CN205691309U CN201620607583.9U CN201620607583U CN205691309U CN 205691309 U CN205691309 U CN 205691309U CN 201620607583 U CN201620607583 U CN 201620607583U CN 205691309 U CN205691309 U CN 205691309U
Authority
CN
China
Prior art keywords
wall
cross
sheet
cross wall
dry
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620607583.9U
Other languages
Chinese (zh)
Inventor
白国良
秦朝刚
赵腾飞
徐亚洲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xian University of Architecture and Technology
Original Assignee
Xian University of Architecture and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xian University of Architecture and Technology filed Critical Xian University of Architecture and Technology
Priority to CN201620607583.9U priority Critical patent/CN205691309U/en
Application granted granted Critical
Publication of CN205691309U publication Critical patent/CN205691309U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a kind of big ratio chi assembled integral Shear wall tube structure structure, belong to assembled monolithic concrete structure experimentation field, it is difficult to simulate assembled integral shear wall structure house, office building contour level building structural element level connection joint, vertical connection and the construction technology of Prefabricated integral floor for solving assembled integral Shear wall tube structure structure, affect a difficult problem for the type structure block mold experimentation further, meanwhile, a difficult problem for low elastic modulus pea gravel concreten match ratio is solved.Described model structure includes dry wall sheet, cross wall in first, cross wall, connecting portion and precast floor slab are constituted in second, and model structure plane be " field " type, designs the horizontal layout form with bias;Use this utility model to become more meticulous and realize the big scale model structural test research of assembled integral shear wall prototype structure, the anti-seismic performance of checking the type prototype structure.

