CN205530280U - Novel prefabricated two walls unification foundation ditch enclosure system - Google Patents
Novel prefabricated two walls unification foundation ditch enclosure system Download PDFInfo
- Publication number
- CN205530280U CN205530280U CN201620101393.XU CN201620101393U CN205530280U CN 205530280 U CN205530280 U CN 205530280U CN 201620101393 U CN201620101393 U CN 201620101393U CN 205530280 U CN205530280 U CN 205530280U
- Authority
- CN
- China
- Prior art keywords
- novel
- support system
- prefabricated
- foundation pit
- building
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 230000003014 reinforcing effect Effects 0.000 claims abstract description 7
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 5
- 238000007569 slipcasting Methods 0.000 claims description 2
- 238000010276 construction Methods 0.000 abstract description 16
- 238000005119 centrifugation Methods 0.000 abstract 3
- 230000007613 environmental effect Effects 0.000 description 5
- 230000003068 static effect Effects 0.000 description 5
- 238000000034 method Methods 0.000 description 4
- 238000007789 sealing Methods 0.000 description 3
- 239000002689 soil Substances 0.000 description 3
- 238000005056 compaction Methods 0.000 description 2
- 230000000994 depressogenic effect Effects 0.000 description 2
- 230000006978 adaptation Effects 0.000 description 1
- 238000009412 basement excavation Methods 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000009440 infrastructure construction Methods 0.000 description 1
- 238000009413 insulation Methods 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 238000003032 molecular docking Methods 0.000 description 1
- 238000003786 synthesis reaction Methods 0.000 description 1
Landscapes
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
Description
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620101393.XU CN205530280U (en) | 2016-02-01 | 2016-02-01 | Novel prefabricated two walls unification foundation ditch enclosure system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620101393.XU CN205530280U (en) | 2016-02-01 | 2016-02-01 | Novel prefabricated two walls unification foundation ditch enclosure system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205530280U true CN205530280U (en) | 2016-08-31 |
Family
ID=56775057
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620101393.XU Active CN205530280U (en) | 2016-02-01 | 2016-02-01 | Novel prefabricated two walls unification foundation ditch enclosure system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205530280U (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106284412A (en) * | 2016-09-29 | 2017-01-04 | 陕西建筑产业投资集团有限公司 | A kind of prefabricated pipe gallery and construction method |
CN106368211A (en) * | 2016-09-20 | 2017-02-01 | 俞晓东 | Rectangular concrete piles used for constructing side wall of pipe gallery |
CN106480875A (en) * | 2016-09-21 | 2017-03-08 | 俞晓东 | For building the rectangular concrete pile of piping lane side wall |
CN106836287A (en) * | 2017-03-28 | 2017-06-13 | 新疆维泰开发建设(集团)股份有限公司 | A kind of construction method of pipe gallery |
CN107023015A (en) * | 2016-02-01 | 2017-08-08 | 上海城地建设股份有限公司 | A kind of new prefabricated two walls unification foundation pit system and its contrary sequence method |
CN108797637A (en) * | 2017-04-26 | 2018-11-13 | 杭州南联土木工程科技有限公司 | Prefabricated board combined cast-in-situ concrete considers the underground pipe gallery construction method of structure and ground |
-
2016
- 2016-02-01 CN CN201620101393.XU patent/CN205530280U/en active Active
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107023015A (en) * | 2016-02-01 | 2017-08-08 | 上海城地建设股份有限公司 | A kind of new prefabricated two walls unification foundation pit system and its contrary sequence method |
CN106368211A (en) * | 2016-09-20 | 2017-02-01 | 俞晓东 | Rectangular concrete piles used for constructing side wall of pipe gallery |
CN106368211B (en) * | 2016-09-20 | 2018-10-23 | 俞晓东 | Rectangular concrete pile for building piping lane side wall |
CN106480875A (en) * | 2016-09-21 | 2017-03-08 | 俞晓东 | For building the rectangular concrete pile of piping lane side wall |
