CN206352388U - A kind of special scaffold of dual operation platform elevator - Google Patents

A kind of special scaffold of dual operation platform elevator Download PDF

Info

Publication number
CN206352388U
CN206352388U CN201621452971.0U CN201621452971U CN206352388U CN 206352388 U CN206352388 U CN 206352388U CN 201621452971 U CN201621452971 U CN 201621452971U CN 206352388 U CN206352388 U CN 206352388U
Authority
CN
China
Prior art keywords
platform
mat
bar
lower floor
upper strata
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621452971.0U
Other languages
Chinese (zh)
Inventor
陈如华
陈金鑫
韩旭
李卫进
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU HONGSHENG CONSTRUCTION ENGINEERING GROUP Co Ltd
Original Assignee
JIANGSU HONGSHENG CONSTRUCTION ENGINEERING GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU HONGSHENG CONSTRUCTION ENGINEERING GROUP Co Ltd filed Critical JIANGSU HONGSHENG CONSTRUCTION ENGINEERING GROUP Co Ltd
Priority to CN201621452971.0U priority Critical patent/CN206352388U/en
Application granted granted Critical
Publication of CN206352388U publication Critical patent/CN206352388U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Movable Scaffolding (AREA)

Abstract

A kind of special scaffold of dual operation platform elevator, is related to architectural engineering elevator shaft structure construction scaffolding, including upper strata operating platform, lower level operations platform, connection ladder, four vertical reinforcements and two suspension rods;Upper strata operating platform includes top mat, and in the online hinged closures of top bars, bamboo slab rubber is connected in the top of top mat;Lower level operations platform includes lower floor's bar-mat reinforcement, and slidingtype scaffold board is set in the top of lower floor's bar-mat reinforcement;Connection ladder is connected between upper strata operating platform and lower level operations platform;The upper end of four vertical reinforcements is welded on four angles of top mat, and lower end is welded on four angles of lower floor's bar-mat reinforcement;Two pairs of annulus are welded on the net in top bars, and suspension rod is set in annulus.The utility model can carry out installing for upper former and is used with dismounting, and the metope that can have been constructed by lower floor's platform is repaired, and set opening for the horizontal safety net in elevator to set by lower floor's platform, safe and reliable, economic, practical.

