CN205653802U CN201620517204.7U CN201620517204U CN205653802U CN 205653802 U CN205653802 U CN 205653802U CN 201620517204 U CN201620517204 U CN 201620517204U CN 205653802 U CN205653802 U CN 205653802U
Authority
CN
China
Prior art keywords
reinforcing bar
support pile
template
gap
soil body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620517204.7U
Other languages
Chinese (zh)
Inventor
于海申
裴鸿斌
苏亚武
刘鹏
杨红岩
周申彬
柯子平
戚明浩
汤淼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201620517204.7U priority Critical patent/CN205653802U/en
Application granted granted Critical
Publication of CN205653802U publication Critical patent/CN205653802U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model provides a prop up interim block structure in fender pile clearance, include: first reinforcing bar, second reinforcing bar and template, first reinforcing bar is followed fender pile vertical interval bar planting is in a fender pile dorsad on one side of the soil body, first reinforcing bar utensil tangible becomes the tip that exposes on a fender pile surface, the second reinforcing bar laterally with the upper first reinforcing bar in the same or close high position of each fender pile expose tip fixed connection, make arbitrary two adjacent strutting between the stake, move towards at the second reinforcing bar set up the template on the inboard of the soil body, just arbitrary two adjacently strut that the clearance does between the stake the template shutoff. The utility model discloses an aforementioned technical scheme, a fender pile clearance of having solved the foundation ditch one side of in the past constructing earlier causes the technical problem who cheats the outer soil body and subside easily because of rain leads to the fact soil erosion and water loss, seepage to foundation ditch is inboard to reach the silt of guaranteeing a fender pile clearance during earthwork excavation to the improvement engineering is executed and is made efficiency, has also maintained useful technological effects such as foundation ditch steadiness.

