CN205475250U - Pin -connected panel steel stair in foundation ditch - Google Patents

Pin -connected panel steel stair in foundation ditch Download PDF

Info

Publication number
CN205475250U
CN205475250U CN201620267205.0U CN201620267205U CN205475250U CN 205475250 U CN205475250 U CN 205475250U CN 201620267205 U CN201620267205 U CN 201620267205U CN 205475250 U CN205475250 U CN 205475250U
Authority
CN
China
Prior art keywords
foundation ditch
stair
square frame
assembling type
type steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620267205.0U
Other languages
Chinese (zh)
Inventor
唐际宇
林忠和
陈勇辉
唐阁威
梁月利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201620267205.0U priority Critical patent/CN205475250U/en
Application granted granted Critical
Publication of CN205475250U publication Critical patent/CN205475250U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Steps, Ramps, And Handrails (AREA)

Abstract

The utility model relates to a pin -connected panel steel stair in foundation ditch, include: pour the pier structure formed at the foundation ditch bottom, the connecting plate has set firmly on the pier structure, four square bights are located to the pier structure, a plurality of stair units that the concatenation is connected about being, the stair unit includes frame construction and connects the staircase structure in frame construction, the stair unit that is located foundation ditch bottom with the structural connecting plate of pier is connected fixedly, and the corresponding reinforced structure of connecting each stair unit, the reinforced structure is connected fixedly with the supporting construction that the foundation ditch inner wall was located. The steel stair that adopts stair unit assembly to form, the stair unit can reduce the reliance that adds industrial area ground to the job site directly in mill's processing preparation. Assemble simply at the scene, and the engineering time is short, and the cost is with low costs, convenient and practical. The foundation ditch is inside to have set up the pier structure, has ensured the steadiness of steel stair.

