CN205518849U CN201620096185.5U CN201620096185U CN205518849U CN 205518849 U CN205518849 U CN 205518849U CN 201620096185 U CN201620096185 U CN 201620096185U CN 205518849 U CN205518849 U CN 205518849U
Authority
CN
China
Prior art keywords
charge
combustion gas
gas
retainer plate
valve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620096185.5U
Other languages
Chinese (zh)
Inventor
牛正峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Zhujiang Gas Group Co ltd
Original Assignee
Guangdong Zhujiang Gas Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Zhujiang Gas Group Co ltd filed Critical Guangdong Zhujiang Gas Group Co ltd
Priority to CN201620096185.5U priority Critical patent/CN205518849U/en
Application granted granted Critical
Publication of CN205518849U publication Critical patent/CN205518849U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Vibration Prevention Devices (AREA)

Abstract

The utility model discloses a shockproof type gas pipeline purging system, including mark target, anti -seismic support, the gas person in charge, gas be in charge of, hose, air compressor, flow distribution valve, flow control main valve and manometer, the gas is responsible for to go up to open and is swept the mouth, air compressor's delivery outlet through the hose with a mouthful seals and docking sweeps, the flow control main valve is connected in this hose, anti -seismic support be two, both ends difference bearing in the anti -seismic support of hose, the gas is in charge of for many, and the entry end that each gas is in charge of is responsible for the intercommunication through flow distribution valve and gas respectively one by one, and the mark target is relative with the exit end that an at least gas is in charge of, and the manometer one -to -one is installed on each gas is in charge of. The utility model discloses ability effective resistance sweeps the vibrations of mouth, avoids debugging many times, labour saving and time saving.

