- CN205787767U CN205787767U CN201620626576.3U CN201620626576U CN205787767U CN 205787767 U CN205787767 U CN 205787767U CN 201620626576 U CN201620626576 U CN 201620626576U CN 205787767 U CN205787767 U CN 205787767U
- Authority
- CN
- China
- Prior art keywords
- ping
- trip
- circuit
- module
- relay
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
nullA kind of controller to pre-power purchase arrearage trip(ping) circuit implementing monitoring,It includes LCD MODULE (1)、Micro-control unit (2)、GPRS communication module (3)、Relay control module (4)、VA gathers memory module (5)、DC power supplier (6),Wherein,LCD MODULE、GPRS communication module、Relay control module、VA gathers memory module、DC power supplier is connected with micro-control unit respectively,And the first control relay (41) of relay control module concatenates the front end into trip(ping) circuit (10),DC power supplier controls relay (42) through the second of relay control module and receives the rear end of trip(ping) circuit,Second control relay of relay control module is by one group of the output of the DC power supplier voltage-drop loading less than 24V to trip(ping) circuit,The rear end of this trip(ping) circuit gathers memory module through VA and is connected with micro-control unit.
Description
Technical field
This utility model relates to a kind of pre-power purchase high pressure measurement trip(ping) circuit, particularly a kind of based on nonlinear wind vibration
Controller to pre-power purchase arrearage trip(ping) circuit implementing monitoring.
Background technology
There is following defect in pre-power purchase high pressure measurement trip(ping) circuit in the market:
1, loop goes offline
In high-voltage metering cubicle, trip signal is to be sent by the intelligent electric meter being loaded in high-voltage metering cubicle, and trip switch
Being not in same cabinet with intelligent electric meter, its trip signal need to through the binding post of high-voltage metering cubicle, then lead to be correlated with
Need outgoing line cabinet or the binding post of incoming line cabinet of tripping operation, be then connected to the trip(ping) circuit of trip switch through this binding post,
In the running of switch cubicle, the situation that this trip signal transmission loop goes offline, therefore, owing of intelligent electric meter often occur
Though expense signal sends, but can not trip successfully.
2, artificially break
The power mode of pre-power purchase, is widely popularized by power marketing department, how to guarantee arrearage not electricity consumption, and electricity consumption is the most pre-
Purchase, be the thing paid close attention to the most of power marketing department, when using the special trip(ping) circuit of artificial destruction such as electric consumer, when controlling machine room
After arrearage signal sends, tripping operation can not be implemented, or causes arrearage to run, or needs power marketing personnel to run a timing according to arrearage
Back-end data analysis after between, more manually have a power failure to electricity consumption field conduct, increase labor intensity.
3, difficulty is patrolled and examined
In the trip(ping) circuit of high-voltage switch gear, contact, rectifier bridge, current/voltage coil etc. are the most all gone here and there, under normal circumstances
It is all charging operation state, when power supply department is normally patrolled and examined, whether is in normal condition by detection trip(ping) circuits such as circuit testers,
Can not be tested by scene tripping operation success or not, otherwise cause power failure accident.
Utility model content
Technical problem to be solved in the utility model is, not enough for prior art, it is provided that one can be to using forward purchasing
The trip(ping) circuit of the high-voltage metering cubicle of electricity realizes monitoring in real time, it is ensured that after arrearage signal sends, trip switch tripping operation successfully control
Device processed.
For solving above-mentioned technical problem, this utility model be the technical scheme is that a kind of to pre-power purchase arrearage tripping operation
The controller of loop implementing monitoring, it includes LCD MODULE, micro-control unit, GPRS communication module, Control mould
Block, VA gather memory module, DC power supplier, wherein, LCD MODULE, GPRS communication module, relay control module,
VA gathers memory module, DC power supplier is connected with micro-control unit respectively, and the first control of relay control module continues
Electrical equipment concatenates the front end into trip(ping) circuit, for isolating the action control power supply of trip(ping) circuit;DC power supplier is through relay
The rear end of trip(ping) circuit received by second control relay of control module, for loading one group in trip(ping) circuit less than 24V's
DC voltage;The rear end of this trip(ping) circuit gathers memory module through VA and is connected with micro-control unit.
This VA gathers filtering partial pressure unit, impedance matching unit and the A/D converting unit that memory module includes being linked in sequence.
