CN107142839B - A kind of attachment device of pile slab structure floorings and roadbed - Google Patents

A kind of attachment device of pile slab structure floorings and roadbed Download PDF

Info

Publication number
CN107142839B
CN107142839B CN201710543227.4A CN201710543227A CN107142839B CN 107142839 B CN107142839 B CN 107142839B CN 201710543227 A CN201710543227 A CN 201710543227A CN 107142839 B CN107142839 B CN 107142839B
Authority
CN
China
Prior art keywords
roadbed
cast
upside
cushion block
thickness
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710543227.4A
Other languages
Chinese (zh)
Other versions
CN107142839A (en
Inventor
胡可
杨晓光
吴平平
郑建中
魏民
席进
朱俊
李剑鸾
杨凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Transport Consulting and Design Institute Co Ltd
Original Assignee
Anhui Transport Consulting and Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Transport Consulting and Design Institute Co Ltd filed Critical Anhui Transport Consulting and Design Institute Co Ltd
Priority to CN201710543227.4A priority Critical patent/CN107142839B/en
Publication of CN107142839A publication Critical patent/CN107142839A/en
Application granted granted Critical
Publication of CN107142839B publication Critical patent/CN107142839B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/22Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
    • E01C11/224Surface drainage of streets
    • E01C11/225Paving specially adapted for through-the-surfacing drainage, e.g. perforated, porous; Preformed paving elements comprising, or adapted to form, passageways for carrying off drainage
    • E01C11/226Coherent pavings
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/22Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
    • E01C11/224Surface drainage of streets
    • E01C11/227Gutters; Channels ; Roof drainage discharge ducts set in sidewalks
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

A kind of attachment device of pile slab structure floorings and roadbed is related to highway and builds new technical field, including plain concrete cushion layer, cushion block, beam slab, former roadbed, drainage network, the polyurethane cementation of fissures, cast-in-place piece, polyester fiber cloth and asphalt concrete pavement;The upper outside position of plain concrete cushion layer is arranged in cushion block, beam slab is fixed at the upside of cushion block, former roadbed is arranged in plain concrete cushion layer inner side, lap belt is poured after being provided between beam slab and former roadbed, drainage network is arranged on the lateral surface of former roadbed, the outside of drainage network is arranged in the polyurethane cementation of fissures, cast-in-place piece is cast between cushion block, beam slab and the polyurethane cementation of fissures, the upside of beam slab, cast-in-place piece and former roadbed is arranged in polyester fiber cloth, and asphalt concrete pavement is laid on the upside of polyester fiber cloth.Globality of the present invention is preferable, and construction is simple is saved the area, and surrounding enviroment are influenced with small, prefabricated construction degree height, short construction period, good economy performance.

Description

A kind of attachment device of pile slab structure floorings and roadbed
Technical field:
The present invention relates to highways to build new technical field, and in particular to a kind of company of pile slab structure floorings and roadbed Connection device.
Background technique:
With the development of Modern Traffic science and technology and information technology, work and the accelerating rhythm of life, people are to fast and easy The cry of trip is higher and higher.In recent years, China increases infrastructure construction speed, but as urbanization scale continues to increase, Increased population, corresponding volume of transport and car quantity rapid growth, urban traffic blocking and environmental protection problem are got over It more protrudes, mass rapid highway reconstruction and expansion is extremely urgent.
There are problems, such as expropriation of land difficulty, the amount of banketing are big for conventional reorganization and expansion method;Long construction period, social shadow It rings big;Environment is polluted, not environmentally etc..Common solution has: stake plate type retaining wall, halfway up the hill half-bridge, pile slab structure etc., but all The defects such as there are restricted applications, and cost is higher, and assembling degree is low.
Peg board formula roadbed is being saved the area, and construction period is shortened, and has huge advantage in terms of reducing construction infection, to week Surrounding environment influences small, prefabricated construction degree height, short construction period, good economy performance, with very big promotional value.Pile slab structure road Base is mainly made of part-structures such as reinforced concrete bridge deck plate, steel bar concrete pile, bent cap and inter-pile soils.For how to have Effect connects each component, is to be worth the problem of inquiring into especially by floorings and roadbed lateral connection.
Summary of the invention:
The invention reside in defect existing in the prior art is overcome, a kind of good integrity, the peg board knot of construction is simple are provided The attachment device of structure floorings and roadbed.
The following technical solution is employed for the technical problems to be solved by the invention to realize:
A kind of attachment device of pile slab structure floorings and roadbed, it is characterised in that: including plain concrete cushion layer, cushion block, Beam slab, former roadbed, drainage network, the polyurethane cementation of fissures, cast-in-place piece, polyester fiber cloth and asphalt concrete pavement;The cushion block is set It sets in the upper outside position of plain concrete cushion layer, the beam slab is fixed at the upside of cushion block, and the former roadbed is set It sets and pours lap belt, the drainage network after being provided between plain concrete cushion layer inner side, the beam slab and former roadbed It is arranged on the lateral surface of former roadbed and is poured in lap belt after being located at, the outside of drainage network is arranged in the polyurethane cementation of fissures, Described cast-in-place piece is cast between cushion block, beam slab and the polyurethane cementation of fissures, and the polyester fiber cloth is arranged in beam slab, cast-in-place piece With the upside of former roadbed, the asphalt concrete pavement is laid on the upside of polyester fiber cloth.
The polyurethane cementation of fissures with a thickness of 1cm, the drainage network with a thickness of 2cm, cast-in-place piece of the width Degree is 95cm.
The width of the cushion block is 30cm.
Weeper drain, the interval between the weeper drain are laterally evenly arranged on the upside of the plain concrete cushion layer Distance is 3m.
Pervious concrete bed course is provided on the upside of the asphalt concrete pavement.
The asphalt concrete pavement is with a thickness of 1mm or more.
The pervious concrete bed course with a thickness of 20cm, the plain concrete cushion layer with a thickness of 10cm.
The present invention is handled disease old road roadbed, is such as tamped after existing roadbed is excavated to base surface With grouting etc., meet the requirements after-pouring blinding concrete.Blinding concrete is divided into two layers, and upper layer is the permeable coagulation of 20cm thickness C20 Soil padding, lower layer are the impermeable water subfill of 10cm thickness plain concrete, and emulsified asphalt waterproof layer is arranged between two layers of bed course.Mat surface One of weeper drain is arranged in every 3m.Lap belt is poured after 95cm wide is set between floorings and existing roadbed, is set on the outside of lap belt Set 30cm wide cushion block.The expansion joint 1cm is set between Bars In Poured Concrete Slab transverse direction and cement stabilized macadam, with the highly-elastic urethane cementation of fissures.High-elastic poly- ammonia 2cm thickness three-dimensional water discharge geonet is laid on the inside of the ester cementation of fissures.
The pervious concrete requires water penetration to be not less than 1mm/s, logical to form water draining between good lateral supercrust Road, emulsified asphalt waterproof layer film thickness are not less than 1mm.For treated disease old road roadbed, it is desirable that the comprehensive rebound mould in its top surface Amount is not less than 80MPa.The comprehensive modulus of resilience in roadbed top surface should be verified using drop hammer deflection meter, such as fallen short of the target and wanted It asks, then the embankment for coping with roadbed and deeper continues to handle, until can pour blinding concrete not after meeting the requirements It is able to increase blinding concrete thickness to replace roadbed to handle.
Advantageous effects of the invention: globality of the present invention is preferable, and construction is simple is saved the area, to surrounding enviroment Influence small, prefabricated construction degree height, short construction period, good economy performance, with very big promotional value.
Detailed description of the invention:
Fig. 1 is schematic structural view of the invention;
Fig. 2 is partial enlargement structural representation of the present invention;
Serial number in above-mentioned figure: 1- asphalt concrete pavement, 2- polyester fiber cloth, the 3- polyurethane cementation of fissures, the drainage network 4-, 5- beam Plate, 6- cushion block, cast-in-place piece of 7-, 8- weeper drain, 9- plain concrete cushion layer.
Specific embodiment:
In order to realize the present invention technological means, create new feature, reach purpose and effect is easy to understand, below In conjunction with being specifically illustrating, the present invention is further explained.
Embodiment one
As depicted in figs. 1 and 2,
A kind of attachment device of pile slab structure floorings and roadbed, including plain concrete cushion layer 9, cushion block 6, beam slab 5, Yuan Lu Base 10, drainage network 4, the polyurethane cementation of fissures 3, cast-in-place piece 7, polyester fiber cloth 2 and asphalt concrete pavement 1;The setting of cushion block 6 is mixed in element The upper outside position of solidifying soil padding 9, beam slab 5 are fixed at the upside of cushion block 6, and former roadbed 10 is arranged in plain concrete cushion layer 9 inner sides pour lap belt after being provided between beam slab 5 and former roadbed 10, and drainage network 4 is arranged on the lateral surface of former roadbed 10 And poured in lap belt after being located at, the polyurethane cementation of fissures 3 is arranged in the outside of drainage network 4, cast-in-place piece 7 be cast in cushion block 6, beam slab 5 with Between the polyurethane cementation of fissures 3, the upside of beam slab 5, cast-in-place piece 7 and former roadbed 10, asphalt concrete pavement is arranged in polyester fiber cloth 2 1 is laid on the upside of polyester fiber cloth 2.
The polyurethane cementation of fissures 3 with a thickness of 1cm, drainage network 4 with a thickness of 2cm, cast-in-place piece 7 of width is 95cm.Cushion block 6 Width is 30cm.9 upside of plain concrete cushion layer is laterally evenly arranged with weeper drain 8, and the spacing distance between weeper drain 8 is 3m.The upside of asphalt concrete pavement 1 is provided with pervious concrete bed course.Asphalt concrete pavement is with a thickness of 1mm or more.It is permeable Concrete cushion with a thickness of 20cm, plain concrete cushion layer 9 with a thickness of 10cm.
Before concrete cast-in-situ, cement stabilized macadam, lime soil contact face smear pitch, the seam top surface pitch cementation of fissures.Envelope Layer must covering joints.Top surface is laid with Fibergrass polyester mat at lap side seam, and wide 3m prevents reflection cracking in a pavement.On former roadbed 10 Original corrugated beam barrier is cut to peg board back plate, pours together with peg board beam Cast-in-Situ Segment, inside filling plain concrete.It is interior Side second row fence upright discards column with other and carries out inserting piling.
The above shows and describes the basic principles and main features of the present invention and the advantages of the present invention.The technology of the industry Personnel are it should be appreciated that the present invention is not limited to the above embodiments, and the above embodiments and description only describe this The principle of invention, without departing from the spirit and scope of the present invention, various changes and improvements may be made to the invention, these changes Change and improvement all fall within the protetion scope of the claimed invention.The claimed scope of the invention by appended claims and its Equivalent thereof.

Claims (6)

1. a kind of attachment device of pile slab structure floorings and roadbed, it is characterised in that: including plain concrete cushion layer, cushion block, beam Plate, former roadbed, drainage network, the polyurethane cementation of fissures, cast-in-place piece, polyester fiber cloth and asphalt concrete pavement;The cushion block setting In the upper outside position of plain concrete cushion layer, the beam slab is fixed at the upside of cushion block, the former roadbed setting Lap belt is poured after being provided between plain concrete cushion layer inner side, the beam slab and former roadbed, the drainage network is set It sets on the lateral surface of former roadbed and is poured in lap belt after being located at, the outside of drainage network, institute is arranged in the polyurethane cementation of fissures Cast-in-place piece stated is cast between cushion block, beam slab and the polyurethane cementation of fissures, the described polyester fiber cloth setting beam slab, cast-in-place piece and The upside of former roadbed, the asphalt concrete pavement are laid on the upside of polyester fiber cloth, and blinding concrete is divided into two layers, on Layer is 20cm thickness C20 pervious concrete bed course, and lower layer is the impermeable water subfill of 10cm thickness plain concrete, and cream is arranged between two layers of bed course Change bituminous water-proof coating, be laterally evenly arranged with weeper drain on the upside of the plain concrete cushion layer, between the weeper drain Spacing distance be 3m.
2. the attachment device of a kind of pile slab structure floorings and roadbed according to claim 1, it is characterised in that: described The polyurethane cementation of fissures with a thickness of 1cm, the drainage network with a thickness of 2cm, cast-in-place piece of the width is 95cm.
3. the attachment device of a kind of pile slab structure floorings and roadbed according to claim 1 or 2, it is characterised in that: institute The width for the cushion block stated is 30cm.
4. the attachment device of a kind of pile slab structure floorings and roadbed according to claim 1, it is characterised in that: described Pervious concrete bed course is provided on the upside of asphalt concrete pavement.
5. the attachment device of a kind of pile slab structure floorings and roadbed according to claim 4, it is characterised in that: described Asphalt concrete pavement is with a thickness of 1mm or more.
6. the attachment device of a kind of pile slab structure floorings and roadbed according to claim 5, it is characterised in that: described Pervious concrete bed course with a thickness of 20cm, the plain concrete cushion layer with a thickness of 10cm.
CN201710543227.4A 2017-07-05 2017-07-05 A kind of attachment device of pile slab structure floorings and roadbed Active CN107142839B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710543227.4A CN107142839B (en) 2017-07-05 2017-07-05 A kind of attachment device of pile slab structure floorings and roadbed

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710543227.4A CN107142839B (en) 2017-07-05 2017-07-05 A kind of attachment device of pile slab structure floorings and roadbed

Publications (2)

Publication Number Publication Date
CN107142839A CN107142839A (en) 2017-09-08
CN107142839B true CN107142839B (en) 2019-08-23

Family

ID=59785238

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710543227.4A Active CN107142839B (en) 2017-07-05 2017-07-05 A kind of attachment device of pile slab structure floorings and roadbed

Country Status (1)

Country Link
CN (1) CN107142839B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107675572A (en) * 2017-10-26 2018-02-09 安徽省交通控股集团有限公司 A kind of seamless road surface of assembling beam and slab type
CN113073538A (en) * 2021-03-17 2021-07-06 安徽省交通规划设计研究总院股份有限公司 High pile plate-soil combined road
CN113389150B (en) * 2021-07-22 2022-08-09 山东省交通规划设计院集团有限公司 Highway reconstruction and extension construction method for expanded bridge road section

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101691724A (en) * 2009-09-17 2010-04-07 西南交通大学 Liquefied soil foundation quake-proof road-bridge transition section structure of ballastless track of high-speed railway
JP6201929B2 (en) * 2014-08-12 2017-09-27 Jfeスチール株式会社 Abutment scour prevention structure
CN204418003U (en) * 2014-12-12 2015-06-24 苏州规划设计研究院股份有限公司 A kind of bridge platform post processing combined system
KR101741044B1 (en) * 2015-01-07 2017-05-29 주식회사 포스코건설 Settlement adjusting apparatus and settlement adjusting maintenance method for earthwork connecting portion
CN204401447U (en) * 2015-01-27 2015-06-17 重庆交通大学 A kind of structure preventing bumping at bridge-head
CN204644799U (en) * 2015-05-12 2015-09-16 中铁第一勘察设计院集团有限公司 A kind of four line ballastless track roadbed pile slab structure
CN106835880A (en) * 2017-01-23 2017-06-13 安徽省交通规划设计研究总院股份有限公司 Highway lateral support type peg board formula is without earth roadbed

Also Published As

Publication number Publication date
CN107142839A (en) 2017-09-08

Similar Documents

Publication Publication Date Title
CN108103871B (en) Construction method of roadbed foam concrete filling technology adjacent to existing subway facility
CN103334357B (en) Viaduct road embankment structure with lower pile foundation bearing platform extending in roadbed, and construction method
CN108797249A (en) The construction method of soft soil roadbed high roadbed steep slope road section Foam lightweight soil
CN109914173B (en) Foam light soil pouring table back structure in expressway reconstruction and extension project and construction method thereof
CN107142839B (en) A kind of attachment device of pile slab structure floorings and roadbed
CN113445396A (en) High-fill road foundation filling construction method for high liquid limit soil road section
CN109750571A (en) A kind of road landslide emergency and permanent supporting and retaining system integral structure and construction method
CN110042723B (en) Construction method of full-prefabricated assembled permeable road
CN210262555U (en) Light soil road structure
CN211596259U (en) Sponge city structure of mating formation of permeating water
CN111287040A (en) Method for constructing liquid soil road
CN207552833U (en) A kind of elevated bridge basal perimeter ground road structure
CN1335433A (en) Overhead road with composite foundation
CN114293430A (en) Urban road reconstruction method and structure jointly built with flood control wall and prop platform
CN210104468U (en) Water-permeable prefabricated assembled concrete road
CN210458918U (en) Space stacked bridge structure
CN210104461U (en) Roadbed structure of light soil roadbed combined with steel pipe pile
CN207597177U (en) A kind of elevated bridge lower floor road structure
CN207484194U (en) A kind of seamless road surface of assembling beam and slab type
CN217298503U (en) Municipal construction road structure
CN110067171A (en) A kind of water penetration anti-settling road and its construction method
CN209873492U (en) Permeable pavement structure
CN217869799U (en) Low-maintenance urban landscape ecological ground
CN218666977U (en) Be used for forest park to wind mountain pavement and prevent connection structure that collapses
CN216809408U (en) Green type road surface structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant