CN205576973U - Circular inspection shaft of prefabricated formula - Google Patents

Circular inspection shaft of prefabricated formula Download PDF

Info

Publication number
CN205576973U
CN205576973U CN201620416598.7U CN201620416598U CN205576973U CN 205576973 U CN205576973 U CN 205576973U CN 201620416598 U CN201620416598 U CN 201620416598U CN 205576973 U CN205576973 U CN 205576973U
Authority
CN
China
Prior art keywords
well
room main
main body
well lid
circular inspection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620416598.7U
Other languages
Chinese (zh)
Inventor
徐萌
赵震
牟惠跃
李文辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongxin Road & Bridge Material Co Ltd
Original Assignee
Zhongxin Road & Bridge Material Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongxin Road & Bridge Material Co Ltd filed Critical Zhongxin Road & Bridge Material Co Ltd
Priority to CN201620416598.7U priority Critical patent/CN205576973U/en
Application granted granted Critical
Publication of CN205576973U publication Critical patent/CN205576973U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model relates to a circular inspection shaft of prefabricated formula, including well room main part, well lid base, well lid, well room main part adopts concrete an organic whole to pour the shaping, well room main part includes the wall of a well and well seat, the well seat sets up the lower extreme of the wall of a well is followed the radial outside outstanding installation base that is formed with of the wall of a well, installation boss shape becomes there is plane portion, the mounting hole with plane portion the wall of a well sets up with running through, the well lid pedestal mounting is in the top of well room main part, the well lid with the installation of well lid base looks adaptation ground. The utility model provides a present circular inspection shaft of prefabricated formula be unfavorable for reserving the problem of hole, make prefabricated formula inspection shaft can with the drainage pipe high -speed joint, and circular inspection shaft is sturdy and durable, production efficiency is high, practices thrift the manufactured materials.

Description

A kind of prefabricated circular inspection well
Technical field
This utility model relates to inspection shaft technical field, particularly relates to a kind of prefabricated circular inspection well.
Background technology
Inspection shaft be the power supply for Urban Underground infrastructure, feedwater, draining, blowdown, communication, cable television, gas pipe, Public lighting circuits etc. keep in repair, easy for installation and arrange.Be generally located at pipeline intersection, turning, caliber or gradient change, And locate at a certain distance on straight line pipeline section, it is easy for making regular check on auxiliary construction.
The most traditional inspection shaft is most to be built by on-the-spot building block, is needing the local excavation of inspection shaft, is then being built by artificial Building, often long construction period, build work by laying bricks or stones and need to expend a large amount of artificial, inefficiency, work quality is poor, there is very great danger Dangerous.Although existing some inspection shafts utilizing prefabricated to manufacture that the most also occurs in that, but prefabricated is generally used to manufacture The shape of inspection shaft is square or rectangle, owing to circular inspection well sidewall is arcwall face, is unfavorable for reserving hole, so deposits Being exactly that inconvenience is connected with drainage pipeline a drawback, therefore, prefabricated circular inspection well there is presently no is used widely, Need those skilled in the art badly and this is made improvement.
Utility model content
A purpose of the present utility model is to overcome above-mentioned the deficiencies in the prior art, and then provides a kind of prefabricated circle inspection Look into well, solve pre existing standard circular inspection well and be unfavorable for the problem of reserving hole, enable prefabricated inspection shaft and draining Pipeline quickly connects, and circular inspection well is sturdy and durable, and production efficiency is high, saves and manufactures material.
The technical solution of the utility model:
A kind of prefabricated circular inspection well, including well room main body, well lid base, well lid, described well room main body uses concrete Formed by integrally casting molding, described well room main body includes the borehole wall and well seat, and described well seat is arranged on the lower end of the described borehole wall, along described Projecting radially outwardly of the borehole wall is formed with installation base, and described installation base is formed with planar portions, installing hole and described planar portions, The described borehole wall is penetratingly arranged;Described well lid floor installation is above the main body of described well room, at the bottom of described well lid and described well lid Seat is installed suitablely.
Further, between described well room main body and described well lid base, adjusting ring and step, described adjusting ring it are additionally provided with Upper end grafting with described well room main body is fixed, and the upper end grafting of described step and described adjusting ring is fixed, described well lid base Upper end grafting with described step is fixed.
Further, described step, adjusting ring, well room main body inwall on be all positioned apart from cat ladder.
Further, described adjusting ring, step all use concrete formed by integrally casting molding.
Further, described well lid base can be by concrete formed by integrally casting molding or employing spheroidal graphite cast-iron casting.
Further, sealing strip is all used to be tightly connected between described well room main body, adjusting ring, step.
This utility model has the advantages that prefabricated circle inspection disclosed in this utility model relative to prior art Well, including well room main body, well lid base, well lid, well room main body uses concrete formed by integrally casting molding, so can improve The manufacture efficiency of well room main body, well room main body includes the borehole wall and well seat, is formed with installation base along projecting radially outwardly of the borehole wall, Installation base is formed with planar portions, and installing hole runs through planar portions and the borehole wall, by having the setting of the installation base of planar portions, Pre existing standard circular inspection well can be efficiently solved and be unfavorable for the problem of reserving hole, enable prefabricated inspection shaft and row Waterpipe quickly connects.Prefabricated circular inspection well disclosed in this utility model uses concrete formed by integrally casting molding, more traditional On-the-spot masonry way, in terms of efficiency of construction, had a large increase, and the labor intensity of workman can have been alleviated, concrete one The inspection shaft poured is more sturdy and durable, and circular inspection well is more existing square or rectangle inspection well is compared, it is possible to saves and manufactures Material, reduces manufacturing cost.
Additional aspect of the present utility model and advantage will part be given in the following description, and part will become from the following description Obtain substantially, or recognized by the practice of utility model.
Accompanying drawing explanation
Fig. 1 is the structural representation of this utility model embodiment;
Fig. 2 is the structural representation of this utility model embodiment well room main body;
Fig. 3 is the structural representation of this utility model embodiment adjusting ring;
Fig. 4 is the structural representation of this utility model embodiment step;
1-well room main body in figure;2-well lid base;3-well lid;The 4-borehole wall;5-well seat;6-installation base;7-planar portions; 8-installing hole;9-adjusting ring;10-step;11-cat ladder.
Detailed description of the invention
Below in conjunction with accompanying drawing, this utility model is described in detail.
In conjunction with shown in Fig. 1 to Fig. 4, prefabricated circular inspection well disclosed in the present embodiment, including at the bottom of well room main body 1, well lid Seat 2, well lid 3, well room main body 1 uses concrete formed by integrally casting molding, the well room main body 1 of concrete formed by integrally casting molding In structure more sturdy and durable, and the efficiency of construction of well room main body 1 can be improved.
Well room main body 1 includes the borehole wall 4 and well seat 5, and well seat 5 is arranged on the lower end of the borehole wall 4, along the borehole wall 4 radially outward Highlighting and be formed with installation base 6, installation base 6 is formed with planar portions 7, and installing hole 8 is with planar portions, the borehole wall 4 penetratingly Arrange, by having the setting of the installation base 6 of planar portions 7, pre existing standard circular inspection well can be efficiently solved not The problem being beneficial to reserving hole, enables prefabricated inspection shaft to be quickly connected with drainage pipeline.
Well lid base 2 is arranged on the top of well room main body 1, and well lid 3 is installed suitablely with well lid base 2, well lid base 2 arrange can be well lid 3 installation provide support, well lid base 2 can by concrete formed by integrally casting molding or use spheroidal graphite Iron casting molding, well lid 3 can facilitate and coordinates the closure or openness realizing well lid 3 with well lid base 2.
Preferably, between well room main body 1 and well lid base 2, be additionally provided with adjusting ring 9 and step 10, adjusting ring 9 with The upper end grafting of well room main body 1 is fixed, and the upper end grafting of step 10 and adjusting ring 9 is fixed, well lid base 2 and step Upper end grafting is fixed, it is preferable that all use sealing strip to be tightly connected between well room main body 1, adjusting ring 9, step 10, Sealing strip can ensure that the connection between well room main body 1, adjusting ring 9, step 10 is sealing state, can prevent to inspection shaft Internal infiltration, can improve the impermeability of inspection shaft;Owing to inspection shaft needs to be arranged in many places, the geographical position of each position Put and can there are differences, therefore adjusting ring 9 is set and can adjust the difference in height of inspection shaft and ground as required, so can make The inspection shaft of prefabricated can be applicable to any physical features, has range of application widely.The setting of step 10, can basis Need to adjust the diameter difference between main body 1 inside, well room and well lid 3, so can facilitate between well room main body 1 and well lid 3 Assembling.
Preferably, step 10, adjusting ring 9, well room main body 1 inwall on be all positioned apart from cat ladder 11, so Workman can be facilitated to pass through cat ladder 11 and to enter the inside of inspection shaft.
Preferably, adjusting ring 9, step 10 all use concrete formed by integrally casting molding, so can improve manufacture efficiency, Simultaneously can be cost-effective.
The on-the-spot masonry way that this utility model is traditional, has had large increase in terms of efficiency of construction, and can alleviate the labor of workman Fatigue resistance, the inspection shaft of concrete formed by integrally casting is more sturdy and durable, and circular inspection well is more existing square or rectangle inspection well Compare, it is possible to save and manufacture material, reduce manufacturing cost.
Above example is the exemplary illustration to this patent, does not limit its protection domain, and those skilled in the art are also Its local can be changed, as long as no the spirit beyond this patent, all in the protection domain of this patent.

Claims (6)

1. a prefabricated circular inspection well, it is characterised in that include well room main body (1), well lid base (2), well lid (3), Described well room main body (1) uses concrete formed by integrally casting molding, and described well room main body (1) includes the borehole wall (4) and well seat (5), Described well seat (5) is arranged on the lower end of the described borehole wall (4), is formed with installation along projecting radially outwardly of the described borehole wall (4) Boss (6), described installation base (6) is formed with planar portions (7), installing hole (8) and described planar portions (7), described The borehole wall (4) is penetratingly arranged;Described well lid base (2) is arranged on the top of described well room main body (1), described well lid (3) Install suitablely with described well lid base (2).
A kind of prefabricated circular inspection well the most according to claim 1, it is characterised in that described well room main body (1) And it is additionally provided with adjusting ring (9) and step (10), described adjusting ring (9) and described well between described well lid base (2) The upper end grafting of room main body (1) is fixed, and the upper end grafting of described step (10) and described adjusting ring (9) is fixed, described The upper end grafting of well lid base (2) and described step (10) is fixed.
A kind of prefabricated circular inspection well the most according to claim 2, it is characterised in that described step (10), Adjusting ring (9), well room main body (1) inwall on be all positioned apart from cat ladder (11).
A kind of prefabricated circular inspection well the most according to claim 3, it is characterised in that described adjusting ring (9), partially Mouth (10) all uses concrete formed by integrally casting molding.
A kind of prefabricated circular inspection well the most according to claim 4, it is characterised in that described well lid base (2) Can be by concrete formed by integrally casting molding or employing spheroidal graphite cast-iron casting.
A kind of prefabricated circular inspection well the most according to claim 5, it is characterised in that described well room main body (1), Sealing strip is all used to be tightly connected between adjusting ring (9), step (10).
CN201620416598.7U 2016-05-10 2016-05-10 Circular inspection shaft of prefabricated formula Active CN205576973U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620416598.7U CN205576973U (en) 2016-05-10 2016-05-10 Circular inspection shaft of prefabricated formula

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620416598.7U CN205576973U (en) 2016-05-10 2016-05-10 Circular inspection shaft of prefabricated formula

Publications (1)

Publication Number Publication Date
CN205576973U true CN205576973U (en) 2016-09-14

Family

ID=56857193

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620416598.7U Active CN205576973U (en) 2016-05-10 2016-05-10 Circular inspection shaft of prefabricated formula

Country Status (1)

Country Link
CN (1) CN205576973U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109778994A (en) * 2019-02-25 2019-05-21 重庆大学 The prefabricated assembled drainage inspection well of spheroidal graphite cast-iron
CN112376653A (en) * 2020-11-30 2021-02-19 黑龙江省水利科学研究院 Totally-enclosed integrated metal well chamber

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109778994A (en) * 2019-02-25 2019-05-21 重庆大学 The prefabricated assembled drainage inspection well of spheroidal graphite cast-iron
CN112376653A (en) * 2020-11-30 2021-02-19 黑龙江省水利科学研究院 Totally-enclosed integrated metal well chamber

Similar Documents

Publication Publication Date Title
CN2801923Y (en) Concrete built-in anti-leakage special casing pipe
CN201232197Y (en) Combined inspection well
CN109458757B (en) Static drilling root planting energy pile and production method and construction method thereof
CN205576973U (en) Circular inspection shaft of prefabricated formula
CN203270612U (en) Vertical slitting type combined inspection shaft
CN202466631U (en) Prefabricated reinforced concrete inspection well and die thereof
CN203284803U (en) Combined type multifunctional comprehensive inspection well chamber
CN103790181B (en) Daylight illumination device pier base and manufacturing method thereof
CN208121807U (en) A kind of matched benzvalene form interface prefabrication type reinforced concrete water collection well of pipe gallery
CN206090623U (en) Prefabricated inspection shaft of construction efficient
CN204174724U (en) A kind of polycrystalline substance of Prefabricated pumping plant
CN106592635A (en) Integrated inspection shaft and installation method thereof
CN207064863U (en) A kind of new waterproof sleeve pipe
CN203960902U (en) A kind of glass fiber reinforced plastics manhole
CN208088346U (en) Closing type composite plastic water meter well
CN208201925U (en) prefabricated rainwater inspection well
KR960003303Y1 (en) Fabricated manhole structure
CN203297768U (en) Leakage preventing connecting tube penetrating through floor slab and connecting structure thereof
CN2814074Y (en) Device for sealing up pipe in the wall
CN203583521U (en) Constructional engineering well body structure
CN103244754A (en) Antiseep connecting pipe penetrating through floor and connecting structure of antiseep connecting pipe
CN205688545U (en) A kind of plumbing integration module
CN204326105U (en) A kind of plastic inspection well
CN214940398U (en) Assembled precast concrete overhaul (inspection) well
CN204000937U (en) Integrated communication pipe manhole

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant