CN205840190U - A kind of pin key connects the mounting structure of prefabricated bench - Google Patents
A kind of pin key connects the mounting structure of prefabricated bench Download PDFInfo
- Publication number
- CN205840190U CN205840190U CN201620840168.8U CN201620840168U CN205840190U CN 205840190 U CN205840190 U CN 205840190U CN 201620840168 U CN201620840168 U CN 201620840168U CN 205840190 U CN205840190 U CN 205840190U
- Authority
- CN
- China
- Prior art keywords
- bench
- pin key
- ladder beam
- shaft hole
- pin
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Ladders (AREA)
Abstract
The utility model proposes a kind of pin key and connect the mounting structure of prefabricated bench, its composition includes: bench body, pin shaft hole, suspension hook, landing slab, ladder beam, described bench body is arranged between upper and lower two terraced beams, the step of described bench body is provided with hole for hoist, it is provided with suspension hook described in a group at described this body side surface of bench, the step of described bench body rear and front end respectively has pin shaft hole described in a group;Described ladder beam is L-type, is built-in with pin key at described ladder beam, and described pin shaft hole is enclosed within described pin key, and described ladder beam is fixed with described bench body by the vertical direction at described pin key by reinforcement, pours CGM grouting material in described pin shaft hole.It provides the benefit that: this utility model node connects reasonable stress, and operation is simple, and prefabricated bench uses pin key to be connected with cast-in-place ladder beam, CGM grouting material joint filling, belongs to and flexibly connects category, connects ductility of joint high, and construction technology is simple, and quality is easily controllable.
Description
Technical field
This utility model relates to bench installing area, particularly relates to a kind of pin key and connects the mounting structure of prefabricated bench.
Background technology
Currently, the commonly used cast-in-place mode of stair bench in architectural engineering, formwork erection is complicated, by outside environmental elements shadow
Ringing big, concrete appearance Forming Quality is difficult to ensure that, needs the long period to carry out maintenance, cannot function as transport logical before form removal
Road, this have impact on the duration to a certain extent.
Batch production or in-situ precast stair bench, production efficiency is high, and low cost, component quality is easily controllable, building waste
Discharge is few.But prefabricated bench and cast-in-place structural connected mode and the lifting of prefabricated bench, construction technique, be that needs are urgently to be resolved hurrily
Problem.
Utility model content
This utility model, for solving problems of the prior art, proposes a kind of pin key and connects the installation knot of prefabricated bench
Structure.
The technical solution of the utility model is achieved in that
A kind of pin key connects the mounting structure of prefabricated bench, and its composition includes: bench body, pin shaft hole, suspension hook, platform
Plate, ladder beam, described bench body is arranged between upper and lower two terraced beams, is provided with hole for hoist on the step of described bench body,
It is provided with suspension hook described in a group at described this body side surface of bench, the step of described bench body rear and front end respectively has described in one group
Pin shaft hole;Described ladder beam is L-type, is built-in with pin key at described ladder beam, and described pin shaft hole is enclosed within described pin key, at described pin key
Vertical direction by reinforcement by described ladder beam fix with described bench body, described pin shaft hole pours CGM grouting material.
The opening of described hole for hoist is positioned at the step both sides of described bench body, and described suspension hook is located at this side of described bench
The two ends in face.
Described pin key is L-shaped, and in described pin key lower end embedment described ladder beam, described pin key upper end is inserted into described pin shaft hole
In.
Gap between described bench body and ladder beam is filled with foamed glue.
The beneficial effects of the utility model are: this utility model simple in construction, and node connects reasonable stress, and operation is simple,
Prefabricated bench uses pin key to be connected with cast-in-place ladder beam, CGM grouting material joint filling, belongs to and flexibly connects category, connects ductility of joint high, execute
Work technique is simple, and quality is easily controllable.
Accompanying drawing explanation
In order to be illustrated more clearly that this utility model embodiment or technical scheme of the prior art, below will be to embodiment
Or the required accompanying drawing used is briefly described in description of the prior art, it should be apparent that, the accompanying drawing in describing below is only
It is embodiments more of the present utility model, for those of ordinary skill in the art, in the premise not paying creative work
Under, it is also possible to other accompanying drawing is obtained according to these accompanying drawings.
Fig. 1 is bench mounting structure schematic diagram of the present utility model;
Fig. 2 is the structural representation of the bench of the present invention;
Fig. 3 is the structural representation that the bench of the present invention leaves pedestal under order;
Fig. 4 is the structural representation that the bench level of the present invention stacks;
Fig. 5 is the structural representation of the floor occasional passage of the present invention;
Fig. 6 is the structural representation that the pin key of the present invention is pre-buried;
Fig. 7 is the structural representation of the terraced top surface of the beam mortar levelling of the present invention;
Fig. 8 is the structural representation of the bench lifting of the present invention;
Fig. 9 is that the bench of the present invention is installed and the structural representation of ladder beam;
Figure 10 is the fine setting of the bench of the present invention, interim fixing structural representation;
Figure 11 is the structural representation of the filling of the CGM grouting material of the present invention;
Figure 12 is the structural representation of the bench lifting repetitive process of the present invention;
Figure 13 is the structural representation of the lifting shoulder pole of the present invention;
Figure 14 is the partial enlarged drawing of label 17 of the present invention;
Figure 15 is the partial enlarged drawing of label 18 of the present invention.