Description

Assembling type steel stair in foundation ditch
Technical field
This utility model relates to the realm of building construction, refers in particular to assembling type steel stair in a kind of foundation ditch.
Background technology
Connection foundation ditch top and the stair of bottom can be set in the foundation ditch of job site, with convenient construction people Member's walking.Connection foundation ditch top and the stair of bottom, usually utilize substantial amounts of building materials to carry out at the scene Build, so construction site is had bigger dependence, and the engineering time is long.
Utility model content
The purpose of this utility model is to overcome the defect of prior art, it is provided that pin-connected panel in a kind of foundation ditch Steel stair, when solving strong to place dependency when stair in existing foundation ditch are built at the scene and construction Between long problem.
The technical scheme realizing above-mentioned purpose is:
Assembling type steel stair in this utility model one foundation ditch, including:
Pour the stub structure being formed at bottom foundation ditch, on described stub structure, be installed with connecting plate, Described stub structure is located at square four corner;
In splicing multiple stairway unit of connection up and down, described stairway unit includes frame structure and connection Staircase structure in frame structure, is positioned in the stairway unit bottom foundation ditch and described stub structure Connecting plate connects fixing;And
The corresponding ruggedized construction connecting each stairway unit, propping up at described ruggedized construction and foundation ditch inwall Protection structure connects fixing.
Using the steel stair that stairway unit is assembled, stairway unit can be directly in factory process system Make, reduce the dependence to processing place, job site.On-site consolidation is simple, and the engineering time is short, cost Low cost, convenient and practical.Stub structure it is provided with, it is ensured that the steadiness of steel stair inside foundation ditch. This steel stair can repeatedly have enough to meet the need use, and economic and practical, safe and reliable, and satisfied country carries out energetically The requirement of green construction.
In this utility model foundation ditch, assembling type steel stair further improvement is that, in described stub structure The part that anchoring has multiple screw rod, described screw rod to be anchored in described stub structure passes through bar connecting, Described screw rod protrudes out the part of described stub structure and wears described connecting plate and by nut with described Connecting plate is fastenedly connected.
Further improvement is that of assembling type steel stair in this utility model foundation ditch, described stairway unit Frame structure includes square frame, lower square frame and is connected between described upper square frame and described lower square frame Vertical rod, described upper square frame and described lower square frame connect by cross bar and vertical pole and formed, described staircase structure Oblique it is connected between described upper square frame and described lower square frame.
Further improvement is that of assembling type steel stair in this utility model foundation ditch, described staircase structure Platform of marking time it is equipped with, the bottom of described staircase structure and institute between the end of top and described upper square frame State and between the end of lower square frame, be also equipped with platform of marking time.
Further improvement is that of assembling type steel stair in this utility model foundation ditch, two adjacent stair Lower square frame and upper square frame between unit are bolted fixing, and are welded with steel plate in junction.
Further improvement is that of assembling type steel stair in this utility model foundation ditch, described supporting construction bag Including along foundation ditch inwall is vertically arranged support column and the described support column of connection and the Guan Liang in horizontally set, Described support column is arranged along the interval of prolonging in week of foundation ditch, and described Guan Liang is along between the vertical direction of described support column Every setting;Described ruggedized construction includes that a pair channel-section steel, described channel-section steel one end are welded and fixed with described vertical rod, The other end is welded and fixed with the pre-embedded steel slab of anchoring on the described Guan Liang of described supporting construction.
Further improvement is that of assembling type steel stair in this utility model foundation ditch, described staircase structure Both sides connect guard rail, and the bottom of described guard rail connects baffle plate.
Further improvement is that of assembling type steel stair in this utility model foundation ditch, is positioned at foundation ditch top The top of stairway unit is provided with protection canopy.
Further improvement is that of assembling type steel stair in this utility model foundation ditch, is positioned at foundation ditch top Be connected, between stairway unit with foundation ditch top, steel plate of marking time, described in mark time and be provided with platform of marking time on steel plate Rank.
Further improvement is that of assembling type steel stair in this utility model foundation ditch, described in mark time steel plate Both sides are equipped with guard bar structure.
Accompanying drawing explanation
Fig. 1 is assembling type steel stair and the side view of foundation ditch in this utility model foundation ditch.
Fig. 2 is the side view of assembling type steel stair in this utility model foundation ditch.
Fig. 3 is the top view of assembling type steel stair in this utility model foundation ditch.
Fig. 4 is the side view of stairway unit in assembling type steel stair in this utility model foundation ditch.
Fig. 5 is in this utility model foundation ditch in assembling type steel stair center pillar pier structure and stairway unit The attachment structure schematic diagram of lower square frame.
Fig. 6 is the sectional view of assembling type steel stair center pillar pier structure in this utility model foundation ditch.
Fig. 7 is assembling type steel stair top and the structural representation at foundation ditch top in this utility model foundation ditch Figure.
Detailed description of the invention
The utility model is described in further detail with specific embodiment below in conjunction with the accompanying drawings.
This utility model provides assembling type steel stair in a kind of foundation ditch, at the top of foundation ditch and the end The passage for people's walking is formed between portion.Use the unified stairway unit made of factory, at the construction field (site) Carrying out assembly, have assembled simple, the engineering time is short, sound construction, safe and reliable, cost The advantage such as low.Below in conjunction with the accompanying drawings assembling type steel stair in this utility model foundation ditch are illustrated.
Refering to Fig. 1, it is shown that assembling type steel stair and the side view of foundation ditch in this utility model foundation ditch. Below in conjunction with Fig. 1, assembling type steel stair in this utility model foundation ditch are illustrated.
As it is shown in figure 1, in this utility model foundation ditch assembling type steel stair include multiple stairway unit 22, Ruggedized construction 23 and stub structure, shown in Fig. 5 and Fig. 6, stub structure 21 pours and is formed at The bottom 112 of foundation ditch 11, is installed with connecting plate 211 on stub structure 21, this stub structure 21 It is located at square four corner portion, is used for supporting connection stairway unit 22.Multiple stairway unit 22 in Splicing connection up and down, stairway unit 22 includes frame structure 221 and staircase structure 222, and stair are tied Structure 222 connects with in frame structure 221, is positioned at stairway unit 22 and the post of bottom foundation ditch 11 112 Connecting plate 211 on pier structure 21 connects fixing.Ruggedized construction 23 is corresponding connects each stairway unit 22, ruggedized construction 23 is connected fixing with the supporting construction 12 at foundation ditch 11 inwall, by adding consolidation Supporting construction 12 drawknot of stairway unit with foundation ditch 11 is fixed by structure 23, it is ensured that stairway unit 22 Steadiness.
In stub structure 21, anchoring has multiple screw rod 212, and screw rod 212 is anchored in stub structure 21 Part connect molding by reinforcing bar 213, screw rod 212 protrudes out the part of stub structure 21 and wears Connecting plate 211 is also fastenedly connected with connecting plate 211 by nut.Screw rod 212 is provided with four, profit With reinforcing bar 213 welding fabrication, then casting concrete is to form stub structure 21, and by screw rod 212 Anchoring.
In conjunction with shown in Fig. 2 to Fig. 4, the frame structure 221 of stairway unit 22 includes by cross bar 2211 Connect, with vertical pole 2212, upper square frame 2214, the lower square frame 2215 formed and be connected to upper square frame 2214 And the vertical rod 2213 between lower square frame 2215, staircase structure 222 is oblique is connected to square frame 2214 And between lower square frame 2215.Spread between the end of the top of staircase structure 222 and upper square frame 2214 It is provided with platform 223 of marking time, lays between bottom and the end of lower square frame 2215 of staircase structure 222 Mark time platform 223.The adjacent lower square frame between two stairway unit 22 and upper square frame pass through spiral shell Tether and connect fixing, and be welded with steel plate 226 in junction, steel plate 226 and adjacent two stair lists The square frame of unit 22 all welds.The both sides of staircase structure 222 connect guard rail 224, plays guarantor Protecting effect, connecting in the bottom of guard rail 224 has baffle plate.
As it is shown in figure 1, supporting construction 12 include along foundation ditch 11 inwall be vertically arranged support column and Connecting the hat beam 121 of support column, support column is arranged along the interval of prolonging in week of foundation ditch, will by hat beam 121 All of support column links together, and hat beam 121 is spaced setting along the vertical direction of support column.Add Fixing structure 23 includes a pair channel-section steel, and one end of channel-section steel is welded solid with the vertical rod 2213 of stairway unit 22 Fixed, the other end is welded and fixed with the pre-embedded steel slab of anchoring on the hat beam 121 of supporting construction 12, pre-buried Steel plate is fixed on hat beam 121 by expansion bolt.
As it is shown in fig. 7, be provided with protection at the top of the stairway unit 22 being positioned at foundation ditch 11 top 111 Canopy 225, protection canopy 225 uses square tube and angle steel welding to be formed, prevents high-altitude object from pounding steel stair, And close at the steel fabric sheet that all around sets of stairway unit 22.It is positioned at foundation ditch 11 top 111 Stairway unit 22 be connected, between foundation ditch 11 top 111, steel plate 24 of marking time, this steel plate of marking time 24 are arranged in Z-shaped, have been coated with the corner of foundation ditch 11, weld in the bending place of steel plate 24 of marking time There is triangular plate, play the effect of reinforcing.It is provided with, on steel plate 24 of marking time, step 241 of marking time, Convenient walking.The mark time both sides of steel plate 24 are equipped with guard bar structure 242, play a protective role.
In this utility model foundation ditch, assembling type steel stair lead to as the safety at bottom connection foundation ditch and top Road, its installation site is usually against foundation pit supporting construction, bag stairway unit between on-the-spot employing tower crane It is lifted in stub structure, uses steel plate and bolt to connect between stairway unit fixing.Stairway unit and The hat beam drawknot of the supporting construction of foundation ditch is fixed, and fixes pre-embedded steel slab by expansion bolt on Guan Liang (80mm*80mm*4mm), drawknot is fixing uses channel-section steel to connect, and forms ruggedized construction, adds consolidation The data of the Guan Liang that the quantity of structure combines on-the-spot foundation ditch determine, each Taoist priest's cap beam all does and adds consolidation together Structure.The size of stub structure is long 600mm* width 600mm* height 800mm, uses C30 concrete Pouring formation, the connecting plate in stub structure uses steel plate (350mm*350mm*12mm).Building The size of ladder unit is long 6000mm* width 2200mm* height 3000mm, cross bar, vertical pole and vertical rod Use square tube or angle steel.Staircase structure uses 3mm checkered steel plate to make.It is welded to connect and all uses Full weld, to guarantee rigidity, stairway unit unifies brushing antirust paint.
In this utility model foundation ditch, assembling type steel stair has the beneficial effect that
Using the steel stair assembled by stairway unit, stairway unit can directly add in factory Work makes, and reduces and relies on processing place, job site.On-site consolidation is simple, and the engineering time is short, makes Valency low cost, convenient and practical.The steel stair of lower foundation ditch can repeatedly have enough to meet the need use, and economic and practical, Safe and reliable, the requirement of the green construction that satisfied country carries out energetically.
Above in association with accompanying drawing embodiment, this utility model is described in detail, common skill in this area This utility model can be made many variations example by art personnel according to the above description.Thus, in embodiment Some details should not constitute restriction of the present utility model, and this utility model will be with appended claims The scope defined is as protection domain of the present utility model.

Claims (10)

1. assembling type steel stair in a foundation ditch, it is characterised in that including:
Pour the stub structure being formed at bottom foundation ditch, on described stub structure, be installed with connecting plate, Described stub structure is located at square four corner;
In splicing multiple stairway unit of connection up and down, described stairway unit includes frame structure and connection Staircase structure in frame structure, is positioned in the stairway unit bottom foundation ditch and described stub structure Connecting plate connects fixing;And
The corresponding ruggedized construction connecting each stairway unit, propping up at described ruggedized construction and foundation ditch inwall Protection structure connects fixing.
2. assembling type steel stair in foundation ditch as claimed in claim 1, it is characterised in that described post The part that in pier structure, anchoring has multiple screw rod, described screw rod to be anchored in described stub structure passes through steel Muscle connects, and described screw rod protrudes out the part of described stub structure and wears described connecting plate and pass through nut It is fastenedly connected with described connecting plate.
3. assembling type steel stair in foundation ditch as claimed in claim 1, it is characterised in that described building Ladder unit frame structure include square frame, lower square frame and be connected to described upper square frame and described under Vertical rod between square frame, described upper square frame and described lower square frame are formed by cross bar and vertical pole connection, described Staircase structure is oblique to be connected between described upper square frame and described lower square frame.
4. assembling type steel stair in foundation ditch as claimed in claim 3, it is characterised in that described building It is equipped with, between top and the end of described upper square frame of ladder structure, platform of marking time, described staircase structure Also it is equipped with, between bottom and the end of described lower square frame, platform of marking time.
5. assembling type steel stair in foundation ditch as claimed in claim 3, it is characterised in that adjacent Lower square frame and upper square frame between two stairway unit are bolted fixing, and weld in junction There is steel plate.
6. assembling type steel stair in foundation ditch as claimed in claim 3, it is characterised in that described Protection structure includes along foundation ditch inwall to be vertically arranged support column and connects described support column and in laterally setting The Guan Liang put, described support column is arranged along the interval of prolonging in week of foundation ditch, and described Guan Liang is along described support column Vertical direction interval is arranged;Described ruggedized construction includes a pair channel-section steel, and described channel-section steel one end is vertical with described Bar is welded and fixed, and the other end welds solid with the pre-embedded steel slab of anchoring on the described Guan Liang of described supporting construction Fixed.
7. assembling type steel stair in foundation ditch as claimed in claim 1, it is characterised in that described building The both sides of ladder structure connect guard rail, and the bottom of described guard rail connects baffle plate.
8. assembling type steel stair in foundation ditch as claimed in claim 1, it is characterised in that be positioned at base The top of the stairway unit at top, hole is provided with protection canopy.
9. assembling type steel stair in foundation ditch as claimed in claim 1, it is characterised in that be positioned at base The stairway unit at top, hole is connected, between foundation ditch top, steel plate of marking time, described in mark time and set on steel plate Mark time step.
10. assembling type steel stair in foundation ditch as claimed in claim 9, it is characterised in that described in step on The both sides of step steel plate are equipped with guard bar structure.
CN201620267205.0U 2016-03-31 2016-03-31 Pin -connected panel steel stair in foundation ditch Expired - Fee Related CN205475250U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620267205.0U CN205475250U (en) 2016-03-31 2016-03-31 Pin -connected panel steel stair in foundation ditch

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620267205.0U CN205475250U (en) 2016-03-31 2016-03-31 Pin -connected panel steel stair in foundation ditch

Publications (1)

Publication Number Publication Date
CN205475250U true CN205475250U (en) 2016-08-17

Family

ID=56646279

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620267205.0U Expired - Fee Related CN205475250U (en) 2016-03-31 2016-03-31 Pin -connected panel steel stair in foundation ditch

Country Status (1)

Country Link
CN (1) CN205475250U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106677558A (en) * 2017-01-04 2017-05-17 山西五建集团有限公司 Construction method for deep foundation pit assembling type stairway used for people
CN108505764A (en) * 2018-05-28 2018-09-07 山东新城建工股份有限公司 A kind of construction of underground depth large-engineering is marked time bench channel and its construction method
CN109208609A (en) * 2018-11-07 2019-01-15 北京市第三建筑工程有限公司 A kind of fixed foundation pit berm structure of assembled two point and its construction method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106677558A (en) * 2017-01-04 2017-05-17 山西五建集团有限公司 Construction method for deep foundation pit assembling type stairway used for people
CN108505764A (en) * 2018-05-28 2018-09-07 山东新城建工股份有限公司 A kind of construction of underground depth large-engineering is marked time bench channel and its construction method
CN109208609A (en) * 2018-11-07 2019-01-15 北京市第三建筑工程有限公司 A kind of fixed foundation pit berm structure of assembled two point and its construction method
CN109208609B (en) * 2018-11-07 2024-04-09 北京市第三建筑工程有限公司 Assembled double-point fixed foundation pit pavement structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN106639045B (en) A kind of prefabricated assembled steel plate-concrete combined shear wall structural system and its construction method
CN107090925A (en) Reinforced precast reinforced concrete shear wall, structural system and its construction method
CN110387822B (en) Cast-in-situ bent cap assembly type steel pipe support and construction method thereof
CN205475250U (en) Pin -connected panel steel stair in foundation ditch
JP5701435B1 (en) Temporary partition structure that can be diverted to a permanent partition structure or a structure having other functions
CN201786036U (en) Temporary protective barrier for building construction
CN202248958U (en) Anti-seismic reinforcing structure of brick-concrete structural building
CN212507296U (en) High formwork system
CN209194354U (en) High-altitude long-span binder base-supporting shellfish thunder support construction
JP5688040B2 (en) Partition structure
CN111648229A (en) Assembled hoop platform for bent cap construction and mounting method thereof
US5325557A (en) Portable, demountable bridge to ford rivers and the like
CN207314147U (en) A kind of bridge construction employment row safety climbing ladder
CN114319159B (en) Ascending ramp dismantling system and construction method
CN102619335A (en) Construction method of large-height small-sized cast-in-place concrete beam slab
CN207017300U (en) A kind of corrugated steel retaining wall
CN211815605U (en) Construction device for pile column type pier tie beam and capping beam
CN209907266U (en) Prefabricated combined reinforced concrete isolation guardrail
CN210563283U (en) Rectangular column construction operation platform
CN209976088U (en) Assembled protection canopy
CN211473320U (en) Tool type external hanging rack for corridor
JP5688039B2 (en) Partition structure
CN209874193U (en) Transition joint of tower crane for full-assembly crossing reinforced concrete floor
CN215829259U (en) Cantilever beam type support for high formwork operation
CN214737445U (en) Firm type platform is used in construction of continuous rigid frame bridge

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160817

CF01 Termination of patent right due to non-payment of annual fee