Description

A kind of special scaffold of dual operation platform elevator
Technical field
The utility model is related to architectural engineering elevator shaft structure construction scaffolding, mainly solves in main structure construction, Elevator inner template is installed, with being carried out in frame, elevator, horizontal safety net closing is used, elevator inner wall surface is repaired for dismounting It is used.
Background technology
At present in skyscraper, frame-shear-wall structure, framework core wall structure occupy higher proportion.These buildings One common feature of thing is elevator using reinforced concrete shear wall structure come the horizontal shear of resisting structure, is met simultaneously The need for the installation of building elevator is fixed.But in elevator shaft structure work progress, because from basement to roof, it is middle not every Layer, elevator is a big passage, is required to use scaffold when its internal formwork erection, dismounting, for skyscraper, Traditional scaffold is to take top layer always from basement, and it is more that scaffold material requested is set up in inside, and because there is wall on its periphery Closing, the quality of scaffold is not easy to check, is difficult to ensure that safely.Therefore scaffold for elevator shaft is pacified into during civil engineering The emphasis worked entirely.
The content of the invention
In order to which the drawbacks of scaffold, the utility model provides a kind of dual operation platform electricity needed for overcoming current construction of lift well The special scaffold of stair shaft, one is that can carry out installing for upper former to be used with dismounting, and two can be by lower floor's platform progress Metope of having constructed is repaired, and three be to set the opening for horizontal safety net in elevator to set by lower floor's platform, safe and reliable, Economic, practical, material-saving, saving of labor.
What the purpose of this utility model was realized in:A kind of special scaffold of dual operation platform elevator, including upper strata Operating platform, lower level operations platform, connection ladder, four vertical reinforcements and two suspension rods;The upper strata operating platform includes upper strata Bar-mat reinforcement, sets in the middle of top mat and imports and exports, in the online hinged closures of top bars, cover plate is covered in import and export Place, bamboo slab rubber is connected in the top of top mat;The lower level operations platform includes lower floor's bar-mat reinforcement, in lower floor's bar-mat reinforcement Top sets slidingtype scaffold board;The connection ladder is connected between upper strata operating platform and lower level operations platform, and is connected The upper end of ladder is arranged on the import and export of top mat;The upper end of four vertical reinforcements is welded on four angles of top mat On, the lower end of four vertical reinforcements is welded on four angles of lower floor's bar-mat reinforcement;Two pairs of circles are welded on the net in the top bars Ring, wherein a suspension rod is set in a pair of annulus, another suspension rod is set in another pair annulus.
The utility model is designed more than, and 1, upper strata operating platform, formed by Φ 20 reinforcement welding, in addition to skeleton, Inside carries out arrangement welding by the mm of spacing 300, and middle correct position stays a hole(Import and export)It is easy to personnel flat into lower level operations Platform.Laid and be fixed with bamboo slab rubber on framework of steel reinforcement, box out position sets openable removable cover.2nd, lower level operations are put down Platform, preparation method is identical with upper strata, is discontented with paving bamboo slab rubber, and is replaced with two pieces of scaffold boards, to ensure that lower horizontal peace can be carried out The tensioning of the whole network.3rd, it is weldingly connected between levels operating platform with Φ 20 vertical reinforcement from four angles.4th, it is guarantee The fixation of this double-layer electric stair shaft operating platform, is provided with annulus facing each other, in order to same with steel pipe in the bottom of upper platform When through shear wall hole to be provided, platform reserve ring, platform reserve ring, shear wall hole to be provided mode, by this double-deck operating platform Fixed to the required position in elevator.The steel pipe and circumferential ring need 2 sets, to ensure its stability.
It is of the present utility model to install:1st, it is after the completion of foundation engineering, the dual operation platform elevator made in advance is special Hung in scaffold in elevator foundation pit, its size, per the small 50mm in side, can be lifted by crane normally than elevator inwall during so as to normal effect. 2nd, before current layer concreting, the about 100mm height under position of the shear wall from corner 75mm, plate, elevator has the wall of door And its Φ 75 PVC sleeve pipes are reserved on the wall on opposite.After form removable, that is, form hole to be provided.3rd, in current layer form removable Afterwards, the dual operation face special scaffold of elevator is sling by specified altitude assignment by tower crane, pvc is penetrated from elevator outside by suspension rod Reserved sleeve pipe, the reinforcing bar collar, the reinforcing bar collar, pvc are reserved in sleeve pipe, complete consolidating for the dual operation special scaffold of platform elevator It is fixed.4th, in completion after layer operation, continuation in the same way moves up this special frame, until completing the construction of whole floors.
It is of the present utility model to use:1st, installing and removing for current layer template is carried out.2nd, removed in lower template, it is special Frame is hung to behind upper strata, by the operating platform of lower floor, carries out the finishing of lower floor's metope.3rd, by lower level operations platform, in shelf Bottom carries out opening for horizontal safety net and set, and meets the requirement of elevator internal portioning layer protection.
The utility model is simple in construction, easy to make, easy to use, material economy, can be used in turn.
Preferably, skirting board is welded in the surrounding of lower floor's bar-mat reinforcement, to ensure the safe operation of lower floor personnel, the bottom of at Plate surrounding sets the high skirting boards of 150mm.
For ease of the lifting of whole support body, suspension ring are respectively welded on four angles of the top mat.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model.
Fig. 2 is A-A direction views in Fig. 1.
Fig. 3 is B-B direction view in Fig. 1.
Fig. 4 is stereogram of the present utility model.
Embodiment
As Figure 1-4, the special scaffold of dual operation platform elevator, mainly includes upper strata operating platform 1, lower floor and grasps Make platform 11, connection ladder 10, four vertical reinforcements 14 and two suspension rods 6.
Upper strata operating platform 1 includes top mat 2, and top mat 2 is formed by Φ 20 reinforcement welding, and surrounding is sealed Frame is closed, inside carries out arrangement welding by the mm of spacing 300, is set in the middle of top mat 2 and imports and exports 5, in upper strata steel Hinged closures 4 on muscle net 2, cover plate 4 is covered at import and export 5, and bamboo slab rubber 3 is connected in the top of top mat 2.In upper strata steel Suspension ring 7 are respectively welded on four angles of the top of muscle net 2.
Lower level operations platform 11 includes lower floor's bar-mat reinforcement 12, and slidingtype scaffold board is set in the top of lower floor's bar-mat reinforcement 12 13, in the high skirting boards 15 of the surrounding welding 150mm of lower floor's bar-mat reinforcement 12, it is ensured that the safe operation of lower floor personnel.
Connect ladder 10 to be connected between upper strata operating platform 1 and lower level operations platform 11, and connect the upper end of ladder 10 and set Put at the import and export 5 of top mat 2.
The upper end of four vertical reinforcements 14 is welded on four angles of top mat 2, the lower end of four vertical reinforcements 14 It is welded on four angles of lower floor's bar-mat reinforcement 12.
Two pairs of annulus 8 are welded in the lower section of top mat 2, wherein a suspension rod 6 is set in a pair of annulus 8, it is another Root suspension rod 6 is set in another pair annulus 8.Suspension rod 6 is reserved also cross shear wall hole to be provided 9, annulus 8, annulus 8, shear wall The mode in hole 9, the required position in elevator is fixed to by this double-deck operating platform.The suspension rod 6 and annulus 8 need two sets, to protect Demonstrate,prove its stability.

