CN205857419U - A kind of pouring after settlement supporting construction - Google Patents

A kind of pouring after settlement supporting construction Download PDF

Info

Publication number
CN205857419U
CN205857419U CN201620580600.4U CN201620580600U CN205857419U CN 205857419 U CN205857419 U CN 205857419U CN 201620580600 U CN201620580600 U CN 201620580600U CN 205857419 U CN205857419 U CN 205857419U
Authority
CN
China
Prior art keywords
pouring
support column
settlement
supporting construction
lower floor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620580600.4U
Other languages
Chinese (zh)
Inventor
梅志凯
周红壮
郎新川
李林
汪廷勇
欧阳国云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201620580600.4U priority Critical patent/CN205857419U/en
Application granted granted Critical
Publication of CN205857419U publication Critical patent/CN205857419U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

This utility model provides a kind of pouring after settlement supporting construction, including: support column, it is supported between upper and lower floor, described support column bottom support stays on structural beams in lower slab surfaces, the top of described support column;Fixing muscle, is located at bottom described support column, and is fixed on described lower floor.By being fixed on lower floor with fixing muscle the bottom of support column, the top of support column is stayed on upper floor pouring after settlement incision position, it is to avoid the problem that the structure brought because of pouring after settlement is unstable.This utility model have simultaneously revolving height, be prone to set up, simple in construction and save the advantages such as material.

