CN205804068U - Town road structure - Google Patents

Town road structure Download PDF

Info

Publication number
CN205804068U
CN205804068U CN201620700228.6U CN201620700228U CN205804068U CN 205804068 U CN205804068 U CN 205804068U CN 201620700228 U CN201620700228 U CN 201620700228U CN 205804068 U CN205804068 U CN 205804068U
Authority
CN
China
Prior art keywords
layer
lane
concrete layer
asphalt
greenbelt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620700228.6U
Other languages
Chinese (zh)
Inventor
杨增光
施建华
赵云鹤
袁东恩
毛常君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianhong Construction Group Co Ltd
Original Assignee
Tianhong Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianhong Construction Group Co Ltd filed Critical Tianhong Construction Group Co Ltd
Priority to CN201620700228.6U priority Critical patent/CN205804068U/en
Application granted granted Critical
Publication of CN205804068U publication Critical patent/CN205804068U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

This utility model town road structure, including being positioned at middle car lane, and is positioned at the bicycle lane of car lane both sides, is provided with footpath, is provided with greenbelt between car lane and bicycle lane outside bicycle lane;Car lane is from top to bottom respectively grain formula asphalt concrete layer in 4cm particulate formula asphalt concrete layer, modified emulsifying asphalt adhesion coating, 6cm, modified emulsifying asphalt adhesion coating, 8cm Coarse Graded Bituminous Concrete layer, liquid asphalt permeable layers, 36cm cement stabilized macadam base, 70cm pool slag punishment layer;Bicycle lane is from top to bottom respectively grain formula asphalt concrete layer in 4cm particulate formula asphalt concrete layer, modified emulsifying asphalt adhesion coating, 6cm, liquid asphalt permeable layers, 20cm cement stabilized macadam base, 60cm pool slag punishment layer;Footpath is from top to bottom respectively 6cm granite material ground brick layer, 3cm building building cement screed, 15cm cement concrete layer, 10cm metalling, 40cm pool slag punishment layer.There is structural stability high, planning rationally, service life length feature.

Description

Town road structure
Technical field
This utility model relates to a kind of road structure, and more specifically it relates to a kind of town road structure.
Background technology
Along with improving constantly of Urbanization in China, urban road construction mileage rapid development;To urban road construction Requirement the most constantly increase, owing to urban road is as the critical facility of urban transportation, driving vehicle is more, after having built not Preferably the most repeatedly construct;Therefore, urban road is different from general highway construction, and its planning requirement is more rigorous, construction quality Requiring higher, service life requires longer, and how reaching above-mentioned requirements is the problem that existing municipal road construction side needs to solve.
Utility model content
The deficiency existed for prior art, the purpose of this utility model is to provide a kind of town road structure, has Structural stability is high, planning rationally, service life length feature.
For achieving the above object, this utility model provides following technical scheme: a kind of town road structure, including being positioned at Middle car lane, and it is positioned at the bicycle lane of car lane both sides, it is provided with footpath, motor vehicles outside bicycle lane Greenbelt it is provided with between road and bicycle lane;Described car lane is from top to bottom respectively 4cm particulate formula Colophonium coagulation In soil layer, modified emulsifying asphalt adhesion coating, 6cm, grain formula asphalt concrete layer, modified emulsifying asphalt adhesion coating, 8cm coarse grain formula Colophonium mix Solidifying soil layer, liquid asphalt permeable layers, 36cm cement stabilized macadam base, 70cm pool slag punishment layer;Bicycle lane from top to bottom divides Not Wei grain formula asphalt concrete layer in 4cm particulate formula asphalt concrete layer, modified emulsifying asphalt adhesion coating, 6cm, liquid asphalt saturating Layer, 20cm cement stabilized macadam base, 60cm pool slag punishment layer;Footpath is from top to bottom respectively 6cm granite material ground Brick layer, 3cm building building cement screed, 15cm cement concrete layer, 10cm metalling, 40cm pool slag punishment layer.
By using technique scheme, car lane of the present utility model and bicycle lane all use multilamellar Colophonium to mix Solidifying soil layer is sandwiched between the structure of modified emulsifying asphalt adhesion coating, connects upper and lower two size by modified emulsifying asphalt adhesion coating Different asphalt concrete layer so that connect more closely knit, improves anti-shear ability;It is steady that asphalt concrete layer is provided below cement Determine broken stone foundation, have that intensity is high, bearing capacity big, the feature of resistance to erosion, and asphalt concrete layer and cement stabilized macadam base Between be provided with liquid asphalt permeable layers, liquid asphalt permeable layers plays and prevents from oozing under water and pitch binder applied concrete layer and cement stabilizing The effect of crushed rock base course, has preferable water proofing property and improves the structural strength of cement stabilized macadam base;Cement stabilized macadam Being provided with thicker pool slag punishment layer below basic unit, fill up road foundation ditch by pool slag so that roadbed is more stable, intensity is preferable, improves Bearing capacity;In sum, this utility model town road structure has structural stability height, intensity is big, water resistance is good;Use The feature of life-span length, and its planning is rationally, is more suitable for urban road construction.
This utility model is further arranged to: the height of described greenbelt and footpath is higher than car lane and non-machine Motor-car road.
By using technique scheme so that between footpath and greenbelt and car lane, bicycle lane Form obvious demarcation line, drive a vehicle safer.
This utility model is further arranged to: be embedded with steel wire lattice in the middle of the 70cm pool slag punishment layer of described car lane Grid.
By using technique scheme, the steel wire grid being embedded in carbon slag punishment layer can further improve car lane The stability of place's roadbed, it is to avoid relative settlement.
This utility model is further arranged to: described greenbelt both sides are provided with granite curbstone plate, car lane with Bicycle lane and greenbelt junction are provided with the flat slabstone of granite contacting at granite curbstone plate, granite curbstone plate The bottom of slabstone flat with granite is connected by pea gravel concreten layer, pea gravel concreten layer in the inner side of greenbelt to flower hilllock Rock kerbstone plate is formed with the supporting construction of triangle.
By using technique scheme, granite curbstone plate can be by greenbelt and car lane, bicycle lane Separate, prevent greenbelt earth excessive;Granite curbstone plate can be carried out outside greenbelt by the flat slabstone of granite Supporting, additionally the bottom of granite curbstone plate and the flat slabstone of granite is connected by pea gravel concreten layer, enhances both companies Connect intensity and sealing property, and pea gravel concreten layer is also formed with triangle to granite curbstone plate in the inner side of greenbelt The supporting construction of shape so that granite curbstone plate both sides are respectively provided with support, structural stability is high, and service life is long.
This utility model is further arranged to: the width of described car lane is 15m, and the width of every bicycle lane is 3m, the width of every footpath is 2m;The width of every greenbelt is 1.5m.
By using technique scheme, above-mentioned reasonable wide, it is more applicable for city road planning design.
In sum, it is high that this utility model provides a kind of structural stability, planning rationally, service life length municipal road Line structure.
Accompanying drawing explanation
Fig. 1 is the schematic diagram of the present embodiment;
Fig. 2 is the schematic diagram that the present embodiment highlights granite curbstone plate support system.
Description of reference numerals: 1,4cm particulate formula asphalt concrete layer;2, modified emulsifying asphalt adhesion coating;3, grain formula drip in 6cm Blue or green concrete layer;4, modified emulsifying asphalt adhesion coating;5,8cm Coarse Graded Bituminous Concrete layer;6, liquid asphalt permeable layers;7,36cm water Cement-stabilizing broken stone basic unit;8,70cm pool slag punishment layer;9,4cm particulate formula asphalt concrete layer;10, modified emulsifying asphalt adhesion coating; 11, grain formula asphalt concrete layer in 6cm;12, liquid asphalt permeable layers;13,20cm cement stabilized macadam base;14,60cm pool slag Punishment layer;15,6cm granite material ground brick layer;16,3cm building building cement screed;17,15cm cement concrete layer;18、 10cm metalling;19,40cm pool slag punishment layer;20, car lane;21, bicycle lane;22, footpath;23, greening isolation Band;24, granite curbstone plate;25, the flat slabstone of granite;26, pea gravel concreten layer;27, supporting construction.
Detailed description of the invention
Below in conjunction with accompanying drawing, this utility model is described in further detail.
Present embodiment discloses a kind of town road structure, as it is shown in figure 1, include the 15m width car lane being positioned at centre 20, and it is positioned at the wide bicycle lane of 3m 21 of car lane 20 both sides, it is provided with the wide footpath of 2m 22, machine outside bicycle lane 21 The wide greenbelt of 1.5m 23 it is provided with between motor-car road 20 and bicycle lane 21;Greenbelt 23 and the height of footpath 22 Higher than car lane 20 and bicycle lane 21.
Car lane 20 is from top to bottom respectively 4cm particulate formula asphalt concrete layer 1, modified emulsifying asphalt adhesion coating 2,6cm Middle grain formula asphalt concrete layer 3, modified emulsifying asphalt adhesion coating 4,8cm Coarse Graded Bituminous Concrete layer 5, liquid asphalt permeable layers 6, 36cm cement stabilized macadam base 7,70cm pool slag punishment layer 8;It is embedded with steel in the middle of the 70cm pool slag punishment layer 8 of car lane 20 Silk grid.
Bicycle lane 21 from top to bottom be respectively 4cm particulate formula asphalt concrete layer 9, modified emulsifying asphalt adhesion coating 10, Grain formula asphalt concrete layer 11, liquid asphalt permeable layers 12,20cm cement stabilized macadam base 13,60cm pool slag punishment layer in 6cm 14;
Footpath 22 is from top to bottom respectively 6cm granite material ground brick layer, 3cm building building cement screed, 15cm water Cement concrete layer, 10cm metalling, 40cm pool slag punishment layer.
As in figure 2 it is shown, greenbelt 23 both sides are provided with granite curbstone plate 24, car lane 20 and bicycle lane 21 The flat slabstone of granite 25 contacting at granite curbstone plate 24, granite curbstone plate 24 He it is provided with greenbelt 23 junction The bottom of the flat slabstone of granite 25 is connected by pea gravel concreten layer 26, and pea gravel concreten layer 26 is in the inner side of greenbelt 23 Granite curbstone plate 24 is formed the supporting construction 27 of triangle.
Construction method, first to clear bottom roadbed foundation ditch table, leveling, rammed soil type of foundation, more successively constructs.
The foregoing is only preferred embodiment of the present utility model, be not limited to this utility model, all in this practicality Within novel design concept, any modification, equivalent substitution and improvement etc. made, should be included in protection of the present utility model Within the scope of.

Claims (5)

1. a town road structure, it is characterised in that: include the car lane (20) being positioned at centre, and be positioned at car lane (20) bicycle lane (21) of both sides, bicycle lane (21) outside is provided with footpath (22), car lane (20) and non-machine Greenbelt (23) it is provided with between motor-car road (21);Described car lane (20) is from top to bottom respectively 4cm particulate formula Colophonium Grain formula asphalt concrete layer (3) in concrete layer (1), modified emulsifying asphalt adhesion coating (2), 6cm, modified emulsifying asphalt adhesion coating (4), 8cm Coarse Graded Bituminous Concrete layer (5), liquid asphalt permeable layers (6), 36cm cement stabilized macadam base (7), 70cm pool slag are punished Layer (8);Bicycle lane (21) is from top to bottom respectively 4cm particulate formula asphalt concrete layer (9), modified emulsifying asphalt adhesion coating (10), grain formula asphalt concrete layer (11), liquid asphalt permeable layers (12), 20cm cement stabilized macadam base (13), 60cm in 6cm Pool slag punishment layer (14);Footpath (22) is from top to bottom respectively 6cm granite material ground brick layer (15), 3cm building building cement Screed (16), 15cm cement concrete layer (17), 10cm metalling (18), the 40cm pool slag punishment layer (19).
Town road structure the most according to claim 1, it is characterised in that: described greenbelt (23) and footpath (22) height is higher than car lane (20) and bicycle lane (21).
Town road structure the most according to claim 1, it is characterised in that: at the 70cm pool slag of described car lane (20) Control and be embedded with steel wire grid in the middle of layer (8).
4. according to the town road structure described in claim 1 or 2 or 3, it is characterised in that: described greenbelt (23) both sides Be provided with granite curbstone plate (24), car lane (20) and bicycle lane (21) and greenbelt (23) junction be provided with to Touch the flat slabstone of the granite (25) in granite curbstone plate (24), granite curbstone plate (24) and the end of the flat slabstone of granite (25) Portion by pea gravel concreten layer (26) connect, pea gravel concreten layer (26) in the inner side of greenbelt (23) to granite curbstone Plate (24) is formed with the supporting construction (27) of triangle.
Town road structure the most according to claim 2, it is characterised in that: the width of described car lane (20) is 15m, The width of every bicycle lane (21) is 3m, and the width of every footpath (22) is 2m;The width of every greenbelt (23) Degree is 1.5m.
CN201620700228.6U 2016-07-02 2016-07-02 Town road structure Expired - Fee Related CN205804068U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620700228.6U CN205804068U (en) 2016-07-02 2016-07-02 Town road structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620700228.6U CN205804068U (en) 2016-07-02 2016-07-02 Town road structure

Publications (1)

Publication Number Publication Date
CN205804068U true CN205804068U (en) 2016-12-14

Family

ID=58139658

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620700228.6U Expired - Fee Related CN205804068U (en) 2016-07-02 2016-07-02 Town road structure

Country Status (1)

Country Link
CN (1) CN205804068U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106939537A (en) * 2017-02-23 2017-07-11 王娟 A kind of urban road of people's car separation
CN108999050A (en) * 2018-07-30 2018-12-14 杨芳林 A kind of pavement structure and its construction method
CN110029547A (en) * 2019-04-28 2019-07-19 长江勘测规划设计研究有限责任公司 A kind of urban road pedestrian passage unobstructed construction
CN114908630A (en) * 2022-05-13 2022-08-16 山东电力工程咨询院有限公司 Factory road structure and secondary permanent-temporary combined layered construction method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106939537A (en) * 2017-02-23 2017-07-11 王娟 A kind of urban road of people's car separation
CN108999050A (en) * 2018-07-30 2018-12-14 杨芳林 A kind of pavement structure and its construction method
CN110029547A (en) * 2019-04-28 2019-07-19 长江勘测规划设计研究有限责任公司 A kind of urban road pedestrian passage unobstructed construction
CN114908630A (en) * 2022-05-13 2022-08-16 山东电力工程咨询院有限公司 Factory road structure and secondary permanent-temporary combined layered construction method

Similar Documents

Publication Publication Date Title
CN205804068U (en) Town road structure
CN102587243B (en) Urban road water permeability cement concrete pavement structure and construction process thereof
CN109440571A (en) The construction method for building road is faced in a kind of laying of prefabricated board
CN202787044U (en) Longitudinal crack treatment structure for bituminous concrete pavement
CN210262547U (en) Wide structure is tied up to bituminous paving
CN205368926U (en) Garden way supercrust structure that water permeability is strong
CN203613426U (en) Groove-shaped embankment structure
CN204940043U (en) A kind of asphalt pavement structure being applicable to hot area
CN107142839B (en) A kind of attachment device of pile slab structure floorings and roadbed
CN202519561U (en) Urban road permeable cement concrete pavement structure
CN202347384U (en) Low-noise abrasion-resisting pavement structure
CN216663671U (en) Highway road surface pavement structure
CN214529999U (en) Anti-crack road with gradient structure
CN212388282U (en) Pitch combined type town road pavement structure
CN204185743U (en) A kind of Desulphurization roadbed cement pavement structure
CN107604786A (en) A kind of full impregnated pavement structure
CN209924091U (en) Rectangular side ditch structure for reducing roadbed water level and discharging road surface
CN202787016U (en) Novel water seepage concrete member
CN111945506A (en) Porous concrete base layer composite asphalt pavement structure and laying method thereof
CN219793489U (en) Roadbed pavement structure
CN201534947U (en) Yudong plain county rural highway cement concrete pavement structure
CN212077527U (en) Asphalt composite road pavement structure
CN110067171A (en) A kind of water penetration anti-settling road and its construction method
CN206359859U (en) A kind of pavement pavement structure
CN207227934U (en) A kind of bridge pavement structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
PP01 Preservation of patent right
PP01 Preservation of patent right

Effective date of registration: 20190808

Granted publication date: 20161214

PD01 Discharge of preservation of patent
PD01 Discharge of preservation of patent

Date of cancellation: 20210425

Granted publication date: 20161214

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161214