CN204000937U - Integrated communication pipe manhole - Google Patents

Integrated communication pipe manhole Download PDF

Info

Publication number
CN204000937U
CN204000937U CN201420156077.3U CN201420156077U CN204000937U CN 204000937 U CN204000937 U CN 204000937U CN 201420156077 U CN201420156077 U CN 201420156077U CN 204000937 U CN204000937 U CN 204000937U
Authority
CN
China
Prior art keywords
well bore
shaft bottom
communication pipe
utility
model
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420156077.3U
Other languages
Chinese (zh)
Inventor
陈曦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenyang Telecommunication Planning And Design Institute Co ltd
Original Assignee
Shenyang Telecom Planning & Design Institute (co Ltd)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang Telecom Planning & Design Institute (co Ltd) filed Critical Shenyang Telecom Planning & Design Institute (co Ltd)
Priority to CN201420156077.3U priority Critical patent/CN204000937U/en
Application granted granted Critical
Publication of CN204000937U publication Critical patent/CN204000937U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model discloses a kind of integrated communication pipe manhole, it has, and simple in structure, applicability is strong, construction is simple, and the feature of reduction of erection time significantly.The well lid that is provided with through hole cover well bore above, on the inwall of well bore, cable bracket is housed, the borehole wall is provided with window, pipeline foundation plate is arranged on window place, below well bore, be provided with shaft bottom, shaft bottom plane slightly tilts to outfall place, with the shaft bottom of outfall, by gutter, is connected with municipal drainage well, and well bore integral body is carried out waterproofing work with water-repellent paint.The utility model can dwindle after mechanism size according to the construction needs of different engineerings, forms communication pipe hand hole.The all parts of the utility model all can be produced in batch production, pre-formed, job site assembling.

Description

Integrated communication pipe manhole
Technical field
The utility model relates to communication equipment manufacturing technical field, and definite says, it is a kind of integrated communication pipe manhole.
Background technology
Communication ray cable is worn and is let slip in journey carrying out underground pipeline, can not without distance limit in pipeline, wear and put, communication pipeline manhole need to be set on certain distance, so that wearing of Communication ray cable put, inspection and maintenance operation.In prior art, communication pipeline manhole is many to be comprised of some parts, that is: cast well lid cladding plate, brick well bore, sole plate, drift bolt, cable supporting plate and water accumulation tank etc., because the meter parts that this structure is established are more, thereby caused communication pipeline manhole intensity to decline, in addition also trouble comparatively of the construction of this manhole, construction period is long, often do not catch up with the have stable political situation paces of road administration road construction of city.
Summary of the invention
this uses novel object is exactly to solve defect and the deficiency existing in prior art, provide a kind of simple in structure, applicability is strong, mechanical strength is high, particularly can greatly shorten the integrated communication pipe manhole of construction period.
This uses novel object is to realize like this, integrated communication pipe manhole, it is characterized in that: the well lid that is provided with through hole cover well bore above, on the inwall of well bore, cable bracket is housed, the borehole wall is provided with window, and pipeline foundation plate is arranged on window place, below well bore, be provided with shaft bottom, shaft bottom plane slightly tilts to outfall place, with the shaft bottom of outfall, by gutter, is connected with municipal drainage well, and well bore integral body is carried out waterproofing work with water-repellent paint.
the utility model has the advantages that: according to the construction needs of different engineerings, after the utility model minification, can becoming one communication pipe hand hole; All parts all can be produced in batch production, pre-formed, job site assembling; Mechanical strength is high, job specfication; Particularly it can also shorten construction period greatly, thoroughly solves the problem of long-term ponding in communication pipe.
Accompanying drawing explanation
Fig. 1 is overall structure schematic diagram of the present utility model.
The specific embodiment
embodiment 1:
well lid 1 of the present utility model, well bore 2, pipeline foundation plate 3 and shaft bottom 6 can adopt steel concrete to make, reserved through hole 9, window 5 and outfall 8.Well bore 2 and shaft bottom 6 can one-shot formings, and well bore 2 integral body are carried out waterproofing work with water-repellent paint.The periphery of inner wall of well bore 2 is installed cable supporting plate 4, so that later stage Da unwrapping wire cable, quantity can be determined according to specific needs.Shaft bottom 6 should tilt to outfall 8 places gradually, is convenient to ponding and by the gutter 7 being communicated with municipal drainage well, discharges in time, prevents well internal water accumulation, and screen pack can be installed by gutter place 7, to prevent obstruction.
The utility model can contract, put overall structure size according to the construction needs of different engineerings, and after minification, the utility model can becoming one communication pipe hand hole.All parts all can be produced in batch production, pre-formed, job site assembling.