Description

A kind of pouring after settlement supporting construction
Technical field
This utility model relates to the realm of building construction, particularly relates to a kind of pouring after settlement supporting construction.
Background technology
During concrete construction, the floor between floor because of the character of concrete itself, and may be sent out Raw expansion or contraction so that floor occurs the phenomenon of sedimentation.General in order to prevent floor from settling, can be complete at floor slab construction Defects liability period after one-tenth, arranges pouring after settlement to prevent concrete to be destroyed.The fracture of current most pouring after settlement The support system at place is the form such as integral formwork support, bracing frame separation support, but shuttering supporting easily damages when construction Bad;Bracing frame can use again more metal material, relatively costly, and does not has a kind of form unified and consolidate so that under Portion supports instability.We are badly in need of a kind of saving metal material, but structure is the most firm and can have enough to meet the need the sedimentation of use Late poured band support solves problem above.
Utility model content
In view of the foregoing, it would be desirable to a kind of supporting construction that the port of pouring after settlement is supported.
For achieving the above object, this utility model adopts the technical scheme that:
A kind of pouring after settlement supporting construction, including: support column, it is supported between upper and lower floor, the top of described support column Portion stays on the pouring after settlement incision position of floor;
Fixing muscle, encloses and is located at bottom described support column, and be fixed on described lower floor.
The beneficial effects of the utility model are, by the bottom of support column is fixed on lower floor with fixing muscle, and will The top of support column stays on floor pouring after settlement incision position, it is to avoid unstable the asking of structure brought because of pouring after settlement Topic;This utility model have simultaneously revolving height, be prone to set up, simple in construction and save the advantages such as material.
Further improvement is that of this utility model pouring after settlement supporting construction, described support column top stays on described The structural beams of pouring after settlement incision position, and and described structural beams between be provided with reinforcing wedge.
Further improvement is that of this utility model pouring after settlement supporting construction, described reinforcing wedge is metal reinforced wedge, The wedge surface of described metal reinforced wedge is inserted between described support column and described structural beams.
Further improvement is that of this utility model pouring after settlement supporting construction, is provided with described bottom described structural beams Reinforce the locating part that wedge fixes.
Further improvement is that of this utility model pouring after settlement supporting construction, described locating part is bolt or cement Nail.
Further improvement is that of this utility model pouring after settlement supporting construction, described support column is long steel pipe.
Further improvement is that of this utility model pouring after settlement supporting construction, described support column includes: multiple head and the tail The steel pipe being connected, adjacent two described steel pipes are connected by connector.
Further improvement is that of this utility model pouring after settlement supporting construction, described connector is for connecting sleeve pipe, institute State adapter sleeve pipe box and be located at the junction of adjacent described steel pipe, and be fixedly connected on adjacent described steel pipe.
Further improvement is that of this utility model pouring after settlement supporting construction, described fixing muscle is by the way of bar planting Being fixed on described lower floor, described fixing muscle is welded in the outer wall of described support column.
Further improvement is that of this utility model pouring after settlement supporting construction, described fixing muscle is inserted in described going downstairs The reinforcing mortar of reinforcement effect is poured at plate.
Accompanying drawing explanation
Fig. 1 is a kind of structural representation of this utility model pouring after settlement supporting construction.
Fig. 2 is enlarged drawing at the A of this utility model a kind of structure of pouring after settlement supporting construction.
Fig. 3 is enlarged drawing at the B of this utility model a kind of structure of pouring after settlement supporting construction.
Fig. 4 is the another kind of structural representation of this utility model pouring after settlement supporting construction.
Detailed description of the invention
The for the benefit of understanding to structure of the present utility model, illustrates below in conjunction with accompanying drawing and preferred embodiment.
Refer to Fig. 1, Fig. 1 and show a kind of structural representation of this utility model pouring after settlement supporting construction.This reality A kind of pouring after settlement supporting construction is provided with novel, including: support column 3, it is supported between upper and lower floor, described support column The top of 3 stays on pouring after settlement 1 fracture of floor;
Fixing muscle 5, encloses and is located at bottom described support column 3, and be fixed on described lower floor 2.
This utility model is intended to floor because of the support of the incision position 1 of pouring after settlement, strengthens the knot before floor completion Structure intensity.To the support between upper floor and lower floor 2, typically all act in structural beams, i.e. this utility model includes one It is supported in the support column 3 between the structural beams 11 of pouring after settlement incision position 1 and lower floor 2.