Description

Shockproof purge gas channel system
Technical field
The utility model relates to shockproof purge gas channel system.
Background technology
Pipe gas is before ventilation, general by purging, come the airtight performance to gas pipeline, Manometric flow accuracy, the supply gas pressure etc. of combustion gas are tested, the most removable Gas Pipe The remaining sand and dust of some in road.
But, there is air-blast device owing to accessing at blow valve port, in blow valve port, easily produce resonance, Cause supervisor's strenuous vibration at blow valve port place, and then affect the sealing of blow valve port inlet valve Can, often need to repeatedly debug, take time and effort.
Utility model content
In order to overcome the deficiencies in the prior art, the purpose of this utility model is to provide shockproof combustion Feed channel purging system, is highly resistant to the vibrations of blow valve port, it is to avoid repeatedly debug, and save time province Power.
The purpose of this utility model is achieved through the following technical solutions:
Shockproof purge gas channel system, including target, para-seismic support, combustion gas supervisor, combustion Gas is in charge of, flexible pipe, air compressor, flow divider valve, flow-control main valve and Pressure gauge, Having blow valve port on combustion gas supervisor, the delivery outlet of air compressor is sealed with blow valve port by flexible pipe Docking, flow-control main valve is connected to this flexible pipe, and para-seismic support is two, and the two ends of flexible pipe are divided Other support is in para-seismic support;Combustion gas is in charge of for many, and the arrival end that each combustion gas is in charge of divides one by one Tong Guo not connect with combustion gas supervisor by flow divider valve, the outlet that target is in charge of with at least combustion gas Relatively, Pressure gauge one_to_one corresponding is installed on each combustion gas and is in charge of end.
Further, para-seismic support includes support body, retainer plate, lasso and some springs, fixing Circle is hollow circle body, and this retainer plate is fixed on support body upper end, in lasso is placed in retainer plate and with solid With one heart, this lasso is fixedly sheathed in flexible pipe to fixed circle, and one end of spring is connected with lasso ball-and-socket, bullet The other end of spring penetrates retainer plate and is slidably matched with retainer plate, and the other end end of this spring is solid Surely stopper, each spring is had to be set around the periphery of lasso at equal intervals.
Further, this shockproof purge gas channel system also includes blow down valve, this blow down valve One_to_one corresponding is installed on the port of export that each combustion gas is in charge of.
Compared with prior art, the utility model has the advantages that
The utility model is by the para-seismic support set up, thus compresses with combustion gas supervisor and air The flexible pipe that machine connects carries out bumper and absorbing shock, and, flexible pipe also carries flexibility, and then effectively keeps away Exempt from the vibration of the blow valve port caused because of blowing of air compressor, and, flow-control is total Valve controllably regulates the air mass flow being passed through combustion gas supervisor, it is to avoid too much air and cause excessive shake Dynamic, thus improve sealing property, flow can be controlled again, in conjunction with each blow down valve and/or pressure The test of table and control, be avoided that and repeatedly debug, time saving and energy saving.
Accompanying drawing explanation
Fig. 1 is the connection diagram of the utility model shockproof purge gas channel system;
Fig. 2 is the structural representation of the utility model para-seismic support.
In figure: 1, target;2, para-seismic support;21, support body;22, retainer plate;23, set Circle;24, spring;25, stopper;3, combustion gas supervisor;4, combustion gas is in charge of;5, air pressure Contracting machine;6, blow down valve;7, flow-control main valve;8, Pressure gauge;9, flexible pipe;10, stream Amount distributing valve.
Detailed description of the invention
The utility model is described in further detail with specific embodiment below in conjunction with the accompanying drawings.
Shockproof purge gas channel system as shown in Figure 1-2, it is characterised in that include mark Target 1, para-seismic support 2, combustion gas supervisor 3, combustion gas are in charge of 4, flexible pipe 9, air compressor 5, Flow divider valve 10, flow-control main valve 7 and Pressure gauge 8, combustion gas supervisor 3 has purging Mouthful, the delivery outlet of air compressor 5 is docked with blow valve port sealing by flexible pipe 9, flow-control Main valve 7 is connected to this flexible pipe 9, and para-seismic support 2 is two, the two ends of flexible pipe 9 support respectively In para-seismic support 2;Combustion gas is in charge of 4 for many, and each combustion gas is in charge of the arrival end of 4 and is divided one by one Tong Guo not connect with combustion gas supervisor 3 by flow divider valve 10, target 1 divides with at least combustion gas The port of export of pipe 4 is relative, and Pressure gauge 8 one_to_one corresponding is installed on each combustion gas and is in charge of on 4.
By the para-seismic support 2 set up, thus connect with combustion gas supervisor 3 and air compressor 5 The flexible pipe 9 connect carries out bumper and absorbing shock, and, flexible pipe 9 also carries flexibility, and then effectively keeps away Exempt from the vibration of the blow valve port caused because of blowing of air compressor 5, and, flow-control Main valve 7 controllably regulates the air mass flow being passed through combustion gas supervisor 3, it is to avoid too much air and cause Excessive vibrations, thus improve sealing property, flow can be controlled again, in conjunction with the survey of Pressure gauge 8 Examination, is avoided that and repeatedly debugs, time saving and energy saving.
Wherein, when, after air compressor 5 blow out air, air enters flexible pipe 9, through flow control Main valve 7 processed controls flow output to combustion gas and is responsible for 3, then by flow divider valve 10 by each combustion Gas is in charge of the flow needs of 4 and is distributed one by one after regulating distribution to each combustion gas and be in charge of 4, by pressing Power table 8 detects the air pressure that combustion gas is in charge of on 4, can set up blow down valve 6, this blow down valve 6 One_to_one corresponding is installed on the port of export that each combustion gas is in charge of 4, releases by handling blow down valve 6 opening and closing Put the purging that corresponding combustion gas is in charge of 4, after 4 blow out air are in charge of in combustion gas, will be at target 1 On leave the marking, with show purging work normal.The mode of available suds auxiliary white paint, comes Target 1 is left a trace.
Exemplarily, the para-seismic support 2 of this example includes support body 21, retainer plate 22, lasso 23 With some springs 24, retainer plate 22 is hollow circle body, and this retainer plate 22 is fixed on support body 21 Upper end, it is interior and concentric with retainer plate 22 that lasso 23 is placed in retainer plate 22, and this lasso 23 is fixed Being socketed on flexible pipe 9, one end of spring 24 is connected with lasso 23 ball-and-socket, another of spring 24 End penetrates retainer plate 22 and is slidably matched with retainer plate 22, the other end end of this spring 24 Being fixed with stopper 25, each spring 24 is set around the periphery of lasso 23 at equal intervals.By uniformly The spring 24 arranged, comes flexible pipe 9, the shake of combustion gas supervisor 3 that equalizing and buffering lasso 23 accepts Dynamic, stress is discharged on retainer plate 22 simultaneously, and is absorbed by support body 21, with effective antidetonation, And, the mode that spring 24 is connected with lasso 23 ball-and-socket, the most each to unloading vibrations, bullet Spring 24 is slidably matched with retainer plate 22, can resist bigger vibration amplitude, and stopper 25 can Stop that spring 24 comes off.
Embodiment of the present utility model is not limited to this, according to foregoing of the present utility model, Utilize ordinary technical knowledge and the customary means of this area, without departing from the above-mentioned base of the utility model Under this technological thought premise, the utility model can also be made the amendment of other various ways, replace Change or change, within the scope of all falling within the utility model rights protection.

Claims (3)