Description

A kind of big than chi assembled integral Shear wall tube structure structure
Technical field
This utility model relates to assembled monolithic concrete structure experimentation technical field, is specifically related to one greatly than chi Assembled integral Shear wall tube structure structure and manufacture method, structural plan is " field " type, can simulate respectively " L ", " T ", "+" three kinds The cast-in-place connecting portion of precast shear wall and structure under Bidirectional Ground Motion effect torsional effect.
Background technology
Assembled integral shear wall structure is the assembled integral concrete completely or partially using prefabricated panel to be built into Structure, each prefabricated panel longitudinal reinforcement uses sleeve grouting to connect or slurry anchor overlap joint connects, and horizontal reinforcement uses stirrup cuff method Connecting after-pouring concrete and form entirety, this version is applicable to tier building or skyscraper.Because this structural elements uses Industrialized production and mechanization assemble, it is achieved building course greenization, integrated and industrialization, construction speed can significantly carry Rise, the productivity of liberation building trade, promote China's Urbanization Construction and work of renovating shantytowns engineering.But, China is mostly District's building structure must take into provides fortification against earthquakes, because reinforced bar sleeve grouting connects and rear cast-in-place position and assembling entirety between prefabricated panel Formula floor is difficult in scaled model structure, and presently relevant literature research only considers that assembled integral shear wall structure is single Wall sheet or two-layer full size sub-structural test research, and multilayered model structural test object of study avoid sleeve grouting type of attachment and The cast-in-place position of dry wall sheet and the similarity of precast floor slab, not yet have model structure design to support prototype assembled integral shear wall The experimental study of structure skyscraper.
Summary of the invention
For above-mentioned problems of the prior art, the purpose of this utility model is, it is provided that a kind of greatly than chi assembling Monoblock type Shear wall tube structure structure and manufacture method, for checking the anti-of assembled integral shear wall structure multilayer structure Shock stability, the problem solving many high-rise assembled integral shear wall block mold structural test research.
In order to realize above-mentioned task, this utility model by the following technical solutions:
A kind of big ratio chi assembled integral Shear wall tube structure structure, including dry wall sheet, cross wall in first, cross wall in second And connecting portion;Described connecting portion includes the first connecting portion of L-shaped, the second connecting portion of T-shaped and the criss-cross 3rd even Meeting portion, described dry wall sheet arranges multistage, and multistage dry wall sheet surrounds into a rectangular configuration jointly, and cross wall in first, In second, cross wall is arranged in a mutually vertical manner in the inside of described rectangular configuration, and cross wall in first, in second the end of cross wall with Dry wall sheet connects;Cross wall in described first, cross wall is respectively provided with two sections in second, cross wall in first, in second between cross wall Connected by the 3rd connecting portion;The end of cross wall in first, in second the end of cross wall all by the second connecting portion and phase Two sections of adjacent dry wall sheets connect, and are all connected by the first connecting portion between adjacent two sections of dry wall sheets of corner;Institute The dry wall sheet stated, in cross wall and second, the inside of cross wall is all vertically arranged with embedded bar in first, embedded bar End passes the end face of dry wall sheet;It is all provided with on cross wall, cross wall is constituted in second four regions in dry wall sheet and first Be equipped with precast floor slab, inside precast floor slab, be intervally distributed with the first galvanized wire, the first galvanized iron circumfili around in back-shaped structure, The two ends of back-shaped structure pass the side of precast floor slab and are set in and pass the embedded bar of dry wall sheet end face, pass In one in cross wall or second on the embedded bar of cross wall end face;The surface of described precast floor slab is equipped with steel fabric sheet, After laying steel fabric sheet, a more cast-in-place layer concrete layer.
Further, cross wall in described dry wall sheet and first, the inside of cross wall is all vertically arranged with in second Second galvanized wire, precast floor slab is intervally distributed with multiple capillary tubing, when described Shear wall tube structure structure arranges multilamellar Time, the second galvanized wire of the Shear wall tube structure structure being located below a layer passes capillary tubing and passes the upper end of capillary tubing Portion, and the second galvanized wire of the Shear wall tube structure structure of above a layer stretches out in capillary tubing, then by capillary tubing Portion's grouting material is filled with.
Further, cross wall in described dry wall sheet and first, the second galvanized wire of the inside of cross wall in second Between connected by spaced horizontal bar.
Further, the thickness of described precast floor slab is 10mm, on the surface of precast floor slab after laying steel fabric sheet again The thickness pouring a layer concrete layer is 10mm~30mm.
Further, the internal diameter of described capillary tubing is 6mm~8mm, and the wall thickness of capillary tubing is 1mm~2mm.
Further, described dry wall sheet, cross wall in first, the thickness of cross wall is 20mm~60mm in second, highly For 300mm~1000mm.
Further, the proportioning of the concrete used in described Shear wall tube structure structure is:
Cement: fine aggregate: coarse aggregate: water: Gypsum Fibrosum=1:3.64:3.64:0.93:0.5
Present invention also offers a kind of big manufacture method than chi assembled integral Shear wall tube structure structure, including following step Rapid:
Step one, determines dry wall sheet, cross wall in first, the position of cross wall in second according to design drawing, and prefabricated Wall sheet, cross wall in first, colligation the second galvanized wire in cross wall position in second, between the second galvanized wire by horizontal bar even Connect;
Step 2, after the second galvanized wire colligation well, cross wall, supporting at cross wall and dry wall sheet in second in first Wall sheet template, wall sheet template internal preset embedded bar, and at the internal casting concrete of wall sheet template;