CN106284412A (en) * | 2016-09-29 | 2017-01-04 | 陕西建筑产业投资集团有限公司 | A kind of prefabricated pipe gallery and construction method |
CN106284412B (en) * | 2016-09-29 | 2017-05-31 | 陕西建筑产业投资集团有限公司 | A kind of prefabricated pipe gallery and construction method |
CN106836287A (en) * | 2017-03-28 | 2017-06-13 | 新疆维泰开发建设(集团)股份有限公司 | A kind of construction method of pipe gallery |
CN106836287B (en) * | 2017-03-28 | 2019-03-22 | 新疆维泰开发建设(集团)股份有限公司 | A kind of construction method of pipe gallery |
CN108797637A (en) * | 2017-04-26 | 2018-11-13 | 杭州南联土木工程科技有限公司 | Prefabricated board combined cast-in-situ concrete considers the underground pipe gallery construction method of structure and ground |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205530280U (en) | Novel prefabricated two walls unification foundation ditch enclosure system | |
CN103981898B (en) | A kind of inverse underground engineering construction method done of overall open cut node | |
CN105298507B (en) | A kind of underground pipe gallery construction method of top open cut bottom tunneler construction | |
CN101408025B (en) | Pit construction method by using major structure as bearing point | |
CN103726495B (en) | Coastal waters deep foundation pit supporting structure and construction method thereof | |
CN202689031U (en) | Deep foundation pit retaining and protecting retaining wall | |
CN111851597B (en) | Penetration protection structure of pipe jacking close-distance downward-penetrating pipe gallery and construction method | |
CN204098043U (en) | After staying soil, excavation is in conjunction with inner support Retaining Structure with Double-row Piles | |
CN202194148U (en) | Waterproof curtain | |
CN100510281C (en) | Semi-reverse construction method for ultra-large-diameter and ultra-buried depth storage tank | |
CN107747308A (en) | A kind of diaphram wall and construction method | |
CN101793023A (en) | Foundation pit construction method | |
CN103334452A (en) | Underground engineering mixed construction method | |
CN103397634A (en) | Anchoring construction method for fastener steel tube pile cofferdam | |
CN104234057A (en) | Polymer grouting curtain and prestressed pipe pile combined foundation pit supporting structure | |
CN101824825B (en) | Deep foundation pit open cutting construction method | |
CN103572770B (en) | A kind of stake case hydraulic structures and construction method thereof | |
CN203654309U (en) | Pile-caisson hydraulic structure | |
CN104775439A (en) | Foundation pit support and water stop integrated structure and construction method thereof | |
CN104895079A (en) | Reverse construction method for piling steel sheet piles | |
CN109898556A (en) | A kind of underground pipe gallery structure and sunk type construction method | |
CN109594574A (en) | Large-scale push pipe open caisson reversed construction method based on the confined space | |
CN202108045U (en) | Sleeve pipe with anchor rod penetrating through underground continuous wall | |
CN106638670B (en) | Half prefabricated piping lane and construction method | |
CN202706049U (en) | Reinforced concrete basin open caisson |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: 201806, B, Lane 518, Lane 1, Heng Yong Road, Shanghai, Jiading District 502-1 Co-patentee after: SHANGHAI CHENGDI ROCK-SOIL DESIGN Co.,Ltd. Patentee after: Shanghai chengdixiangjiang Data Technology Co.,Ltd. Address before: 201806, B, Lane 518, Lane 1, Heng Yong Road, Shanghai, Jiading District 502-1 Co-patentee before: SHANGHAI CHENGDI ROCK-SOIL DESIGN Co.,Ltd. Patentee before: SHANGHAI CHENGDI CONSTRUCTION Co.,Ltd. |
|
CP01 | Change in the name or title of a patent holder | ||
TR01 | Transfer of patent right |
Effective date of registration: 20231220 Address after: Room J815, 3rd Floor, No. 5358 Huyi Road, Jiading District, Shanghai, June 2018 Patentee after: Zhongji Engineering (Shanghai) Geotechnical Co.,Ltd. Address before: 502-1, area B, No.1, Lane 518, Hengyong Road, Jiading District, Shanghai, 201806 Patentee before: Shanghai chengdixiangjiang Data Technology Co.,Ltd. Patentee before: SHANGHAI CHENGDI ROCK-SOIL DESIGN Co.,Ltd. |
|
TR01 | Transfer of patent right |