1. shockproof purge gas channel system, it is characterised in that include that target, antidetonation are propped up Frame, combustion gas supervisor, combustion gas are in charge of, flexible pipe, air compressor, flow divider valve, flow control Main valve processed and Pressure gauge, combustion gas supervisor has blow valve port, and the delivery outlet of air compressor passes through Flexible pipe seals with blow valve port and docks, and flow-control main valve is connected to this flexible pipe, and para-seismic support is two Individual, the two ends of flexible pipe support respectively is in para-seismic support;Combustion gas is in charge of for many, and each combustion gas divides The arrival end of pipe is connected with combustion gas supervisor by flow divider valve the most respectively, target and at least The port of export that root combustion gas is in charge of is relative, and Pressure gauge one_to_one corresponding is installed on each combustion gas and is in charge of.
Shockproof purge gas channel system the most according to claim 1, its feature exists In, para-seismic support includes support body, retainer plate, lasso and some springs, and retainer plate is open circle Body, this retainer plate is fixed on support body upper end, and it is interior and concentric with retainer plate that lasso is placed in retainer plate, This lasso is fixedly sheathed in flexible pipe, and one end of spring is connected with lasso ball-and-socket, the other end of spring Penetrating retainer plate and be slidably matched with retainer plate, the other end end of this spring is fixed with stopper, Each spring is set around the periphery of lasso at equal intervals.
Shockproof purge gas channel system the most according to claim 1, its feature exists In, this shockproof purge gas channel system also includes blow down valve, and this blow down valve one_to_one corresponding is pacified It is loaded on the port of export that each combustion gas is in charge of.
CN201620096185.5U 2016-01-29 2016-01-29 Shockproof type gas pipeline purging system Active CN205518849U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620096185.5U CN205518849U (en) 2016-01-29 2016-01-29 Shockproof type gas pipeline purging system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620096185.5U CN205518849U (en) 2016-01-29 2016-01-29 Shockproof type gas pipeline purging system

Publications (1)

Publication Number Publication Date
CN205518849U true CN205518849U (en) 2016-08-31

Family

ID=56774649

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620096185.5U Active CN205518849U (en) 2016-01-29 2016-01-29 Shockproof type gas pipeline purging system

Country Status (1)

Country Link
CN (1) CN205518849U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110805745A (en) * 2019-11-15 2020-02-18 昆山新联德五金机械设备有限公司 Flow monitoring formula five metals sleeve pipe
CN113020140A (en) * 2019-12-09 2021-06-25 中国科学院大连化学物理研究所 In-situ cleaning method for ion transfer tube

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110805745A (en) * 2019-11-15 2020-02-18 昆山新联德五金机械设备有限公司 Flow monitoring formula five metals sleeve pipe
CN113020140A (en) * 2019-12-09 2021-06-25 中国科学院大连化学物理研究所 In-situ cleaning method for ion transfer tube

Similar Documents

Publication Publication Date Title
CN205518849U (en) Shockproof type gas pipeline purging system
CN101672006B (en) Stay cable
CN201348591Y (en) Blasting test device for engine plastic suction manifold
CN110632424B (en) Portable detection equipment for solenoid valve and solenoid valve coil
CN105203427A (en) Gas-instant-desorption testing device and method
CN205518848U (en) Do benefit to sealed gas pipeline purging system
CN205518847U (en) Gas pipeline purging system
CN204831713U (en) Bypass valve detection device admits air
CN204286730U (en) The system of breathing heavily is moved back in a kind of bypass for Compressor test part
CN207584133U (en) One kind can be with corrosion-resistant piston reducing valve
CN203785877U (en) Tester for pressure regulating performance of pressure-regulating valve
CN204740145U (en) Air is strained test bench and is added grey device
CN208283014U (en) A kind of air tightness detection machine convenient for fastening and measuring
CN109139083B (en) Simulation experiment system for ventilation dilution of gas gushing in shield construction tunnel
CN206248316U (en) A kind of check valve reliability-test equipment
CN203743815U (en) Double-membrane gas holder
CN207961838U (en) A kind of fast mechanism for assembling-disassembling in the air duct of wind quantity test
CN205262752U (en) Engine simulation plateau air inlet unit
CN207215405U (en) Fluid tube assembly tightness measuring device
CN207882080U (en) A kind of device for the nuclear power plant voltage stabilizer pressure release case water pressure test
CN201277935Y (en) Detection apparatus for gas barrier performance
CN209340494U (en) A kind of catalyst test block seal assembly
CN205785696U (en) Valve air tight test device
CN209570294U (en) A kind of copper flange air-tightness detection device
CN213209630U (en) High-purity gas sampler

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 510168 No. 188 Caibin North Road, Baiyun District, Guangzhou City, Guangdong Province

Patentee after: GUANGDONG ZHUJIANG GAS GROUP CO.,LTD.

Address before: 510168 No. 188 Caibin North Road, Baiyun District, Guangzhou City, Guangdong Province

Patentee before: GUANGDONG ZHUJIANG GAS GROUP CO.,LTD.

CP01 Change in the name or title of a patent holder
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Shockproof type gas pipeline purging system

Effective date of registration: 20191211

Granted publication date: 20160831

Pledgee: Bank of China Limited by Share Ltd. Guangzhou Panyu branch

Pledgor: GUANGDONG ZHUJIANG GAS GROUP CO.,LTD.

Registration number: Y2019440000275

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20230310

Granted publication date: 20160831

Pledgee: Bank of China Limited by Share Ltd. Guangzhou Panyu branch

Pledgor: GUANGDONG ZHUJIANG GAS GROUP CO.,LTD.

Registration number: Y2019440000275

PC01 Cancellation of the registration of the contract for pledge of patent right