This utility model is by loading one group of magnitude of voltage less than 24V in trip(ping) circuit, and records different magnitude of voltage and exist
The current value formed in trip(ping) circuit, and in view of the resistance of the element such as diode and electric capacity present in trip(ping) circuit with temperature
Variation characteristic (voltage is different, and temperature rise is also different), and with a coefficient, the current value recorded is corrected, thus formed non-linear
C-V characteristic standard curve, recycling said method in the case of normal electricity consumption, monitoring trip(ping) circuit in current value, if electric
Flow valuve deviates nonlinear wind vibration standard curve really, then notify that management personnel carry out relevant treatment, it is thus possible to make administrative man
Member can find fault in time and get rid of, and trip(ping) circuit is properly functioning.Further, since the action control power supply of trip(ping) circuit is
Being isolated in advance by this utility model, the magnitude of voltage of DC power supplier is far below the working value of trip(ping) circuit, and therefore, this practicality is new
Type, when patrolling and examining trip(ping) circuit, does not results in line switch or the misoperation of forward purchasing electric switch.
Accompanying drawing explanation
Fig. 1 is this utility model modular structure schematic diagram.
Fig. 2 is this utility model principle schematic.
Fig. 3 is the nonlinear wind vibration standard curve schematic diagram formed during this utility model uses.
Detailed description of the invention
As it is shown in figure 1, this utility model based on nonlinear wind vibration to pre-power purchase arrearage trip(ping) circuit implementing monitoring
Controller includes: have the LCD MODULE 1 of man machine interface, micro-control unit (MCU) 2, GPRS communication module 3, relay
Control module 4, VA gather and memory module 5, DC power supplier 6, wherein, LCD MODULE 1, GPRS communication module 3, continue
Electrical control module 4, VA gather memory module 5, DC power supplier 6 and are connected with micro-control unit (MCU) 2 respectively, and relay
First control relay 41 of device control module 4 concatenates the front end into trip(ping) circuit, and DC power supplier 6 is through Control mould
The rear end of trip(ping) circuit 10 received by second control relay 42 of block 4, and the first control relay of this relay control module 4 is used
In the action control power supply of isolation trip(ping) circuit 10, the second control relay of relay control module 4 is by DC power supplier 6
Output voltage be loaded in trip(ping) circuit 10, this DC power supplier 6 is for loading one group less than 24V in trip(ping) circuit 10
DC voltage value, the rear end of this trip(ping) circuit 10 through VA gather memory module 5 be connected with micro-control unit (MCU) 2.This VA adopts
Collection memory module 5 includes filtering partial pressure unit 7, the impedance matching unit 8 and A/D converting unit 9 being linked in sequence.
This utility model intelligent controller is loaded in the control room of high-voltage metering cubicle, and trip(ping) circuit 10 can be loaded on high pressure measurement
In cabinet, it is possible to be loaded in other switch cubicles or other intervals.
The trip(ping) circuit related in this utility model is known loop, thus the most too much describes at this.General standard goes out
The action element of the trip(ping) circuit of line or special pre-electric switch is voltage or current mode coil, because of its special to curtage
Requirement, before working value input, reply input power carries out full-wave bridge rectifier, and the most also string has and meets power industry " five
Anti-" contact other relay, the auxiliary contacts etc. required.
When this utility model uses, first micro-control unit (MCU) 2 is continued by the first control of relay control module 4
The action control power supply of trip(ping) circuit isolated by electrical equipment 41, determines after isolating successfully, controls to continue through the second of relay control module 4
Adjustable for out-put supply DC power supplier 6 is loaded into the rear end of trip(ping) circuit by electrical equipment 42, and DC power supplier 6 sends one group
Voltage signal less than 24V is in trip(ping) circuit 10.The rear end of this trip(ping) circuit 10 gathers the filtering dividing potential drop of memory module 5 through VA
Unit 7, impedance matching unit 8 and A/D converting unit 9 are connected with micro-control unit (MCU) 2, by the electricity under different voltage status
Flow valuve sends into micro-control unit 2.Micro-control unit 2 is with the magnitude of voltage that arranges as abscissa, and the current value of corresponding input is sat for vertical
Mark and draw VA characteristic curve processed, it addition, the current value collected is entered by micro-control unit 2 according to the coefficient (± VA%) stored
Row is automatically revised and is formed nonlinear wind vibration standard curve, and is stored in MCU, during normal electricity consumption, and this utility model
Can use said method that the current value of trip(ping) circuit 10 is monitored according to the cycle set, as measured value is identical store
In the nonlinear wind vibration standard curve category in loop, then can determine that trip(ping) circuit is in normal condition, can ensure that arrearage is jumped
Lock success.If measured value is not in the nonlinear wind vibration standard curve category of the same circuit of storage, micro-control unit
Again sending measurement signal uses said method again to measure trip(ping) circuit 10, and measured value is sent into MCU compares
Right, as comparison is unsuccessful again, this utility model will start GPRS communication module 3 and by SMS automatically by trip(ping) circuit
The information of fault is dealt into related management personnel.Simultaneously by the LCD MODULE 1 of man machine interface, parameter can be carried out prompting can
Realize sound and light alarm, owing to the action control power supply of trip(ping) circuit 10 is isolated in advance by this utility model, DC power supplier 6
Magnitude of voltage far below the working value of trip(ping) circuit, therefore, this utility model when trip(ping) circuit 10 is patrolled and examined, Bu Huizao
Become line switch or the misoperation of forward purchasing electric switch.
Claims (2)
1. the controller to pre-power purchase arrearage trip(ping) circuit implementing monitoring, it is characterised in that include LCD MODULE (1),
Micro-control unit (2), GPRS communication module (3), relay control module (4), VA gather memory module (5), DC source mould
Block (6), wherein, LCD MODULE, GPRS communication module, relay control module, VA gather memory module, DC source mould
Block is connected with micro-control unit respectively, and the first control relay (41) of relay control module concatenates into trip(ping) circuit (10)
Front end, for isolating the action control power supply of trip(ping) circuit;DC power supplier is through the second control of relay control module
The rear end of trip(ping) circuit received by relay (42), for loading one group of DC voltage less than 24V in trip(ping) circuit;This tripping operation
The rear end in loop gathers memory module through VA and is connected with micro-control unit.
A kind of controller to pre-power purchase arrearage trip(ping) circuit implementing monitoring the most according to claim 1, it is characterised in that
This VA gathers filtering partial pressure unit (7), impedance matching unit (8) and the A/D converting unit that memory module includes being linked in sequence
(9).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620626576.3U CN205787767U (en) | 2016-06-23 | 2016-06-23 | A kind of controller to pre-power purchase arrearage trip(ping) circuit implementing monitoring |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620626576.3U CN205787767U (en) | 2016-06-23 | 2016-06-23 | A kind of controller to pre-power purchase arrearage trip(ping) circuit implementing monitoring |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205787767U true CN205787767U (en) | 2016-12-07 |
Family
ID=58129983
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620626576.3U Active CN205787767U (en) | 2016-06-23 | 2016-06-23 | A kind of controller to pre-power purchase arrearage trip(ping) circuit implementing monitoring |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205787767U (en) |
-
2016
- 2016-06-23 CN CN201620626576.3U patent/CN205787767U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205681098U (en) | Three pole earth leakage protective devices | |
CN104811224A (en) | Test system for power line carrier communication module | |
CN103022959A (en) | Method and device for adhesion detection of main contact of alternating-current contactor | |
CN112467831A (en) | Remote-program online capacity check management system for storage battery pack | |
CN112748367B (en) | Battery management system and detection method for battery disconnection fault | |
CN106569145A (en) | Comprehensive monitoring device and monitoring method for UPS power supply of ring-network cabinet | |
CN110908360A (en) | Communication power supply monitoring system and high-frequency switching power supply charging module self-checking method | |
CN109342935A (en) | Device and method for detecting failure of direct-current bus charging circuit relay and motor | |
CN109546741A (en) | The self-checking system of battery remote maintenance equipment | |
CN109613348A (en) | A kind of high-voltaghe compartment tooling automatic detection device | |
CN105301478A (en) | Detection device and detection method of 3.7V cell single-string protection plate | |
CN115184817A (en) | Storage battery online monitoring system | |
CN110829852B (en) | DC power supply open-circuit monitoring and output voltage self-healing compensation device | |
CN104655973B (en) | A kind of method and apparatus that battery module short circuit is detected in ups system | |
CN112531642A (en) | Residual current protection circuit and residual current protection device | |
CN109950879B (en) | Charging protection device and method for power utilization circuit and circuit with charging protection function | |
CN105892379B (en) | A kind of method and intelligent controller to pre- power purchase arrearage trip(ping) circuit implementing monitoring | |
CN206497184U (en) | A kind of detection means and the detection circuit for contactor | |
CN205787767U (en) | A kind of controller to pre-power purchase arrearage trip(ping) circuit implementing monitoring | |
CN211741532U (en) | Broken line detection circuit of PE line | |
CN110412474B (en) | DC on-line monitoring auxiliary system in station | |
CN109390914B (en) | Protection method and device for charging circuit of frequency converter | |
CN106291241A (en) | A kind of electric power cable intelligent fault warning system | |
CN105182063A (en) | Single-phase electric energy meter, maximum current continuous monitoring method and current variation monitoring method | |
CN109450044A (en) | Charging pile electric energy management method and system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |