CN205710993U CN201620621963.8U CN201620621963U CN205710993U CN 205710993 U CN205710993 U CN 205710993U CN 201620621963 U CN201620621963 U CN 201620621963U CN 205710993 U CN205710993 U CN 205710993U
Authority
CN
China
Prior art keywords
electrophoresis
bearing
transfer tooling
gap
utility
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201620621963.8U
Other languages
Chinese (zh)
Inventor
姚成虎
王传应
付朋
曹衡
江玉龙
方阳洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Ankai Automobile Co Ltd
Original Assignee
Anhui Ankai Automobile Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Ankai Automobile Co Ltd filed Critical Anhui Ankai Automobile Co Ltd
Priority to CN201620621963.8U priority Critical patent/CN205710993U/en
Application granted granted Critical
Publication of CN205710993U publication Critical patent/CN205710993U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Escalators And Moving Walkways (AREA)

Abstract

This utility model relates to this utility model and relates to a kind of half loading coach electrophoresis transfer tooling, including process trolley, and is symmetricly set at least four supporting construction at process trolley two ends;Described supporting construction includes that electrophoresis base and electrophoresis bearing, described electrophoresis bearing are detachably connected with electrophoresis base, and the side of described electrophoresis bearing has gap, and described gap is fixing with the inner side of the side skirt rail of Bus Frame to be connected.This utility model is compared to traditional passenger vehicle electrophoresis transfer tooling, it is possible to preferably completes the transport of Bus Frame discrepancy Electrophoresis Lab, mounts and dismounts more convenient, reliable simultaneously.Through repeatedly putting into practice, can be used for various half carrying vehicle and use, there is the higher suitability.