Claims (3)

1. a kind of special scaffold of dual operation platform elevator, it is characterised in that:Put down including upper strata operating platform, lower level operations Platform, connection ladder, four vertical reinforcements and two suspension rods;The upper strata operating platform includes top mat, in top mat Middle set import and export, in the online hinged closures of top bars, cover plate is covered in import and export, in the upper of top mat Side's connection bamboo slab rubber;The lower level operations platform includes lower floor's bar-mat reinforcement, and slidingtype pin hand is set in the top of lower floor's bar-mat reinforcement Plate;It is described connection ladder be connected between upper strata operating platform and lower level operations platform, and connect ladder upper end be arranged on upper strata The import and export of bar-mat reinforcement;The upper end of four vertical reinforcements is welded on four angles of top mat, four vertical reinforcements Lower end is welded on four angles of lower floor's bar-mat reinforcement;Two pairs of annulus are welded on the net in the top bars, wherein a suspension rod is worn Put in a pair of annulus, another suspension rod is set in another pair annulus.
2. the special scaffold of dual operation platform elevator according to claim 1, it is characterised in that:In lower floor's reinforcing bar The surrounding welding skirting board of net.
3. the special scaffold of dual operation platform elevator according to claim 1 or 2, it is characterised in that:On the upper strata Suspension ring are respectively welded on four angles of bar-mat reinforcement.
CN201621452971.0U 2016-12-28 2016-12-28 A kind of special scaffold of dual operation platform elevator Expired - Fee Related CN206352388U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621452971.0U CN206352388U (en) 2016-12-28 2016-12-28 A kind of special scaffold of dual operation platform elevator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621452971.0U CN206352388U (en) 2016-12-28 2016-12-28 A kind of special scaffold of dual operation platform elevator

Publications (1)

Publication Number Publication Date
CN206352388U true CN206352388U (en) 2017-07-25

Family

ID=59348848

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621452971.0U Expired - Fee Related CN206352388U (en) 2016-12-28 2016-12-28 A kind of special scaffold of dual operation platform elevator

Country Status (1)

Country Link
CN (1) CN206352388U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108775139A (en) * 2018-07-03 2018-11-09 江苏盛浩工程科技有限公司 A kind of climbing frame bottom pulley formula walkway board
CN111962849A (en) * 2020-07-31 2020-11-20 晟通科技集团有限公司 Operation platform
CN112900900A (en) * 2021-01-21 2021-06-04 北京燕化天钲建筑工程有限责任公司 Elevartor shaft entrance to a cave protection platform
CN113482312A (en) * 2021-07-01 2021-10-08 广西建工集团控股有限公司 Guide type double-layer structure elevator shaft operating platform and construction method based on platform

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108775139A (en) * 2018-07-03 2018-11-09 江苏盛浩工程科技有限公司 A kind of climbing frame bottom pulley formula walkway board
CN111962849A (en) * 2020-07-31 2020-11-20 晟通科技集团有限公司 Operation platform
CN112900900A (en) * 2021-01-21 2021-06-04 北京燕化天钲建筑工程有限责任公司 Elevartor shaft entrance to a cave protection platform
CN113482312A (en) * 2021-07-01 2021-10-08 广西建工集团控股有限公司 Guide type double-layer structure elevator shaft operating platform and construction method based on platform

Similar Documents

Publication Publication Date Title
CN106223360B (en) Using the open cut cast in place and precast construction subway station construction method of stake supporting system
CN103924711B (en) The construction technology of assembling grillage shear wall structural system
CN206352388U (en) A kind of special scaffold of dual operation platform elevator
CN101886466B (en) Construction method for support structure of coal tower template for tamping type coke oven
CN208586936U (en) A kind of control protects brick mixed building joist and demolishes walls constructing device
CN104695337B (en) Self-lifting sliding and turnover construction system and construction method
CN105649360A (en) Integral assembling type building system and installing method
CN109811878A (en) The shell integrated structure of the cast-in-place coinsiding die of assembled architecture and construction method
CN206016309U (en) A kind of overall assembled building system
CN205917702U (en) Whole system of transferring of bridge deep basal pit steel sheet piling cofferdam internal stay
CN205025086U (en) Strength nature skeleton concrete beam construction suspend template in midair
CN106869548B (en) A kind of newel frame assembled underground parking structural system and construction method
CN101225708A (en) Method for mounting up-sliding bottom-brick-building derrick-free hydraulic sliding formwork of chimney
CN103352537B (en) Overall load bearing heat preserving wallboard and production construction process thereof
CN206233541U (en) A kind of interior top external climbing mould bases operation platform for construction of super highrise building
CN104652813A (en) Tower crane construction technology used for super high-rise building steel structure
CN208072415U (en) Deep foundation pit reinforced concrete support part changes structure
CN204781927U (en) Elevartor shaft formwork and elevartor shaft concrete placement operation platform
CN107165281A (en) A kind of high-altitude long-span overhung steel platform mould bases construction
CN206267309U (en) A kind of assembled steel concrete frame core wall structure system
CN205976167U (en) Based on cast -in -place floor structures of detachable positioning control spare
CN103758045B (en) Box girder wet joint formwork construction method under space limitation condition
CN105347142B (en) A kind of building hoist is mounted on the threading installation method on basement roof
CN108005397A (en) Armored concrete elevator shaft construction safety protecting method
CN105888227B (en) Superelevation is tubaeform steel structure exterior finish operation platform and its building method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170725

Termination date: 20171228