CN205675105U - Cantalever tube beam fixed structure - Google Patents
Cantalever tube beam fixed structure Download PDFInfo
- Publication number
- CN205675105U CN205675105U CN201620533214.XU CN201620533214U CN205675105U CN 205675105 U CN205675105 U CN 205675105U CN 201620533214 U CN201620533214 U CN 201620533214U CN 205675105 U CN205675105 U CN 205675105U
- Authority
- CN
- China
- Prior art keywords
- plate
- pipe
- mounting bracket
- installing plate
- fixed structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000009434 installation Methods 0.000 claims description 8
- 238000011176 pooling Methods 0.000 abstract description 3
- 238000010586 diagram Methods 0.000 description 4
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000005336 cracking Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 239000002360 explosive Substances 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000035772 mutation Effects 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Landscapes
- Body Structure For Vehicles (AREA)
Abstract
The utility model discloses a kind of cantalever tube beam fixed structure, including vehicle frame and Guan Liang, also include fixing pipe and mounting bracket;Described fixing pipe box is contained in the root of described Guan Liang, and the both sides of described fixing pipe are extended outward horizontally so as to form two first installing plates respectively;The side of described mounting bracket is fixed on vehicle frame, and the opposite side of described mounting bracket is connected by the first installing plate level described in bolt and two.This programme uses fixing pipe, mounting bracket two parts to realize that Guan Liang's is fixing, two parts are with bolts, certain pooling feature can be played in junction, position easy to crack is transferred to bolt by pipe Liang Genbuhanfengchu, the life-span of whole pipe beam assembly is guaranteed, pipe beam fracture of root can be avoided, improve the life-span of pipe beam assembly.
Description
Technical field
The utility model relates to pipe beam field of fixation devices, particularly relates to a kind of cantalever tube beam fixed structure.
Background technology
Pipe boom support on automobile, is used for installing mud guard, mark time support or other parts, and Guan Liang ties as cantilever
Structure, the arm of force is long, and stress is relatively big, and during due to running car, frequent vibration, easily cause the cantilever type parts roots such as Guan Liang to break
Split.And this type component cost is high, changes trouble, therefore need to improve its life-span extremely urgent.
As it is shown in figure 1, existing pipe beam 2a and pipe beam fixed mount 1a welds, and by reinforcement, pipe beam fixed mount 1a is strengthened,
Then realizing the connection with vehicle frame 3a by bolt, i.e. in fact, pipe boom support and Guan Liang are integral type, Guan Liang is as cantilever
Structure, the arm of force is long, and stress is relatively big, and automobile is when traveling is jolted, due to direct and vehicle frame phase after pipe beam fixed mount and the welding of pipe beam
Even, causing pipe beam root (with the weld seam at connecting tube) stress maximum, stress mutation is fast, and pipe beam fixed mount is equal with Guan Liang and vehicle frame
For being directly rigidly connected, it is impossible to effectively eliminating stress, especially when vehicle travels when jolting road surface, pipe beam root meets with stresses
Abruptly increase, easily makes pipe beam root fatigue cracking.
Utility model content
The utility model, in order to solve existing integral type pipe beam fixed mount, when vehicle travels and jolts road surface, is easily sent out
The problem of raw pipe beam fracture of root.
The utility model provides a kind of cantalever tube beam fixed structure to achieve these goals, including vehicle frame and Guan Liang, also
Including fixing pipe and mounting bracket;Described fixing pipe box is contained in the root of described Guan Liang, and the both sides of described fixing pipe are respectively outwards
Horizontal-extending formation two first installing plates;The side of described mounting bracket is fixed on vehicle frame, the opposite side of described mounting bracket
It is connected by the first installing plate level described in bolt and two.
Preferably, described fixing pipe is made up of the symmetrical opposed installation of two parts, and each several part all includes a semi-circular tube and sets
First installing plate of the both sides of described semi-circular tube, described first installing plate offer multiple first installing hole.
Preferably, described mounting bracket includes the gusseted plate of both sides, and the top of gusseted plate described in two passes through one
Connecting plate is connected;The bottom of gusseted plate described in two is horizontally outward extended with the second installing plate, described second installing plate respectively
Just described first installing plate is arranged, each described second installing plate offers multiple second installing hole respectively;Described bolt depends on
Secondary pass through the first installing hole, be connected with a nut after the second installing hole.