As it is shown in figure 1, support column 3 is as wire support member, on the one hand there is certain structural strength;The opposing party Face, enough light, it is simple to workmen sets up.Preferably, support column 3 is a long steel pipe.
Refer to Fig. 4, Fig. 4 and showing is the another kind of structural representation of this utility model pouring after settlement supporting construction, Being long steel pipe for support column, its structure can also be for the structure shown in Fig. 4:
Support column 3a includes multiple end to end steel pipe, is connected by connector 7 between adjacent steel pipe, connector 7 For connecting sleeve pipe, adapter sleeve pipe box is located at the junction of adjacent described steel pipe, and is fixedly connected on adjacent described steel pipe, preferably Ground, this connection sleeve pipe is a metal tube.
In the present embodiment, connector 7 is preferred embodiment for connecting sleeve pipe, and its connector 7 can also be reinforcing bar, this steel Muscle one end is welded in the bottom outer wall of steel pipe, and the other end is welded in the top outer wall of adjacent steel pipe, thus play adjacent steel pipe it Between connect effect (diagram).
When support column complete needs holded up time, workmen water after settling the structural beams 11 of band incision position 1 with In limited distance between lower floor 2, support column is carried and holds up, if support column and structural beams 11 and lower floor Distance between 2 is identical, can not be holded up from the point of view of mathematical angle (fixing muscle 5 is arranged at bottom).So support column need to be shorter than This distance, the top of support column and structural beams 11 between there is gap, it is impossible to play the effect of support.In order to solve above-mentioned asking Topic, is provided with reinforcing wedge 6 between support column top and structural beams 11.Preferably, reinforcing wedge 6 is metal reinforced wedge, and this metal adds Gu the wedge surface of wedge be inserted in support column 3 and structural beams 11 between, fill up gap therebetween.
Refer to Fig. 2, Fig. 2 and show enlarged drawing at the A of this utility model a kind of structure of pouring after settlement supporting construction, with As a example by support column is long steel pipe, owing to construction has the running of heavy-duty machines, floor usually can resonate so that reinforces Wedge 6 easily drops, in order to make up this defect, when reinforcing wedge 6 and being inserted between support column 3 and structural beams 11, in structural beams Reclining on 11 to reinforce and be provided with locating part 8 at wedge 6, this locating part 8 is fixed on structural beams 11 and abuts against reinforcing wedge 6.Preferably, limit Position part 8 is bolt or cement nail.
Refer to Fig. 2, Fig. 2 and show enlarged drawing at the B of this utility model a kind of structure of pouring after settlement supporting construction, knot Closing Fig. 1 and Fig. 2 to understand, the bottom of support column 3 is fixed on lower floor 2 by enclosing the fixing muscle 5 being located at described support column 3, should Fixing muscle 5 have be inserted in that described lower floor is fixed plug end, it is preferable that support column 3 end, is fixed in fixing muscle 5 one end Portion's outer wall, the other end plug by the way of bar planting be fixed on lower floor 2 (first can carry out punching plugging by external force equipment, This is prior art, does not do unnecessary description).In order to that reinforces between fixing muscle 5 with lower floor 2 further fixing is connected and right Fixing muscle 5 is protected, it is preferable that be inserted in the reinforcing mortar 4 pouring reinforcement effect at lower floor 2 at fixing muscle 5 so that What this reinforcing mortar 4 buried the seam between support column 3 and lower floor 2 and fixing muscle 5 and lower floor 2 plugs place.
Needing to indicate, the number of this bar planting 5 should determine according to practical situation, not as structure of the present utility model Limit.
Being as a example by a long steel pipe by support column, the operation that is embodied as of this utility model pouring after settlement supporting construction is:
First, by long steel pipe transporting to described support;Then, bottom welding the planting as fixing muscle of long steel pipe Muscle, adjusts long steel pipe position, is holded up by long steel pipe, and inserted by the way of bar planting by fixing muscle in lower floor (can be by outward Power equipment first punches and is inserted into) fixing;Finally, between the top and structural beams of long steel pipe, plug reinforcing wedge, and with bolt or Person's cement nail is spacing firmly reinforces wedge, is poured by reinforcing mortar and buries bar planting and lower floor underground and plug surface and long steel pipe and lower floor Seam.
After taking above technical scheme, obtain following beneficial effect:
By the bottom of support column is fixed on lower floor with fixing muscle, the top of support column is stayed on upper floor and sinks Fall post-cast strip incision position, it is to avoid the problem that the structure brought because of pouring after settlement is unstable.This utility model has turnover simultaneously Property high, be prone to set up, simple in construction and save the advantages such as material.
Being described in detail this utility model above in association with accompanying drawing embodiment, those skilled in the art can root According to described above, this utility model made multiple change.Thus, before not violating claim objective of the present utility model Putting, some details in embodiment should not constitute restriction of the present utility model, and this utility model will be with claims The scope that book defines is as protection domain.

