CN205805393U - The heavy_weight factory headwall big door gear of full open formula - Google Patents

The heavy_weight factory headwall big door gear of full open formula Download PDF

Info

Publication number
CN205805393U
CN205805393U CN201620585110.3U CN201620585110U CN205805393U CN 205805393 U CN205805393 U CN 205805393U CN 201620585110 U CN201620585110 U CN 201620585110U CN 205805393 U CN205805393 U CN 205805393U
Authority
CN
China
Prior art keywords
factory building
headwall
folding door
pillar
factory
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201620585110.3U
Other languages
Chinese (zh)
Inventor
郭杭锋
赵小林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China United Engineering Corp Ltd
Original Assignee
China United Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China United Engineering Corp Ltd filed Critical China United Engineering Corp Ltd
Priority to CN201620585110.3U priority Critical patent/CN205805393U/en
Application granted granted Critical
Publication of CN205805393U publication Critical patent/CN205805393U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Power-Operated Mechanisms For Wings (AREA)

Abstract

This utility model relates to a kind of heavy_weight factory headwall big door gear of full open formula, including electric vertical elevating folding door, it is characterized in that being provided with Factory Building pillar at the headwall of both sides, gate, described factory building columns attached bag includes Factory Building inner pillar and the outer pillar of Factory Building, Factory Building inner pillar pillar outer with Factory Building is connected by crane way beam is fixing, electric vertical elevating folding door is arranged on headwall, and mobile stand is sleeved on folding door top, and electric vertical elevating folding door is connected with mobile stand.This utility model is reasonable in design, brief and practical, uses the full open formula electric vertical elevating folding door that this is high for 36m width x40m, has that wind loading rating is strong, lightweight, good airproof performance, opens and keep in repair the feature of simplicity.

Description

The heavy_weight factory headwall big door gear of full open formula
Technical field
This utility model relates to a kind of heavy_weight factory headwall big door gear of full open formula, is mainly used in goliath turnover Factory Building headwall, in order to weight Large-Scale Equipment product is directly loaded onto ship, entrucking transport.
Background technology
Originally (36m width x40m is high) gate of Factory Building, by device fabrication, selects raw material and construction and installation to be affected quality and join Difference is uneven so that structure bulky;Poor sealing performance;Wind loading rating is weak and potential safety hazard is big;Open and keep in repair loaded down with trivial details;Installation Long in time limit, cause cost high.
Utility model content
This utility model solves the technical problem that it is to overcome the drawbacks described above existing for prior art, and provides a kind of heavy The Factory Building headwall big door gear of full open formula.
This utility model solves above-mentioned technical problem and be the technical scheme is that
A kind of heavy_weight factory headwall big door gear of full open formula, including electric vertical elevating folding door, is characterized in that gate Being provided with Factory Building pillar at the headwall of both sides, described factory building columns attached bag includes the outer pillar of Factory Building inner pillar and Factory Building, Factory Building inner pillar with The outer pillar of Factory Building connects by crane way beam is fixing, and electric vertical elevating folding door is arranged on headwall, mobile stand set Being contained in electric vertical elevating folding door top, electric vertical elevating folding door is connected with mobile stand both sides.Mobile stand Electric vertical elevating folding door can be made to improve rigidity strengthen wind loading rating, alleviate overall weight, raising sealing property, drive and fold Door moves up and down, and opens or closes gate.
The outer pillar of Factory Building described in the utility model uses herringbone structure or cancelled structure, supports more stable, further Improve wind loading rating, alleviate weight.
The Breadth Maximum of folding door described in the utility model is 36 meters, and height is 40 meters.
This utility model is reasonable in design, brief and practical, uses the full open formula electric vertical that this is high for 36m width x40 m to lift Folding door, has that wind loading rating is strong, lightweight, good airproof performance, opens and keep in repair the feature of simplicity.Solve typhoon zone big part profit Pass in and out Factory Building headwall, directly a transport difficult problem for shipment with heavy_weight factory 700t crane, and meet the clean factory of Large-Scale Equipment manufacture The totally enclosed particular/special requirement in room.
Accompanying drawing explanation
Fig. 1 is the structural representation of this utility model embodiment.
Fig. 2 is this utility model embodiment electric vertical elevating folding door structural representation when opening.
Detailed description of the invention
Seeing Fig. 1, Fig. 2, the present embodiment includes that electric vertical elevating folding door 1, Factory Building pillar, described factory building columns attached bag include Factory Building inner pillar and the outer pillar 2 of Factory Building, Factory Building inner pillar pillar 2 outer with Factory Building is connected by crane way beam 21 is fixing, electronic Vertical lift folding door 1 is arranged on headwall 3, and mobile stand 22 is sleeved on folding door 1 top, electric vertical elevating folding door 1 is connected with mobile stand 22, when crane 4 is by headwall 3, drive electric vertical elevating folding door 1 to move up and down, open or Close gate, be very easy to the turnover of weight equipment.
Complete opening type electric vertical elevating folding door 1 is utilized to isolate autonomous closure processing district at Large-Scale Equipment manufacturing building, Utilize large-sized workshop heavy duty crane to solve clean, a Large-Scale Equipment transport difficult problem for constant temperature air conditioning Factory Building, and meet Large-Scale Equipment Manufacture clean, the totally enclosed particular/special requirement of constant temperature air conditioning Factory Building.Full open formula electric vertical elevating folding door 1 full-size is: Wide 36m, high 40m, substantially meet Large-Scale Equipment and pass in and out clean, the requirement of constant temperature air conditioning Factory Building from large-sized workshop, and divider wall is light and handy Flexible durable.
The present embodiment uses advanced light metal material and design concept, for local wind speed and blast according to factory building Code for structural design carries out gate and design-build gone along with sb. to guard him by Factory Building, and Factory Building inner pillar pillar outer with Factory Building 2 is fixing to be connected, outside Factory Building Pillar 2 uses herringbone structure or cancelled structure, improves wind loading rating, reduces overall weight, improves sealing property.Full open When formula electric vertical elevating folding door 1 is opened, foldable portion and the mobile stand 22 of electric vertical elevating folding door 1 rise Being deposited in doorframe top 11, when closing gate, mobile stand 22 plays the effect of guide support and reinforcing, improves electronic hanging down Go straight up to drop folding door 1 wind loading rating, alleviate overall weight, raising sealing property.
Simple deformation or the equivalence of every this utility model design concept are replaced, it is considered that fall into protection of the present utility model Scope.

Claims (3)

1. the big door gear of heavy_weight factory headwall full open formula, including electric vertical elevating folding door, is characterized in that: gate two Being provided with Factory Building pillar at side wall, described factory building columns attached bag includes Factory Building inner pillar and the outer pillar of Factory Building, Factory Building inner pillar and factory Outside room, pillar connects by crane way beam is fixing, and electric vertical elevating folding door is arranged on headwall, and mobile stand is set with On electric vertical elevating folding door top, electric vertical elevating folding door is connected with mobile stand both sides.
The heavy_weight factory headwall big door gear of full open formula the most according to claim 1, is characterized in that: the outer pillar of described Factory Building Use herringbone structure or cancelled structure.
The heavy_weight factory headwall big door gear of full open formula the most according to claim 1, is characterized in that: described electric vertical liter The Breadth Maximum of fall folding door is 36 meters, and height is 40 meters.
CN201620585110.3U 2016-06-16 2016-06-16 The heavy_weight factory headwall big door gear of full open formula Withdrawn - After Issue CN205805393U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620585110.3U CN205805393U (en) 2016-06-16 2016-06-16 The heavy_weight factory headwall big door gear of full open formula

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620585110.3U CN205805393U (en) 2016-06-16 2016-06-16 The heavy_weight factory headwall big door gear of full open formula

Publications (1)

Publication Number Publication Date
CN205805393U true CN205805393U (en) 2016-12-14

Family

ID=58143318

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620585110.3U Withdrawn - After Issue CN205805393U (en) 2016-06-16 2016-06-16 The heavy_weight factory headwall big door gear of full open formula

Country Status (1)

Country Link
CN (1) CN205805393U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106014172A (en) * 2016-06-16 2016-10-12 中国联合工程公司 End wall fully-open type gate device for heavy-duty workshop

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106014172A (en) * 2016-06-16 2016-10-12 中国联合工程公司 End wall fully-open type gate device for heavy-duty workshop

Similar Documents

Publication Publication Date Title
CN204716124U (en) Portable removable level-sensing device inspection platform
CN207293097U (en) The removable displaying container of one kind
CN205805393U (en) The heavy_weight factory headwall big door gear of full open formula
CN204897124U (en) Outdoor elevator guard gate
CN106368457B (en) Workshop is moved in sandblasting dust suppression
CN206798461U (en) A kind of totally-enclosed cover of ribbon conveyer
CN205563689U (en) End system of self -service receiving and sending parcel
CN206485179U (en) A kind of foldable top cover of square cabin with radar invisible function
CN205405584U (en) Commodity circulation end system
CN207699112U (en) A kind of mechanical-assisted hoistable platform with transportation function
CN204823021U (en) Sand system on spiral
CN105735479A (en) Prefabricated house with folding wallboards
CN106014172B (en) A kind of big door gear of heavy_weight factory headwall full open formula
CN204139309U (en) All-round daylighting is built
CN206457932U (en) A kind of laborsaving hoisting mechanism in collapsible house
CN204173714U (en) A kind of building hoist
CN206842540U (en) A kind of teaching stacking machine
CN207194785U (en) Double magnetic control handle hollow glass with inlaid louver blades windows easy for installation
CN109505446A (en) It is a kind of it is novel exempt to ascend a height safeguard integral type base station
CN205742770U (en) A kind of soft-sphere model intelligent opening skylight
CN210067044U (en) Movable board house
CN203295074U (en) Telescopic two-dimensional full-automatic miniature cantilever crane
CN106284806A (en) A kind of track lifting folding house roof method
CN207597889U (en) A kind of construction device for transporting objects
CN207032498U (en) Glass sunlight house structure easy to remove with carrying

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20161214

Effective date of abandoning: 20180522

AV01 Patent right actively abandoned