CN205776292U - 一种用于桩基工程孔位中心的定位装置 - Google Patents

一种用于桩基工程孔位中心的定位装置 Download PDF

Info

Publication number
CN205776292U
CN205776292U CN201620446252.1U CN201620446252U CN205776292U CN 205776292 U CN205776292 U CN 205776292U CN 201620446252 U CN201620446252 U CN 201620446252U CN 205776292 U CN205776292 U CN 205776292U
Authority
CN
China
Prior art keywords
screw thread
pile foundation
thread drill
centrical
positioner
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620446252.1U
Other languages
English (en)
Inventor
贺建龙
徐桂权
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Sixth Engineering Division Co Ltd
Original Assignee
China Construction Sixth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Sixth Engineering Division Co Ltd filed Critical China Construction Sixth Engineering Division Co Ltd
Priority to CN201620446252.1U priority Critical patent/CN205776292U/zh
Application granted granted Critical
Publication of CN205776292U publication Critical patent/CN205776292U/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

本实用新型公开了一种用于桩基工程孔位中心的定位装置,它包括四个螺纹钢钎,所述的四个螺纹钢钎一端具有螺纹并且另一端用于***桩基孔位周边的土层中固定,所述的四个螺纹钢钎成十字交叉状设置,在每一个螺纹钢钎上螺纹连接有一个螺母垫片,四个所述的螺母垫片设置在同一水平面上,在相对设置的两个螺母垫片上水平连接有一根绳,两根绳成十字交叉状,两根绳的交叉点作为桩位中心,所述的四个螺纹钢钎到桩位中心点的距离相等。本装置制作简单,使用方便,有足够的刚度、强度,体积小,便于携带,适合工地的流动使用。同时避免了桩基孔位中心偏差较大,导致桩身与墩柱(墙)偏心受力的质量事故和重新返工、补桩给工程造成经济损失。

Description

一种用于桩基工程孔位中心的定位装置
技术领域
本实用新型涉及孔位中心定位施工,尤其涉及用于公路、铁路桥梁工程中桩基工程的孔位中心定位装置。
背景技术
随着我国高速公路、高速铁路、城市建设的快速发展,各种桥梁、高层建筑等基础设施工程大量建设,地基基础工程技术得到了快速发展。桩基础具有对周围环境及邻近建筑物影响小,能穿越各种复杂地层,适应各种地质条件,稳定性好、承载力大、沉降量小、抗震性能好等优点,在各类基础设施工程中得到了广泛应用。桩基础孔位中心定位施工技术对桩基础的质量至关重要,目前由于桩位偏差较大而导致桩身与墩柱(墙)偏心受力的质量事故,往往采取返工、补桩的挽救措施,给工程造成了一定的额外经济损失。
发明内容
本实用新型的目的在于克服已有技术的缺陷,提供一种确保桩基工程孔位中心定位准确,确保了桩基础施工质量的一种用于桩基工程孔位中心的定位装置。
本实用新型的一种用于桩基工程孔位中心的定位装置,它包括四个螺纹钢钎,所述的四个螺纹钢钎一端具有螺纹并且另一端用于***桩基孔位周边的土层中固定,所述的四个螺纹钢钎成十字交叉状设置,在每一个螺纹钢钎上螺纹连接有一个螺母垫片,四个所述的螺母垫片设置在同一水平面上,在相对设置的两个螺母垫片上水平连接有一根绳,两根绳成十字交叉状,两根绳的交叉点作为桩位中心,所述的四个螺纹钢钎到桩位中心点的距离相等。
桩基工程孔位中心定位装置,制作简单,使用方便,有足够的刚度、强度,体积小,便于携带,适合工地的流动使用。同时避免了桩基孔位中心偏差较大,导致桩身与墩柱(墙)偏心受力的质量事故和重新返工、补桩给工程造成经济损失。
附图说明
图1是本实用新型的一种用于桩基工程孔位中心的定位装置中的螺纹钢钎的结构示意图;
图2是本实用新型的一种用于桩基工程孔位中心的定位装置的安装示意图。
具体实施方式
下面结合附图和具体实施例对本实用新型作以详细描述。
如附图所示的一种用于桩基工程孔位中心的定位装置,它包括四个螺纹钢钎1,所述的四个螺纹钢钎1一端具有螺纹并且另一端用于***桩基孔位周边的土层中固定,所述的四个螺纹钢钎1成十字交叉状设置,在每一个螺纹钢钎1上螺纹连接有一个螺母垫片2,四个所述的螺母垫片2设置在同一水平面上,在相对设置的两个螺母垫片2上水平连接有一根绳3,两根绳3成十字交叉状,两根绳3的交叉点作为桩位中心,所述的四个螺纹钢钎1到桩位中心点的距离相等。
优选的螺纹钢钎上部1/3长度范围内带螺纹,克服了由于桩基孔位周边土层地势高低不平的不利因素,上、下调节螺母垫片2,使四个所述的螺母垫片2在同一水平面上,拉线十字交叉快捷、准确定位桩孔中心。
本实用新型的一种用于桩基工程孔位中心的定位装置的使用方法如下:(1)全站仪测量放样出桩位中心点。(2)将通过桩位中心点的两相交直线洒石灰标识,成十字交叉状,直线长度比孔直径长20-40cm。(3)在两直线末端分别打入螺纹钢钎1,使螺纹钢钎1到桩位中心点的距离相等。(4)将螺母垫片2拧入螺纹钢钎1。(5)将水准尺平放在相邻侧的两个螺母垫片2上,上、下调节钢钎上的螺母垫片2,使水准尺4上的水准气泡居中,确保所有螺母垫片2在同一水平面上。(6)将绳3系紧在螺母垫片2上,两绳3交叉成十字状,交点即为桩位中心。(7)根据孔径大小,定出护筒埋设边缘位置,埋设护筒。(8)钻机就位施工,视桩基孔位地质情况每钻进1-2m,从孔中提出钻头,重复步骤(5)-(6)定出桩位中心。重新调整钻机位置,使钻头中心与桩位中心在同一竖向直线上,继续钻进至孔底高程。

