CN205876502U - A natural gas heating mechanism for gas and steam combined cycle unit gas turbine - Google Patents

A natural gas heating mechanism for gas and steam combined cycle unit gas turbine Download PDF

Info

Publication number
CN205876502U
CN205876502U CN201620836414.2U CN201620836414U CN205876502U CN 205876502 U CN205876502 U CN 205876502U CN 201620836414 U CN201620836414 U CN 201620836414U CN 205876502 U CN205876502 U CN 205876502U
Authority
CN
China
Prior art keywords
hot water
natural gas
gas
heated
inlet channel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620836414.2U
Other languages
Chinese (zh)
Inventor
姚挺生
康新平
张建营
赖晓华
李洪
胡世光
陈振良
吴公宝
王晓军
方思远
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhuhai Yuhai Electric Power Co Ltd
Original Assignee
Zhuhai Yuhai Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhuhai Yuhai Electric Power Co Ltd filed Critical Zhuhai Yuhai Electric Power Co Ltd
Priority to CN201620836414.2U priority Critical patent/CN205876502U/en
Application granted granted Critical
Publication of CN205876502U publication Critical patent/CN205876502U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Heat-Pump Type And Storage Water Heaters (AREA)

Abstract

The utility model relates to a natural gas heating mechanism for gas and steam combined cycle unit gas turbine lies in utilizing the hot water input joint in the auxiliary boiler steam pocket to heat the natural gas to the performance heater of the leading module of gas turbine in, the performance heater is including the inlet tube and the outlet pipe that communicate each other, natural gas heating mechanism includes hot water input joint interface, hot water output interface and inlet channel, the hot water input joint interface is connected with the auxiliary boiler steam pocket, and the hot water input joint interface passes through inlet channel and hot water output interface connection, the water piping connection that advances of hot water output interface and performance heater, the auxiliary boiler steam pocket passes through hot water input joint interface, inlet channel, hot water output interface, inlet tube and performance heater intercommunication, be provided with stop valve and flow control valve on the inlet channel.

Description

Heated by natural gas mechanism for Combined cycle gas-steam turbine unit gas turbine
Technical field
This utility model relates to generating set field, more particularly, to one for Combined cycle gas-steam turbine unit The heated by natural gas mechanism of gas turbine.
Background technology
At present, the gas turbine of Combined cycle gas-steam turbine unit is on startup, it is desirable to the temperature of input natural gas is the lowest In the threshold value set, when the gas turbine of such as ANSALDO AE94.3A gas combustion-gas vapor combined cycle unit requires igniting Natural gas temperature be not less than 10 DEG C.To this end, weather is colder when, natural gas must be through before input gas turbine Cross heat treated so that the temperature of natural gas meets the requirement of gas turbine.
At present, typically arranging electric heater in the preposition module of gas turbine, the natural gas of input is entering combustion gas wheel It is heated to suitable temperature by electric heater before machine, then inputs gas turbine.But electric heater is specifically used Time easily suffer from the drawback that
1) in the case of protection is malfunctioning, electric heater heating overtemperature can make gas explosion accident;
2) electric heater can lose efficacy, so that periodically tie up electric heater in the case of not using for a long time Protect, produce the problem that maintenance cost rises;
3) potential safety hazard of electric heater is bigger.
Utility model content
This utility model is the difficult problem solving above prior art, it is provided that a kind of for Combined cycle gas-steam turbine unit The heated by natural gas mechanism of gas turbine, this system can be prevented effectively from the situation producing heating overtemperature in use.
For realizing above utility model purpose, the technical scheme is that
A kind of heated by natural gas mechanism for Combined cycle gas-steam turbine unit gas turbine, is to utilize starting trouble Natural gas is heated to the performance heater of the preposition module of gas turbine by the hot water input in drum, and described performance heats Device includes that water inlet pipe and the outlet pipe being interconnected, described heated by natural gas mechanism include that the output of hot water input interface, hot water connects Mouth and inlet channel, described hot water input interface is connected with starting trouble drum, and hot water input interface is by inlet channel and warm Water output interface connects, and hot water output interface is connected with the water inlet pipe of performance heater, and described starting trouble drum passes through hot water Input interface, inlet channel, hot water output interface, water inlet pipe connect with performance heater, described inlet channel is provided with and cuts Only valve and flow control valve.
When needs use heated by natural gas mechanism to heat natural gas, it is first turned on stop valve, now starts pot Hot water in stove drum is inputted to performance heater by hot water input interface, inlet channel, hot water output interface, water inlet pipe In, natural gas is heated by hot water, and the temperature of natural gas exports after being increased to the temperature required in performance heater.At tool In the implementation process of body, by the flow of the hot water that Flow-rate adjustment valve regulation flows into performance heater, the rate of heat addition can be entered Row sum-equal matrix.Hot water in performance heater is by, outside outlet pipe discharging performance heater, being such as expelled to steam turbine condenser Or be exhausted directly in neighbouring flash vessel or drain.After completing the heating of natural gas, close stop valve and flow control valve.
In such scheme, utilizing the hot water in starting trouble drum that natural gas carries out heating has two benefits, and one is nothing Need ancillary cost fund to purchase electric heater, reduce the investment of project;Two is that the temperature of the hot water in starting trouble drum is general Less than 220 DEG C, therefore at most by the heated by natural gas in performance heater to 220 DEG C, the point of this temperature distance natural gas Combustion temperature (270 DEG C 540 DEG C) also has bigger distance, the generation gas explosion caused thus without producing heating overtemperature The situation of accident, its safety is greatly improved.
Preferably, starting trouble drum be performance heater be attached with when connecting, can be at starting trouble drum On offer new outlet, it is also possible to utilize the outlet of existing starting trouble, such as, this scheme can be used: start The blow-off pipe of boiler-steam dome is connected with hot water input interface, and starting trouble drum passes through blow-off pipe, hot water input interface, water inlet pipe Road, hot water output interface, water inlet pipe connect with performance heater.Hot water in starting trouble drum can be exported by blow-off pipe To performance heater, but specifically used when, the cleanliness factor of the hot water that blow-off pipe is initially discharged may be not so good, At this moment should wait a few minutes, wait hot water cleanliness factor situation relatively good time re-use heating arrangements by starting trouble drum with Performance heater connects and connection is got up.
Preferably, described heated by natural gas mechanism also includes water return pipeline, one end of water return pipeline and performance heater Outlet pipe connect, the other end of water return pipeline is connected with the oxygen-eliminating device of starting trouble or water tank, and performance heater passes through backwater Pipeline connects with oxygen-eliminating device or the water tank of starting trouble.Water return pipeline is for arriving the hot water backwater exported through performance heater In starting trouble, form the circulation of a heating, saving water resource effectively.
Preferably, easily there is the situation of buildup in the inside of heating arrangements pipeline after a protracted use, in order to Blowoff valve can be provided with on the inlet channel of the heating arrangements of the present invention and water return pipeline by these dirt discharge lines.
Preferably, described inlet channel is provided with two stop valves and a flow control valve.
Preferably, it is provided with thermometer in described inlet channel.Thermometer is for gathering the temperature data of hot water, for technology Personnel's temperature conditions of electrolyzing hot water.
Preferably, it is provided with effusion meter and Pressure gauge in described inlet channel.Effusion meter and Pressure gauge are respectively used to gather The flow of hot water and hydraulic pressure conditions.Understand for technical staff.