Preferably, each described second installing plate is just bent to form downwards bracket fixture portions to the side of described vehicle frame, described
Bracket fixture portions is coplanar with described connecting plate, and described bracket fixture portions and described connecting plate all offer multiple fixing hole.
Preferably, also including the guide pipe being located between the first installing plate and the second installing plate, described guide pipe is fixed on institute
State the bottom of the first installing plate, and just described first installing hole is arranged.
Preferably, described bolt is hollow bolt.
Preferably, also include the elastomeric pad being arranged on described hollow bolt, the bottom of described elastomeric pad with described
Nut against.
Preferably, described fixing pipe is welded on described Guan Liang.
Effect of the present utility model is: using fixing pipe, mounting bracket two parts to realize that Guan Liang's is fixing, two parts are adopted
Being connected with, certain pooling feature can be played in junction, and position easy to crack is transferred to bolt by pipe Liang Genbuhanfengchu, whole
The life-span of individual pipe beam assembly is guaranteed, and can avoid pipe beam fracture of root, improve the life-span of pipe beam assembly.
Brief description
In order to be illustrated more clearly that the embodiment of the present application or technical scheme of the prior art, below will be to institute in embodiment
The accompanying drawing using is needed to be briefly described, it should be apparent that, the accompanying drawing in describing below is only described in the utility model
Some embodiments, for those of ordinary skill in the art, other accompanying drawing can also be obtained according to these accompanying drawings.
Fig. 1 is the installation diagram of Guan Liang in prior art.
The installation diagram of Guan Liang during the pipe beam fixed structure that Fig. 2 provides for using the present embodiment.
Fig. 3 is the axonometric drawing of mounting bracket.
Fig. 4 is the top view of mounting bracket in Fig. 3.
Fig. 5 is the front view of mounting bracket in Fig. 3.
Fig. 6 is the side view of mounting bracket in Fig. 3.
Fig. 7 is the explosive view of fixing tube and tube beam junction.
Fig. 8 is the installation diagram of fixing tube and tube beam.
In prior art diagram: 1a-pipe beam fixed mount 2a-pipe beam 3a-vehicle frame
In the present embodiment figure: 1-vehicle frame 2-pipe beam 3-fixes pipe 4-mounting bracket 41-gusseted plate 42-and connects
Plate 43-the second installing plate 44-the second installing hole 45 bracket fixture portions 5-the first installing plate 51-the first installing hole 6-nut
7-guide pipe 8-bolt
Detailed description of the invention
In order to make those skilled in the art be more fully understood that the technical solution of the utility model, below in conjunction with accompanying drawing pair
The utility model is further detailed.
See shown in Fig. 2-8, a kind of cantalever tube beam fixed structure providing for the utility model embodiment, including vehicle frame 1
With pipe beam 2, wherein, this programme improvement is, by the mounting bracket of integral type before, to make two parts into, it is to avoid one piece rigid
Connecting, anti-seismic performance is poor, causes the problem that pipe beam root easily occurs fracture.Specifically, the present embodiment uses fixing pipe 3 and peace
Dress support 4 realizes the fixing of pipe beam 2 root;Wherein, fix the root that pipe 3 is sleeved on pipe beam 2, then can weld realization further
Fixing pipe 3 closely cooperates with pipe beam 2, and the both sides of fixing pipe 3 are extended outward horizontally so as to form two first installing plates 5 respectively;Install
The side of support 4 is fixed on vehicle frame 1, and the opposite side of mounting bracket 4 is connected with two first installing plate 5 levels by bolt 8, its
In, mounting bracket 4 can use common structure, and such as horizontal vertical structure stand, i.e. vertical section are fixed on vehicle frame, and horizontal segment is respectively
It is connected with two first installing plate bolts.The present embodiment uses fixing pipe, mounting bracket two parts to realize that Guan Liang's is fixing, and two
Part is with bolts, and certain pooling feature can be played in junction, can be prevented effectively from the fracture of root of Guan Liang.
In order to ensure the reliability that fixing tube and tube beam connects, in conjunction with shown in Fig. 7, Fig. 8, fixing pipe 3 in this programme by
Symmetrical two parts are opposed installs composition, the first installing plate 5 that each several part all includes a semi-circular tube with the both sides being located at semi-circular tube,
Multiple first installing hole 51 is offered on described first installing plate 5.During assembling, two halves pipe welds with pipe beam 2 respectively, uses spiral shell
Bolt 8 is connected with mounting bracket 4 after sequentially passing through the first installing hole 51 of fixing pipe 3 both sides.
Mounting bracket 4 in such scheme, when design, should be descended to ensure mounting bracket in the situation saving material as far as possible
Intensity, in conjunction with shown in Fig. 2-6, mounting bracket 4 in the present embodiment, further with improvement, comprising: the gusseted plate of both sides
41, the top of two triangle gripper shoes 41 is connected by a plate 42;The bottom of two triangle gripper shoes 41 all horizontally outward extends
Having the second installing plate 43, the first installing plate 5 is just arranged by the second installing plate 43, on each second installing plate 43 offer respectively multiple
Second installing hole 44;Bolt 8 is connected with a nut 6 after sequentially passing through the first installing hole the 51st, the second installing hole 44, it is achieved installs and props up
Frame 4 and the connection of fixing pipe 3, namely achieve the fixing of pipe beam 2 root.When fixing with vehicle frame 1, can directly weld or second
Installing plate 43 is just being bent to form downwards bracket fixture portions 45, wherein, bracket fixture portions 45 and described connecting plate to the side of vehicle frame 1
42 is coplanar, and bracket fixture portions 45 all offers multiple fixing hole on described connecting plate 42.When being connected fixing with vehicle frame, use
Bolt realizes, this fixed solution facilitates the dismounting of mounting bracket 4.
Wherein, between the first installing plate 5 and the second installing plate 43, also can set up guide pipe 7, in order to the installation of bolt 8 with
And reduce the stress of bolt 8.Wherein, guide pipe 7 is fixed on the bottom of the first installing plate 5, and just arranges the first installing hole 51.
Fixing employing bolt pattern employing flexible connected between pipe 3 and mounting bracket 4, for improving bolt 8 life-span, usually
Reduce bolt 8 rigidity, can reach to reduce the maximum of bolt 8 total pulling force, i.e. reduce the purpose of stress amplitude, thus improve bolt
8 life-spans.For reducing bolt 8 rigidity, can suitably increase the length of bolt 8.Or use waisted bar bolt or hollow bolt, or at spiral shell
Female flexible member installed below, such as elastomeric pad, as shown in Figure 6, during installation, with nut 6 against employing bullet bottom elastomeric pad
Property pad, reduce stress at bolt, improve the life-span of bolt further.
In sum: pipe beam root stress is big and frequent vibration, uses this attachment structure form, and position easy to crack is by Guan Liang
Being transferred at root run at bolt, the life-span of whole pipe beam assembly is guaranteed, and can avoid pipe beam fracture of root, improve pipe
The life-span of beam assembly;Even if it the bolt fracture of easy fracture, is easily replaced, and replacement cost is low;Bolt is used to flexibly connect, can
It is prevented effectively from cantilever beam fracture;Meanwhile, the structure of mounting bracket, has some strength and rigidity, can improve spiral shell to a certain extent
The bolt life-span.
By way of explanation, only describe some one exemplary embodiment of the present utility model above, undoubtedly, for
Those of ordinary skill in the art, in the case of without departing from spirit and scope of the present utility model, can be with various different
Described embodiment is modified by mode.Therefore, above-mentioned accompanying drawing and description are inherently illustrative, should not be construed as
Restriction to the utility model claims.
Claims (8)
1. a cantalever tube beam fixed structure, including vehicle frame and Guan Liang, it is characterised in that: also include fixing pipe and mounting bracket;
Described fixing pipe box is contained in the root of described Guan Liang, and the both sides of described fixing pipe are extended outward horizontally so as to form two first installations respectively
Plate;The side of described mounting bracket is fixed on vehicle frame, and the opposite side of described mounting bracket is installed with described first by bolt
Plate level is connected.
2. cantalever tube beam fixed structure as claimed in claim 1, it is characterised in that: described fixing pipe is by symmetrical two parts pair
Put installation composition, the first installing plate that each several part all includes a semi-circular tube with the both sides being located at described semi-circular tube, described first peace
Multiple first installing hole is offered on dress plate.
3. cantalever tube beam fixed structure as claimed in claim 2, it is characterised in that: described mounting bracket includes the triangle of both sides
Gripper shoe, the top of gusseted plate described in two is connected by a plate;The bottom of gusseted plate described in two level respectively
Being outward extended with the second installing plate, described first installing plate is just arranged by described second installing plate, on each described second installing plate
Offer multiple second installing hole respectively;It is connected with a nut after described screw bolt passes the first installing hole, the second installing hole.
4. cantalever tube beam fixed structure as claimed in claim 3, it is characterised in that: each described second installing plate is just to described car
The side of frame is bent to form downwards bracket fixture portions, and described bracket fixture portions is coplanar with described connecting plate, described bracket fixture portions
With all offer multiple fixing hole on described connecting plate.
5. the cantalever tube beam fixed structure as described in claim 3 or 4, it is characterised in that: also include being located at the first installing plate with
Guide pipe between the second installing plate, described guide pipe is fixed on the bottom of described first installing plate, and just installs to described first
Hole is arranged.
6. cantalever tube beam fixed structure as claimed in claim 5, it is characterised in that: described bolt is hollow bolt.
7. cantalever tube beam fixed structure as claimed in claim 6, it is characterised in that: also include being arranged on described hollow bolt
Elastomeric pad, the bottom of described elastomeric pad and described nut against.
8. cantalever tube beam fixed structure as claimed in claim 1, it is characterised in that: described fixing pipe is welded on described Guan Liang
On.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620533214.XU CN205675105U (en) | 2016-05-30 | 2016-05-30 | Cantalever tube beam fixed structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620533214.XU CN205675105U (en) | 2016-05-30 | 2016-05-30 | Cantalever tube beam fixed structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205675105U true CN205675105U (en) | 2016-11-09 |
Family
ID=57434994
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620533214.XU Expired - Fee Related CN205675105U (en) | 2016-05-30 | 2016-05-30 | Cantalever tube beam fixed structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205675105U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110154719A (en) * | 2019-06-10 | 2019-08-23 | 天津恒天新能源汽车研究院有限公司 | One kind being used for pure electric vehicle power assembly system mounting bracket |
-
2016
- 2016-05-30 CN CN201620533214.XU patent/CN205675105U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110154719A (en) * | 2019-06-10 | 2019-08-23 | 天津恒天新能源汽车研究院有限公司 | One kind being used for pure electric vehicle power assembly system mounting bracket |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP2013079047A (en) | Structure of vehicular shock absorber mounting part | |
CN103879253A (en) | Connecting structure for independent suspension of overweight special vehicle | |
CN203713552U (en) | Transmission suspension device | |
CN205675105U (en) | Cantalever tube beam fixed structure | |
CN201956450U (en) | Antenna installation device | |
CN207257338U (en) | A kind of motor suspension of electric car | |
CN210454955U (en) | Combined support crossbeam | |
CN203957781U (en) | A kind of automotive air-conditioning condenser assembly | |
CN203818966U (en) | Independent suspension connecting structure of extra-heavy special vehicle | |
CN204325911U (en) | A kind of interdigitated electrode structure damping displacement bridge extension joint | |
CN206106844U (en) | Rear overhang swing arm circle tubular beams installation component | |
CN204432296U (en) | A kind of front stabilizer bar upper bracket | |
CN202827150U (en) | Transmission shaft hanging bracket for medium weight automobile | |
CN104786827A (en) | Vibration isolation lifting lug device with exhaust pipe and auxiliary frame connected | |
CN204895095U (en) | Automobile engine gearbox suspension support | |
CN205573617U (en) | Silencer fixing device | |
CN205674857U (en) | A kind of integrated gear-box bracket assembly | |
CN206175048U (en) | Silencer installing support structure | |
CN103895775A (en) | Motorcycle frame with split type underbeam tube | |
CN206615057U (en) | Engine suspension soft pad assembly | |
CN204506469U (en) | Driving engine left and right mounting bracket | |
CN209814183U (en) | Cross-country motorcycle frame | |
CN204701655U (en) | A kind of idle rod mounting bracket and automobile | |
CN201932305U (en) | Engine bracket structure for motorcycles | |
CN208867811U (en) | A kind of subframe reinforcement structure of stabiliser bar installation place |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C56 | Change in the name or address of the patentee | ||
CP01 | Change in the name or title of a patent holder |
Address after: 230601 Anhui Province, Hefei City Industrial Park, the Peach Blossom Road No. 669 Patentee after: Anhui Jianghuai Automobile Group Limited by Share Ltd Address before: 230601 Anhui Province, Hefei City Industrial Park, the Peach Blossom Road No. 669 Patentee before: Anhui Jianghuai Automobile Co., Ltd. |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20161109 Termination date: 20190530 |