Claims (2)

1. integrated communication pipe manhole, it is characterized in that: the well lid (1) that is provided with through hole (9) cover well bore (2) above, cable bracket (4) is housed on the inwall of well bore (2), the borehole wall is provided with window (5), pipeline foundation plate (3) is arranged on window (5) and locates, well bore (2) be provided with below shaft bottom (6), with the shaft bottom (6) of outfall (8), by gutter (7), be connected with municipal drainage well.
2. integrated communication pipe manhole according to claim 1, is characterized in that: shaft bottom (6) plane is slightly located to outfall (8).
CN201420156077.3U 2014-04-02 2014-04-02 Integrated communication pipe manhole Expired - Fee Related CN204000937U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420156077.3U CN204000937U (en) 2014-04-02 2014-04-02 Integrated communication pipe manhole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420156077.3U CN204000937U (en) 2014-04-02 2014-04-02 Integrated communication pipe manhole

Publications (1)

Publication Number Publication Date
CN204000937U true CN204000937U (en) 2014-12-10

Family

ID=52040962

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420156077.3U Expired - Fee Related CN204000937U (en) 2014-04-02 2014-04-02 Integrated communication pipe manhole

Country Status (1)

Country Link
CN (1) CN204000937U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108457304A (en) * 2018-03-28 2018-08-28 合肥云智物联科技有限公司 Cable shaft based on Phase of Electric Power Projects and its monitoring system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108457304A (en) * 2018-03-28 2018-08-28 合肥云智物联科技有限公司 Cable shaft based on Phase of Electric Power Projects and its monitoring system

Similar Documents

Publication Publication Date Title
CN204898721U (en) Steel construction city utility tunnel
CN103806470B (en) Mounting method produced by steel concrete manhole
CN201605599U (en) Integrated prefabricated inspection well
CN204000937U (en) Integrated communication pipe manhole
CN102619521B (en) Construction method for vertical shaft bedrock section wall structure
CN204080839U (en) A kind of Yield rainfall relation device
CN204983399U (en) Section of hanging down is transferred to testing column steel pipe
CN204112365U (en) Integrated form steel valve pit
CN204370462U (en) Open-cut station water drainage of deep foundation pit system
CN205576973U (en) Circular inspection shaft of prefabricated formula
CN203188238U (en) Assembled type prefabricated reinforced concrete combined inspection well
CN201381518Y (en) Standard integral outdoor equipment well
CN204418728U (en) A kind of precast monolithic washroom
CN104652426B (en) A kind of saline soil area waterglass anticorrosion pile foundation construction method
CN203927685U (en) A kind of integral solar garden lamp
CN103015457A (en) Method for building rural brick buried sewage treatment facility
CN104251008B (en) A kind of guiding gutter and restorative procedure repairing pipe duct and back drop with water
CN202850101U (en) Buried type preset whole rainwater pumping station
CN202369996U (en) Water-draining sealing device for foundation pit
CN202148537U (en) Fire-fighting integral valve shaft
CN202672331U (en) Prefabricated reinforced concrete circular grit well
CN201180309Y (en) Metal threaded steel pipe inspection shaft
CN210342175U (en) Assembled inspection shaft
CN105003036A (en) Prefabricated rail and its manufacturing method
CN206319220U (en) A kind of pre-embedded device of anti-inspection shaft road surface relative settlement nearby

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 110021 gliding Road, Tiexi District, Shenyang, Liaoning Province, No. 25

Patentee after: SHENYANG TELECOMMUNICATION PLANNING AND DESIGN INSTITUTE CO.,LTD.

Address before: 110021 gliding Road, Tiexi District, Shenyang, Liaoning Province, No. 25

Patentee before: SHENYANG INSTITUTE OF TELECOMMUNICATION PLANNING AND DESIGNING (Co.,Ltd.)

CP01 Change in the name or title of a patent holder
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141210

CF01 Termination of patent right due to non-payment of annual fee