Compared with prior art, the beneficial effects of the utility model are:
1) purchase electric heater without ancillary cost fund, reduce the investment of project.
2) temperature of the hot water in starting trouble drum is usually no more than 220 DEG C, therefore at most by performance heater Heated by natural gas to 220 DEG C, the ignition temperature (270 DEG C 540 DEG C) of this temperature distance natural gas also has bigger distance, because of This situation that gas explosion accident occurs that will not produce heating overtemperature and cause, its safety is greatly improved.
Accompanying drawing explanation
Fig. 1 is the structural representation of heating arrangements.
Detailed description of the invention
Accompanying drawing being merely cited for property explanation, it is impossible to be interpreted as the restriction to this patent;
Below in conjunction with drawings and Examples, this utility model is further elaborated.
Embodiment 1
Marrow of the present utility model is to utilize the hot water in starting trouble drum to input to the preposition module of gas turbine In performance heater 1 heating natural gas, this scheme has two kinds of benefits, and one is to purchase electricity without ancillary cost fund Heater, reduces the investment of project;Two is that the temperature of the hot water in starting trouble drum is usually no more than 220 DEG C, the most at most By the heated by natural gas in performance heater 1 to 220 DEG C, the ignition temperature (270 DEG C 540 DEG C) of this temperature distance natural gas Also have bigger distance, the situation that gas explosion accident occurs caused thus without producing heating overtemperature, its safety It is greatly improved.
As it is shown in figure 1, heated by natural gas mechanism includes hot water input interface, hot water output interface and inlet channel 2, described Hot water input interface is connected with starting trouble drum, and hot water input interface is connected with hot water output interface by inlet channel 2, heat Water output interface is connected with the water inlet pipe of performance heater 1, and described starting trouble drum passes through hot water input interface, inlet channel 2, hot water output interface, water inlet pipe connect with performance heater 1, and described inlet channel 2 is provided with stop valve 3 and Flow-rate adjustment Valve.
When needs use heated by natural gas mechanism to heat natural gas, it is first turned on stop valve 3, now starts pot Hot water in stove drum is inputted to performance heater 1 by hot water input interface, inlet channel 2, hot water output interface, water inlet pipe In, natural gas is heated by hot water, and the temperature of natural gas exports after being increased to the temperature required in performance heater 1.? In concrete implementation process, can be come heating speed by the flow of the hot water that Flow-rate adjustment valve regulation flows into performance heater 1 Rate is adjusted.Hot water in performance heater 1 is by, outside outlet pipe discharging performance heater 1, being such as expelled to steam turbine Condenser or be exhausted directly in neighbouring flash vessel or drain.After completing the heating of natural gas, close stop valve 3 and flow is adjusted Joint valve.
In such scheme, utilizing the hot water in starting trouble drum that natural gas carries out heating has two benefits, and one is nothing Need ancillary cost fund to purchase electric heater, reduce the investment of project;Two is that the temperature of the hot water in starting trouble drum is general Less than 220 DEG C, therefore at most by the heated by natural gas in performance heater 1 to 220 DEG C, the point of this temperature distance natural gas Combustion temperature (270 DEG C 540 DEG C) also has bigger distance, the generation gas explosion caused thus without producing heating overtemperature The situation of accident, its safety is greatly improved.
Wherein, it is provided with thermometer in inlet channel 2.Thermometer is for gathering the temperature data of hot water, for technical staff The temperature conditions of electrolyzing hot water.In concrete implementation process, in inlet channel 2, it is provided with effusion meter and Pressure gauge.Effusion meter It is respectively used to gather flow and the hydraulic pressure conditions of hot water with Pressure gauge.Understand for technical staff.
In the present embodiment, starting trouble drum be performance heater 1 be attached with when connecting, can be at starting trouble Offer new outlet on drum, it is also possible to utilize the outlet of existing starting trouble, such as, this scheme can be used: The blow-off pipe of starting trouble drum is connected with hot water input interface, and starting trouble drum passes through blow-off pipe, hot water input interface, enters Waterpipe 2, hot water output interface, water inlet pipe connect with performance heater 1.Hot water in starting trouble drum can pass through blowdown Pipe exports to performance heater 1, but specifically used when, the cleanliness factor of the hot water that blow-off pipe is initially discharged may Poorly, at this moment should wait a few minutes, the cleanliness factor situation of wait hot water re-uses heating arrangements time relatively good will start pot Stove drum is connected with performance heater 1 and connects.
In the present embodiment, as it is shown in figure 1, heated by natural gas mechanism also includes water return pipeline 4, one end of water return pipeline 4 Being connected with the outlet pipe of performance heater 1, the other end of water return pipeline 4 is connected with the oxygen-eliminating device of starting trouble or water tank, performance Heater 1 is connected with oxygen-eliminating device or the water tank of starting trouble by water return pipeline 4.Water return pipeline 4 will be for heating through performance The hot water backwater of device 1 output, in starting trouble, forms one circulation heated, saving water resource effectively.
In the present embodiment, easily there is the situation of buildup in the inside of heating arrangements pipeline after a protracted use, In order to by these dirt discharge lines, the row of being provided with on the inlet channel 2 of the heating arrangements of the present invention and water return pipeline Dirty valve 5.
Obviously, above-described embodiment of the present utility model is only for clearly demonstrating this utility model example, and It it is not the restriction to embodiment of the present utility model.For those of ordinary skill in the field, in described above On the basis of can also make other changes in different forms.Here without also all of embodiment being given Exhaustive.All any amendment, equivalent and improvement etc. made within spirit of the present utility model and principle, should be included in Within this utility model scope of the claims.

Claims (7)

1., for a heated by natural gas mechanism for Combined cycle gas-steam turbine unit gas turbine, it is to utilize starting trouble vapour Natural gas is heated to the performance heater of the preposition module of gas turbine by the hot water input in bag, described performance heater Including the water inlet pipe being interconnected and outlet pipe, it is characterised in that: described heated by natural gas mechanism includes hot water input interface, heat Water output interface and inlet channel, described hot water input interface is connected with starting trouble drum, and hot water input interface is by water inlet Pipeline is connected with hot water output interface, and hot water output interface is connected with the water inlet pipe of performance heater, described starting trouble drum Connected with performance heater by hot water input interface, inlet channel, hot water output interface, water inlet pipe, on described inlet channel It is provided with stop valve and flow control valve.
Heated by natural gas mechanism for Combined cycle gas-steam turbine unit gas turbine the most according to claim 1, its Being characterised by: the blow-off pipe of described starting trouble drum is connected with hot water input interface, starting trouble drum passes through blow-off pipe, heat Water input interface, inlet channel, hot water output interface, water inlet pipe connect with performance heater.
Heated by natural gas mechanism for Combined cycle gas-steam turbine unit gas turbine the most according to claim 1, its It is characterised by: described heated by natural gas mechanism also includes water return pipeline, one end of water return pipeline and the water outlet of performance heater Pipe connect, the other end of water return pipeline is connected with the oxygen-eliminating device of starting trouble or water tank, performance heater pass through water return pipeline and The oxygen-eliminating device of starting trouble or water tank connection.
Heated by natural gas mechanism for Combined cycle gas-steam turbine unit gas turbine the most according to claim 3, its It is characterised by: on described inlet channel and water return pipeline, be provided with blowoff valve.
Heated by natural gas mechanism for Combined cycle gas-steam turbine unit gas turbine the most according to claim 1, its It is characterised by: on described inlet channel, be provided with two stop valves and a flow control valve.
6. according to the heated by natural gas for Combined cycle gas-steam turbine unit gas turbine described in any one of claim 1 ~ 5 Mechanism, it is characterised in that: it is provided with thermometer in described inlet channel.
Heated by natural gas mechanism for Combined cycle gas-steam turbine unit gas turbine the most according to claim 6, its It is characterised by: in described inlet channel, be provided with effusion meter and Pressure gauge.
CN201620836414.2U 2016-08-04 2016-08-04 A natural gas heating mechanism for gas and steam combined cycle unit gas turbine Expired - Fee Related CN205876502U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620836414.2U CN205876502U (en) 2016-08-04 2016-08-04 A natural gas heating mechanism for gas and steam combined cycle unit gas turbine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620836414.2U CN205876502U (en) 2016-08-04 2016-08-04 A natural gas heating mechanism for gas and steam combined cycle unit gas turbine