Description

Support pile gap temporary plugging structure
Technical field
This utility model relates to civil engineering technical field, relates in particular to foundation pit supporting pile gap interim Plugging construction technology.
Background technology
Support pile is generally used for pattern foundation pit supporting structure, slope retaining and landslide control, is used for bearing horizontal soil Pressure or Thrust of Landslide.Wherein, pattern foundation pit supporting structure is for ensureing Underground Construction and foundation ditch surrounding enviroment Safety, foundation pit side-wall and surrounding enviroment employing are propped up gear, reinforce and protective measure.
It should be noted that foundation ditch area is big, mostly use support pile or interim ground-connecting-wall to be separated Construction.Two parts foundation ditch separated is frequently not construction simultaneously but successively construction, but first constructs The support pile gap of foundation ditch side can be mingled with mud in work progress, can cause a large amount of when rainy season Soil erosion, cause hole outer Study on Soil Collapse.
Utility model content
In view of the foregoing, this utility model provides a kind of support pile gap temporary plugging structure, passes through Temporary blocking is set between support pile gap, solves between the support pile of the most first construction foundation pit side Gap easily causes soil erosion because of rain, causes the technical problem cheating outer Study on Soil Collapse, reaches to guarantee at soil During side's excavation, the mud in support pile gap is non-leakage to foundation ditch, thus improves engineering and apply efficiency, Also the Advantageous Effects such as foundation ditch steadiness are maintained.
For achieving the above object, this utility model adopts the technical scheme that:
A kind of support pile gap temporary plugging structure, is formed at soil mass of foundation pit and is located at described soil with the most several Between support pile before body, described temporary plugging structure includes: the first reinforcing bar, the second reinforcing bar and mould Plate, wherein, described first reinforcing bar is vertically spaced bar planting in the support pile soil body dorsad along described support pile On side, described first reinforcing bar has the exposed end portion being formed at support pile surface;Described second reinforcing bar Laterally with each support pile on be positioned at same or like height and position the exposed end portion of the first reinforcing bar fix Connect;Make between any two adjacent support piles, arrange on the inner side of the described soil body at the second reinforcing bar Between template, and described any two adjacent support piles, gap is the closure of described template.
Further improvement is that of this utility model support pile gap temporary plugging structure, described second steel Muscle is laterally fixing with the exposed end portion of described first reinforcing bar by solder technology to be connected.
Further improvement is that of this utility model support pile gap temporary plugging structure, described second steel Muscle setting space on described support pile is vertical is 0.5-1.5 meter;Described setting space is more preferably 1 Meter.
Further improvement is that of this utility model support pile gap temporary plugging structure, described template is At corresponding second reinforcing bar, it is provided with timber wedge, in order to fasten soil between plank sheathing, and described template and the soil body Body.
Further improvement is that of this utility model support pile gap temporary plugging structure, described template Opposite sides is provided with arc inclined-plane, makes described template be placed between two adjacent support piles and by being located at described The inner side of two reinforcing bars, described two arc inclined-planes and the laminating of two adjacent support pile surfaces, described two adjacent supportings Between Zhuan, gap is the closure of described template.
This utility model, by aforementioned support pile gap temporary plugging structure, has following technical effect that
(1) by bar planting on support pile and be welded and fixed with horizontal reinforcement, on support pile is vertical between Several horizontal reinforcement is set every fixed range, in order to arrange template inside horizontal reinforcement, plays really Effective gear soil effect;
(2) by placing the most several small-sized timber wedge inside plank sheathing and between the soil body, closing is formed Space, has guarantee plank sheathing and can fasten the soil body, further the effect of strengthening gear soil;
(3) this utility model support pile gap temporary plugging structure is playing the effect avoiding soil erosion Time, it may have it is quick, convenient to apply, it is possible to whole construction work efficiency of construction useful is substantially improved Technique effect.
Accompanying drawing explanation
Figure 1A is that support pile gap of the present utility model is mingled with soil body floor map.
Figure 1B is that support pile gap of the present utility model is mingled with soil body elevational schematic view.
Fig. 2 A is support pile bar planting floor map of the present utility model.
Fig. 2 B is support pile bar planting elevational schematic view of the present utility model.
Fig. 3 A is horizontal reinforcement plane positioning schematic diagram of the present utility model.
Fig. 3 B is that horizontal reinforcement facade of the present utility model positions schematic diagram.
Fig. 4 A is plank sheathing plane positioning schematic diagram of the present utility model.
Fig. 4 B is that plank sheathing facade of the present utility model positions schematic diagram.
Fig. 4 C is the 4C dotted line frame close-up schematic view of this utility model Fig. 4 A.
Fig. 5 A is nose key floor map of the present utility model.
Fig. 5 B is nose key elevational schematic view of the present utility model.
Fig. 5 C is the 5C dotted line frame close-up schematic view of this utility model Fig. 5 A.
Reference is as follows with the corresponding relation of parts:
The soil body 10;Support pile 20;First reinforcing bar 30;Exposed end portion 31;Second reinforcing bar 40;Template 50; Arc inclined-plane 51,52;Timber wedge 60;Vertical X.
Detailed description of the invention
For the benefit of to understanding of the present utility model, illustrate below in conjunction with drawings and Examples.
Referring to Figure 1A to Fig. 5 C, this utility model provides a kind of support pile gap temporary plugging structure, Wherein, the soil mass of foundation pit 10 that described temporary plugging structure is formed in such as Figure 1A, 1B sets with the most several Between support pile 20 before the described soil body 10;As shown in Fig. 2 A to Fig. 5 C, of the present utility model Support pile gap temporary plugging structure includes first reinforcing bar the 30, second reinforcing bar 40, template 50 and wood Wedge 60.
Need to first illustrate, in this utility model, described first reinforcing bar 30 also includes bar planting, bar planting Reinforcing bar or other mean that bar planting reinforcing bar on support pile, described second reinforcing bar 40 also include reinforcing bar, water Flat reinforcing bar or other mean horizontally set and the reinforcing bar being connected with the first reinforcing bar 30 on each support pile 20. Further, defining described support pile 20 along its vertical direction is a vertical X.
Such as Fig. 2 A, 2B, described first reinforcing bar 30 is to be spaced bar planting along the described vertical X of support pile 20 On the side of support pile 20 soil body 10 dorsad, described first reinforcing bar 30 has and is formed at support pile The exposed end portion 31 on 20 surfaces.
Such as Fig. 3 A, 3B, described second reinforcing bar 40 be laterally with each support pile 20 on be positioned at identical Or the exposed end portion 31 of the first reinforcing bar 30 of close height and position connects by solder technology is fixing.
Such as Fig. 4 A, 4B, 4C, described template 50 in order to be arranged on any two adjacent support piles 20 it Between, and it is fixed on the second reinforcing bar 40 towards on the inner side of the described soil body 10.In the present embodiment, institute State template 50 for plank sheathing, and described template 50 have along support pile 20 vertical X extension relative Both sides, the opposite sides of described template 50 is embedded at cylindrical support pile 20 and described second reinforcing bar 40 Clamping at, to block the gap between any two adjacent support piles 20.It is preferred that described template The opposite sides of 50 is provided with the arc inclined-plane 51,52 of corresponding support pile 20 surface configuration, makes described template 50 are placed between two adjacent support piles 20 and during by being located at the inner side of described second reinforcing bar 40, and described two Between adjacent support pile 20, gap is by described two arc inclined-planes 51,52 and the laminating of support pile 20 surface Blocked well.
Such as Fig. 5 A, 5B, 5C, between described template 50 and the soil body 10 at corresponding second reinforcing bar 40 It is provided with timber wedge 60, in order to fasten soil mass of foundation pit.In the present embodiment, such as Fig. 5 B, described timber wedge 60 are preferably small-sized timber wedge, and between two adjacent support piles 20 at corresponding second reinforcing bar 40, with three Individual timber wedge 60 is one group to arrange.
Specifically, this utility model support pile gap temporary plugging structure includes:
As shown in Figure 1A, 1B, the soil body 10 space before at foundation ditch arranges support pile 20, and adjacent Between support pile 20, there is gap;Then, such as Fig. 2 A, 2B, at support pile 20 towards in foundation ditch The side in portion, the vertical X along support pile 20 carries out bar planting;After completing, as Fig. 3 A, 3B separately take Reinforcing bar 40 flatly with the bar planting exposed end portion 31 of same or like height and position on each support pile 20 It is welded and fixed;For another example Fig. 4 A, 4B, 4C at horizontal reinforcement 40 towards the inner side placing mold of the soil body 10 Plate 50 forms temporary plugging structure, supports the soil body 10 for gear and subsides towards foundation ditch;And in order to ensure mould Plate 50 can fasten the soil body 10, preferably such as Fig. 5 A, 5B, 5C, places timber wedge 60 inside plank sheathing, Carry the fastening effect obtaining the soil body 10.
Above in association with drawings and Examples, this utility model is described in detail, common in this area This utility model can be made many variations example by technical staff according to the above description.Thus, in embodiment Some details should not constitute restriction of the present utility model, this utility model will be with claims The scope that book defines is as protection domain of the present utility model.

Claims (6)

1. a support pile gap temporary plugging structure, be formed at soil mass of foundation pit with the most several be located at described Between support pile before the soil body;It is characterized in that, described temporary plugging structure includes:
First reinforcing bar, the second reinforcing bar and template, wherein, described first reinforcing bar erects along described support pile To interval bar planting on the side of the support pile soil body dorsad, described first reinforcing bar has and is formed at support pile The exposed end portion on surface;Described second reinforcing bar is laterally positioned at same or like height with on each support pile The exposed end portion of the first reinforcing bar of position is fixing to be connected;Make between any two adjacent support piles, second Reinforcing bar arranges gap between template, and described any two adjacent support piles on the inner side of the described soil body Block for described template.
Support pile gap the most according to claim 1 temporary plugging structure, it is characterised in that:
Described second reinforcing bar is laterally fixing with the exposed end portion of described first reinforcing bar by solder technology to be connected Connect.
Support pile gap the most according to claim 1 temporary plugging structure, it is characterised in that:
Described second reinforcing bar setting space on described support pile is vertical is 0.5-1.5 meter.
Support pile gap the most according to claim 3 temporary plugging structure, it is characterised in that:
Described second reinforcing bar setting space on described support pile is vertical is 1 meter.
Support pile gap the most according to claim 1 temporary plugging structure, it is characterised in that:
Described template is to be provided with wood at corresponding second reinforcing bar between plank sheathing, and described template and the soil body Wedge, in order to fasten the soil body.
Support pile gap the most according to claim 1 temporary plugging structure, it is characterised in that:
The opposite sides of described template is provided with arc inclined-plane, makes described template be placed between two adjacent support piles And by being located at the inner side of described second reinforcing bar, described two arc inclined-planes and the laminating of two adjacent support pile surfaces, Between described two adjacent support piles, gap is the closure of described template.
CN201620517204.7U 2016-05-31 2016-05-31 Prop up interim block structure in fender pile clearance Expired - Fee Related CN205653802U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620517204.7U CN205653802U (en) 2016-05-31 2016-05-31 Prop up interim block structure in fender pile clearance

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620517204.7U CN205653802U (en) 2016-05-31 2016-05-31 Prop up interim block structure in fender pile clearance

Publications (1)

Publication Number Publication Date
CN205653802U true CN205653802U (en) 2016-10-19

Family

ID=57404897

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620517204.7U Expired - Fee Related CN205653802U (en) 2016-05-31 2016-05-31 Prop up interim block structure in fender pile clearance

Country Status (1)

Country Link
CN (1) CN205653802U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105908757A (en) * 2016-05-31 2016-08-31 中国建筑第八工程局有限公司 Temporary blocking structure for clearances of support piles and construction method of temporary blocking structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105908757A (en) * 2016-05-31 2016-08-31 中国建筑第八工程局有限公司 Temporary blocking structure for clearances of support piles and construction method of temporary blocking structure

Similar Documents

Publication Publication Date Title
CN102094425B (en) Foundation pit construction method adopting shallow buried depth Larsen steel plate pile as protective cofferdam
CN204491626U (en) The foundation pit enclosure structure that Larsen steel sheet pile and prestressed anchor combine
CN203654294U (en) Foundation pit supporting structure used in reverse building method
CN105239578B (en) Water-rich sand layer deep foundation pit underwater construction method
CN103938634B (en) A kind of deep foundation pit supporting structure and construction method
CN107059882A (en) Arch anchor net and Anchor-Pile Retaining Structure structure
CN106065628B (en) Based on the major diameter running water pipe security protection construction method faced forever with reference to theory
CN109667273A (en) A kind of construction method of deep foundation pit supporting structure
CN107558477A (en) The supporting construction and construction method that a kind of foundation ditch is combined with side slope
JP5229913B2 (en) Slope reinforcement method
CN205617390U (en) A softer side of sears layer excavation supporting system for loess area
KR101262357B1 (en) Inclined Earth Retaining Structure Method
CN204590059U (en) A kind of combined type tower-crane foundation structure
CN207714348U (en) A kind of deep basal pit fast rainfall device
CN205653802U (en) Prop up interim block structure in fender pile clearance
CN103669976B (en) Ancient pagoda correction method
CN105544559B (en) The structure and method of pattern foundation pit supporting structure are carried out using prefabricated components
CN112709143A (en) Cast-in-place inclined leg rigid frame bridge disc buckle type full-space support and template construction method
CN208701700U (en) A kind of pile foundation protective device close near deep basal pit
CN204715364U (en) A kind of foundation pit support device
CN107780418A (en) The rapid constructing method cheated in Deep Foundation Pit
CN205804365U (en) A kind of cap excavation method top board node structure
KR101117924B1 (en) Composite type steel temporary construction and construction method thereof
CN214993928U (en) Compound supporting construction that nature was put slope and SMW worker method stake and is combined
KR100487838B1 (en) Prefabricated retaining wall and it's construction method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161019

CF01 Termination of patent right due to non-payment of annual fee