Claims (10)

1. a pouring after settlement supporting construction, it is characterised in that including:
Support column, is supported between upper and lower floor, and the top of described support column stays on the pouring after settlement incision position of floor;
Fixing muscle, encloses and is located at bottom described support column, and be fixed on described lower floor.
Pouring after settlement supporting construction the most according to claim 1, it is characterised in that: described support column top stays on institute State the structural beams of pouring after settlement incision position, and and described structural beams between be provided with reinforcing wedge.
Pouring after settlement supporting construction the most according to claim 2, it is characterised in that: described reinforcing wedge is metal reinforced Wedge, the wedge surface of described metal reinforced wedge is inserted between described support column and described structural beams.
Pouring after settlement supporting construction the most according to claim 3, it is characterised in that: it is provided with institute bottom described structural beams State and reinforce the locating part that wedge fixes.
Pouring after settlement supporting construction the most according to claim 4, it is characterised in that: described locating part is bolt or water Mud is followed closely.
Pouring after settlement supporting construction the most according to claim 1, it is characterised in that: described support column is long steel pipe.
Pouring after settlement supporting construction the most according to claim 1, it is characterised in that: described support column includes: multiple head The steel pipe that tail is connected, adjacent two described steel pipes are connected by connector.
Pouring after settlement supporting construction the most according to claim 7, it is characterised in that: described connector is connection sleeve pipe, Described adapter sleeve pipe box is located at the junction of adjacent described steel pipe, and is fixedly connected on adjacent described steel pipe.
Pouring after settlement supporting construction the most according to claim 1, it is characterised in that: the described fixing muscle side by bar planting Formula is fixed on described lower floor, and described fixing muscle is welded in the outer wall of described support column.
Pouring after settlement supporting construction the most according to claim 1, it is characterised in that: described fixing muscle is inserted in described The reinforcing mortar of reinforcement effect is poured at lower floor.
CN201620580600.4U 2016-06-15 2016-06-15 A kind of pouring after settlement supporting construction Expired - Fee Related CN205857419U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620580600.4U CN205857419U (en) 2016-06-15 2016-06-15 A kind of pouring after settlement supporting construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620580600.4U CN205857419U (en) 2016-06-15 2016-06-15 A kind of pouring after settlement supporting construction

Publications (1)

Publication Number Publication Date
CN205857419U true CN205857419U (en) 2017-01-04

Family

ID=57639009

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620580600.4U Expired - Fee Related CN205857419U (en) 2016-06-15 2016-06-15 A kind of pouring after settlement supporting construction

Country Status (1)

Country Link
CN (1) CN205857419U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111910785A (en) * 2020-08-06 2020-11-10 北京建工集团有限责任公司 Ground anti-seismic deformation joint structure and construction method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111910785A (en) * 2020-08-06 2020-11-10 北京建工集团有限责任公司 Ground anti-seismic deformation joint structure and construction method thereof
CN111910785B (en) * 2020-08-06 2022-04-19 北京建工集团有限责任公司 Ground anti-seismic deformation joint structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN105888236B (en) frame template system
CN104453224A (en) Formwork support structure of basement exterior wall and construction method of formwork support structure
CN103088842A (en) Rubble retaining wall reinforced single-face pattern plate support system and construction method
CN102926504A (en) Connecting steel construction member for steel and concrete overlapped beam combined part and construction method thereof
CN106592996B (en) The construction method that small ocean housing reform is made
CN208701698U (en) A kind of foundation pit recoverable concrete support
CN205857419U (en) A kind of pouring after settlement supporting construction
CN214245749U (en) Support replacing structure for deep and shallow foundation pit construction
CN104372923B (en) Scaffolding
CN106088379A (en) A kind of BRB locking detrusion nodal point connecting and installation method thereof
CN212129218U (en) Basement outer wall single face formwork system
CN102433894B (en) Construction method for station side wall by covered top-down excavation method
CN205024719U (en) Pile foundation and integrated reverse construction vertical braces system of underground continuous wall
CN104060616A (en) Construction template used in retaining engineering and construction method thereof
CN203285056U (en) Stair formwork supporting base
CN107299596A (en) Support beam template system and its construction method under concrete support trestle plate
CN108951643A (en) The big region support replacement construction method of Super High deep basal pit basement Core Walls Structure large span
CN205776259U (en) A kind of deep basal pit retaining wall one side formwork constructing device
CN206189389U (en) Underground continuous wall structure for reverse construction method
CN205875202U (en) Cast -in -place frame tunnel formwork system of high water content ultra -soft soil box multi -chambered
CN212507061U (en) Structure column of early and late construction structure
CN204940845U (en) A kind of with the formwork reinforcement system of steel generation wood
CN107460879A (en) A kind of fixed structure of flare template
CN210712865U (en) Local inner support system of deep foundation pit
CN104074126B (en) A kind of steel reinforced concrete composite beam plate structure of small-sized bridges and culverts

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170104