Publications (1)

Publication Number Publication Date
CN205876502U true CN205876502U (en) 2017-01-11

Family

ID=57702524

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620836414.2U Expired - Fee Related CN205876502U (en) 2016-08-04 2016-08-04 A natural gas heating mechanism for gas and steam combined cycle unit gas turbine

Country Status (1)

Country Link
CN (1) CN205876502U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107829832A (en) * 2017-11-16 2018-03-23 大连派思燃气***股份有限公司 Circulation bypath system for performance heater
CN110360010A (en) * 2019-07-01 2019-10-22 华电电力科学研究院有限公司 A kind of gas turbine gas inlet heating system and its control method
CN111577460A (en) * 2020-05-09 2020-08-25 广州华跃电力工程设计有限公司 Method for improving efficiency of gas turbine and removing white smoke
CN112197295A (en) * 2020-10-28 2021-01-08 常熟市飞奥压力容器制造有限公司 High-temperature high-pressure performance heater

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107829832A (en) * 2017-11-16 2018-03-23 大连派思燃气***股份有限公司 Circulation bypath system for performance heater
CN110360010A (en) * 2019-07-01 2019-10-22 华电电力科学研究院有限公司 A kind of gas turbine gas inlet heating system and its control method
CN110360010B (en) * 2019-07-01 2024-01-30 华电电力科学研究院有限公司 Gas turbine gas inlet heating system and control method thereof
CN111577460A (en) * 2020-05-09 2020-08-25 广州华跃电力工程设计有限公司 Method for improving efficiency of gas turbine and removing white smoke
CN112197295A (en) * 2020-10-28 2021-01-08 常熟市飞奥压力容器制造有限公司 High-temperature high-pressure performance heater

Similar Documents

Publication Publication Date Title
CN205876502U (en) A natural gas heating mechanism for gas and steam combined cycle unit gas turbine
CN204552846U (en) A kind of back pressure steam turbines utilization system
CN205447710U (en) System for utilize steam turbine bypass steam heating boiler feed water
CN109520001A (en) A kind of heat supply network draining system
CN208504350U (en) It is a kind of to improve low when thermal power plant unit peak regulation plus leaving water temperature device
CN205261524U (en) Marine boiler hot well steam -jet ejector heating system
CN104180530A (en) Pressure-bearing hot-water boiler system
CN205746765U (en) Steam boiler
CN203810975U (en) Waste heat recovery device for heating system
CN204005932U (en) A kind of Novel connection exhaust heat reclamation device
CN205878119U (en) Power plant boiler over heater steam recycling protection system
CN208458053U (en) A kind of thermal power plant unit operating system improving safety
CN102207332A (en) Energy-saving steam water heater
CN201053673Y (en) Steaming boiler constant pressure watering energy-saving device
CN206831468U (en) A kind of residual heat from boiler fume recovery system
CN206958585U (en) A kind of blast furnace blower Lubricating oil heating device
CN205535732U (en) Header tube socket in middle of exhaust -heat boiler's high -pressure over heater
CN206173017U (en) Reduce cyclone film deaerator of vibration
CN205261512U (en) Quick clean steam generator
CN206695099U (en) The pipeline structure of double inverse three backhaul helical-tubing steam generators
CN109945224A (en) Low temperature heat system
CN108826340A (en) A kind of boiler afterheat reclaimer and its recovery method
CN103776007B (en) A kind of multi-cavity type heat-exchange energy-saving heating plant for flashing producing steam
CN205372611U (en) Economizer of thermal power plant
CN202382224U (en) Boiler flue gas waste-heat recovery system

Legal Events

Date Code Title Description
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170111

Termination date: 20190804