Step 3, installs precast floor slab, first galvanized wire of back-shaped structure is distributed inside precast floor slab, plates first The end of zinc-iron silk is through on dry wall sheet, in cross wall or second, cross wall end face stretches out in first embedded bar, in prefabricated building Steel fabric sheet is laid on plate;
Step 4, after treating concrete setting within wall sheet template 48 hours, pours the connecting portion between dry wall sheet Position, the connecting portion of cross wall in cross wall and/or second in dry wall sheet and first, connecting portion is L-shaped, T-shaped or cross;So After pour a layer concrete layer on precast floor slab surface;
Step 5, when whole concrete strengths reach more than 80%, removes wall sheet template, carries out next story shear wall mould The construction of type structure;During the construction of next story shear wall model structure, first at dry wall sheet, cross wall in first, cross wall in second Top capillary tubing is set, by the second galvanized wire of the Shear wall tube structure structure of last layer through capillary tubing pass hair The upper end of fine steel tube, is inserted into the second galvanized wire of the Shear wall tube structure structure of this layer in capillary tubing, then in capillary Steel duct fills grouting material, after grouting material solidifies, then carries out the colligation of this layer the second galvanized wire.
This utility model compared with prior art has a techniques below feature:
1. the big ratio chi assembled integral Shear wall tube structure structure that the utility model proposes, solves assembled integral shearing Wall model structure be difficult to simulate assembled integral shear wall structure house, office building contour level building structural element level connection joint, An industry difficult problem for the vertical construction technology connected with Prefabricated integral floor, and have impact on further and promoted the type structure Overall model test is studied;
2. this utility model is that experimentation provides a kind of multilayered model experimentation object, can carry out prototype assembling whole The experimentation of body formula shear wall structure skyscraper, and give the processing technology of correspondence, through actual verification, this practicality is new The structural manufacturing process that type proposes is simple, and properties is satisfied by requirement of experiment, solves low elastic modulus pea gravel concreten simultaneously and joins A difficult problem for composition and division in a proportion.
3. use structure of the present utility model can become more meticulous realize assembled integral shear wall prototype structure greatly than chi Model structure experimental study, the anti-seismic performance of checking the type prototype structure.
Accompanying drawing explanation
Fig. 1 is overall structure schematic diagram of the present utility model;
Fig. 2 is plan structure schematic diagram of the present utility model;
Fig. 3 is that the A of Fig. 1 is to sectional view (for two-layer model structure in figure);
Fig. 4 is that the B of Fig. 1 is to sectional view (for two-layer model structure in figure);
Fig. 5 is structure for amplifying schematic diagram at the D of Fig. 3;
Fig. 6 is the laying structure schematic diagram of internal first galvanized wire of precast floor slab;
Fig. 7 is the structure enlarged diagram in Fig. 1 at C;
Fig. 8 is the structural representation of steel fabric sheet;
In figure, label represents: 1 dry wall sheet, 2 first connecting portions, 3 second connecting portions, 4 the 3rd connecting portions, Cross wall in 5 first, cross wall in 6 second, 7 precast floor slabs, 8 first galvanized wires, 9 capillary tubings, 10 is pre-buried Reinforcing bar, 11 second galvanized wires, 12 concrete layers, 13 grouting materials, 14 steel fabric sheets.
Detailed description of the invention
Defer to technique scheme, as shown in Figures 1 to 7, a kind of big ratio chi assembled integral Shear wall tube structure structure, bag Include in dry wall sheet 1, first cross wall 6 and connecting portion in cross wall 5, second, dry wall sheet 1 is provided with door opening or window opening; Three kinds of common connecting portions in connecting portion simulation prototype structure in this programme, connecting portion includes the first connecting portion 2 of L-shaped, T Second connecting portion 3 of shape and criss-cross 3rd connecting portion 4, as shown in Figure 1.
Described dry wall sheet 1 arranges multistage, and multistage dry wall sheet 1 surrounds into rectangular configuration, such as this reality jointly This example executed in example is exactly square structure, and each limit of square structure is by dry wall sheet 1 structure of more than a section Become;And in cross wall 5, second, cross wall 6 is arranged in a mutually vertical manner in the inside of described rectangular configuration in first, and cross wall 5 in first, In second, the end of cross wall 6 is connected with dry wall sheet 1, and the plane graph of this sample plan is sphere of movements for the elephants shape;Knot within matrix pattern Structure, in i.e. first, in cross wall 5, second, cross wall 6, on the premise of keeping being mutually perpendicular to, can offset, the intersection of the two relatively It is not necessarily located at the center position of rectangular configuration, to change the Stiffness Distribution in structural plan, assembled integral can be studied Shear wall structure torsional effect under bi-directional earthquakes.
In described first, in cross wall 5, second, cross wall 6 is respectively provided with two sections, logical between cross wall 6 in cross wall 5, second in first Cross the 3rd connecting portion 4 to connect;The end of cross wall 5 in first, in second the end of cross wall 6 all by the second connecting portion 3 with Two sections of adjacent dry wall sheets 1 connect, and cross wall 5 end in i.e. first, the end of cross wall 6 is equal with rectangular configuration junction in second Have the dry wall sheet 1 of two spacer segments, cross wall 5 end in these two sections of dry wall sheets 1 and first, in second the end of cross wall 6 this three By second connecting portion 3 between end, i.e. T-shaped structure connects;The adjacent two sections of dry wall sheets 1 being positioned at corner are (the most vertical Straight dry wall sheet 1) between all connected by the first connecting portion 2;The thickness of cross wall 6 in cross wall 5, second in dry wall sheet 1, first Degree is 20mm~60mm, and height is 300mm~1000mm.
In described dry wall sheet 1, first, in cross wall 5 and second, the inside of cross wall 6 is all vertically arranged with a diameter of The embedded bar 10 of 4mm, its effect is to ensure that between precast floor slab 7 with dry wall sheet 1 and is connected reliably;The surface of precast floor slab 7 Need coarse process, after coarse process again casting concrete layer 12 time, can guarantee that precast floor slab 7 is bonding with concrete reliably; The end of embedded bar 10 passes the end face of dry wall sheet 1;In dry wall sheet 1 with first, in cross wall 5, second, cross wall 6 is constituted Four regions on be provided with precast floor slab 7 with simulation practical structures in floor, the thickness of precast floor slab 7 is 10mm;In advance Internal first galvanized wire 8 (8# galvanized wire) that is intervally distributed with of floor 7 processed, its cloth set direction and model structure short side direction one Cause;First galvanized iron circumfili is around in back-shaped structure, and back-shaped structure is end to end, then for one section of first galvanized wire 8 Being stretched the structure making its major part be parallel to each other and to be formed, at this time its end is equivalent to a U-shaped button;Back-shaped structure Two ends pass the side of precast floor slab 7 being set in pass dry wall sheet 1 end face embedded bar 10, pass first in horizontal In wall 5 or the second on the embedded bar 10 of cross wall 6 end face;The surface of described precast floor slab 7 is equipped with steel fabric sheet 14, The reinforcing bar that steel fabric sheet 14 is used is 10# galvanized wire, and will roll under the end of steel fabric sheet 14 so that it is end is supported on pre- The top of cross wall 6 in cross wall 5, second in wall sheet 1, first processed;After laying steel fabric sheet 14, a more cast-in-place layer concrete layer 12, The thickness of concrete layer 12 is 10mm~30mm.
In dry wall sheet 1 and first, in cross wall 5, second, the inside of cross wall 6 is all vertically arranged with the second galvanized wire 11, precast floor slab 7 is intervally distributed with multiple capillary tubing 9, to simulate sleeve grouting connection, the second plating in simulation prefabricated panel Zinc-iron silk 11 is in vertical connection;When described Shear wall tube structure structure arranges multilamellar, it is located below the shear wall mould of a layer Second galvanized wire 11 of type structure passes capillary tubing 9 and passes the upper end of capillary tubing 9, and the shear wall of above a layer Second galvanized wire 11 of model structure stretches out in capillary tubing 9, for the connected mode of overlap joint between galvanized wire, then will Capillary tubing 9 inside high intensity contraction-free grouting concrete 13 is filled with.The internal diameter of capillary tubing 9 is 6mm~8mm, capillary steel The wall thickness of pipe 9 is 1mm~2mm.
In this utility model, use low-elasticity-modulconcrete concrete simulation prototype structure concrete.According to model structure with The similarity relation of prototype structure, concrete crushing strength used and elastic modelling quantity are all low than prototype structure concrete, it is considered to material The general applicability of material, concrete coarse aggregate is selected peastone, fine aggregate selection river sand, cement selection P.O42.5, is selected Gypsum Fibrosum Reducing its intensity and elastic modelling quantity, this four classes material can realize the low-elasticity-modulconcrete concrete of varying strength through trial.Through examination The pea gravel concreten match ratio (quality) joining intensity and elastic modelling quantity reduction by 1/3 is:
Numbering Cement: fine aggregate: coarse aggregate: water: Gypsum Fibrosum
1 1:3.64:3.64:0.93:0.5
For assembled integral shear wall prototype structure, prefabrication shear wall, it is transported to job site, is lifted in place Dry wall sheet 1, installs connecting portion template to be poured, and pours connecting portion concrete and precast floor slab 7 plate surface concrete, completes Assembled integral shear wall index bed is constructed.
Accordingly, this utility model additionally provides a kind of big than chi assembled integral Shear wall tube structure construction manufacturing method:
A kind of big manufacture method than chi assembled integral Shear wall tube structure structure, comprises the following steps:
Step one, determines in dry wall sheet 1, first position of cross wall 6 in cross wall 5, second according to design drawing, and in advance Cross wall 6 position colligation the second galvanized wire 11 in cross wall 5, second in wall sheet 1, first processed is logical between second galvanized wire 11 Cross horizontal bar to connect;The junction colligation stirrup of cross wall 6, single stirrup and draw in cross wall 5, second in dry wall sheet 1, first Muscle, to guarantee to pour the intensity of rear connecting portion;
Step 2, after the second galvanized wire 11 colligation well, cross wall 6 and dry wall sheet 1 in cross wall 5, second in first Place's braced wall sheet template, wall sheet template internal preset embedded bar 10, and (the most above-mentioned at the internal casting concrete of wall sheet template Low-elasticity-modulconcrete concrete);
Step 3, installs precast floor slab 7, internal the first galvanized wire 8 that back-shaped structure is distributed of precast floor slab 7, by the The embedded bar 10 that the end of one galvanized wire 8 is stretched out through cross wall 6 end face in cross wall 5 or the second in dry wall sheet 1, first On, precast floor slab 7 is laid steel fabric sheet 14;
Step 4, after treating concrete setting within wall sheet template 48 hours, pours the connecting portion between dry wall sheet 1 Position is with the connecting portion of cross wall 6 in cross wall 5 and/or second in formation connecting portion, dry wall sheet 1 and first, and connecting portion is L Shape, T-shaped or cross;Then a layer concrete layer 12 is poured on precast floor slab 7 surface;
Step 5, when whole concrete strengths reach more than 80%, removes wall sheet template, carries out next story shear wall mould The construction of type structure;During the construction of next story shear wall model structure, first horizontal in cross wall 5, second in dry wall sheet 1, first The top of wall 6 arranges capillary tubing 9, by the second galvanized wire 11 of the Shear wall tube structure structure of last layer through capillary tubing 9 And pass the upper end of capillary tubing 9, by the second galvanized wire of the Shear wall tube structure structure of this layer (the most current layer to be onstructed) 11 are inserted in capillary tubing 9, then fill grouting material 13 inside capillary tubing 9, after grouting material 13 solidifies, then carry out this layer The colligation of the second galvanized wire 11, continues construction at the beginning from step above after colligation.