Description

A kind of half loading coach electrophoresis transfer tooling
Technical field
This utility model relates to passenger car field, a kind of transfer tooling for half loading coach electrophoresis process.
Background technology
At present, the most severe, unstable along with global climate, bring various choosing to the product anticorrosion of bus industry War, the car load skeleton electrophoresis of passenger vehicle is more and more universal.In order to complete car load electrophoresis process, need supporting weldering on body frame Connect support seat, for the electrophoresis of unitary body skeleton, because of more for supporting the position of seat welding on chassis, selection remaining Ground is relatively big, and installation difficulty is the highest.And for for half loading coach, then need the fastening feelings in view of body frame Yu chassis Condition, and then can only be distributed at side skirt rail for the support seat of electrophoresis, the structure supporting seat is just designed and proposes phase by this To higher requirement.
Utility model content
The technical problems to be solved in the utility model is to provide a kind of half loading coach electrophoresis transfer tooling, uses simple Fixed form easily, meets the requirement of strength in transport process simultaneously, improves the operating efficiency of electrophoresis.
For solving the problems referred to above, this utility model relates to a kind of half loading coach electrophoresis transfer tooling, including process trolley, And it is symmetricly set at least four supporting construction at process trolley two ends;Described supporting construction includes that electrophoresis base and electrophoresis prop up Seat, described electrophoresis bearing is detachably connected with electrophoresis base, and the side of described electrophoresis bearing has gap, described gap and passenger vehicle The inner side of the side skirt rail of skeleton is fixing to be connected.
Further, described electrophoresis base includes that the pedestal being welded on process trolley, described pedestal upper end are provided with circle Shape is protruding, the lateral opening hole of described circular protrusions cross-under limited location bolt in hole;Described electrophoresis bearing includes base plate, described Base plate is provided with the circular hole matched with described circular protrusions, and the two ends of base plate are arranged with two U-lags, described gap and two The same sidewall of individual U-lag connects composition fixed part, and the inner side of the side skirt rail of described Bus Frame is welded in fixed part, institute Stating electrophoresis bearing to be fastened with circular protrusions by circular hole, the two ends of described caging bolt are each passed through two U-lags and pass through spiral shell Female fixing.
Further, the top of the described gap height far from bottom is less than or equal to 10mm.
The beneficial effects of the utility model are: this utility model is simple and reliable for structure, right on the process trolley of transhipment Claiming to arrange at least four supporting construction, the electrophoresis base of supporting construction is fixed on process trolley, electrophoresis bearing and Bus Frame Weld together, electrophoresis base and electrophoresis bearing Aided design, fixed and be prone to split, thus by electrophoresis bearing and electricity Swimming base can realize the quick assembly and disassembly of Bus Frame and process trolley;When Bus Frame is transported to electrophoresis by process trolley During workshop, Bus Frame can be transported to tiselius apparatus electrophoresis by chain sling, and electrophoresis bearing can be retained on vehicle body with Bus Frame, and not shadow Ring the assembling of Bus Frame.This utility model is compared to traditional passenger vehicle electrophoresis transfer tooling, it is possible to preferably complete passenger vehicle bone The transport of frame discrepancy Electrophoresis Lab, mounts and dismounts more convenient, reliable simultaneously.Through repeatedly putting into practice, can be used for various half Carrying vehicle uses, and has the higher suitability.
Accompanying drawing explanation
Below in conjunction with the accompanying drawings detailed description of the invention of the present utility model is described in further detail, wherein:
Fig. 1 is overall structure schematic diagram of the present utility model;
Fig. 2 is electrophoresis seat structure schematic diagram of the present utility model;
Fig. 3 is the installation diagram of electrophoresis bearing of the present utility model and electrophoresis base;
Fig. 4 be the electrophoresis bearing of the present utility model side skirt rail with Bus Frame weld schematic diagram.
Detailed description of the invention
With reference to a kind of half loading coach electrophoresis transfer tooling of Fig. 1, including process trolley 100, and it is symmetricly set on technique Four supporting constructions 200 at dolly two ends.
With reference to shown in Fig. 2 and Fig. 3, described supporting construction 200 includes electrophoresis base 2 and electrophoresis bearing 1, described electrophoresis Base 2 includes that the pedestal 22 being welded on process trolley 100, described pedestal 22 upper end are provided with circular protrusions 21, and described circle is convex Rise 21 lateral opening hole and in hole cross-under limited location bolt 3.
Described electrophoresis bearing 1 includes that base plate 10, described base plate 10 are provided with the circular hole matched with described circular protrusions 21 11, the two ends of base plate 10 are arranged with two U-lags 12, and the side of base plate 10 has gap 13, described gap 13 and two U-shapeds The same sidewall of groove 12 connects composition fixed part;With reference to shown in Fig. 4, the inner side of the side skirt rail 5 of described Bus Frame 300 is welded In fixed part, described electrophoresis bearing 1 is fastened with circular protrusions 21 by circular hole 11, and the two ends of described caging bolt 3 are worn respectively Cross two U-lags 12 and fixed by nut 4.
Because of electrophoresis bearing 1 with Bus Frame 300 permanent weld on passenger-carrying chassis, therefore need consider electrophoresis prop up The disguise of seat 1, preferably designs the top of gap 13 height dimension far from bottom at below 10mm, it is ensured that do not highlight gusset skirt Side bar 5 is too many, affects attractive in appearance.
It is it to need with chassis in place of being different from all-loading coach due to half loading coach to carry out fastening assembling, lead Cause the limitation of existing electrophoresis supporting construction welding position.And this utility model optimization design supporting construction 200, it is divided into and work Fixing electrophoresis base 2 part of skill dolly 100 and electrophoresis bearing 1 part fixed with Bus Frame 300, and person mutually fastens also Being dismounted by caging bolt 3, installation unloading is the most convenient and swift, substantially reduces the time of installing/dismounting on line;And electrophoresis bearing 1 Compact conformation, becomes with gusset group and welds the assembling without affecting Bus Frame 300 and attractive in appearance inside beam 5.
The above, the only preferable detailed description of the invention of this utility model, but this utility model protection domain does not limit to In this, any those familiar with the art in the technical scope that this utility model discloses, the change that can readily occur in Change or replace, all should contain within protection domain of the present utility model.Therefore this utility model protection domain is with claim The protection domain of book is as the criterion.

Claims (3)

1. one and half loading coach electrophoresis transfer tooling, it is characterised in that include process trolley, and it is little to be symmetricly set on technique At least four supporting construction at car two ends;Described supporting construction includes electrophoresis base and electrophoresis bearing, described electrophoresis bearing and electricity Swimming base is detachably connected with, and the side of described electrophoresis bearing has the side skirt rail of gap, described gap and Bus Frame Inner side is fixing to be connected.
A kind of half loading coach electrophoresis transfer tooling the most according to claim 1, it is characterised in that at the bottom of described electrophoresis Seat includes the pedestal being welded on process trolley, and described pedestal upper end is provided with circular protrusions, the lateral opening hole of described circular protrusions And in hole cross-under limited location bolt;Described electrophoresis bearing includes that base plate, described base plate are provided with and matches with described circular protrusions The circular hole closed, the two ends of base plate are arranged with the same sidewall of two U-lags, described gap and two U-lags composition that connects and fix Portion, the inner side of the side skirt rail of described Bus Frame is welded in fixed part, and described electrophoresis bearing is convex with circle by circular hole Rising and fasten, the two ends of described caging bolt are each passed through two U-lags and are fixed by nut.
A kind of half loading coach electrophoresis transfer tooling the most according to claim 1, it is characterised in that the top of described gap Height away from bottom is less than or equal to 10mm.
CN201620621963.8U 2016-06-22 2016-06-22 A kind of half loading coach electrophoresis transfer tooling Withdrawn - After Issue CN205710993U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620621963.8U CN205710993U (en) 2016-06-22 2016-06-22 A kind of half loading coach electrophoresis transfer tooling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620621963.8U CN205710993U (en) 2016-06-22 2016-06-22 A kind of half loading coach electrophoresis transfer tooling

Publications (1)

Publication Number Publication Date
CN205710993U true CN205710993U (en) 2016-11-23

Family

ID=57316368

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620621963.8U Withdrawn - After Issue CN205710993U (en) 2016-06-22 2016-06-22 A kind of half loading coach electrophoresis transfer tooling

Country Status (1)

Country Link
CN (1) CN205710993U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105887169A (en) * 2016-06-22 2016-08-24 安徽安凯汽车股份有限公司 Electrophoresis transfer tool of semi-integral coaches

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105887169A (en) * 2016-06-22 2016-08-24 安徽安凯汽车股份有限公司 Electrophoresis transfer tool of semi-integral coaches
CN105887169B (en) * 2016-06-22 2018-01-16 安徽安凯汽车股份有限公司 A kind of half loading coach electrophoresis transfer tooling

Similar Documents

Publication Publication Date Title
CN103568771B (en) Motorcar body with the externally-located reinforcer for connecting back axle
JP6737243B2 (en) Vehicle substructure
CN102897228B (en) The rear floor assembly structure of plug-in hybrid-power automobile
CN204801903U (en) Pick up, vehicle and be used for branch of pick up
JP6603222B2 (en) Lightweight container
CN105539590B (en) Rear overhang frame installing structure and automobile
CN106335551A (en) Motor vehicle body with multi-shelled wheelhouse
CN105835898A (en) Bogie
CN205710993U (en) A kind of half loading coach electrophoresis transfer tooling
CN206374865U (en) process trolley for vehicle
CN105887169B (en) A kind of half loading coach electrophoresis transfer tooling
CN104085460A (en) Passenger car assembly method and passenger car assembly line
CN207875701U (en) A kind of load-carrying tool car
CN102941983A (en) Universal carrier for carrying diesel engines with V-shaped hitching legs
CN102745241B (en) Frame structure of mining dumper and dumper comprising structure
CN202967152U (en) Universal transport frame for transporting diesel engine with V-shaped hitching leg
CN104588948A (en) Assembling tool and method for front frame of electric wheel dumper
CN201516882U (en) Vehicle body transportation carriage
CN202623839U (en) Damper installation plate and automobile bottom surface floor assembly connecting structure
CN205097984U (en) Seat crossbeam fixing device and have its electric automobile
CN106585693B (en) Table top type multi-functional carrying tool car
CN206374849U (en) A kind of multi-purpose mounting bracket
CN203753011U (en) Pedal fixing device and truck
CN205769617U (en) A kind of inner plate of automobile rear wheel cover assembly structure
CN205554203U (en) Bogie

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20161123

Effective date of abandoning: 20180116

AV01 Patent right actively abandoned