Claims (2)

1.一种用于桩基工程孔位中心的定位装置,其特征在于:它包括四个螺纹钢钎,所述的四个螺纹钢钎一端具有螺纹并且另一端用于***桩基孔位周边的土层中固定,所述的四个螺纹钢钎成十字交叉状设置,在每一个螺纹钢钎上螺纹连接有一个螺母垫片,四个所述的螺母垫片设置在同一水平面上,在相对设置的两个螺母垫片上水平连接有一根绳,两根绳成十字交叉状,两根绳的交叉点作为桩位中心,所述的四个螺纹钢钎到桩位中心点的距离相等。
2.根据权利要求1所述的用于桩基工程孔位中心的定位装置,其特征在于:所述的螺纹钢钎的上部1/3长度范围内带螺纹。
CN201620446252.1U 2016-05-17 2016-05-17 一种用于桩基工程孔位中心的定位装置 Expired - Fee Related CN205776292U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620446252.1U CN205776292U (zh) 2016-05-17 2016-05-17 一种用于桩基工程孔位中心的定位装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620446252.1U CN205776292U (zh) 2016-05-17 2016-05-17 一种用于桩基工程孔位中心的定位装置

Publications (1)

Publication Number Publication Date
CN205776292U true CN205776292U (zh) 2016-12-07

Family

ID=58118593

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620446252.1U Expired - Fee Related CN205776292U (zh) 2016-05-17 2016-05-17 一种用于桩基工程孔位中心的定位装置

Country Status (1)

Country Link
CN (1) CN205776292U (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107916675A (zh) * 2017-11-30 2018-04-17 国网湖北省电力公司咸宁供电公司 一种设备预制基础定位装置及其使用方法
CN109883296A (zh) * 2019-01-29 2019-06-14 中建六局建设发展有限公司 一种用于检测桩径与桩位偏差的测量工具和测量方法
CN111155782A (zh) * 2020-01-06 2020-05-15 中建三局集团有限公司 一种高水位既有地下室桩基施工工法

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107916675A (zh) * 2017-11-30 2018-04-17 国网湖北省电力公司咸宁供电公司 一种设备预制基础定位装置及其使用方法
CN107916675B (zh) * 2017-11-30 2023-05-02 国网湖北省电力公司咸宁供电公司 一种设备预制基础定位装置及其使用方法
CN109883296A (zh) * 2019-01-29 2019-06-14 中建六局建设发展有限公司 一种用于检测桩径与桩位偏差的测量工具和测量方法
CN109883296B (zh) * 2019-01-29 2024-01-02 中建六局建设发展有限公司 一种用于检测桩径与桩位偏差的测量工具和测量方法
CN111155782A (zh) * 2020-01-06 2020-05-15 中建三局集团有限公司 一种高水位既有地下室桩基施工工法

Similar Documents

Publication Publication Date Title
CN205776292U (zh) 一种用于桩基工程孔位中心的定位装置
CN206052741U (zh) 一种用于支护承台基坑的钢板桩围堰
CN203583497U (zh) 一种逆作钢管柱垂直度校正装置
CN106088172B (zh) 一种联合测定灌注桩桩顶和桩端位移的试验装置
CN103669385A (zh) 利用网状桩基础提高桩群承载力的方法
CN206503141U (zh) 一种桥梁桩柱基础施工中的超长护筒精确定位安装工装
CN113529707A (zh) 一种伞形轻型锚杆、边坡支护结构及其施工方法
CN110820950B (zh) 大跨度组合式超重偏心坡角钢结构整体同步顶升施工工法
CN106320392A (zh) 一种大吨位的桩基试验加载装置
CN204151813U (zh) 一种用于纠正输电铁塔基础沉降的可调式基础
CN104878786A (zh) 斜直交替群桩-土-结构相互作用实验模型
CN105241648A (zh) 模拟黄土隧道锁脚锚管端头受力的加载装置及其使用方法
CN109778923B (zh) 一种基桩屈曲临界荷载试验装置及方法
CN204753656U (zh) 斜直交替群桩-土-结构相互作用实验模型
CN203310412U (zh) 一种减少多路径效应的全球卫星定位***观测墩
CN106403996A (zh) 用于精密工程测量的强制归心观测标桩的制作方法
CN205228789U (zh) 一种模拟黄土隧道锁脚锚管端头受力的加载装置
Zhu et al. The land subsidence and building deformation during the excavation process of the deep foundation pit
He et al. Algorithm for vertical bearing capacity calculation of rock-socketed piles in karst area based on load transfer method
CN109024269B (zh) 适用于采空区场地的沉降补偿箱型桥梁及其沉降补偿方法
CN209339175U (zh) 一种水上测量平台用多层减震桩及减震的水上测量平台
CN107705689A (zh) 一种适用于土木、水利和海洋工程室内模型实验槽的土面平整装置
CN210342024U (zh) 一种双向反力梁抗拔试验桩装置
CN103498467B (zh) 高承载力基础桩及其与基础的处理方法
CN206034509U (zh) 一种联合测定灌注桩桩顶和桩端位移的试验装置

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161207

Termination date: 20210517