Claims (6)

1. a big ratio chi assembled integral Shear wall tube structure structure, it is characterised in that include dry wall sheet (1), horizontal in first Wall (5), cross wall (6) and connecting portion in second;Described connecting portion includes the second company of first connecting portion (2) of L-shaped, T-shaped Connecing portion (3) and criss-cross 3rd connecting portion (4), described dry wall sheet (1) arranges multistage, and multistage dry wall sheet (1) is altogether With surrounding into a rectangular configuration, and cross wall (5) in first, cross wall (6) is arranged in a mutually vertical manner in described rectangle knot in second The inside of structure, and cross wall (5) in first, the end of cross wall (6) is connected with dry wall sheet (1) in second;Horizontal stroke in described first Wall (5), cross wall (6) is respectively provided with two sections in second, cross wall (5) in first, in second between cross wall (6) by one the 3rd connection Portion (4) connects;The end of cross wall (5) in first, in second the end of cross wall (6) all by the second connecting portion (3) with adjacent Two sections of dry wall sheets (1) connect, and are positioned between adjacent two sections of dry wall sheets (1) of corner all by the first connecting portion (2) even Connect;Described dry wall sheet (1), in cross wall (5) and second, the inside of cross wall (6) is all vertically arranged with pre-buried steel in first Muscle (10), the end of embedded bar (10) passes the end face of dry wall sheet (1);In dry wall sheet (1) and first cross wall (5), Being provided with precast floor slab (7) on four regions that in second, cross wall (6) is constituted, precast floor slab (7) is internal is intervally distributed with the One galvanized wire (8), the first galvanized iron circumfili is around in back-shaped structure, and the two ends of back-shaped structure pass the side of precast floor slab (7) Face being set in pass dry wall sheet (1) end face embedded bar (10), pass first in cross wall in cross wall (5) or second (6) on the embedded bar (10) of end face;The surface of described precast floor slab (7) is equipped with steel fabric sheet (14), lays steel After silk netting (14), a more cast-in-place layer concrete layer (12).
2. big ratio chi assembled integral Shear wall tube structure structure as claimed in claim 1, it is characterised in that described dry wall Cross wall (5) in sheet (1) and first, the inside of cross wall (6) is all vertically arranged with the second galvanized wire (11) in second, prefabricated It is intervally distributed with multiple capillary tubing (9) on floor (7), when described Shear wall tube structure structure arranges multilamellar, is located below Second galvanized wire (11) of the Shear wall tube structure structure of a layer passes capillary tubing (9) and passes the upper end of capillary tubing (9) Portion, and second galvanized wire (11) of the Shear wall tube structure structure of above a layer stretches out in capillary tubing (9), then by capillary Steel pipe (9) inside grouting material (13) is filled with.
3. big ratio chi assembled integral Shear wall tube structure structure as claimed in claim 2, it is characterised in that described dry wall Cross wall (5) in sheet (1) and first, arranged by interval between second galvanized wire (11) of the inside of cross wall (6) in second Horizontal bar connect.
4. big ratio chi assembled integral Shear wall tube structure structure as claimed in claim 1, it is characterised in that described prefabricated building The thickness of plate (7) is 10mm, pours a layer concrete layer (12) again after steel fabric sheet (14) is laid on the surface of precast floor slab (7) Thickness be 10mm~30mm.
5. big ratio chi assembled integral Shear wall tube structure structure as claimed in claim 2, it is characterised in that described capillary steel The internal diameter of pipe (9) is 6mm~8mm, and the wall thickness of capillary tubing (9) is 1mm~2mm.
6. big ratio chi assembled integral Shear wall tube structure structure as claimed in claim 1, it is characterised in that described dry wall Sheet (1), cross wall (5) in first, the thickness of cross wall (6) is 20mm~60mm in second, and height is 300mm~1000mm.
CN201620607583.9U 2016-06-20 2016-06-20 A kind of big than chi assembled integral Shear wall tube structure structure Expired - Fee Related CN205691309U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620607583.9U CN205691309U (en) 2016-06-20 2016-06-20 A kind of big than chi assembled integral Shear wall tube structure structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620607583.9U CN205691309U (en) 2016-06-20 2016-06-20 A kind of big than chi assembled integral Shear wall tube structure structure

Publications (1)

Publication Number Publication Date
CN205691309U true CN205691309U (en) 2016-11-16

Family

ID=57415355

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620607583.9U Expired - Fee Related CN205691309U (en) 2016-06-20 2016-06-20 A kind of big than chi assembled integral Shear wall tube structure structure

Country Status (1)

Country Link
CN (1) CN205691309U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106066233A (en) * 2016-06-20 2016-11-02 西安建筑科技大学 A kind of big than chi assembled integral Shear wall tube structure structure and manufacture method
CN106493837A (en) * 2016-11-22 2017-03-15 西安建筑科技大学 A kind of universal sideshields mould for preparing fabricated shear wall component

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106066233A (en) * 2016-06-20 2016-11-02 西安建筑科技大学 A kind of big than chi assembled integral Shear wall tube structure structure and manufacture method
CN106066233B (en) * 2016-06-20 2018-06-01 西安建筑科技大学 One kind is greatly than ruler assembled integral Shear wall tube structure structure and production method
CN106493837A (en) * 2016-11-22 2017-03-15 西安建筑科技大学 A kind of universal sideshields mould for preparing fabricated shear wall component
CN106493837B (en) * 2016-11-22 2018-12-07 西安建筑科技大学 A kind of general side mode being used to prepare fabricated shear wall component

Similar Documents

Publication Publication Date Title
CN104405123B (en) Cast-in-situ reinforced concrete thin-wall rectangular small bore open tubular column template assembly and construction method thereof
CN102116061A (en) Masonry construction method for filling wall core pillar, core girder and building blocks into framework structure
CN103410332A (en) Concrete hollow block reinforced wall construction technology
CN105804410A (en) Sub-cabin pressure grouting method for vertical connection of prefabricated concrete structure
CN107355010A (en) Precast concrete shear wall shaped steel node connection structure
CN105735469A (en) Partially-bonded precast prestressed concrete frame structure
CN207660136U (en) A kind of assembly concrete frame-shear wall keyway connection structure
CN105926771B (en) A kind of the interior joint connection structure and its construction method of prefabricated integral frame column beam
CN110821004A (en) Assembled wall body using high-ductility TRC composite material as permanent formwork and construction method
CN109057046A (en) The assembled integral beam-column node structure and construction method of additional closure connection reinforcing bar
CN107143065A (en) Prefabricated load bearing concrete wall panel combining structure and construction method
CN107642179A (en) Assembled frame-shear structure steel plate keyway attachment structure and assembling method
CN101225690A (en) Insulation roof slab and method for making same
CN110130534A (en) A kind of novel energy-consumption precast shear wall and its processing installation method
CN205691309U (en) A kind of big than chi assembled integral Shear wall tube structure structure
CN106894538A (en) Filling wall and agent structure concrete integral shaping method
CN206329145U (en) A kind of quick assembled type enclosure wall
CN207160270U (en) Precast concrete shear wall shaped steel node connection structure
CN105735470A (en) Precast concrete frame system using high-performance materials differentially
CN207525906U (en) A kind of assembled frame-shear structure wall splitlevel connection structure
CN208037775U (en) A kind of positioning member for the positioning of elevator rail holder
CN108301510B (en) A kind of bean column node and its construction method
CN207525938U (en) A kind of assembled frame-shear structure column splitlevel connection structure
CN206581482U (en) A kind of assembled architecture of concrete prefabricated wallboard and its composition
CN106066233A (en) A kind of big than chi assembled integral Shear wall tube structure structure and manufacture method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161116

Termination date: 20200620