CN205894121U - Emergent anti structure of floating of basement - Google Patents

Emergent anti structure of floating of basement Download PDF

Info

Publication number
CN205894121U
CN205894121U CN201620754294.1U CN201620754294U CN205894121U CN 205894121 U CN205894121 U CN 205894121U CN 201620754294 U CN201620754294 U CN 201620754294U CN 205894121 U CN205894121 U CN 205894121U
Authority
CN
China
Prior art keywords
hole
basement
aqueduct
pressure release
relief hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620754294.1U
Other languages
Chinese (zh)
Inventor
徐建军
李水明
陈俊杰
张谡灵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningbo Jiangong Engineering Group Co Ltd
Original Assignee
Ningbo Jiangong Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningbo Jiangong Engineering Group Co Ltd filed Critical Ningbo Jiangong Engineering Group Co Ltd
Priority to CN201620754294.1U priority Critical patent/CN205894121U/en
Application granted granted Critical
Publication of CN205894121U publication Critical patent/CN205894121U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model relates to a pressure release hole that the anti emergent anti structure of floating of basement who floats of building, it runs through basement bottom plate layer and bed course when emergent is related to to and the leading water pipe that is used for groundwater to pilot a ship into harbour, the external drain pipe of leading water pipe. Basement bottom plate layer includes a stagnant water hole that lies in pressure release hole upper portion, filtering body was wrapped up to the leading water pipe bottom, leading water pipe bottom and cross filtering body and insert and switch on groundwater along the pressure release hole, the leading water pipe global with the pressure release hole between the clearance in pack plug formation and seal up, setting valve between leading water pipe and the drain pipe, and the valve lies in that the stagnant water is downthehole not to be exposed, is detachably connected between valve and the drain pipe. Be used for the groundwater pressure release and recharge the basement increasing load through directly seting up the pressure release hole, treat the water -level recovery after, set up the stagnant water hole, insert the pressure release hole with the leading water pipe and switch on groundwater, after treating that the construction of basement roof earthing is accomplished, fill the stagnant water hole with expansion concrete. The utility model is suitable for a basement is emergent anti to float.

Description

Basement is met an urgent need float Structure
Technical field
This utility model is related to build anti-floating construction field, and a kind of basement especially relating to basement anti-floating is emergent anti- Floating structure.
Background technology
In order to reduce the investment cost of basement structure, at present, design of basement measure of anti float mainly leans on underground ceiling Earthing on plate, and pile foundation arranges anti-group of stake or the way of anti-group of both anchor poles combination is more universal, design typically requires underground Room construction must finish in top plate earth-covering construction and can stop the outer precipitation of foundation ditch.During practice of construction, basement structure exists Outer wall waterproof backfills after finishing already, and a lot of designs do not have the quantity of the outer Yield rainfall relation well of clear and definite foundation ditch yet, therefore most reservation A few Yield rainfall relation well of the post-cast strip termination of lower chamber outer wall as the Yield rainfall relation of foundation ditch, in especially big typhoon, heavy rain climatic environment Under, depend merely on the requirement that these Yield rainfall relation wells much do not reach Yield rainfall relation, it mainly still relies on untight post-cast strip to let out The subsoil water that pressure rises.But in the municipal administration greening incipient stage in later stage, basement post-pouring zone pours already and finishes, these Yield rainfall relation wells Also closed by backfill, if earthing construction is not now had started on basement roof, in this case, as quick in level of ground water on Rise, basement does not reserve relief hole yet, whole basement arises that the danger of floating.Basement is taken to fill in traditional method Water and the provisional preloading of top board are as emergent means, but in case of emergency, this measure was difficult to ensure that on the obvious time, often Occur pouring water or preloading work is also undone, basement begins to be occurred floating, and causes basement heavy damage, economic loss is miserable Weight.In addition, prior art also has in advance in Interior design pressure release discharge structure, that is, by opening up in basement bottom board Relief hole, pressure release in the hole draws drain pipe, thus preventing basement floating-up, but this kind of structure is typically using being arranged on ground In the catch pit of lower room given design, and the limited amount of catch pit, under conventional design catch pit is generally disposed in closely The peripheral position of chamber outer wall, and basement floating-up to destroy maximum be regional location therebetween, therefore its anti-floating pressure release effect is less Preferable.And using pressure release discharge structure of constructing in advance, cost input is larger, the later stage is without emergency in addition it is also necessary to letting out Laminated structure carries out filling up construction, drags slow Construction Schedule.For this reason, there being one kind to be designed quickly can realize ground in emergency situations The technical scheme of lower room anti-floating.
Content of the invention
For overcoming above-mentioned deficiency, the purpose of this utility model is to provide a kind of basement emergent float Structure to this area, Making it solve the construction of existing basement anti-floating emergency measure wastes time and energy, and input cost and the higher technology of later stage processing cost are asked Topic.Its objective is to be achieved through the following technical solutions.
This basement is met an urgent need and is run through the relief hole of basement backplane level and bed course when float Structure includes emergent, and insertion Pressure release in the hole is used for the aqueduct of diversion, the external drain pipe of aqueduct.Its structural feature is that described basement bottom board layer includes One sealing hole being located at relief hole top, the depth in sealing hole be basement bottom board thickness degree 1 to two/3rd/ One, its aperture is more than the aperture of described relief hole;Filtering bodies are wrapped up in described aqueduct bottom, and aqueduct bottom and filtering bodies edge are let out Subsoil water is inserted and turns in pressure hole, and in the gap between aqueduct side face and relief hole, filling plug forms sealing;Described draw Between water pipe and drain pipe, valve is set, and valve does not expose positioned at described sealing in the hole, is detachable between valve and drain pipe Formula connects.Compared with prior art, substantive difference is when running into basement and having floating hidden danger this technical scheme, directly over the ground Lower room opens up relief hole, so that subsoil water quickly pours in down a chimney to underground interior, realizes pressure release and increases basement load double acting, Construction is simple, can eliminate the problem of basement floating-up in the short time.The purpose in above-mentioned sealing hole is to form one sealing Seam, prevents vertical relief hole after subsequent construction closure, and subsoil water directly leaks into underground interior along the hole wall of relief hole. Above-mentioned valve is arranged at sealing in the hole and does not expose, and facilitates follow-up sealing hole plugging construction.
Described sealing hole and described relief hole are by concentric holes so that the sealing seam being formed between sealing hole and relief hole stops Water effect is more reliable.
The aperture of described relief hole is 100~150mm, is hardly damaged basement floor structure it is ensured that constructs is reliable and secure.
The pipeline section that described aqueduct is located at described sealing hole welds seal ring, and the ring diameter of seal ring is than described relief hole Little more than the 50mm in aperture.By seal ring, prevent subsoil water indoor to underground along aqueduct leaktightness of wall of tubes.
When described drain pipe removal, expansion sealing strip or Grouting Pipe, described sealing are buried in described sealing hole bottom hole edge The expansive concrete of basement bottom board floor absolute altitude one described in packing ratio in space between hole and relief hole and aqueduct.Pass through This structure, improves sealing and plugging effect.
Described filtering bodies are flax silk group, or the flax silk group for geotextiles parcel.Rely on geotextiles parcel flax silk group, thus anti- Susceptible to plugging problem during the original soil layer that only flax silk group insertion subsoil water is located.
Described plug is flax silk and the combination of closure slurry.Quick plugging construction is realized by this structure.
The pipeline section side face that described aqueduct is located at below plug is provided with inlet opening.Diversion bank of tubes is conducive to by this structure Water.
This utility model structure is simple, operation, easy construction, and application flexibility is strong.Both can as the phase after construction because Basement Yield rainfall relation well or a kind of reserved not enough supplementary device of relief hole are it is also possible to conduct is situations such as typhoon, extra torrential rain Under, because of the non-earthing of basement roof, and it is used for preventing a kind of emergent means of basement floating-up.Not only avoid traditional meeting an urgent need to do Method wastes time and energy, the big problem of basement floating-up risk, and greatly reduces the cost that the emergent anti-floating of tradition spends, and is suitable as The building float Structure such as basement uses, and is particularly suitable for emergent anti-floating.
Brief description
Fig. 1 is the cross-sectional view that this utility model opens up relief hole.
Fig. 2 is the cross-sectional view that this utility model opens up sealing hole.
Fig. 3 is that this utility model installs aqueduct, the cross-sectional view of drain pipe.
Fig. 4 is that this utility model pours the cross-sectional view expanding the solidifying soil of rolling reserved valve operation space.
Fig. 5 is the cross-sectional view after the completion of this utility model construction.
The figures above sequence number and title: 1, basement bottom board layer, 2, bed course, 3, original soil layer, 4, relief hole, 5, sealing hole, 6th, aqueduct, 601, seal ring, 7, valve, 8, drain pipe, 9, geotextiles, 10, flax silk group, 11, plug, 12, expand coagulation Soil, 13, working place.
Specific embodiment
In conjunction with accompanying drawing, taking anti-floating construction of specifically meeting an urgent need as a example, this utility model is described further.
First, the number of openings calculating relief hole is reasonably distributed according to actual basement, the quantity of relief hole is that basis is let out The area COMPREHENSIVE CALCULATING in the aperture of pressure hole and aqueduct, estimated peak level and basement determines, through measuring and calculating, the coastal south Generally 600 square metres about settings of one layer of basement one.Pressure release hole number calculates after determining, should be in basement bottom board layer table In the face of it is positioned, typically preferably it is arranged on basement pillar diagonal centre position, relief hole should be put down in basement bottom board layer All it is distributed.Can be spudded in after the completion of positioning relief hole, and its order of spudding in symmetrically is carried out to edge direction for basement zone line, A bench drill machine can sequentially carry out, also can multiple stage rig symmetrically carry out simultaneously.Relief hole is after concrete core drilling rig coring Formed, as shown in figure 1, the diameter general control of relief hole is in 100~150mm, its depth will pass through basement bottom board layer And drill through bed course, then carry brill, pressure release in the hole is slowly withdrawn by the concrete cylindrical block of coring, form relief hole.Relief hole After formation, subsoil water will be gushed, and in emergency circumstances this relief hole plays pressure release level of ground water and recharge basement increases The dual function of load.Whne level of ground water be reduced to basement bottom board layer surface equal when, you can opened with concrete core drilling rig Bore sealing hole.The hole heart alignment of the Kong Xinyu relief hole in sealing hole, both are concentric holes, and the diameter in sealing hole typically should compare pressure release Big more than the 100mm in hole, sealing hole drill hole depth be base plate thickness 1 to two/3rd/, its effect is in relief hole Between form one sealing seam, prevent vertical relief hole after closure, subsoil water directly leaks into ground along the hole wall of relief hole Lower interior.
Aqueduct is buried and the time of sealing of hole flexibly can be grasped according to construction period, flood season situation.During sealing of hole as far as possible Avoid flood season and typhoon weather, subsoil water return to basement bottom board layer surface or following blocked when be optimal.Sealing of hole is Constructed by material fit such as aqueduct, drain pipe, expansion sealing strip or Grouting Pipe, flax silk, leak stopping slurry and expansive concretes Become, wherein aqueduct is to be made with rustless steel or copper pipe material, to prevent tube wall from soaking and corrosion, aqueduct for a long time Caliber should be less more than 50mm than relief hole.Aqueduct upper weld seal ring, prevents subsoil water from penetrating into along diversion tube wall In basement bottom board layer surface, tube wall periphery has the inlet opening of 5~8mm in the 50mm scope of bottom, is beneficial to draining.
Before aqueduct is inserted into relief hole, should first be clogged to relief hole bottom hole with the flax silk group of geotextiles parcel, or directly Connect and be wrapped in aqueduct bottom, be inserted into aqueduct, make the flax silk group press-in that geotextiles are wrapped up to original soil layer (level of ground water Put), this flax silk rolls into a ball the drainage layer as aqueduct, prevents clod from blocking the inlet opening of diversion bottom of the tube.Aqueduct tackles pressure release Hole, the hole heart position in sealing hole, and by outside support, aqueduct is fixed temporarily, prevent aqueduct double swerve.Draw Water pipe upper end is tightly connected valve, then connects drain pipe by valve, makes subsoil water be introduced to underground by aqueduct and drain pipe Carry out pump drainage in the gutter of room or sump, be connected by thread seal or snap joint wherein between valve and drain pipe, Thus facilitating drain pipe to dismantle.Next, flax silk is inserted in layering in space between relief hole and aqueduct, flax silk is made to be filled to At the height of diversion tube wall inlet opening, prevent the flax silk that relief hole top is inserted from blocking draining hole wall.
After aqueduct insertion relief hole, subsoil water can be discharged from the drain pipe of aqueduct and connection;At this moment, concrete is let out The Groundwater pressure of pressure in the hole can reduce, then layered tamping flax silk and closure slurry in the empty wall with aqueduct for the relief hole Body, answers uniform mixing before flax silk and closure slurry filling, after filling in the space between relief hole and aqueduct, is polished with head Reinforcing bar carries out inserting in fact, often fills out one layer and inserts in fact once, till non-leakage.Generally, 100mm left and right thickness slurry is with regard to energy Play stagnant water effect.
After the water outlet of basement pressure release in the hole is blocked, subsoil water is all derived in aqueduct, pressure release in the hole no subsoil water Ooze out.At this moment, pour expansive concrete in sealing in the hole.Before pouring, should bury in the bottom hole edge in sealing hole and expand Sealing rod or Grouting Pipe, to stitch the secondary sealing defence after the first line of defence as subsoil water by sealing, then pour than former The higher leveled expansive concrete of underplate concrete label.Make it should be noted that reserving a breach at the valve of aqueduct when pouring Working place for valve.Treat that the earthing on basement roof is completed by design requirement, and after reaching design strength, you can close The valve of aqueduct, and remove the drain pipe being connected with valve, finally reserved working place expansive concrete at valve Pour closely knit, just complete the process construction of whole float Structure to this.
Above content is intended to technological means of the present utility model are described, not limits technical scope of the present utility model.This Skilled person with reference to existing common knowledge, this utility model is done conspicuously improved, also fall into this utility model protection Within the scope of.

Claims (8)

1. the emergent float Structure of a kind of basement, it runs through basement backplane level (1) and the relief hole of bed course (2) when including emergent (4), and insertion pressure release in the hole is used for the aqueduct (6) of diversion, the external drain pipe of aqueduct (8) is it is characterised in that describedly Lower room backplane level (1) includes a sealing hole (5) being located at relief hole (4) top, and the depth in sealing hole is basement bottom board layer / to two/3rd of thickness, its aperture is more than the aperture of described relief hole;Filtering bodies are wrapped up in described aqueduct bottom, Subsoil water is inserted and turned on to aqueduct bottom and filtering bodies along relief hole, fills in the gap between aqueduct side face and relief hole Plug (11) forms sealing;Setting valve (7) between described aqueduct and drain pipe, and valve is located at described sealing in the hole not Expose, be connected for dismountable type between valve and drain pipe (8).
2. basement according to claim 1 meets an urgent need float Structure it is characterised in that described sealing hole (5) and described pressure release Hole (4) is concentric holes.
3. basement according to claim 1 meets an urgent need float Structure it is characterised in that the aperture of described relief hole (4) is 100~150mm, big more than the 100mm in aperture of the aperture ratio relief hole of described sealing hole (5).
4. basement according to claim 1 meets an urgent need float Structure it is characterised in that described aqueduct (6) is located at described stopping Pipeline section welding seal ring (601) in water hole (5), the ring diameter 50mm more than less than the aperture of described relief hole (4) of seal ring.
5. basement according to claim 1 meets an urgent need float Structure it is characterised in that described sealing hole (5) bottom hole edge buries If expansion sealing strip or Grouting Pipe, described in packing ratio in the space between described sealing hole and relief hole (4) and aqueduct (6) The expansive concrete (12) of lower room backplane level (1) absolute altitude one.
6. basement according to claim 1 meets an urgent need float Structure it is characterised in that described filtering bodies are flax silk group (10), Or the flax silk group wrapped up for geotextiles (9).
7. basement according to claim 1 meet an urgent need float Structure it is characterised in that described plug (11) be flax silk and The combination of closure slurry.
8. basement according to claim 1 meets an urgent need float Structure it is characterised in that described aqueduct (6) is located at plug (11) the pipeline section side face below is provided with inlet opening.
CN201620754294.1U 2016-07-15 2016-07-15 Emergent anti structure of floating of basement Expired - Fee Related CN205894121U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620754294.1U CN205894121U (en) 2016-07-15 2016-07-15 Emergent anti structure of floating of basement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620754294.1U CN205894121U (en) 2016-07-15 2016-07-15 Emergent anti structure of floating of basement

Publications (1)

Publication Number Publication Date
CN205894121U true CN205894121U (en) 2017-01-18

Family

ID=57772726

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620754294.1U Expired - Fee Related CN205894121U (en) 2016-07-15 2016-07-15 Emergent anti structure of floating of basement

Country Status (1)

Country Link
CN (1) CN205894121U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106013265A (en) * 2016-07-15 2016-10-12 宁波建工工程集团有限公司 Emergency basement anti-floating structure and construction method thereof
CN109372033A (en) * 2018-11-13 2019-02-22 湖北天利建筑技术有限责任公司 Water draw-off and its construction method for Underground Building for Anti-floating
CN111764397A (en) * 2020-05-28 2020-10-13 浙江土工岩土科技有限公司 Underground diaphragm wall plugging device and method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106013265A (en) * 2016-07-15 2016-10-12 宁波建工工程集团有限公司 Emergency basement anti-floating structure and construction method thereof
CN109372033A (en) * 2018-11-13 2019-02-22 湖北天利建筑技术有限责任公司 Water draw-off and its construction method for Underground Building for Anti-floating
CN111764397A (en) * 2020-05-28 2020-10-13 浙江土工岩土科技有限公司 Underground diaphragm wall plugging device and method

Similar Documents

Publication Publication Date Title
CN106013265B (en) Basement is met an urgent need the construction method of float Structure
CN102454167B (en) The construction method of especially big & deep open caisson
CN106320353B (en) A kind of construction method of basement construction Yield rainfall relation device
CN102418347B (en) Drainage construction method for blind drain and sump wells in deep foundation pit
CN105297743B (en) A kind of ground-connecting-wall defect seepage stops discharge structure and its construction method
CN107326918B (en) Hidden type plugging impervious water collecting well penetrating through raft plates and construction process thereof
CN102535441A (en) Construction method of underground diaphragm wall
CN205894121U (en) Emergent anti structure of floating of basement
CN103046565A (en) Draining method for ultra-deep batholith deep foundation pit
CN105926682A (en) Basement baseplate post-cast strip construction method with pressure bearing water and higher water pressure
CN105544622A (en) Floating resisting device, and seepage insulation device and drainage path checking device thereof for underground building
CN207392152U (en) Concrete face rockfill dam dam body water draining structure
CN109723071B (en) Construction method of double-layer steel drum drainage system built in basement floor post-cast strip
CN107100206A (en) A kind of prevention and controls of basement leakage
CN104234089A (en) Construction method for waterproof and water-draining combination of basement
CN104196046B (en) Reduce the water proof drainage system of underground hydrostatic water table
CN113882410A (en) Deep foundation pit underground water treatment structure and method
CN109577337A (en) The construction method of deep foundation ditch of flowing line
CN204023593U (en) Reduce the water proof drainage system of underground hydrostatic water table
CN212001206U (en) Structure for controlling diving and confined water stop and precipitation
CN210086317U (en) Leachate leakage detection collection structure
CN114293578A (en) Basement drainage and water level monitoring system and construction method thereof
KR20010002387A (en) An underground pressure release well system
CN107419739B (en) A kind of building bottom plate dewatering construction method
CN106759364B (en) Deep basal pit bottom plate step-by-step construction method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170118

Termination date: 20190715

CF01 Termination of patent right due to non-payment of annual fee