Detailed description of the invention
Below in conjunction with the accompanying drawing in this utility model embodiment, the technical scheme in this utility model embodiment is carried out
Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of this utility model rather than whole
Embodiment.Based on the embodiment in this utility model, those of ordinary skill in the art are not under paying creative work premise
The every other embodiment obtained, broadly falls into the scope of this utility model protection.
A kind of pin key connects the mounting structure of prefabricated bench, and its composition includes: bench 5, pin shaft hole 1, suspension hook 4, landing slab
9, ladder beam 3, described bench 5 is arranged between upper and lower two terraced beams 3, is provided with hole for hoist 2, in institute on the step of described bench 5
State bench 5 side and be provided with suspension hook 4 described in a group, the step of described bench 5 rear and front end respectively has pin shaft hole 1 described in a group;
Described ladder beam 3 is L-type, is built-in with pin key 16 at described ladder beam 3, and described pin shaft hole 1 is enclosed within described pin key 16, at described pin key
Described ladder beam 3 is fixed with described bench 5 by the vertical direction of 16 by reinforcement 23, pours CGM grouting in described pin shaft hole 1
Material 21.
The opening of described hole for hoist 2 is positioned at the step both sides of described bench 5, and described suspension hook 4 is located at described bench 5 side
Two ends.
Described pin key 16 is L-shaped, and in described pin key 16 lower end embedment described ladder beam 3, described pin key 16 upper end is inserted into institute
State in pin shaft hole 1.
Gap between described bench 5 and ladder beam 3 is filled with foamed glue 20.
Construction of the present utility model comprises the steps:
A. bench 5 keeps flat after hanging pedestal, utilizes hole for hoist 2, leaves bench 5 under order processing pedestal, lies against the I lumps of wood 7
With template 8 composition table top on;If there being multiple bench 5, stacking, between levels bench 5, using the I lumps of wood 7 to isolate, folded
Put the number of plies less than 3 layers;
B. set up floor occasional passage, immediately below bench 5, floor beam 12 utilizes fastener type steel pipe scaffold to take
If occasional passage, lay the II lumps of wood 10 and template 8 above passage, template 8 follows closely one tread plate 11 every 300;
C. pin key beam pre-buried, terraced is cast-in-place, pre-buried pin key 16, casting platform plate 9 and ladder beam concrete, controls ladder top surface of the beam 13
Concrete flatness is in the range of ± 5mm;
D. ladder top surface of the beam 13 mortar levelling, ladder top surface of the beam 13 uses mortar levelling, strength classes of mortar to be not lower than bench
Strength grade of concrete;
E. bench 5 lifting being held on ladder beam 3, the shear wall formwork of ladder beam 3 side form and stair both sides is removed and cleaning
Totally, then the hole for hoist 2 using lifting shoulder pole 22 to be connected in bench lifts by crane, and ensures the vertical stress of suspension centre as far as possible, and bench 5 is put
Putting on ladder beam, absolute altitude error control is within ± 5mm;
F. bench is finely tuned, is fixed temporarily, uses timber wedge 19 to be finely adjusted bench 5 position, elevation, it is ensured that the standard of location
Really property, then utilizes two reinforcements 23 bench to be fixed with ladder beam 3;
G. CGM grouting material is filled, and uses CGM grouter to pour into CGM grouting material 21, bench 5 and ladder beam 3 in pin shaft hole 1
Between space use foamed glue 20 to fill, be in the milk, filling should be closely knit;
H. CGM grouting material is carried out water seasoning at least 7 days, when water seasoning, it is ensured that CGM grouting material has enough
Moisture state.
In process step (e), must assure that chain sling with Gravity Centre of Product in vertical state during lifting, lifting speed should uniformly delay
Slowly, during lifting bench, use steel wire to be connected on tower crane by lifting shoulder pole.
In process step (e), lifting shoulder pole 22 uses 6,25 meters of 14,2 3.8 meters long steel wire ropes of 14 meters long 16# channel-section steel
Long steel wire rope, 8 shackles, 4 set lifting bolts 15 are made.
The foregoing is only preferred embodiment of the present utility model, not in order to limit this utility model, all at this
Within the spirit of utility model and principle, any modification, equivalent substitution and improvement etc. made, should be included in this utility model
Protection domain within.
