) | 2016-07-15 | 2016-07-15 | Emergent anti structure of floating of basement |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205894121U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106013265A (en) * | 2016-07-15 | 2016-10-12 | 宁波建工工程集团有限公司 | Emergency basement anti-floating structure and construction method thereof |
CN109372033A (en) * | 2018-11-13 | 2019-02-22 | 湖北天利建筑技术有限责任公司 | Water draw-off and its construction method for Underground Building for Anti-floating |
CN111764397A (en) * | 2020-05-28 | 2020-10-13 | 浙江土工岩土科技有限公司 | Underground diaphragm wall plugging device and method |
-
2016
- 2016-07-15 CN CN201620754294.1U patent/CN205894121U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106013265A (en) * | 2016-07-15 | 2016-10-12 | 宁波建工工程集团有限公司 | Emergency basement anti-floating structure and construction method thereof |
CN109372033A (en) * | 2018-11-13 | 2019-02-22 | 湖北天利建筑技术有限责任公司 | Water draw-off and its construction method for Underground Building for Anti-floating |
CN111764397A (en) * | 2020-05-28 | 2020-10-13 | 浙江土工岩土科技有限公司 | Underground diaphragm wall plugging device and method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106013265B (en) | Basement is met an urgent need the construction method of float Structure | |
CN102454167B (en) | The construction method of especially big & deep open caisson | |
CN106320353B (en) | A kind of construction method of basement construction Yield rainfall relation device | |
CN102418347B (en) | Drainage construction method for blind drain and sump wells in deep foundation pit | |
CN105297743B (en) | A kind of ground-connecting-wall defect seepage stops discharge structure and its construction method | |
CN107326918B (en) | Hidden type plugging impervious water collecting well penetrating through raft plates and construction process thereof | |
CN102535441A (en) | Construction method of underground diaphragm wall | |
CN205894121U (en) | Emergent anti structure of floating of basement | |
CN103046565A (en) | Draining method for ultra-deep batholith deep foundation pit | |
CN105926682A (en) | Basement baseplate post-cast strip construction method with pressure bearing water and higher water pressure | |
CN105544622A (en) | Floating resisting device, and seepage insulation device and drainage path checking device thereof for underground building | |
CN207392152U (en) | Concrete face rockfill dam dam body water draining structure | |
CN109723071B (en) | Construction method of double-layer steel drum drainage system built in basement floor post-cast strip | |
CN107100206A (en) | A kind of prevention and controls of basement leakage | |
CN104234089A (en) | Construction method for waterproof and water-draining combination of basement | |
CN104196046B (en) | Reduce the water proof drainage system of underground hydrostatic water table | |
CN113882410A (en) | Deep foundation pit underground water treatment structure and method | |
CN109577337A (en) | The construction method of deep foundation ditch of flowing line | |
CN204023593U (en) | Reduce the water proof drainage system of underground hydrostatic water table | |
CN212001206U (en) | Structure for controlling diving and confined water stop and precipitation | |
CN210086317U (en) | Leachate leakage detection collection structure | |
CN114293578A (en) | Basement drainage and water level monitoring system and construction method thereof | |
KR20010002387A (en) | An underground pressure release well system | |
CN107419739B (en) | A kind of building bottom plate dewatering construction method | |
CN106759364B (en) | Deep basal pit bottom plate step-by-step construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170118 Termination date: 20190715 |
|
CF01 | Termination of patent right due to non-payment of annual fee |