Claims (4)
1. pin key connects a mounting structure for prefabricated bench, and its composition includes: bench body, pin shaft hole, suspension hook, landing slab,
Ladder beam, described bench body is arranged between upper and lower two terraced beams, it is characterised in that: it is provided with on the step of described bench body
Hole for hoist, is provided with suspension hook described in a group at described this body side surface of bench, the step of described bench body rear and front end respectively has
Pin shaft hole described in one group;Described ladder beam is L-type, is built-in with pin key at described ladder beam, and described pin shaft hole is enclosed within described pin key,
Described ladder beam is fixed with described bench body by the vertical direction of described pin key by reinforcement, pours in described pin shaft hole
CGM grouting material.
Pin key the most according to claim 1 connects the mounting structure of prefabricated bench, it is characterised in that: opening of described hole for hoist
Mouth is positioned at the step both sides of described bench body, and described suspension hook is located at the two ends of described this body side surface of bench.
Pin key the most according to claim 1 connects the mounting structure of prefabricated bench, it is characterised in that: described pin key is L-shaped,
In described pin key lower end embedment described ladder beam, described pin key upper end is inserted in described pin shaft hole.
Pin key the most according to claim 1 connects the mounting structure of prefabricated bench, it is characterised in that: at described bench body
And the gap between ladder beam is filled with foamed glue.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620840168.8U CN205840190U (en) | 2016-08-05 | 2016-08-05 | A kind of pin key connects the mounting structure of prefabricated bench |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620840168.8U CN205840190U (en) | 2016-08-05 | 2016-08-05 | A kind of pin key connects the mounting structure of prefabricated bench |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205840190U true CN205840190U (en) | 2016-12-28 |
Family
ID=57617531
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620840168.8U Active CN205840190U (en) | 2016-08-05 | 2016-08-05 | A kind of pin key connects the mounting structure of prefabricated bench |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205840190U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106088493A (en) * | 2016-08-05 | 2016-11-09 | 中国建筑第七工程局有限公司 | A kind of pin key connects mounting structure and the construction thereof of prefabricated bench |
CN109914717A (en) * | 2019-04-01 | 2019-06-21 | 成都建工第二建筑工程有限公司 | Prefabricated sliding stair and its construction method |
-
2016
- 2016-08-05 CN CN201620840168.8U patent/CN205840190U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106088493A (en) * | 2016-08-05 | 2016-11-09 | 中国建筑第七工程局有限公司 | A kind of pin key connects mounting structure and the construction thereof of prefabricated bench |
CN109914717A (en) * | 2019-04-01 | 2019-06-21 | 成都建工第二建筑工程有限公司 | Prefabricated sliding stair and its construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106088493A (en) | A kind of pin key connects mounting structure and the construction thereof of prefabricated bench | |
CN103898831B (en) | Prefabricated assembled arch rib of ultrahigh-performance concrete and manufacturing and mounting method thereof | |
CN104790675B (en) | Reinforced concrete block masonry structure assemblage construction method | |
CN108130837A (en) | A kind of prefabricated road plate and its construction method | |
CN207160585U (en) | Superelevation outer wall of basement Bailey bracket single side formwork architecture | |
CN104947846B (en) | A kind of prefabricated integral frame light filling lining and preparation method thereof | |
CN205840190U (en) | A kind of pin key connects the mounting structure of prefabricated bench | |
CN114059782A (en) | Construction method of prefabricated slab | |
CN206352388U (en) | A kind of special scaffold of dual operation platform elevator | |
CN206110635U (en) | Automatic convertible integrally lift up elevator shaft operating platform of landing leg | |
CN110924568A (en) | Method for constructing stair partition wall by adopting precast concrete hollow wall board | |
CN104675112A (en) | Steel stair formwork and constructing method for once pouring forming of building staircase | |
CN105347142B (en) | A kind of building hoist is mounted on the threading installation method on basement roof | |
CN109869153A (en) | The whole of rapid construction vertical shaft lining cutting promotes cantilever form device and construction method | |
CN105370027B (en) | The construction method of steel supporting platform structure is integrally lifted in high-rise hanging structure | |
CN107152112A (en) | A kind of modularization Prefabricated stacking floor and its construction method for being used to drop plate region | |
CN208533894U (en) | A kind of lightweight precast concrete stair | |
CN106801384A (en) | Assembled steel reinforced concrete aliform type culvert opening and construction method | |
CN209260578U (en) | Longitudinal temporary connecting structure of suspension bridge concrete stiffening girder installation | |
CN208363666U (en) | It is a kind of for build face side construction safety protection frame | |
CN110230414A (en) | A kind of assembled platform canopy and its installation method | |
CN106193621A (en) | Fabricated construction superimposed sheet string hangs construction method | |
CN204626965U (en) | For the steel stair template of poured up at a time between architectural stair | |
CN206070598U (en) | A kind of poured band of outer wall of basement outboard template and its fixed structure | |
CN115126254A (en) | Construction method of assembled composite floor slab support |